This document contains Questions and Answers related to the federal contract opportunity for the Peterson SFB Bldg 3 Soil Erosion Repair project.
The key details are:
- The Contractor will not need to meter the fire hydrant used for temporary irrigation, but will need backflow prevention.
- 70% ground cover/grass seed germination is required for stabilization, and the Contractor should follow CDOT M-208-1 Temporary Erosion Control Standards for erosion control specifications.
- The trees currently on site do not need to be removed.
- A traffic control plan will only be necessary if the Contractor's work affects the adjacent roads. Construction laydown and parking instructions are provided in Attachment 1.
- As-builts for the irrigation system outside Building 3 are available in Attachment 2.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Technical/Contracts | Questions | Government Response |
| Technical | Will the Contractor have to meter the fire hydrant that is used for temporary irritation? | The Contractor will not have to meter the fire hydrant, however backflow prevention will be necessary. |
| Technical | What are the specifications for the grass seed germination and erosion control material? | 70 percent ground cover/grass seed germination is required for stabilization (para 2.2.7). Please follow Colorado Department Of Transportation (CDOT) M-208-1 Temporary Erosion Control Standards for erosion control specifications (https://www.codot.gov/business/designsupport/mstandards/plansheets/m-208-1-temproary-erosion-control). |
| Technical | Will the trees currently in the drainage need to be removed? | The trees currently in the site area will not need to be removed as part of the project and are not a requirement within the SOW. |
| Technical | Will a traffic control plan be needed? | A traffic control plan will not be necessary unless the Contractor's work affects any of the adjacent roads (para 2.2.9). Please refer to Attachment 1 for construction laydown & parking instructions. |
| Technical | Are there as-builts for the irrigation system outside of building 3, where the project is set? | Yes, please refer to Attachment 2 for Building 3 Irrigation System As-Builts. |