This document contains Questions and Answers related to the federal contract opportunity for the Peterson SFB Bldg 3 Soil Erosion Repair project.

The key details are:

  • The Contractor will not need to meter the fire hydrant used for temporary irrigation, but will need backflow prevention.
  • 70% ground cover/grass seed germination is required for stabilization, and the Contractor should follow CDOT M-208-1 Temporary Erosion Control Standards for erosion control specifications.
  • The trees currently on site do not need to be removed.
  • A traffic control plan will only be necessary if the Contractor's work affects the adjacent roads. Construction laydown and parking instructions are provided in Attachment 1.
  • As-builts for the irrigation system outside Building 3 are available in Attachment 2.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Technical/ContractsQuestionsGovernment Response
TechnicalWill the Contractor have to meter the fire hydrant that is used for temporary irritation?The Contractor will not have to meter the fire hydrant, however backflow prevention will be necessary.
TechnicalWhat are the specifications for the grass seed germination and erosion control material?70 percent ground cover/grass seed germination is required for stabilization (para 2.2.7). Please follow Colorado Department Of Transportation (CDOT) M-208-1 Temporary Erosion Control Standards for erosion control specifications (https://www.codot.gov/business/designsupport/mstandards/plansheets/m-208-1-temproary-erosion-control).
TechnicalWill the trees currently in the drainage need to be removed?The trees currently in the site area will not need to be removed as part of the project and are not a requirement within the SOW.
TechnicalWill a traffic control plan be needed?A traffic control plan will not be necessary unless the Contractor's work affects any of the adjacent roads (para 2.2.9). Please refer to Attachment 1 for construction laydown & parking instructions.
TechnicalAre there as-builts for the irrigation system outside of building 3, where the project is set?Yes, please refer to Attachment 2 for Building 3 Irrigation System As-Builts.