SOW Attach 10 - Recovered Material Form.docx
DOCX document 30 KB Posted
- Attached to
- Peterson SFB Bldg 3 Soil Erosion Repair
- Solicitation number
- FA251724Q0072
About this file
This document is a Recovered Materials Estimate and Certification Form (RMECF) that is required to be submitted by the contractor for federal contracts exceeding $100,000 per FAR 23.4, 52.223-4, and 52.223-9. The form requires the contractor to estimate the percentage of total recovered and post-consumer material content used in the contract performance across various product categories such as insulation, boards, carpets, paints, and construction materials. The contractor must also certify that the recovered material content meets the applicable contract specifications. This form is required to be submitted through the 21st Contracting Squadron to the 21st Civil Engineering Squadron at Peterson Air Force Base.
The related federal contract opportunity is for the repair of eroded portions of the drainage channel and soil erosion on the retention pond located on the south side of Building 3 at Peterson Air Force Base, in accordance with the Statement of Work. The contract is being solicited by the Department of the Air Force Space Command.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Recovered Materials Estimate and Certification Form (RMECF)
(As required by FAR 23.4, 52.223-4, and 52.223-9)
Date:
Project Title: CE Service Mgmnt Insp.: ________
Project #: Contractor Company Name: ________
Contractor Rep & Phone # ________
The Contractor, for contracts exceeding $100,000, shall: (1) Estimate the percentage of the total recovered material used in contract performance including, if applicable, the percentage of post-consumer material content; and (2) Submit this estimate through 21 CONS to CE CEIE.
ESTIMATE
RECYCLED OR RECOVERED
PRODUCT
% REQUIRED
(MINIMUM)
% AVAIL
(ACTUAL)
QUANTITY
USED
EXEMPTED
1,2,3,4
| ROCK WOOL INSUL |
| 75% |
| FIBERGLASS INSUL |
| 20-25% |
| LOOSE FILL/SPRAY ON |
| 75% |
| PERLITE COMP BOARD |
| 23% |
| PLASTIC RIGID FORAM |
| 9% |
| GLASS FIBER REINF |
| 6% |
| PHENOLIC RIGID FOAM |
| 5% |
| STRUCTURAL FIBER BD |
| 80-100% |
| LAMINATED PAPER BD |
| 100% |
| CEMENT/CONCRETE (FLYASH) |
| SEE SPEC* |
| CARPET (PET) |
| 25-100% |
| PATIO BLOCKS/RUBBER |
| 90-100% |
| PATIO BLOCKS/PLASTIC |
| 90-100% |
| FLOOR TILES/RUBBER |
| 90-100% |
| FLOOR TILES/PLASTIC |
| 90-100% |
| TRAFFIC CONES |
| 50-100% |
| TRAFFIC BARRICADES |
| 80-100% |
| PLAYGROUND SURFACES |
| 90-100% |
| RUNNING TRACKS |
| 90-100% |
| COMPOST |
| 100% |
| WOOD-BASED HYDRAULIC MULCH |
| 100% |
| PAPER-BASED HYDRAULIC MULCH |
| 100% |
| REPROCESSED WHITE, OFF-WHITE & PASTEL COLORS |
| 20% |
| REPROCESSED GREY, BROWN, EARTHTONES & OTHER DARK COLORS |
| 50-99% |
| CONSOLIDATED LATEX PAINT |
| 100% |
| PLASTIC/RUBBER PARKING STOPS |
| 100% |
| CONCRETE CONTAINING COAL FLY ASH PARKING STOPS |
| 20-40% |
CONCRETE CONTAINING GGBF
PARKING STOPS
25-70%
| PLASTIC SHOWER & RESTROOM DIVIDERS/PARTITIONS |
| 20-100% |
* Reference the Peterson AFB Service Specification
Recovered Materials Estimate and Certification Form (continued)
* "Post-consumer material" means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Post-consumer material is a part of the broader category of "recovered material."
* "Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
* The following exemptions may apply to the non-procurement of recycled/recovered content materials:
1. The product does not meet appropriate performance standards
1. The product is not available within a reasonable time frame
1. The product is not available competitively (from two or more sources)
4) The product is only available at an unreasonable price (compared with a comparable non-recycled content product.)
CERTIFICATION
I hereby certify I am an employee responsible for the performance of this contract and hereby certify that the percentage of recovered material content for EPA-designated products met the applicable contract specifications.
[Signature of the Contractor] [Typed Name of the Contractor] [Title] [Name of Company, Firm, or Organization] [Date] RETURN Copy TO: Sandy Ingrassia, 21 CES/CEIE
580 Goodfellow St.
Peterson AFB, CO 80914-2370
Phone (719) 556-1478 Email: Sandra.ingrassia@spaceforce.mil
File details come from the government source that posted it. Updated .