SOLICITATION 47PH0825R0007 2025 12 12.pdf
PDF 468 KB Posted
- Solicitation number
- 47PH0825R0007
- Issued by
- Not on record
About this file
This is a GSA Solicitation for a Design Build Contract for the Santa Teresa Land Port of Entry Border Roadway Improvement and Construction (BRIC) project in Santa Teresa, New Mexico. The solicitation is set-aside exclusively for small business firms, with an estimated project price range between $5,000,000 and $10,000,000. The contract will be awarded on a Firm-Fixed-Price basis, with proposals evaluated using three non-price technical factors: Past Performance (40%), Experience (40%), and Technical and Management Approach (20%).
Key submission and evaluation details include a proposal due date of January 21, 2026, with an electronic submission required to the Contracting Officer. A pre-proposal conference and site walk are scheduled for January 7, 2026, with strict security clearance requirements for attendees. Offerors must demonstrate design-build construction experience with two similar projects completed within the last eight years, specifically involving roadway repair, replacement of concrete pavement, and projects at land ports of entry, military bases, or similar complex facilities. Proposals are limited to 40 pages and must include past performance documentation, project experience details, and a comprehensive technical and management approach demonstrating understanding of the project requirements.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA Solicitation No. 47PH0825R0007
Design Build Contract for: Santa Teresa Land Port of Entry Border Roadway Improvement and Construction (BRIC), Santa Teresa, NM
The Solicitation 47PH0825R0007
December 12, 2025
Document: DB201A-SB/2SEPTEMBER 2025 (The Solicitation))
Table of Contents
I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference and Site Walk E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. Receipt of Offers
II. Proposals
A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to be Submitted with Proposal F. Requirements of Joint Venture Offerors
III. General Provisions
A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Notice Concerning Preparation of Proposals F. Bond Requirements G. Contractor Performance Information H. Safeguarding and Dissemination of Controlled Unclassified Information
(CUI) Building Information
IV. FAR/GSAR Solicitation Provisions FAR 52.216-1 Type Of Contract FAR 52.222-5 Construction Wage Rate Requirements-Secondary Site of Work Buy American Requirements Buy American Exceptions FAR 52.233-2 Service of Protest FAR 52.252-1 Solicitation Provisions Incorporated by Reference GSAR 552.102 Incorporating Provisions and Clauses by Reference GSAR 552.236-74, Evaluation of Options (Mar 2019) GSAR 552.236-77, Government’s Right to Exercise Options (Mar 2019)
V. Instructions to Offerors and Clauses
A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition
VI. Method Of Award
A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonableness/Price Realism D. Unbalanced Prices E. Total Evaluated Price F. Non Price Factors G. Evaluation of Joint Venture Offerors
VII. Attachments
A. Past Performance Questionnaire (Factor 1) B. Wage Decisions (NM20250039 & NM20250035) C. GSA 527-21 - Contractor’s Qualifications and Financial Information D. Standard Form 24 Bid Bond E. 1442 F. Pricing Sheet
I. General Information
I.A. The Solicitation and Contract
(1) This Solicitation is set-aside for Small Business Concerns, in accordance with FAR
19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the attached Agreement. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein.
The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.
(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.
(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.
Notice 1: Clause and provision deviations dated February 2025 do not affect the following:
1. Any FAR subparts that are based on statute or are not covered by E.O.
11246 such as:
a. FAR subparts 22.13, Equal Opportunity for Veterans and its related clauses and provisions; and
b. FAR subpart 22.14, Employment of Workers and Disabilities.
2. Existing U.S. laws on civil rights, nondiscrimination, or any laws that generally apply to a company regardless of whether it is a government contractor.
End of Notice
Notice 2:
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including FAR 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals.
GSA will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
Notice 3:
February 2025 clause or provision deviations are available in class deviations CD-2025-04 (February 15, 2025) and CD-2025-05 with Supplement 1 (March 7, 2025), available at https://www.gsa.gov/policy-regulations/policy/acquisiti2on-policy/acquisition-poli cy-library-and-resources#tab--Class-deviations)
End of Notice
Note 4:
All times herein are in the Central Time Zone. Make note that Santa Teresa, NM is in the MST time zone.
I.B. List of Solicitation Documents The Solicitation Documents are comprised of:
(1) The Solicitation
(2) Standard Form (SF) 1442 – Solicitation Offer and Award (4)The Agreement and Attachments to the Agreement
(5) The Statement of Work & Attachments to the SOW
(6) Wage Determination NM20250039 (01/24/2025) & NM20250035 (06/06/2025)
I.C. Authorized Representatives
The following individuals are designated as the authorized GSA representatives under this Solicitation:
Authorized Representative Information:
Contracting Officer’s Information
Name: Ashley Morgan
Address: 819 Taylor Street: Floor 11, Fort Worth, TX 76102
Telephone: (817) 223-9839 https://www.gsa.gov/policy-regulations/policy/acquisition-policy/acquisition-policy-library-and-resources#tab--Class-deviations https://www.gsa.gov/policy-regulations/policy/acquisition-policy/acquisition-policy-library-and-resources#tab--Class-deviations
Authorized Representative Information:
Email: ashley.morgan@gsa.gov
Alternate POC Information
Name: Dannie Crowder
Address: Denver Federal Center, Building 41, Lakewood, CO 80225
Telephone: (303) 349-6756
Email: danny.crowder@gsa.gov
I.D. Pre-Proposal Conference and Site Walk
Date: Wednesday, January 7, 2026
Pre-Proposal Conference Time: 11:00 a.m. Central
Pre-Proposal Conference Location: Virtual
Site-Walk Time: 2:00 p.m. Central
Site-Walk Location: Santa Teresa LPOE, 170 Pete V Domenici Hwy, Santa Teresa, NM 88008
Pre-Proposal Conference will be held virtually January 7, 2026 at 11:00 a.m central. The site walk will be held that same afternoon at 2:00 p.m. central at the Santa Teresa
LPOE.
All offerors who would like to attend the pre-proposal conference and site walk will need to email the individual names, Company names, email addresses and phone numbers to ashley.morgan@gsa.gov of those planning on attending to receive a meeting invite to the meeting. Those that are interested in attending the site-walk at the Santa Teresa LPOE, will have to also provide, the Date of Birth, last four digits of social security number, and the Driver’s License number and state issued, of the individuals that are attending the site-walk. The additional information provided will be submitted to U.S.
Customs and Border Protection (CBP) to run a background check. This is required as the meeting will be on an active Border Crossing. Once the clearance is approved and final, the individuals will receive an email with the additional information to attend the meeting. Please arrive early as you will have to go through a security checkpoint to be escorted to the meeting room. No walk-ins without an invitation will be permitted to attend the site visit. The maximum number of attendees for a company is three (3).
Offerors must submit the request no later than Friday, December 19, 2025. Failure to submit on time will exclude you from the meeting and if you are not cleared by CBP you will not be allowed on-site.
For further information about the site visit or access requirements, please contact:
Name: Adena Alarcon
Telephone: (915) 222-1089
Email: adena.alarcon@gsa.gov
I.E. Estimated Price Range
The estimated price range for the Project is between $5,000,000 and $10,000,000.
I.F. FAR 52.228-1 Bid Guarantee (SEP 96)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids;
and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
I.G. Receipt of Offers
(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 12:00 pm central time on the following date and at the following address.
Date: Wednesday, January 21, 2026 Address: ashley.morgan@gsa.gov
(2) Electronic Submission of Proposals
Electronic Submission of Proposals: Offers must be received by the email address of the GSA Point of Contact (POC) listed herein on or before the date and time established for receipt of offers. The date and time of receipt will be established according to the Government computer system’s documentation showing the exact official time of receipt by the GSA POC listed herein and not by the time the electronic proposal was sent by the Offeror or received by the GSA server. It is the Offeror’s responsibility to ensure proposals are complete and submitted early enough to be received by the GSA POC before the deadline, and to confirm receipt before the deadline. Proposals or portions of proposals which are received by the GSA POC later than the time noted within will be rejected and will not be considered.
NOTE: The maximum file size is 25 MB. GSA has occasionally experienced delays in delivery of emails from the GSA server to an email account. Therefore contractors/offerors need to plan accordingly.
WARNING: Consistent with GAO case law on the issue of “late-is-late rule” related to electronically submitted proposals, GSA will strictly comply with and enforce FAR 52.215-1(c)(3)(ii)(A). Pursuant to GAO’s application of FAR 52.215-1(c)(3)(ii)(A), an electronically submitted proposal that is received late will not be considered unless (1) it is received before award is made, (2) the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition and (3) it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals.
II. Proposals
II.A. Proposal Contents
Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:
1. Price Proposal
2. Technical Proposal
3. Standard Form 24, Bid Bond
4. GSA Form 527 – Contractor’s Qualification and Financial Information
5. Other Documents as Required
II.B. Proposal Format mailto:ashley.morgan@gsa.gov
Firms shall submit one (1) electronic copy of the technical proposal, one (1) electronic copy of the price proposal. The submission should be organized to correspond with the evaluation factors listed below.
Electronic copies must be submitted by email to Ashley Morgan at ashley.morgan@gsa.gov. Electronic copies must be received by the date and time listed in this solicitation. The proposal is considered received upon the date and the time stamp showing receipt by the Contracting Officer’s Government email inbox and not when the contractor sent the email.
The total technical proposal submission should not exceed 40 pages one sided, 8 ½” x 11”, vertical (portrait) format pages, consisting only of the specified materials described in this solicitation. The reference questionnaires or FINAL CPARS will not count toward the page number limit.
References: The questionnaire form or the FINAL evaluation from the Contractor Performance Assessment Reporting System (CPARS) shall be submitted for each project presented in the RFP. Offeror will submit the questionnaire or Final CPARS with their technical proposal set forth in the RFP. The Government may consider all past performance information that it becomes aware of during the evaluation process.
The proposal should include a cover page with the firm’s point of contact, phone number and email. Also included is the company's UEI number, TIN number and name, phone number, email of the person who is authorized to negotiate on behalf of the offeror.
The price proposal section portion of the proposal does not count towards the 40-page limit.
This solicitation does not commit the Government to pay any costs incurred in the submission of any proposals. Nor does it commit the Government to procure or contract for said services. The Contracting Officer is the only individual who can commit the Government to the expenditure of public funds in connection with this proposed procurement.
II.C. Price Proposal
(1) Contents
The Price Proposal shall consist of:
a. Standard Form (SF) 1442 blocks 14, 15, 16, 17, 19, & 20a, b, c signed and dated by an authorized individual. Please include the offeror UEI and EIN number in Block 14 of the SF1442 (note: Block 14 “code” and “facility code” can be left blank).
Indicate the Base Contract Price plus options in Block 17 of the 1442, which must be fully executed (signed and date) by the offeror.
b. Pricing Sheet (excel and signed PDF), with prices and/or rates indicated for each price element shown on the pricing sheet with a signature by an authorized individual on the pricing sheet. Pricing Sheet total shall match what is listed on the SF1442.
c. The Bid Bond in accordance with FAR 52.228-1 Bid Guarantee
d. Acknowledgement of all amendments in Block 19 of the SF1442.
(2) Qualifications, Exclusions and Conditions
If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.
II.D. Technical Proposal
The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.
FACTOR 1 - Past Performance
This factor considers the past performance of the Offeror. The Offeror shall submit one past performance document for each of the similar project submissions for Factor 2.
Accepted documentation can be either Past Performance Questionnaires (PPQ) (attached) or the FINAL evaluation from the Contractor Performance Assessment Reporting System (CPARS) or one of each to satisfy the requirements of two documents. The PPQ and/or CPARS shall be for similar projects substantially completed within the last eight (8) years.
The Past Performance Questionnaire (PPQ) is included in the solicitation as Attachment A, completed by the applicable client. Completed PPQs should be submitted with the proposal. Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror is unable to obtain a completed PPQ from a client for a project before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the project. If the client requests, the client may submit a questionnaire directly to the Government's point of contact, via email at ashley.morgan@gsa.gov prior to proposal closing date. Offerors may resubmit questionnaires previously submitted with other proposals or may obtain an updated/new PPQ from a client for any submission. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.
Also include performance recognition documents received within the last 8 years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), previously submitted PPQ information, and any other known sources not provided by the Offeror. While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. GSA will not maintain a database of PPQs submitted by Offerors.
FACTOR 2 - Experience
This factor considers the extent of the Offeror’s past experience as a firm in providing similar design build construction services. The Offeror must demonstrate successful experience as a Design Build (DB) Contractor responsible for the design & construction of two (2) similar projects substantially completed within the past eight (8) years as defined below. The projects submitted for this factor shall be the same as the two submitted PPQ/CPARs submitted in Factor 1. Similar project is defined as a project that is similar in size, complexity, and type as defined by having all of the following characteristics:
Similar in size projects are:
● Exceed $5,000,000 in total award costs, completed in the last eight (8) years from the date of the Solicitation. One (1) of the two (2) project submissions can be incomplete, however it must be 75% complete from the date of the proposal submission.
Similar in complexity projects are:
● Design and construction of roadway repair and replacement of at least 100,000 SF of concrete pavement 8” or more in depth.
Similar in type projects are:
● A project consisting of major modernization or renovation for road repair of a Land Port of Entry (LPOE), complex, military base, commercial docks or facility area, University Campuses, and highway road construction repair projects. Additional examples include, but are not limited to, highways, airport runways, tarmacs, commercial dock areas, bridges, and distribution center projects.
● Road and paving site work that meet the minimum depth (8 inches thick) of concrete.
Projects NOT considered similar:
● Stand-alone parking lots, sidewalks, and driveways
For each project presented in relation to this factor, the Offeror must explain how the characteristics of the project relate to the characteristics of this project. For each project presented the Offeror shall submit the following data/information:
(a) Project Title
(b) Owner and/or Occupants(s)/Tenant(s)
(c) Location
(d) Description including GSF and/or OSF
(e) Contract Award Date
(f) Contract Type and Contractor's Responsibilities (Scope of Work)
(g) Date of Substantial Completion
(h) Date of Final Completion
(i) Contract Cost at Award
(j) Contract Cost at Completion
(k) Original Schedule Completion Time at Contract Award (Calendar
Days)
(l) Actual Completion Time (Calendar Days)
(m) Number of Change Orders
(n) Classification (reason) of Changes Orders (Latent Conditions, Owner Instituted, Design Errors & Omissions, etc., )
This factor will be evaluated based upon the written response to the solicitation by the Offeror and the past experience demonstrated by the presented projects.
FACTOR 3 - Technical and Management Approach
This factor is concerned with the Offeror’s understanding of the project requirements and the Design Build management approach. The Offeror shall submit a written plan addressing the following:
● A comprehensive and logical plan for executing a design build project of the magnitude and complexity of THIS project.
● Detailed phasing arrangements and planning of work to include road/lane closures of a project that is occupied during normal business hours to allow traffic flow to continue during construction
● Discussion of how the schedule for the project will be met while, at the same time, managing any changes that may occur. Include a logical preliminary schedule with major milestones identified and activities laid out in a critical path method (CPM) schedule.
● Reasonably identifies the main risk drivers for this project with an acceptable mitigation strategy.
● Provide an organization chart for their proposed design build team for this project showing organizational positions – only key personnel names are required. The chart shall demonstrate the offeror’s understanding of what team members are integral to the success of this project.
● Demonstrate the Offeror’s understanding of quality control for this project and the means by which the Design-Build Contractor will attain the quality throughout both the design and construction portions of the Work.
● Demonstrate that the proposed design team has the relevant key individual professional qualifications including professional registrations and experience necessary for this project. Offerors shall refer to the Scope of Work for required Design-Build Team Members and Experts.
II.E. Other Information to be Submitted with Proposal
(1) Representations and Certifications
Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see 52.204-7). Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via System for Award Management.
(2) Qualifications of Offerors
Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract.
Offerors shall submit this information on GSA Form 527 – Contractor’s Qualifications and Financial Information. Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.
II.F. Requirements of Joint Venture Offerors
(1) All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.
(2) An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.
(3) In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by so certifying in the joint venture agreement, or by submitting a separate certification to the Government. The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.
https://www.sam.gov/
(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.
III. General Provisions
III.A. Availability of Funds
Issuance of this Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.
III.B. Requests for Clarification or Interpretation
The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but do not warrant that all such requests will be answered by January 14, 2026. Prospective Offerors should make such requests by January 14, 2026.
Questions shall be submitted in writing to the Contracting Officer at ashley.morgan@gsa.gov and the Project Manager, Adena Alarcon at adena.alarcon@gsa.gov.
III.C. Notice to Small Business Firms
A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (Small Business Administration). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.
III.D. Information Concerning the Disclosure of Solicitation Results
This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will be made available until after award except as provided by FAR 15.503.
III.E. Notice Concerning Preparation of Proposals
Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.
mailto:adena.alarcon@gsa.gov http://www.sba.gov/ http://www.sba.gov/
III.F. Bond Requirements
If a bid guarantee is required to be submitted with your offer, any contract awarded will require a performance bond and payment bond as specified in the Agreement. Offerors who utilize individual sureties should note the requirement for a certified, audited, financial statement for each person acting as an individual surety under clause FAR 52.228-1 Bid Guarantee and the requirements of clause FAR 52.228-11 Pledge of Assets.
III.G. Contractor Performance Information
Evaluating Contractor Performance: The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process. CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is Contractor Performance Assessment.
Completed CPARS evaluations may then be used by the Federal acquisition community for use in making source selection decisions. CPARS assists acquisition officials by serving as the single source for contractor past performance data.
(1)CPARS Registration: Each award requiring an evaluation must be registered in CPARS. The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.
(2)Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (CPARS Training) and updated as needed.
(3)Contractor Representative (CR) Role: All evaluations will be sent to the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.
Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.
GSA shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding http://www.cpars.gov/ http://www.cpars.gov/ https://www.cpars.gov/lc.htm
GSA’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.
Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.
III.H. Safeguarding and Dissemination of Controlled Unclassified Information (CUI) Building Information
Certain information contained in the Solicitation Documents may have been designated as Controlled Unclassified Information (CUI) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.
IV. FAR/GSAR Solicitation Provisions
FAR 52.216-1 Type of Contract (NOV 2025) The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (MAY 14)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
Buy American Requirements
FAR 52.225-10 Notice of Buy American Requirement-Construction Materials (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy
American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-https://www.acquisition.gov/far/part-52#FAR_52_225_9 https://www.acquisition.gov/far/part-52#FAR_52_225_9 https://www.acquisition.gov/far/part-52#FAR_52_225_9 https://www.gsa.gov/forms-library/solicitation-offer-and-award-construction-alteration-or-repair
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
Buy American Exceptions
For Buy American exceptions, if any, see the applicable Buy American clause in Section IV of the Agreement
FAR 52.233-2 Service of Protest (NOV 2025)
(a) Protests, (as defined in FAR 33.102), that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), must be served on the Contracting Officer identified in the solicitation by obtaining written and dated acknowledgment of receipt from them.
(b) The copy of any protest must be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 98)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:
Federal Acquisition Regulation
(End of provision)
The following provisions are incorporated by reference:
NUMBER TITLE DATE
52.204-7 System for Award Management NOV 2025
52.204-22 Alternative Line Item Proposal JAN 17
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations - Representation
NOV 2025
https://www.acquisition.gov/browse/index/far
NUMBER TITLE DATE
52.209-5 Certification Regarding
Responsibility Matters
NOV 2025
52.209-7 Information Regarding Responsibility Matters
NOV 2025
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law
NOV 2025
52.214-34 Submission of Offers in the English Language
APR 91
52.215-16 Facilities Capital Cost of Money JUN 03 52.217-4 Evaluation of Options Exercised at
Time of Contract Award
NOV 2025
52.217-5 Evaluation of Options NOV 2025 52.219-1 Small Business Program
Representations
NOV 2025
GSAR Clause 552.102 Incorporating Provisions and Clauses
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Additional Provisions
(i) GSAR 552.236-74, Evaluation of Options (Mar 2019) The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(ii) GSAR Clause 552.236-77, Government’s Right to Exercise Options (Mar 2019)
(a)The Government may exercise any option in writing in accordance with the terms and conditions of the contract at award. Unless otherwise specified, options may be exercised at contract award.
(b)If the Government exercises the option, the contract shall be considered to include this option clause.
V. Instructions to Offerors and Clauses
V.A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition (NOV 2025)
(a) Definitions. As used in this provision-
In writing, writing, or written means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
Proposal modification is a change made to a proposal before the request for proposal closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
Proposal revision is a change to material elements of a proposal made after the request for proposal closing date, at the request of or as allowed by a Contracting Officer, as the result of negotiations.
Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to requests for proposals. If this request for proposal (RFP) is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this RFP by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals.(1)(i) Proposals and modifications to proposals shall be—
(A) Submitted using the method and the format specified in the RFP;
(B) Addressed to the office specified in the RFP; and
(C) Showing the time and date specified for receipt, the RFP number, and the name and address of the offeror.
(ii) Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i)(B) and (C) of this provision.
(2) The first page of the proposal must show—
(i) The RFP number;
(ii) The name, address, and telephone number of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the RFP and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone number (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
(3)(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the RFP by the time specified in the RFP. If no time is specified in the RFP, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.(ii)(A) Any proposal, modification, or revision received at the Government office designated in the RFP after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-
(1) If it was transmitted through an electronic commerce method authorized by the RFP, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the RFP, and urgent Government requirements preclude amendment of the RFP, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the RFP on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award.
Oral proposals in response to oral RFPs may be withdrawn orally. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the RFP, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this RFP in English, unless otherwise permitted by the RFP, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the RFP.
(6) Offerors may submit modifications to their proposals at any time before the RFP closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this RFP will be valid for the number of days specified on the RFP cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall-
(1) Mark the title page with the following legend:
Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of, or in connection with, the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award.(1) The Government intends to award a contract or contracts resulting from this RFP to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the RFP.
(2) The Government may reject any or all proposals if such action is in the Government’s interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without negotiations with offerors (except clarifications as described in FAR 15.202(b)).
Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct negotiations if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly evaluated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.
(7) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(8) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(9) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(10) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency's evaluation of the significant weaknesses or deficiencies in the debriefed offeror's offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial products, the make and model of the product to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the RFP, applicable regulations, and other applicable authorities were followed by the agency.
(vii) For DoD contracts in excess of $10 million but not in excess of $100 million with a small business or nontraditional defense contractor (10 U.S.C. 3014), an option for the contractor to request disclosure of the agency's written source selection decision document, redacted to protect the confidential and proprietary information of other offerors for the contract award.
(viii) For award of a DoD contract in excess of $100 million, disclosure of the agency's written source selection decision document, redacted to protect the confidential and proprietary information of other offerors for the contract award.
(End of provision)
VI. Method of Award
VI.A. Evaluation of Offers
(1) The Government will award a contract resulting from this Solicitation to the responsible Offeror whose offer conforming to the Solicitation will be most advantageous to the Government, Total Evaluated Price and other factors considered.
In addition to Total Evaluated Price, the following non-price technical factors shall be used to evaluate offers:
(a)Past Performance 40% (b)Experience 40% (c)Technical and Management Approach 20%
(2) For this solicitation, the three non-price technical factors listed above are significantly more important than cost or price. However, as proposals become more equal in their technical merit, the evaluated cost or price becomes more important.
VI.B. Determination of Responsibility
In order to be considered responsible, an Offeror must demonstrate that it meets the requirements of FAR 9.104-1. The Contracting Officer's determination of an Offeror's responsibility or non-responsibility may be based upon any information obtained by the Contracting Officer, and is independent of the evaluation of offers set forth herein.
VI.C. Price…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .