This document is a Section 012400 Options file for the Santa Teresa Land Port of Entry Border Roadway Improvement & Construction (BRIC) project in Santa Teresa, New Mexico. The file outlines eight specific construction options that can be added to the base bid, including roadway improvements for Primary and Commercial Roads, Gantry Road, Commercial Import Dock Parking and Road, and a joint seal and shoulder hardening option. Each option represents a unilateral right for GSA to elect additional work scope, with the total adjustment from the base bid incorporating the specific option's work and any incidental devices or accessories required for a complete installation.
The options cover various roadway and infrastructure improvements, such as POV (Privately Owned Vehicle) primary roads, commercial dock parking and roads, secondary and primary commercial roads, and a gantry road section. The document is part of a small business set-aside solicitation (47PH0625R0007) issued by the GSA Public Buildings Service, which seeks design-build construction services for pavement repair and replacement at the Santa Teresa Land Port of Entry, involving approximately 202,455 square feet of pavement reconstruction and rehabilitation.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Santa Teresa Land Port of Entry BRIC Santa Teresa, New Mexico Kahua #353
SECTION 012400 – OPTIONS
PART 1 GENERAL
1.1 SUMMARY
A. “Option” means a unilateral right in a contract by which, for a specified time, GSA may elect to purchase additional scope of work, products, materials, equipment, systems or installation methods described in the Contract Documents.
B. The amount for an option is the total adjustment from the Base Bid to incorporate the option work into the project.
C. Option work shall include miscellaneous devices, accessory objects and similar items incidental to or required for a complete installation, whether or not mentioned as part of the option description.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 SCHEDULE OF OPTIONS
Base Award: Design
Construction Options - 14 Listed by Section:
Construction Options:
Option 1: POVRD1 & POVRD2 (POV Primary Road 1 and POV Primary Road 2) Option 2: CIDOCKPK1 (Commercial Import Dock Parking 1) and Dock Drain Reconstruction Option 3: CIDOCKRD1 (Commercial Import Dock Primary Road) Option 4: COMMRD1 (Commercial Road 1) and COMMRD2 (Commercial Road 2) Option 5: COMMSRD1 (Commercial Secondary Road 1) Option 6: COMMPRD3 (Commercial Primary Road 3) Option 7: GANTRYRD1 (Gantry Road - South) Option 8: Joint Seal and Shoulder Hardening
END OF SECTION 012400
June 17, 2025 OPTIONS 01 24 00 – Page 1 of 1