This document is a Section 011000 Summary for a Design-Build (DB) contract for the Santa Teresa Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC) project in Santa Teresa, New Mexico. The project involves replacing select pavement sections at the land port of entry, with the DB contractor responsible for design, construction, and ensuring functional performance of all systems. The work will be conducted in multiple phases, requiring coordination with GSA and Customs and Border Protection (CBP) operations, and must minimize disruption to the port's mission and traffic.

Key project details include approximately 202,455 square feet of pavement designated for replacement and rehabilitation, involving removal of existing concrete and base material, surface and full pavement reconstruction to depths between 10-13 inches. The project is a small business set-aside, with the Contracting Officer Ashley Morgan from GSA. The contractor will be responsible for design and construction of pavement patching, traffic maintenance, utility relocations, crack sealing, and traffic control. The project requires careful coordination with ongoing CBP operations and adherence to existing site conditions and safety requirements.

View the file

Other files

File Type Posted
Amendment 3 - 47PH0825R0007 2026 01 29.pdf PDF
Amendment 2 - 47PH0825R0007 2026 01 16.pdf PDF
Pricing Sheet 2026 01 16.xlsx XLSX spreadsheet
Amendment 1 - 47PH0825R0007 2026 01 09.pdf PDF
B. 1. NM20250039 Heavy 2025 01 24.pdf PDF
GSA 01 73 10 CUTTING PATCHING.docx DOCX document
GSA 01 59 50 - SAFETY AND HEALTH.docx DOCX document
GSA 01 29 00 PAYMENT PROCEDURES.docx DOCX document
GSA 01 25 00 Subst. Procedures.docx DOCX document
GSA 01 50 00 TEMPORARY FACILITIES and CONTROLS.docx DOCX document
DB Communications Plan Template FY25.docx DOCX document
AGREEMENT 47PH0825R0007 2025 12 12.pdf PDF
F. Pricing Sheet Santa Teresa LPOE 08_14_2025.xlsx XLSX spreadsheet
GSA 01 74 19 CONSTRUCTION NONHAZARDOUSE WASTE REMOVAL.docx DOCX document
GSA 01 30 00 PROJECT MANAGEMENT INFORMATION SYSTEM.docx DOCX document
GSA 01 70 00 EXECUTION REQUIREMENTS.docx DOCX document
GSA 01 78 10 PROJECT RECORD DOCUMENTS.docx DOCX document
GSA 01 14 00 Work Restrictions.docx DOCX document
GSA 01 42 00 GENERAL REFERENCES.docx DOCX document
Santa Teresa LPOE - Geotechnical Report.pdf PDF
C. GSA 527-21 - Contractor's Qualifications and Financial Information.pdf PDF
D. Standard Form 24 Bid Bond.pdf PDF
E. SF1442 47PH0825R0007 2025 12 12.pdf PDF
B. 2. NM20250035 Highway 2025 06 06.pdf PDF
A. Past Performance Questionnaire Factor 1.pdf PDF
GSA 01 31 00 PROJECT MANAGEMENT COORDINATION.docx DOCX document
GSA 01 40 00 QUALITY ASSURANCE QUALITY CONTROL REQUIREMENTS.docx DOCX document
GSA 01 24 00 Options.docx DOCX document
GSA 01 77 00 CLOSEOUT PROCEDURES.docx DOCX document
GSA 01 73 20 SELECTIVE DEMOLITION.docx DOCX document
GSA 01 27 00 Unit Prices.docx DOCX document
GSA 01 32 00 Construction Progress Documentation.docx DOCX document
GSA 01 59 30 SECURITY REGULATIONS.docx DOCX document
PBS_Core_Building_Standards_Memorandum 24FEB25.pdf PDF
SOW 47PH0825R0007 2025 12 12.pdf PDF
SOLICITATION 47PH0825R0007 2025 12 12.pdf PDF
GSA 01 33 00 Submittal Procedures.docx DOCX document
GSA 01 60 00 PRODUCT REQUIREMENTS.docx DOCX document
GSA 01 32 20 Photographic Documentation.docx DOCX document
GSA 01 31 10 Prospectus CPM Schedule Specs.docx DOCX document
CBS Submittal Matrix.pdf PDF
P-120 PBS Cost and Schedule Management.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Santa Teresa Land Port of Entry BRIC Santa Teresa, New Mexico Kahua #353

SECTION 011000 – SUMMARY DB VERSION

PART 1 GENERAL

1.1 PROJECT INFORMATION

A. Project Name and Location: Santa Teresa Land Port of Entry, Border Roadway Improvement and Construction (BRIC) B. Project Summary Description: Replace select sections of pavements at the Santa Teresa Land Port of Entry as defined in the design documents.

C. Design Build (DB) Contractor: The DB is the prime contractual entity and Designer of Record (DOR) responsible for the proper execution of the work. Responsibility for accuracy and completeness of the final design, delivering high-quality construction, and demonstrating functional performance of all systems lies solely with the DB. Reference to the DB and DOR (regarded as one entity) are used interchangeably. “Contractor,” “DB Contractor,” DB team,” or DB may be used throughout this text with the same meaning.

D. Project Delivery Method: Design Build E. Consultants: No Key Consultants F. The Contracting Officer for the project is: Ashley Morgan 819 Taylor Street, Suite 12A Fort Worth, Texas 76102 Ph: 817-201-8269 jason.gerloff@gsa.gov

1.2 WORK SEQUENCE

A. The work shall be conducted in multiple phases across the site. The Contractor shall coordinate phasing and scheduling with GSA and the Port prior to the start of construction.

Before work is started, the Contractor shall arrange/coordinate with the Contracting Officer and Contracting Officer’s Representative (COR) a sequence of procedures, means of access, space for storage of materials and equipment.

1.3 WORK BY OTHER CONTRACTORS

A. The Contractor shall cooperate with CBP operations at the site which cannot be shut down for construction, including providing labor materials, and other costs necessary to satisfactorily coordinate the Contract work with CBP Land Port of Entry operations.

1.4 SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY

A. The project includes the following Government furnished property to be installed by the Contractor. The contractor shall advise GSA at least 30 days in advance of when the property shall be delivered. NOT APPLICABLE.

1.5 MISCELLANEOUS PROVISIONS

A. Work in existing facilities shall correspond in all respects with the existing conditions to which it connects, or to similar existing conditions, in materials, workmanship and finish.

B. Alterations to Existing Conditions: Existing conditions shall be cut, drilled, removed, temporarily removed, or removed and replaced, as necessary for performance of Work under the Contract and in conformance with Health and Safety requirements outlined in section 015950 - Safety and Health. Existing conditions that are out of alignment (incomplete or substandard) and where exposed by removal of existing work shall be noted and brought to the attention of GSA. Necessary corrective work shall be as directed.

1. Replacements of existing conditions that are removed shall match similar existing conditions.

2. Unless otherwise indicated, existing structural members shall not be cut or altered without authorization by the Contracting Officer. NOT APPLICABLE

3. Conditions remaining in place, which are damaged or defaced during the Work, shall be restored to the condition existing at time of award of Contract.

4. Discolored or unfinished surfaces exposed by removal of existing conditions, that are indicated to be final exposed surfaces, shall be refinished or replaced as necessary to produce uniform and harmonious contiguous surfaces.

C. Existing structures shall remain in place.

D. Existing utility services with related meters and equipment shall remain in place.

E. Removed items indicated to remain the property of the Government shall be stored on site where directed by the Contracting Officer.

PART 2 PRODUCTS (Not Applicable) PART 3 EXECUTION (Not Applicable)

END OF SECTION 011000

June 17, 2025 SUMMARY 01 10 00 - Page 1 of 1

File details come from the government source that posted it. Updated .