Pricing Sheet 2026 01 16.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 47PH0825R0007
- Issued by
- Not on record
About this file
The file is a Pricing Sheet for the Santa Teresa Land Port of Entry (LPOE) Border Roadway Improvement & Construction (BRIC)/Paving Project, solicitation #47PH0825R0007 issued by the U.S. General Services Administration (GSA). The pricing document outlines nine Contract Line Item Numbers (CLINs), including a base design CLIN (0001) and eight optional construction CLINs (0002-0009) for various roadway and infrastructure improvements, such as pavement repair, dock areas, road reconstruction, gantry work, and joint sealing.
The pricing template allows contractors to specify overhead, profit, bond, and insurance percentages for each CLIN, with the intent of providing a comprehensive pricing structure for a design-build project covering approximately 202,455 square feet of pavement replacement and rehabilitation. The solicitation is a small business set-aside, focusing on design and construction services that include pavement patching, traffic maintenance, utility relocation, and construction phasing with minimal disruption to the Land Port of Entry's operations.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| Santa Teresa LPOE Paving | ||||||
| GSA Solicitation Number - #47PH0825R0007 | ||||||
| Description | ||||||
| BASE SCOPE CLIN 0001 - Design | COST / TOTAL | |||||
| CLIN 0001 - DESIGN AND ASSOCIATED EXPENSES | $ - 0 | $ - 0 | $ - 0 | |||
| Overhead | 0.00% | $ - 0 | ||||
| Profit | 0.00% | $ - 0 | ||||
| Subtotal - Overhead, Profit | ||||||
| Insurance Professional Services | 0.00% | $ | ||||
| Total Base Bid | ||||||
| OPTIONS (CONSTRUCTION) ACQUISITION AND INSTALLATION OF MATERIALS | ||||||
| CLIN 0002 - OPTION 1 - POVRD1 and POVRD2 | Price | |||||
| Shall be severable. Contractor shall provide all labor, materials, transportation, supervision, and management to perform the work as it relates to this option, inclusive of Div 1, 31, & 32, Overhead, Profit, bond, insurance. This includes all work incidental to or required for a complete installation whether or not mentioned as part of the option description. |
| $ - 0 | ||
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Subtotal - Overhead, Profit | $ - 0 | |
| Bond | % | $ - 0 |
| Insurance | % | $ - 0 |
| Total Option 1 | $ - 0 |
| CLIN 0003 - OPTION 2 - CIDOCKPK1 and DOCK DRAIN | Price |
| Shall be severable. Contractor shall provide all labor, materials, transportation, supervision, and management to perform the work as it relates to this option, inclusive of Div 1, 31, & 32, Overhead, Profit, bond, insurance. This includes all work incidental to or required for a complete installation whether or not mentioned as part of the option description. |
| $ - 0 | ||
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Subtotal - Overhead, Profit | $ - 0 | |
| Bond | % | $ - 0 |
| Insurance | % | $ - 0 |
| Total Option 2 | $ - 0 |
| CLIN 0004 - OPTION 3 - CIDOCKRD1 | Price |
| Shall be severable. Contractor shall provide all labor, materials, transportation, supervision, and management to perform the work as it relates to this option, inclusive of Div 1, 31, & 32, Overhead, Profit, bond, insurance. This includes all work incidental to or required for a complete installation whether or not mentioned as part of the option description. |
| $ - 0 | ||
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Subtotal - Overhead, Profit | $ - 0 | |
| Bond | % | $ - 0 |
| Insurance | % | $ - 0 |
| Total Option 3 | $ - 0 |
| CLIN 0005 - OPTION 4 - COMMRD1 and COMMRD2 | Price |
| Shall be severable. Contractor shall provide all labor, materials, transportation, supervision, and management to perform the work as it relates to this option, inclusive of Div 1, 31, & 32, Overhead, Profit, bond, insurance. This includes all work incidental to or required for a complete installation whether or not mentioned as part of the option description. |
| $ - 0 | ||
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Subtotal - Overhead, Profit | $ - 0 | |
| Bond | % | $ - 0 |
| Insurance | % | $ - 0 |
| Total Option 4 | $ - 0 |
| CLIN 0006 - OPTION 5 - COMMSRD1 | Price |
| Shall be severable. Contractor shall provide all labor, materials, transportation, supervision, and management to perform the work as it relates to this option, inclusive of Div 1, 31, & 32, Overhead, Profit, bond, insurance. This includes all work incidental to or required for a complete installation whether or not mentioned as part of the option description. |
| $ - 0 | ||
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Subtotal - Overhead, Profit | $ - 0 | |
| Bond | % | $ - 0 |
| Insurance | % | $ - 0 |
| Total Option 5 | $ - 0 |
| CLIN 0007 - OPTION 6 - COMMPRD3 | Price |
| Shall be severable. Contractor shall provide all labor, materials, transportation, supervision, and management to perform the work as it relates to this option, inclusive of Div 1, 31, & 32, Overhead, Profit, bond, insurance. This includes all work incidental to or required for a complete installation whether or not mentioned as part of the option description. |
| $ - 0 | ||
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Subtotal - Overhead, Profit | $ - 0 | |
| Bond | % | $ - 0 |
| Insurance | % | $ - 0 |
| Total Option 6 | $ - 0 |
| CLIN 0008 - OPTION 7 - GANTRYRD1 | Price |
| Shall be severable. Contractor shall provide all labor, materials, transportation, supervision, and management to perform the work as it relates to this option, inclusive of Div 1, 31, & 32, Overhead, Profit, bond, insurance. This includes all work incidental to or required for a complete installation whether or not mentioned as part of the option description. |
| $ - 0 | ||
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Subtotal - Overhead, Profit | $ - 0 | |
| Bond | % | $ - 0 |
| Insurance | % | $ - 0 |
| Total Option 7 | $ - 0 |
| CLIN 0009 - OPTION 8 -Joint Seal / Shoulder Hardening | Price |
| Shall be severable. Contractor shall provide all labor, materials, transportation, supervision, and management to perform the work as it relates to this option, inclusive of Div 1, 31, & 32, Overhead, Profit, bond, insurance. This includes all work incidental to or required for a complete installation whether or not mentioned as part of the option description. |
| $ - 0 | ||
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Subtotal - Overhead, Profit | $ - 0 | |
| Bond | % | $ - 0 |
| Insurance | % | $ - 0 |
| Total Option 8 | $ - 0 | |
| TOTAL BASE + ALL OPTIONS | $ - 0 |
| Type or Print Name |
| Title |
| Signature |
| Firm Name |
| Date |