This document is a Security Procedures specification (Section 01 59 30) for the Santa Teresa Land Port of Entry (LPOE) Border Roadway Improvement & Construction (BRIC) project. The document outlines comprehensive security requirements for contractors working at classified government facilities, including mandatory HSPD-12 credential procedures, access protocols, and strict security regulations. Key security provisions include submitting personnel lists within 30 calendar days of contract award, requiring visible credentials for all personnel, permitting government-controlled site access, and mandating notification for work in secure areas.

The security procedures specify detailed requirements such as prohibiting unauthorized cameras, allowing personal effect inspections, requiring advance notification for overtime work, and submitting weekly detailed work schedules. The government reserves the right to exclude personnel, conduct unscheduled inspections, and immediately close the job site during security concerns. Contractors must comply with all agency security regulations, provide comprehensive personnel information, and follow specific credentialing processes for accessing restricted areas at the land port of entry.

View the file

Other files

File Type Posted
Amendment 3 - 47PH0825R0007 2026 01 29.pdf PDF
Pricing Sheet 2026 01 16.xlsx XLSX spreadsheet
Amendment 2 - 47PH0825R0007 2026 01 16.pdf PDF
Amendment 1 - 47PH0825R0007 2026 01 09.pdf PDF
C. GSA 527-21 - Contractor's Qualifications and Financial Information.pdf PDF
D. Standard Form 24 Bid Bond.pdf PDF
E. SF1442 47PH0825R0007 2025 12 12.pdf PDF
B. 2. NM20250035 Highway 2025 06 06.pdf PDF
A. Past Performance Questionnaire Factor 1.pdf PDF
GSA 01 31 00 PROJECT MANAGEMENT COORDINATION.docx DOCX document
GSA 01 40 00 QUALITY ASSURANCE QUALITY CONTROL REQUIREMENTS.docx DOCX document
GSA 01 24 00 Options.docx DOCX document
GSA 01 77 00 CLOSEOUT PROCEDURES.docx DOCX document
GSA 01 73 20 SELECTIVE DEMOLITION.docx DOCX document
GSA 01 27 00 Unit Prices.docx DOCX document
GSA 01 10 00 SUMMARY.docx DOCX document
GSA 01 32 00 Construction Progress Documentation.docx DOCX document
PBS_Core_Building_Standards_Memorandum 24FEB25.pdf PDF
SOW 47PH0825R0007 2025 12 12.pdf PDF
SOLICITATION 47PH0825R0007 2025 12 12.pdf PDF
GSA 01 33 00 Submittal Procedures.docx DOCX document
GSA 01 60 00 PRODUCT REQUIREMENTS.docx DOCX document
GSA 01 32 20 Photographic Documentation.docx DOCX document
GSA 01 31 10 Prospectus CPM Schedule Specs.docx DOCX document
CBS Submittal Matrix.pdf PDF
P-120 PBS Cost and Schedule Management.pdf PDF
B. 1. NM20250039 Heavy 2025 01 24.pdf PDF
GSA 01 73 10 CUTTING PATCHING.docx DOCX document
GSA 01 59 50 - SAFETY AND HEALTH.docx DOCX document
GSA 01 29 00 PAYMENT PROCEDURES.docx DOCX document
GSA 01 25 00 Subst. Procedures.docx DOCX document
GSA 01 50 00 TEMPORARY FACILITIES and CONTROLS.docx DOCX document
DB Communications Plan Template FY25.docx DOCX document
AGREEMENT 47PH0825R0007 2025 12 12.pdf PDF
F. Pricing Sheet Santa Teresa LPOE 08_14_2025.xlsx XLSX spreadsheet
GSA 01 74 19 CONSTRUCTION NONHAZARDOUSE WASTE REMOVAL.docx DOCX document
GSA 01 30 00 PROJECT MANAGEMENT INFORMATION SYSTEM.docx DOCX document
GSA 01 70 00 EXECUTION REQUIREMENTS.docx DOCX document
GSA 01 78 10 PROJECT RECORD DOCUMENTS.docx DOCX document
GSA 01 14 00 Work Restrictions.docx DOCX document
GSA 01 42 00 GENERAL REFERENCES.docx DOCX document
Santa Teresa LPOE - Geotechnical Report.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kika De La Garza Land Port of Entry Pharr, Texas Kahua #350

Santa Teresa Land Port of Entry BRIC Santa Teresa, New Mexico Kahua #353

SECTION 01 59 30 - SECURITY PROCEDURES

PART 1 GENERAL

1.1 Refer to the Construction Contract Agreement Section III, Terms and Conditions, for HSPD-12 suitability investigation requirements for Contract employees requiring access to the facility. Also see http://www.GSA.gov/HSPD12 for more security suitability requirements.

1.2 GENERAL SECURITY REQUIREMENTS

A. Contractors and their staff will be required to comply with security regulations imposed by the occupying agency including any necessary clearances required for access to classified areas. Access to the project site will be limited to specific times established by the Government.

B. After award of the Contract, all Contractor employees requiring access to classified areas shall be required to furnish information for security clearances and shall comply with security regulations as imposed by the occupying agency and defined in this section.

C. Notification: For all contracting staff that has been successfully cleared, notify the Contracting Officer, or his designated representative, not less than 48 hours prior to performing work in a classified security area. Include the following:

1. Companies: Name of each company performing the work.

2. Employee names.

3. Time: The exact time, date, and hours of work.

4. Areas: Specific areas of the building in which work is to be performed.

1.3 GENERAL SECURITY REGULATIONS

A. Agency Security Regulations: All persons employed within the boundaries of the restricted-access areas therein, and all persons permitted to enter such property and areas shall comply with the security regulations that have been established for this Contract.

1. The Contractor agrees on behalf of themselves and all subcontractors that the following security regulations will be observed by Contractor and subcontractor personnel on the property. The Contractor shall make it a specific provision of his subcontracts that these regulations be accepted.

2. At the commencement of the work under this Contract, the following security facilities and procedures will apply for classified areas within the facility:

a. The Contractor shall provide information about all Contractor and subcontractor personnel and others who require continuing access to the site, before access is required and when access ceases.

b. Within 30 calendar days after the award of the Contract, the Contractor shall submit a list on the Contractor's letterhead stationery of all employees, subcontractors and their employees, and others who will perform work or otherwise require access to the classified area. Personnel shall be listed in alphabetical order by company.

c. The Contractor shall notify the Government in writing when personnel are no longer employed by the Contractor or a subcontractor that have been cleared.

d. In order to permit the Government to supply credentials, they shall follow the procedures for obtaining an HSPD-12 credential as outlined in the Construction Contract Agreement section of the solicitation.

e. The credential furnished by the Government to each Contractor employee or other person granted access to the classified area will serve to authorize the wearer to enter and leave the classified area. The credential must be worn so as to be clearly visible at all times when on the work site. The credential will be retained by the individual as long as they require continued admittance to the classified area. The Contractor will arrange for the credentials immediate return to the Government when such need ceases. Temporary or visitor badges along with escorts will be provided for persons who are identified as having an infrequent or temporary legitimate business need for access to the classified area.

3. At the commencement of the work under this contract, the following security procedures shall apply to the Contractor and all subcontractors.

a. Comply with the security regulations of the building.

b. Cameras are not permitted without written permission from the Occupant Agency and the Contracting Officer or his designated representative. If approved, permission will be granted in writing and will provide additional guidelines.

c. Personnel may be subject to inspection of their personal effects when entering and leaving the facility. In addition, unscheduled inspections of personnel may be made while on site.

d. If any work scheduled within the classified area is canceled, notify the Contracting Officer or his designated representative.

4. The Occupant Agency reserves the right to close down the job site and order Contractor personnel off the premises in the event of a national emergency or a shut-down, for as long as security problems persist. The Contractor may only return to the site with verbal approval from the Occupant Agency and the Contracting Officer or his authorized representative.

5. The Government reserves the right to exclude or remove from the site or building any employee of the Contractor or a subcontractor whom the Government deems incompetent, careless, insubordinate or otherwise objectionable, or whose continued employment on the work is deemed by the Government to be contrary to the public interests. The Government further reserves the right to complete processing of the security documentation for personnel assigned to work within classified areas prior to access to such areas by the personnel.

6. For overtime work within the classified area, the Contractor shall give the Contracting Officer or his designated representative at least 5 calendar days notice. This notice is required so that security escorts may be provided and is separate and distinct from any notices required for utility shutdown or other outages. Also, the Contractor shall notify the Government if personnel will not report to the job site on a particular day so that the security escort can be released for other duties.

7. A detailed weekly schedule shall be submitted once a week by the close of business on the last day of the previous week's work for work planned within classified areas. The schedule shall include the following:

a. Specific location of work for each trade.

b. Description of work for each trade.

c. Number of persons who will be on site for each location and trade.

d. Specific impacts required, such as equipment or utility shutdowns.

e. Hours of operation.

PART 2 PRODUCTS (Not used) PART 3 EXECUTION (Not used)

END OF SECTION 01 59 30

June 17, 2025 SECURITY REGULATIONS 01 59 30 - Page 1 of 4

File details come from the government source that posted it. Updated .