About this file

The document is the GSA Core Building Standards (CBS) Submittal Matrix for 2025, a comprehensive guide detailing the required documentation and submission requirements across different phases of federal construction projects. The matrix covers four project delivery methods (Design Bid Build, Design Build, Design Build Bridging, and Construction Manager as Constructor) and provides detailed guidelines for submittals at various stages of design and construction, from preliminary concept through final construction documents.

The matrix includes extensive requirements for each project phase, addressing areas such as accessibility, climate resilience, building information modeling (BIM), energy usage, zoning analysis, site strategies, enclosure commissioning, architectural design, structural systems, mechanical and electrical systems, cost estimation, and life cycle costing. Each section specifies the exact documentation, drawings, calculations, narratives, and specifications required, with variations based on the project delivery method and funding code. The document is designed to ensure comprehensive documentation, compliance with federal standards, and a systematic approach to design and construction project management.

View the file

Other files

File Type Posted
Amendment 3 - 47PH0825R0007 2026 01 29.pdf PDF
Amendment 2 - 47PH0825R0007 2026 01 16.pdf PDF
Pricing Sheet 2026 01 16.xlsx XLSX spreadsheet
Amendment 1 - 47PH0825R0007 2026 01 09.pdf PDF
SOLICITATION 47PH0825R0007 2025 12 12.pdf PDF
GSA 01 33 00 Submittal Procedures.docx DOCX document
GSA 01 60 00 PRODUCT REQUIREMENTS.docx DOCX document
GSA 01 32 20 Photographic Documentation.docx DOCX document
GSA 01 31 10 Prospectus CPM Schedule Specs.docx DOCX document
P-120 PBS Cost and Schedule Management.pdf PDF
B. 1. NM20250039 Heavy 2025 01 24.pdf PDF
GSA 01 73 10 CUTTING PATCHING.docx DOCX document
GSA 01 59 50 - SAFETY AND HEALTH.docx DOCX document
GSA 01 29 00 PAYMENT PROCEDURES.docx DOCX document
GSA 01 25 00 Subst. Procedures.docx DOCX document
GSA 01 50 00 TEMPORARY FACILITIES and CONTROLS.docx DOCX document
DB Communications Plan Template FY25.docx DOCX document
AGREEMENT 47PH0825R0007 2025 12 12.pdf PDF
F. Pricing Sheet Santa Teresa LPOE 08_14_2025.xlsx XLSX spreadsheet
GSA 01 74 19 CONSTRUCTION NONHAZARDOUSE WASTE REMOVAL.docx DOCX document
GSA 01 30 00 PROJECT MANAGEMENT INFORMATION SYSTEM.docx DOCX document
GSA 01 70 00 EXECUTION REQUIREMENTS.docx DOCX document
GSA 01 78 10 PROJECT RECORD DOCUMENTS.docx DOCX document
GSA 01 14 00 Work Restrictions.docx DOCX document
GSA 01 42 00 GENERAL REFERENCES.docx DOCX document
Santa Teresa LPOE - Geotechnical Report.pdf PDF
C. GSA 527-21 - Contractor's Qualifications and Financial Information.pdf PDF
D. Standard Form 24 Bid Bond.pdf PDF
E. SF1442 47PH0825R0007 2025 12 12.pdf PDF
B. 2. NM20250035 Highway 2025 06 06.pdf PDF
A. Past Performance Questionnaire Factor 1.pdf PDF
GSA 01 31 00 PROJECT MANAGEMENT COORDINATION.docx DOCX document
GSA 01 40 00 QUALITY ASSURANCE QUALITY CONTROL REQUIREMENTS.docx DOCX document
GSA 01 24 00 Options.docx DOCX document
GSA 01 77 00 CLOSEOUT PROCEDURES.docx DOCX document
GSA 01 73 20 SELECTIVE DEMOLITION.docx DOCX document
GSA 01 27 00 Unit Prices.docx DOCX document
GSA 01 10 00 SUMMARY.docx DOCX document
GSA 01 32 00 Construction Progress Documentation.docx DOCX document
GSA 01 59 30 SECURITY REGULATIONS.docx DOCX document
PBS_Core_Building_Standards_Memorandum 24FEB25.pdf PDF
SOW 47PH0825R0007 2025 12 12.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA CBS Submittal Matrix (2025) - Version 1.0 GSA CBS Submittal Matrix (2025) - Version 1.0

The submittal matrix is provided to document the baseline submittal requirements for the four project delivery methods and funding codes.

Project teams must still provide the standard of care for a fully constructible set of documents.

This matrix identifies items that GSA requires to validate that the project is moving forward while meeting the requirements of CBS. Additional submittal requirements may be included in the project contract.

2025 Interim Core Building Standards (CBS) Submittal Matrix

DELIVERY METHODS

Design Bid Build1

Design / Build2

Design / Build / Bridging3

Construction Manager as Constructor4

Photo Credit: Lance Davis, U.S. Courthouse, San Antonio, TX

The submittal matrix is provided to document the baseline submittal requirements for the four project delivery methods and funding codes.

Project teams must still provide the standard of care for a fully constructible set of documents.

This matrix identifies items that GSA requires to validate that the project is moving forward while meeting the requirements of CBS. Additional submittal requirements may be included in the project contract.

2025 Interim Core Building Standards (CBS) Submittal Matrix

DELIVERY METHODS

Design Bid Build1

Design / Build2

Design / Build / Bridging3

Construction Manager as Constructor4

CONCEPT PHASE

DESIGN DEVELOPMENT

CONSTRUCTION DOCUMENTS

START

END

Final Concept

(BA 51, 55, 80,

ESPC)

Concept Development

(BA 51, 55)

Preliminary Concept

(BA 51, 54, 55)

Design Development 100%

(BA 51, 54, 55, 61, 80, ESPC)

CD Final

(BA 51, 54, 55, 61,

80, ESPC)

CD 95%

(BA 51, 54, 55, 80,

ESPC)

CD 65%

(BA 51, 54, 55, 80,

ESPC)

BA51 New Construction BA61 Operating Funds for the purpose of repairs and alterations

BA54 Minor Repair and Alterations BA80 Reimbursable Work Authorization

BA55 Major Repair and Alterations ESPC Energy Savings Performance Contract including utility projects

GSA CBS Submittal Matrix (2025) - Version 1.0

Construction Type

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

DD - 100%

CD - 65%

CD - 95%

CD - Final

General Information

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ABAAS

Section 1

DISASTER RESILIENCY

Section 1

BIM

Section 1

DESIGN COMMENTS

Section 1

CODE AND SAFETY

Section 1

Per The Architectural Barriers Act Accessibility Standard (ABAAS) (42 U.S.C. § 4152):

❏ NARRATIVE (FOR EACH OPTION) Provide narrative entitled, “ACCESSIBILITY PLAN” to address key accessibility issues significantly impacting the concept design as follows:

❏ SITE: Identify constraints/challenges due to site features (e.g. slope or wetlands) and vehicle circulation, building, orientation and surrounding transit infrastructure.

❏ BUILDINGS AND ALTERATIONS: Identify constraints/challenges due to building type and scoping of project. Reference both public and staff spaces and occupancies. Describe applicable accessibility codes to be enforced. Describe accessible path of travel obligations resulting from changes to primary function areas (ABAAS F202.4)

❏ Provide DRAWINGS FOR EACH OPTION that include graphics showing accessible routes from site arrival points to building entrances and to all occupied spaces and elements

Per the Disaster Resiliency Planning Act of 2022 (PL 117-220), Executive Order 13961 (2020), and National Security Memorandum-22 on Critical Infrastructure Security and Resilience:

❏ Provide a statement outlining proposed methods to manage the observed and expected changes in climatic loading (building and site) due to nonstationary weather and extremes, based on the criteria in the statement of work (SOW) and the GSA-provided profile.

❏ Identify project protection levels and include a simple phased adaptation plan.

❏ Include proposed method of documentation for each project design milestone to track that the design is able to adapt to changing conditions and include the thresholds to monitor the asset.

❏ A response template is available for use. The design team may use an alternate format but must include the content in the GSA template. Include outcomes in the project risk register.

❏ N/A

❏ Provide list of applicable codes

❏ BIM Execution plan (Template in 2024 GSA BIM CDX and COBie Standard).

❏ Reality Capture documentation (for an existing building, or historic site, and if required by scope) - e.g. Laser Scans, existing conditions model, 360 photos, etc.

❏ Document existing conditions

❏ Source models to coordinate geolocation/geocoding of site and model orientation

❏ Phasing plan

Section Continues (next page)

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

DD - 100%

CD - 65%

CD - 95%

CD - Final

General Information

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ENERGY USAGE MODEL

Section 1

❏ Meet Energy Modeling Requirements to demonstrate compliance with the Energy Efficiency Performance Standard in 10 CFR 433.100.

DESIGN COMPLIANCE

Section 1

FOSSIL FUEL

REDUCTION

Section 1

❏ For prospectus new construction and major renovation projects, complete GSA’s 2025 Sustainable Design Checklist indicating how sustainable design principles are being applied per EISA 2007 section 433(a)(D)(i).

❏ Document how the project will achieve the 90% fossil fuel reduction required by EISA 2007 section 433(a)(D)(i)(I) and 10 CFR 433.200 for FY2025-FY2029 prospectus new construction and major renovation projects.

Section Continues (previous page) https://www.ecfr.gov/current/title-10/chapter-II/subchapter-D/part-433/subpart-A/section-433.100 https://www.govinfo.gov/content/pkg/PLAW-110publ140/pdf/PLAW-110publ140.pdf#page=122 https://www.govinfo.gov/content/pkg/PLAW-110publ140/pdf/PLAW-110publ140.pdf#page=122 https://www.govinfo.gov/content/pkg/PLAW-110publ140/pdf/PLAW-110publ140.pdf#page=122 https://www.ecfr.gov/current/title-10/section-433.200

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ZONING ANALYSIS

Section 1

DESIGN FOR PUBLIC

USE

Section 2

COLLABORATIVE

DESIGN PROCESS

Section 1

❏ Demonstrate compliance with 40 USC § 3312(b), (c), and (d) with graphics and narrative to describing the community planning context (land use, economic development, urban design, relevant history, etc.).

❏ In coordination with the GSA project team, submit a Community Stakeholder Analysis and narrative summarizing consultation with local officials (stakeholders consulted, meeting minutes), and plans for further consultation to show compliance with 40 U.S.C. § 3312(b) and (c).

❏ Highlight relative merits or challenges presented by the various concepts, in compliance with 40 U.S.C. § 3312(b).

❏ Provide brief zoning and design guideline analysis of site and surroundings to show compliance with 40 U.S.C. § 3312(a) and (c).

❏ Discuss any uncertainties that the proposed concept would align with local requirements, in compliance with 40 U.S.C. § 3312(c).

❏ Demonstrate compliance with 40 USC 3306(b)(3) with narrative of site context (walkability, proximity to neighborhood amenities, access to transit, pedestrian linkages around and through the site) and how proposed design encourages public access to and around building and site and connecting to neighborhood amenities and infrastructure.

❏ Identify potential areas inside and outside the building suitable for shared public use (incl. after hours). Highlight significant challenges or opportunities to create such spaces, in compliance with 40 U.S.C. § 3306(b)(1) and (3).

❏ Identify existing natural features that impact the spatial layout per NEPA and Clean Water Act requirements, including wetlands and streams, forest conservation, and sensitive habitats.

STORMWATER

MANAGEMENT

Section 2

LANDSCAPE

IRRIGATION

Section 2

SITE / LANDSCAPE

STRATEGY

Section 2

NATURAL FEATURES

Section 2

❏ Description and diagrams of the basic intent for site development to demonstrate compliance with 40 USC § 3312(c) (e.g. program, preservation areas, circulation, and physical security)

❏ Various approaches to achieve compliance with EISA section 438 are identified for the project and site systems are diagrammed.

❏ N/A

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ENCLOSURE

COMMISSIONING PLAN

Section 1 & 3

ROOFING / ROOF

DRAINAGE SYSTEM

Section 1 & 3

WHOLE BUILDING AIR

TIGHTNESS

Section 1 & 3

THERMAL BARRIERS

(INSULATION)

Section 1 & 3

VISUAL &

PERFORMANCE

MOCK-UPS

Section 1 & 3

FENESTRATION

(GLAZING SYSTEMS)

Section 1 & 3

OPERATIONS &

MAINTENANCE

Section 1 & 3

BELOW-GRADE

WATERPROOFING

Section 1 & 3

❏ N/A

❏ Proposed roofing and roof drainage systems function without extraordinary means and do not pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle durability.

❏ List any unique site-specific conditions that may impact proposed system.

❏ N/A

❏ N/A

❏ Proposed fenestration systems are appropriate to the climate.

❏ Proposed designs are readily achievable and do not pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle durability.

❏ List any unique site-specific conditions that may impact proposed system.

❏ N/A

❏ N/A

❏ Identify unique programmatic conditions that require improved system performance (e.g., courthouses, laboratories, data centers, etc).

❏ Reflect site conditions, design wind load, and any risk of extreme weather; adjusting standing performance criteria; to ensure facility resilience throughout the intended service life.

❏ Follow ASTM E2813 Enhanced Cx as default, ASTM E2947, D7877 & D8231

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

APPROVED PROGRAM &

ADJACENCIES

MECHANICAL SPACES

BUILDING & SERVICE

SPACES

DESIGN NARRATIVE &

CALCULATIONS

GENERAL

INFORMATION

Sections 1 and 3

DESIGN CONCEPTS

Sections 1 and 3

MILLWORK

FURNITURE, FIXTURES

& EQUIPMENT

FINISHES

❏ In compliance IBC Chapter 1, Section 107, and Appendix K, Section K104, All major spaces are identified with appropriate adjacencies and reasonable size related to the program by division or areas.

❏ In compliance IBC Chapter 1, Section 107, and Appendix K, Section K104, Provide the project objectives relative to the scope.

❏ Plans identifying support spaces with appropriate adjacencies and reasonable size related to the program

❏ Mechanical rooms and service spaces are of sufficient size and quantity to accommodate all required equipment; consider maintenance/installation/removal of equipment.

❏ N/A

❏ In compliance IBC Chapter 1, Section 107 - Short narrative on each design concept. Include basic calculations showing all assumptions.

❏ Three (3) overall building concept designs for Design Excellence projects, or an overall building concept design for all other projects, including drawings, BIM, renderings & photos.

❏ Compare net, usable and gross SF of design concepts to program.

❏ N/A

❏ N/A

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

OFFICE AREAS

INTERIOR FACILITIES

Sections 1 and 3

FLOOR-TO-FLOOR

HEIGHTS

EXTERIOR DESIGN

Sections 1 and 3

INTERIOR CONDITIONS

INTERIOR DESIGN:

MAJOR PUBLIC SPACES

ARCHITECTURAL CODE

COMPLIANCE

Section 1

SIGNAGE &

WAYFINDING

BUILDING MASSING

❏ N/A

❏ N/A

❏ All support spaces identified with appropriate adjacencies and reasonable size related to the program

❏ Interior facilities (restrooms, breakrooms, etc.) are sufficient to comfortably accommodate maximum occupant load.

❏ Show a reasonable vertical profile that will allow for systems integration.

❏ In compliance IBC Chapter 1, Section 107, and Appendix K, Section K104, Floor-to-floor heights are sufficient to accommodate any utilities/cabling/above ceiling requirements.

❏ Overall exterior design is in keeping with specific program requirements by project; exterior is easy to maintain.

❏ In compliance IBC Chapter 1, Section 107, and Appendix K, Section K104, Show a reasonable representation of all of the exterior planes to include materiality and fenestration; describe the design intent for the enclosure system(s): (barrier wall, cavity wall, curtain wall, rain screen, etc.).

❏ N/A

❏ Provide an electronic massing model on a common base, for each design scheme. No fenestration.

In compliance IBC Chapter 1, Section 107, and Appendix K, Section K104:

❏ Show that no major obvious deficiencies are present in the design & Document any deficiencies or waivers required, and Interior and exterior architectural features are code compliant

Section Continues (previous page)

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

DESIGN LOADS

Section 4

VIBRATIONS

Section 4

INNOVATIVE METHODS

& MATERIALS

Section 4

STRUCTURAL SYSTEMS

Section 4

FOUNDATIONS &

GEOTECHNICAL

Section 4

STRUCTURAL ANALYSIS

& CALCULATIONS

Section 4

HISTORIC

CONSIDERATIONS

Section 4

PHYSICAL SECURITY

Section 4

CIVIL SITE

Section 4

QUALITY ASSURANCE &

SPECIAL INSPECTIONS

Section 4

❏ Prepare narrative that summarizes design loads.

❏ Provide geotechnical investigation and approach report.

❏ N/A

❏ Identify any alternative materials, design or construction methods that are planned or may be required, and include any associated peer review and approval processes.

❏ Narrative describing alternatives schemes/materials (including superstructure and foundations) to be considered.

❏ Narrative describing anticipated content of calculations including any special requirements that involve unusual features of the design or complex analysis methods.

❏ N/A

❏ Narrative that identifies historic status and related potential constraints.

❏ Narrative summarizing anticipated physical security requirements and standards. Include FSL information from FSC.

❏ Narrative identifying project site characteristics and civil design challenges, including but not limited to: flood hazard assessment, improvement of roadway & pedestrian/vehicular traffic, stormwater & utility requirements, topography, staging, site setback and security requirements.

❏ Each design has considered the overall site water balance and how that will be preserved and/or enhanced through the various proposals. EO 11988 and ASCE 24-24.

MISCELLANEOUS

COMPONENTS

Section 4

❏ Narrative summarizing primary structural and facade attachments to the exterior of the building.

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

NARRATIVE

Section 5

CALCULATIONS

Section 5

SPECIFICATIONS

Section 5

DRAWINGS

Section 5

❏ Provide at least two (2) HVAC design alternatives, consistent with the requirements of 10 CFR 433.100; where required by 10 CFR 433, Subpart A.

❏ Identify mechanical spaces and primary distribution pathways

❏ Develop base assumptions for each concept

❏ Per International Plumbing Code (IPC) and American Society of Plumbing Engineers (ASPE) handbooks including “Fundamentals of Plumbing Engineering”, provide description of the basic intent for plumbing infrastructure (e.g. domestic water heater technology and arrangement)

Construction Type

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

SYSTEMS & EQUIPMENT

Section 5

CALCULATIONS

Section 5

SPECIFICATIONS

Section 5

DRAWINGS

Section 5

❏ Identify mechanical spaces and primary distribution pathways

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

BASIS OF DESIGN

Section 6

DRAWINGS

Section 6

CALCULATIONS

Section 6

SPECIFICATION

Section 6

ONE LINE

Section 6

❏ Basis of design

❏ N/A

❏ Show basic location of mechanical/electrical rooms. Where applicable, in accordance with NFPA 70, show generator, roll-up generator docking station and utility transformer locations.

Construction Type

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

SYSTEMS DESIGN

Section 7

CALCULATIONS

Section 7

CODE ANALYSIS

Section 7

DRAWINGS

Section 7

❏ N/A

❏ N/A

❏ Design team fire protection engineer must:

❏ Address applicable codes and standards, special requirements that relate to the site, and the proposed occupancy use.

❏ Must address construction type, protection from hazards, means of egress, and occupancy features necessary to minimize danger to life, property, and mission continuity from the effects of fire, including smoke, heat, and toxic gases.

❏ Must be completed by the design team fire protection engineer.

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

COST VIABILITY

COST PLAN

COST ESTIMATE

SUPPORTING COST

ANALYSIS

❏ Cost Estimate

❏ Project is viable from a cost standpoint

❏ Supporting Analyses (Market, LCC, Risk, Sensitivity) See P120 For Details

❏ Cost Plan

❏ QC Review A-E Estimate

LIFE CYCLE COSTING

Section 1

❏ Life cycle cost analysis (LCCA) for the PROPOSED design including:

❏ One ASHRAE 90.1 Appendix G performance rating method (PRM) model for each architectural design scheme. The model must include, at minimum:

❏ Building enclosure assemblies;

❏ Lighting and lighting control system;

❏ HVAC system; and ❏ Service water-heating system.

AND

❏ LCCA for the BASELINE design including:

❏ One ASHRAE 90.1 Appendix G PRM baseline model for each architectural design scheme.

The model must include, at minimum:

❏ Building enclosure assemblies;

❏ Lighting and lighting control system;

❏ HVAC system;

❏ Service water-heating system.

10 CFR §436, Subpart A, Subpart B, Subpart C and NIST Handbook 135

Section Continues (next page) https://www.ecfr.gov/current/title-10/chapter-II/subchapter-D/part-436?toc=1 https://www.ecfr.gov/current/title-10/chapter-II/subchapter-D/part-436/subpart-A https://www.ecfr.gov/current/title-10/chapter-II/subchapter-D/part-436/subpart-B https://www.ecfr.gov/current/title-10/chapter-II/subchapter-D/part-436/subpart-C https://nvlpubs.nist.gov/nistpubs/hb/2020/NIST.HB.135-2020.pdf

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

COST ESTIMATE:

DETAIL

CORE/SHELL, TI

PROJECT DEVELOPING

ON-BUDGET

QUALITY CONTROL

REVIEW

VALUE ENGINEERING

❏ N/A

❏ N/A

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

COURTROOMS

Section 8

CUSTOMER DESIGN

GUIDE DEVIATIONS

Section 8

SPECIALTY SPACES

Section 8

❏ N/A

❏ N/A

❏ List any exceptions or deviations from Customer Agency Design Guides such as US Courts Design Guides and USMS Publication 64

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

SITE PRESERVATION

REQUIREMENTS

ARCHEOLOGICAL

CONDITIONS

DOCUMENT EXISTING

❏ Narrative addressing treatment of historic property on sites acquired for new construction, visual impact of new construction on adjoining historic property, planned mitigation for affected archeological resources, treatment of preservation zones in GSA-controlled historic buildings.

Consult Regional Historic Preservation Officer and Building Preservation Plan.

❏ N/A

❏ Assess potential for archeological artifacts before site acquisition and before initiating design for work requiring ground disturbance on federally controlled property. Consult Regional Historic Preservation Officer regarding National Historic Preservation Act of 1966 (NHPA) section 106 compliance requirements.

Project Phase

Discipline

Concept Design: Preliminary Concept / First Design Review (BA 51, 55)

Preliminary Concept

Concept Development

Final Concept

General Information

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ARCHITECTURAL

DESIGN VALUES

PROCESS

DOCUMENTATION

Preliminary Concept Project Phase

Concept Development

Final Concept

General Information Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ABAAS

Section 1

DISASTER RESILIENCY

Section 1

BIM

Section 1

DESIGN COMMENTS

Section 1

CODE AND SAFETY

Section 1

Per The Architectural Barriers Act Accessibility Standard (ABAAS) (42 U.S.C. § 4152):

❏ NARRATIVE: Further develop the ACCESSIBILITY PLAN to address key accessibility issues significantly impacting the concept design as follows:

❏ SITE: Identify constraints and strategies to include ramps, traffic conflicts, pedestrian crossings, changes in grade and locations of accessible parking and drop-offs, signage and main entrance identification and visibility.

❏ BUILDINGS AND ALTERATIONS: Identify constraints/challenges due to building type and scoping of project. Reference both public and staff spaces and occupancies. Describe applicable accessibility codes to be enforced. Describe accessible path of travel obligations resulting from changes to primary function areas (ABAAS F202.4). Identify any areas intended to meet adaptability vs accessibility.

❏ HISTORIC PRESERVATION: Identify any ABAAS exceptions (see F202.5) and discuss any mitigation measures to be taken to make facility as accessible as possible.

❏ DRAWINGS: Refine drawings of all required Path of Travel elements including site arrival points, accessible routes, accessible parking, clear floor areas and other accessible elements.

Highlight areas of special access consideration. Indicate Pros and Cons for each option.

❏ If the POR is updated, then update the statement to reflect relevant findings and changes.

Identify strategies and elements in the drawings and reference in the statement.

❏ Update project risk register.

❏ Highlight relevant responses to previous submission comments.

❏ Provide list of applicable codes.

❏ Provide assessment of hazardous materials

❏ BIM Execution plan updated (per 2024 GSA BIM CDX and COBie Standard).

❏ Reality Capture documentation (for an existing building, or historic site, and if required by scope) - e.g. Laser Scans, existing conditions model, 360 photos, etc.)

❏ Source models to coordinate geolocation/geocoding of site and model orientation

Preliminary Concept Project Phase

Concept Development

Final Concept

General Information Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ENERGY USAGE MODEL

Section 1

❏ Meet Energy Modeling Requirements to demonstrate compliance with the Energy Efficiency Performance Standard in 10 CFR 433.100.

DESIGN COMPLIANCE

Section 1

FOSSIL FUEL

REDUCTION

Section 1

❏ For prospectus new construction and major renovation projects, update GSA’s 2025 Sustainable Design Checklist indicating how sustainable design principles are being applied per EISA 2007 section 433(a)(D)(i).

❏ Document how the project will achieve the 90% fossil fuel reduction required by EISA 2007 section 433(a)(D)(i)(I) and 10 CFR 433.200 for FY2025-FY2029 prospectus new construction and major renovation projects.

Section Continues (previous page) https://www.ecfr.gov/current/title-10/chapter-II/subchapter-D/part-433/subpart-A/section-433.100 https://www.govinfo.gov/content/pkg/PLAW-110publ140/pdf/PLAW-110publ140.pdf#page=122 https://www.govinfo.gov/content/pkg/PLAW-110publ140/pdf/PLAW-110publ140.pdf#page=122

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ZONING ANALYSIS

Section 1

DESIGN FOR PUBLIC

USE

Section 2

COLLABORATIVE

DESIGN PROCESS

Section 1

❏ Include graphics and narrative to provide additional detail for the site's community planning context, as appropriate, to identify design’s alignment with local planning, design, and development goals, to show compliance with 40 U.S.C. § 3312(b), (c), and (d).

❏ Provide additional details of zoning and design guideline analysis of site and surroundings to show compliance with 40 U.S.C. § 3312(a) and (c), as appropriate.

❏ Provide additional details for shared public use, as appropriate, in compliance with 40 U.S.C. § 3306(b)(1).

❏ Provide additional detail of site’s context and pedestrian linkages to show compliance with 40 U.S.C. § 3306(b)(3), as appropriate.

SITE / LANDSCAPE

STRATEGY

Section 2

STORMWATER

MANAGEMENT

Section 2

LANDSCAPE

IRRIGATION

Section 2

❏ Refinement of concept, additional detail in narratives, and drawings to demonstrate compliance with 40 USC § 3312(c).

❏ For each of the schemes quantify all environmental disturbance and mitigation impacts to cost/ schedule per NEPA and Clean Water Act requirements, including wetlands and streams, forest conservation, and sensitive habitats.

❏ Determine whether irrigation will be required and identify a water source.

❏ Various approaches to achieve compliance with EISA section 438 are identified for the project and site systems are diagrammed.

NATURAL FEATURES

Section 2

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ENCLOSURE

COMMISSIONING PLAN

Section 1 & 3

ROOFING / ROOF

DRAINAGE SYSTEM

Section 1 & 3

WHOLE BUILDING AIR

TIGHTNESS

Section 1 & 3

THERMAL BARRIERS

(INSULATION)

Section 1 & 3

VISUAL &

PERFORMANCE

MOCK-UPS

Section 1 & 3

FENESTRATION

(GLAZING SYSTEMS)

Section 1 & 3

OPERATIONS &

MAINTENANCE

Section 1 & 3

BELOW-GRADE

WATERPROOFING

Section 1 & 3

❏ Identify unique programmatic conditions that require improved system performance (e.g., courthouses, laboratories, data centers, etc).

❏ Reflect site conditions, design wind load, and any risk of extreme weather; adjusting standing performance criteria; to ensure facility resilience throughout the intended service life.

❏ Follow ASTM E2813 Enhanced Cx as default, ASTM E2947, D7877 & D8231

❏ N/A

❏ Proposed roofing and roof drainage systems function without extraordinary means and do not pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle durability.

❏ List any unique site-specific conditions that may impact proposed system.

❏ N/A

❏ Proposed insulation types and considerations

❏ Proposed fenestration systems are appropriate to the climate. Proposed designs are readily achievable and do not pose unusual risks in terms of constructability, performance, ease of maintenance or life cycle durability.

❏ List any unique site-specific conditions that may impact proposed system.

❏ Proposed conceptual designs consider geotechnical conditions and reduce risk to facility life cycle performance.

❏ Proposed enclosure systems are accessible for regular maintenance.

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

APPROVED PROGRAM &

ADJACENCIES

(IBC Chapter 1, Section 107, and Appendix K, Section K104)

MECHANICAL SPACES

BUILDING & SERVICE

SPACES

DESIGN NARRATIVE &

CALCULATIONS

Sections 1 and 3

GENERAL

INFORMATION

Sections 1 and 3

DESIGN CONCEPTS

Sections 1 and 3

MILLWORK

FURNITURE, FIXTURES

& EQUIPMENT

FINISHES

❏ Drawings should include at a minimum: entrances, lobbies, corridors, stairways, elevators, work areas, special spaces, mechanical rooms for major equipment and air handlers, and service spaces (with the principal spaces labeled).

❏ Dimensions for critical clearances, such as vehicle access, should be indicated.

❏ Building elevations and sections labeling most important spaces and showing floor-to-floor heights and other critical dimensions and elevations.

❏ In Compliance with IBC Chapter 1, Section 107, and Appendix K, Section K104, Table of contents identifying specifications to be used on the project

❏ Floorplans of all service spaces, including mailrooms and loading dock/access

❏ Floorplans of all service spaces, including mailrooms and loading dock/access

❏ In Compliance with IBC Chapter 1, Section 107, and Appendix K, Section K104, Extended narrative and further developed calculations. Calculations must refer to code, paragraph of code used, standards, and text books used for specific portion of calculation.

❏ Refinement of selected concept, additional detail in drawings and BIM model

❏ Compare net, usable and gross SF of design concept to program.

❏ N/A

❏ N/A

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

OFFICE AREAS

INTERIOR FACILITIES

Sections 1 and 3

FLOOR-TO-FLOOR

HEIGHTS

EXTERIOR DESIGN

Sections 1 and 3

INTERIOR CONDITIONS

INTERIOR DESIGN:

MAJOR PUBLIC SPACES

ARCHITECTURAL CODE

COMPLIANCE

Section 1

SIGNAGE &

WAYFINDING

BUILDING MASSING

❏ N/A

❏ N/A

❏ All support spaces identified with appropriate adjacencies and reasonable size related to the program

❏ Interior facilities (restrooms, breakrooms, etc.) are sufficient to comfortably accommodate maximum occupant load

❏ In Compliance with IBC Chapter 1, Section 107, and Appendix K, Section K104, Sections, floor-to-floor, indicating ALL critical dimensions

❏ In Compliance with IBC Chapter 1, Section 107, and Appendix K, Section K104, Floor and Roof Elevations, Labeled

In Compliance with IBC Chapter 1, Section 107, and Appendix K, Section K104:

❏ Elevations of major public spaces- include materials and finishes

❏ Interior design for major public spaces aligns with building architectural requirements

❏ Provide an electronic massing model to give a sense of the design including materiality and fenestration.

❏ N/A

❏ Identify public vs. private areas, identify paths of travel.

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

DESIGN LOADS

Section 4

VIBRATIONS

Section 4

INNOVATIVE METHODS

& MATERIALS

Section 4

STRUCTURAL SYSTEMS

Section 4

FOUNDATIONS &

GEOTECHNICAL

Section 4

STRUCTURAL ANALYSIS

& CALCULATIONS

Section 4

HISTORIC

CONSIDERATIONS

Section 4

PHYSICAL SECURITY

Section 4

CIVIL SITE

Section 4

QUALITY ASSURANCE &

SPECIAL INSPECTIONS

Section 4

❏ Update narrative. List design loads on schematic plans.

❏ Narrative addressing alternative foundation approaches including benefits, challenges and relative costs associated for each approach.

❏ Narrative addressing potential vibration issues associated with selected structural scheme

❏ Update narrative. Provide schematic plans showing location of innovative materials and notes for special construction methods.

❏ Update narrative identifying strengths and weaknesses of alternatives. Provide schematic plans showing recommended approach.

❏ Update structural narrative. Provide schematic plans and preliminary calculations.

❏ N/A

❏ Update historic narrative.

❏ Update narrative, including FSL designation. Identify special requirements on schematic plans.

❏ Update civil narrative. Provide schematic site plans and preliminary calculations, including but not limited to stormwater management and flood resistant measures. EO 11988, ASCE 24-24.

❏ A separate brief submission is required to demonstrate compliance with EISA section 438. Any potential project divergence from following the intent of the Federal Law needs to be raised to the full client team at this time and consultation with PM and SMEs needs to begin in earnest.

MISCELLANEOUS

COMPONENTS

Section 4

❏ Provide schematic drawings showing locations.

❏ Update narrative and schematic drawings. Existing structures - identify concealed structural conditions that require probes or non-destructive testing, anchor pull test, steel coupon tests, concrete cores, etc, Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

NARRATIVE

Section 5

CALCULATIONS

Section 5

SPECIFICATIONS

Section 5

DRAWINGS

Section 5

❏ Provide at least two (2) HVAC design alternatives, consistent with the requirements of 10 CFR 433.100; where required by 10 CFR 433, Subpart A

❏ Refined Rough Order of Magnitude for each concept

❏ Major mechanical equipment laid out in the mechanical spaces for each concept

❏ Preliminary Equipment Schedules

❏ Develop base assumptions for each concept

❏ Provide a dew point analysis

❏ Table of contents identifying specifications to be used on the project

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC SYSTEMS & EQUIPMENT

Section 5

CALCULATIONS

Section 5

SPECIFICATIONS

Section 5

DRAWINGS

Section 5

Per ASPE handbooks and the IPC, update previous narrative to include:

❏ Domestic cold water

❏ Domestic hot water

❏ Sanitary systems

❏ Storm drainage

❏ Irrigation

❏ Proposed building zoning and primary distribution pathways

❏ Locations of proposed plumbing fixtures and equipment

❏ Rough Order of Magnitude water consumption calculations

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

BASIS OF DESIGN

Section 6

DRAWINGS

Section 6

CALCULATIONS

Section 6

SPECIFICATION

Section 6

ONE LINE

Section 6

❏ Basis of design

❏ N/A

❏ Stacking, basic room sizes, and locations of major equipment in accordance with NFPA 70

❏ Specifications Table of Contents (TOC)

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

SYSTEMS DESIGN

Section 7

CALCULATIONS

Section 7

CODE ANALYSIS

Section 7

DRAWINGS

Section 7

❏ N/A

❏ N/A

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

❏ Cost Estimate

❏ Supporting Analyses (Market, LCC, Risk, Sensitivity) See P120 For Details

❏ Cost Plan

❏ QC Review A-E Estimate

❏ N/A

❏ N/A

❏ N/A

❏ N/A

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

LIFE CYCLE COSTING

Section 1

❏ Life cycle cost analysis (LCCA) for the PROPOSED design including:

❏ One ASHRAE 90.1 Appendix G performance rating method (PRM) model for each architectural design scheme. The model must include, at minimum:

❏ Architectural design scheme;

❏ Building enclosure assemblies;

❏ Lighting and lighting control system;

❏ HVAC system; and ❏ Service water-heating system.

AND

❏ LCCA for the BASELINE design including:

❏ One ASHRAE 90.1 Appendix G PRM baseline model for each architectural design scheme.

The model must include, at minimum:

❏ Architectural design scheme;

❏ Building enclosure assemblies;

❏ Lighting and lighting control system;

❏ HVAC system; and ❏ Service water-heating system

10 CFR §436, Subpart A, Subpart B, Subpart C and NIST Handbook 135

Section Continues (previous page) https://www.ecfr.gov/current/title-10/chapter-II/subchapter-D/part-436?toc=1 https://www.ecfr.gov/current/title-10/chapter-II/subchapter-D/part-436/subpart-A https://www.ecfr.gov/current/title-10/chapter-II/subchapter-D/part-436/subpart-B

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

COURTROOMS

Section 8

CUSTOMER DESIGN

GUIDE DEVIATIONS

Section 8

SPECIALTY SPACES

Section 8

❏ Design is in keeping with GSA's design philosophy regarding courtroom spaces as laid out in the U.S. Courts Design Guide and USMS Publication 64

❏ Typical Courtroom Elevations; Renderings of interior and exterior showing major design aspects in several vantage points

❏ N/A

❏ List any exceptions or deviations from customer agency design guides such as US Courts

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Concept Development / Second Design Review (BA 51, 55)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

❏ NHPA section 106 Compliance Preservation Report (iterative with each submission) - narrative, photos, drawings explaining preservation design issues and proposed solutions. See Appendix A for report outline template.

❏ Show existing major site utilities.

❏ Archeological compliance submittals in accordance with 106 consultation terms for projects involving ground disturbance - coordinate with RHPO

Preliminary Concept Project Phase

Concept Development

Final Concept

Discipline

Concept Design: Concept Development / Second Design Review (BA 51, 55)

General Information

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

❏ Lead designer's architectural design philosophy is in keeping with GSA's philosophies and values

❏ Provide a statement of design philosophy and how lead designer expects to collaborate with artists on this project.

Project Phase

General Information Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

Preliminary Concept

Concept Development

Final Concept

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Final Concept (BA 51, 55, 80, ESPC)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ABAAS

Section 1

DISASTER RESILIENCY

Section 1

BIM

Section 1

DESIGN COMMENTS

Section 1

CODE AND SAFETY

Section 1

❏ Provide finalized Concept statement. If the POR is updated, then update the statement to reflect relevant findings and changes.

❏ Identify strategies and elements in the drawings and reference in the statement.

❏ Update project risk register.

❏ Highlight relevant responses to previous submission comments. Provide a list of any outstanding substantive comments that have not been resolved.

❏ Provide narrative statement that the proposed design will comply with the applicable codes.

❏ Safety narrative including hazardous materials, fall protection, and arc flash requirements.

❏ Design BIM of Final Design Concept demonstrating that the Final Design Concept aligns with the building program.

❏ All spatial validation data per SDM section of GSA BIM , CDX and COBie Standard.

❏ IFC 2x3 or 4x3 File export from Design BIM

❏ BIM Execution plan updated, Initial COBie Spreadsheet (per 2024 GSA BIM CDX and COBie Standard)

❏ BIM QC Checklist: Identifies what is currently contained in Design BIM

❏ Conceptual Energy BIM Model files (if required)

Per The Architectural Barriers Act Accessibility Standard (ABAAS) (42 U.S.C. § 4152):

❏ NARRATIVE: Finalize ACCESSIBILITY PLAN to address key accessibility issues significantly impacting the concept design as follows:

❏ SITE: Identify constraints and strategies to include ramps, traffic conflicts, pedestrian crossings, changes in grade and locations of accessible parking and drop-offs, signage and main entrance identification and visibility.

❏ BUILDINGS AND ALTERATIONS: Identify constraints/challenges due to building type and scoping of project. Reference both public and staff spaces and occupancies. Describe applicable accessibility codes to be enforced. Describe accessible path of travel obligations resulting from changes to primary function areas (ABAAS F202.4). Identify any areas intended to meet adaptability vs accessibility.

❏ HISTORIC PRESERVATION: Identify any ABAAS exceptions (see F202.5) and discuss any mitigation measures to be taken to make facility as accessible as possible.

❏ DRAWINGS: Refine drawings of all required Path of Travel elements including accessible routes, accessible parking, clear floor areas and other accessible elements. Highlight areas of special access consideration.

Project Phase

General Information Discipline

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

Preliminary Concept

Concept Development

Final Concept

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Final Concept (BA 51, 55, 80, ESPC)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ENERGY USAGE MODEL

Section 1

❏ Meet Energy Modeling Requirements to demonstrate compliance with the Energy Efficiency Performance Standard in 10 CFR 433.100.

DESIGN COMPLIANCE

Section 1

FOSSIL FUEL

REDUCTION

Section 1

❏ For prospectus new construction and major renovation projects, complete GSA’s 2025 Sustainable Design Checklist indicating how sustainable design principles are being applied per EISA 2007 section 433(a)(D)(i).

❏ Document how the project will achieve the 90% fossil fuel reduction required by EISA 2007 section 433(a)(D)(i)(I) and 10 CFR 433.200 for FY2025-FY2029 prospectus new construction and major renovation projects.

Section Continues (previous page) https://www.ecfr.gov/current/title-10/chapter-II/subchapter-D/part-433/subpart-A/section-433.100 https://www.govinfo.gov/content/pkg/PLAW-110publ140/pdf/PLAW-110publ140.pdf#page=122 https://www.govinfo.gov/content/pkg/PLAW-110publ140/pdf/PLAW-110publ140.pdf#page=122

Project Phase

Discipline

Preliminary Concept

Concept Development

Final Concept

Community and Landscape

Building Enclosure Systems

Architecture / Interiors

Structural / Civil

Mechanical

Plumbing

Electrical

Fire Protection

Cost Estimating

Specialty Spaces

Historic Preservation

Art in Architecture

General Information

DD - 100%

CD - 65%

CD - 95%

CD - Final

Page

Concept Design: Final Concept (BA 51, 55, 80, ESPC)

1 - DBB

2 - DB

3 - DB Bridging

4 - CMC

ZONING ANALYSIS

Section 1

DESIGN FOR PUBLIC

USE

Section 2

COLLABORATIVE

DESIGN PROCESS

Section 1

❏ Provide final narrative on site's…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .