A. Past Performance Questionnaire Factor 1.pdf

PDF 172 KB Posted

Attached to
Design Build Construction Services for the Santa Teresa Land Port of Entry (LPOE) Border Roadway Improvement & Construction (BRIC)/Paving Project, Santa Teresa, NM
Solicitation number
47PH0825R0007
Issued by
Not on record

About this file

This document is a GSA Past Performance Questionnaire designed to evaluate a contractor's performance across multiple dimensions. The questionnaire comprehensively assesses the contractor's performance in key areas including schedule adherence, budget management, quality of work, teamwork, customer satisfaction, safety, and overall project execution. The evaluation covers specific metrics such as milestone completion, responsiveness to unforeseen conditions, subcontractor management, quality control, safety practices, and cooperation with project stakeholders.

The form allows an evaluator to rate the contractor's performance using a range of options from "Extremely effective" to "Ineffective" across categories like project schedule, budget compliance, quality of work, teamwork, and safety. It includes sections for documenting the contractor's key staff performance, overall project performance, and provides space for additional comments. The final section asks whether the evaluator would choose to contract with the company again and invites further commentary about the contractor's performance on other projects.

View the file

Other files

File Type Posted
Amendment 3 - 47PH0825R0007 2026 01 29.pdf PDF
Amendment 2 - 47PH0825R0007 2026 01 16.pdf PDF
Pricing Sheet 2026 01 16.xlsx XLSX spreadsheet
Amendment 1 - 47PH0825R0007 2026 01 09.pdf PDF
SOLICITATION 47PH0825R0007 2025 12 12.pdf PDF
GSA 01 33 00 Submittal Procedures.docx DOCX document
GSA 01 60 00 PRODUCT REQUIREMENTS.docx DOCX document
GSA 01 32 20 Photographic Documentation.docx DOCX document
GSA 01 31 10 Prospectus CPM Schedule Specs.docx DOCX document
CBS Submittal Matrix.pdf PDF
P-120 PBS Cost and Schedule Management.pdf PDF
B. 1. NM20250039 Heavy 2025 01 24.pdf PDF
GSA 01 73 10 CUTTING PATCHING.docx DOCX document
GSA 01 59 50 - SAFETY AND HEALTH.docx DOCX document
GSA 01 29 00 PAYMENT PROCEDURES.docx DOCX document
GSA 01 25 00 Subst. Procedures.docx DOCX document
GSA 01 50 00 TEMPORARY FACILITIES and CONTROLS.docx DOCX document
DB Communications Plan Template FY25.docx DOCX document
AGREEMENT 47PH0825R0007 2025 12 12.pdf PDF
F. Pricing Sheet Santa Teresa LPOE 08_14_2025.xlsx XLSX spreadsheet
GSA 01 74 19 CONSTRUCTION NONHAZARDOUSE WASTE REMOVAL.docx DOCX document
GSA 01 30 00 PROJECT MANAGEMENT INFORMATION SYSTEM.docx DOCX document
GSA 01 70 00 EXECUTION REQUIREMENTS.docx DOCX document
GSA 01 78 10 PROJECT RECORD DOCUMENTS.docx DOCX document
GSA 01 14 00 Work Restrictions.docx DOCX document
GSA 01 42 00 GENERAL REFERENCES.docx DOCX document
Santa Teresa LPOE - Geotechnical Report.pdf PDF
C. GSA 527-21 - Contractor's Qualifications and Financial Information.pdf PDF
D. Standard Form 24 Bid Bond.pdf PDF
E. SF1442 47PH0825R0007 2025 12 12.pdf PDF
B. 2. NM20250035 Highway 2025 06 06.pdf PDF
GSA 01 31 00 PROJECT MANAGEMENT COORDINATION.docx DOCX document
GSA 01 40 00 QUALITY ASSURANCE QUALITY CONTROL REQUIREMENTS.docx DOCX document
GSA 01 24 00 Options.docx DOCX document
GSA 01 77 00 CLOSEOUT PROCEDURES.docx DOCX document
GSA 01 73 20 SELECTIVE DEMOLITION.docx DOCX document
GSA 01 27 00 Unit Prices.docx DOCX document
GSA 01 10 00 SUMMARY.docx DOCX document
GSA 01 32 00 Construction Progress Documentation.docx DOCX document
GSA 01 59 30 SECURITY REGULATIONS.docx DOCX document
PBS_Core_Building_Standards_Memorandum 24FEB25.pdf PDF
SOW 47PH0825R0007 2025 12 12.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Solicitation No. 47PH0825R0007

ATTACHMENT A

PAST PERFORMANCE

QUESTIONNAIRE

FACTOR 1

A. D/B Construction Firm:

B. Reference Information:

Name:___________________________________________________________

Company:________________________________________________________ Telephone No.:____________________________________________________ Title:____________________________________________________________ ContractNo._______________________________________________________ Location of Contract Performance:____________________________________ Completion Date:__________________________________________________ Estimated price/cost for services:______________________________________ Type of space/building: _____________________________________________ Type of Contract:_________________________________________________

Actual Sq. Ft. In Project: _____________ New Construction_____________

Number of Stories in Bldg: ___________ Renovation___________________

C. Questions: (Some questions may not apply to your contract)

1. What was the actual work performed by the Contractor?

SCHEDULE

1. Did the Contractor complete the project on schedule?

____Completed prior to originally scheduled completion date.

____Completed by original scheduled completion date.

____Completed within agreed to extended completion date.

____Failed to meet project completion date.

____Not applicable or don’t know

GSA Solicitation No. 47PH08240004

2. To what extent did the Contractor adhere to significant milestones during the Preconstruction Phase?

____Consistently improved scheduled milestone dates.

____Exceeded scheduled milestone requirements.

____Typically delivered as scheduled but occasionally missed milestone dates.

____Contractor rarely met scheduled milestone requirements.

____Not applicable or don’t know

3. How responsive was the Contractor in addressing unforeseen /unanticipated conditions?

____Consistently exercised a pro-active approach.

____Demonstrated some initiative in exercising a pro-active approach.

____Rarely demonstrated a pro-active approach.

____Never demonstrated a pro-active approach.

____Not applicable or don’t know

4. How effectively was the official CPM schedule used as a working tool?

____Consistently used to manage including fragnets.

____Used primarily to measure major milestone progress.

____Approached as a contract requirement nuisance.

____Did not submit an acceptable CPM schedule.

____Not applicable or don’t know

BUDGET

1. Did the Contractor complete the project on budget?

____Completed under budget.

____Completed on budget.

____Completed over budget without outstanding claims.

____Completed over budget with outstanding claims.

____Not applicable or don’t know

2. Did the Contractor submit reasonably priced change proposals from Subcontractors?

____Consistently submitted fair and reasonably priced change proposals.

____Typically submitted fair and reasonably priced change proposals.

____Submitted fair and reasonably priced proposals some of the time.

____Rarely submitted fair and reasonably priced change proposals.

____Not applicable or don’t know

3. How did the Contractor manage Contractor and subcontractor claims?

____Resolved without requiring Owner intervention.

____Agreed and resolved through formal or informal ADR process.

____Submitted as a fully articulated well rationalized claim.

____Sponsored subcontractor claim to owner without independent analysis or validation.

____Not applicable or don’t know

QUALITY

1. How well did the Contractor comply with contract requirements?

____Consistently surpassed contract requirements.

____Exceeded contract requirements.

____Met the minimum requirements.

____Did not meet the minimum requirements.

____Not applicable or don’t know

2. Did they conform to standards of good workmanship?

____Consistently surpassed standards.

____Exceeded standards.

____Met the standards.

____Did not meet standards.

____Not applicable or don’t know

3. How well did the Contractor adapt to changing requirements while maintaining a desired level of quality?

____Extremely effective.

____Considerably effective.

____Effective.

____Ineffective.

____Not applicable or don’t know

4. Did Contractor adhere to the Quality Control/Quality Assurance Plan?

____Proactive in implementing the Plan.

____Used basically as a general guide.

____Approached as a Contract requirement but not a working tool.

____Not able to produce an acceptable QC/QA Plan.

____Not applicable or don’t know

TEAMWORKING

1. How well did the Contractor work with the Owner, Architect and the other technical advisors?

____Extremely cooperative.

____Very cooperative.

____Generally cooperative.

____Not cooperative.

____Not applicable or don’t know

2. How effective was the Contractor’s on-site management team?

____Extremely effective.

____Very effective.

____Generally effective.

____Ineffective.

____Not applicable or don’t know

3. Is the Contractor cooperative, businesslike, and concerned with the interests of project related third party entities (i.e. tenants, other contractors or vendors)?

____Extremely cooperative.

____Very cooperative.

____Generally cooperative.

____Not cooperative.

____Not applicable or don’t know

4. Did the Contractor maintain an excellent project team throughout the duration of the project?

____Maintained the same team throughout the duration of the project.

____Minor adjustments to the support team were made during the project.

____Significant changes to key personnel of the project team were made during the project.

____Contractor maintained no consistency in key personnel during the project.

____Not applicable or don’t know

5. How effective was the Contractor in selecting and managing the Subcontractors?

____Subcontractors were proactive in problem resolution ____Subcontractors generally responded to Contractor’s direction with a positive attitude ____Subcontractors responded to Contractor’s direction with some hesitancy ____Subcontractors responded to Contractor’s direction with some resistance ____Not applicable or don’t know

CUSTOMER SATISFACTION

1. How well did the Contractor coordinate the work of the subcontractors?

____Proactive.

____Moderately active.

____Relied primarily on subcontractors coordinating between themselves.

____Provided virtually no direct coordination of work.

____Not applicable or don’t know

2. How well did the Contractor control the quality & timeliness of submittals?

____Completed in accordance with approved schedule.

____Did not always meet the schedule, however, project schedule was not impacted by this.

____Completed with only a few concessions from the Owner.

____Significantly impacted the project schedule and quality.

____Not applicable or don’t know

3. How appropriately did the Contractor utilize the RFI process?

____Primarily used to document resolution of drawing and specification clarifications.

____Primarily used to document a question, if the answer is not immediately apparent.

____Primarily used to pass-through subcontractor questions.

____Primarily used as a mechanism to pursue change orders and claims.

____Not applicable or don’t know

4. How efficiently did the Contractor complete the punchlist and close out the contract?

____Punchlist and Close-out completed within 1 month of substantial completion.

____Punchlist and Close-out completed within 4 months of substantial completion.

____Punchlist and Close-out completed within 1 year of substantial completion.

____Punchlist and Close-out completed later than 1 year after substantial completion.

____Not applicable or don’t know

SAFETY

1. Did the Contractor implement an effective accident prevention program?

____Extremely safety conscious.

____Generally safety conscious.

____Occasionally safety conscious.

____Rarely safety conscious.

____Not applicable or don’t know

2. What was the actual Safety record?

____No actual loss time accidents.

____Minimal minor accidents.

____Minimal actual loss time accidents.

____One or more major loss time accidents.

____Not applicable or don’t know

3. How was the Contractor’s Safety Incentive program received by the workers?

____Virtually all worker enforced construction safety practices.

____Most workers enforced construction safety practices.

____Supervisors were often needed to enforce safety practices.

____Owner had to consistently remind Contractor to enforce safety practices.

____Not applicable or don’t know

GENERAL

1. List the names of the Contractor’s Key Staff and circle their Overall Performance:

Project Manager ________________________________ (Excellent, Very Good, Good, Marginal, Poor) Project Superintendent____________________________ (Excellent, Very Good, Good, Marginal, Poor) Project Engineer________________________________ (Excellent, Very Good, Good, Marginal, Poor) Quality Control Superintendent____________________ (Excellent, Very Good, Good, Marginal, Poor)

Project Scheduler_______________________________ (Excellent, Very Good, Good, Marginal, Poor)

2. Circle the Contractor’s Overall Performance (Excellent, Very Good, Good, Marginal, Poor)

3. If you had a choice, would you contract with the Contractor again? Why or Why not?

4. Do you know of any other projects performed by this Contractor? Do you have any other comments?

ADDITIONAL COMMENTS OR CLARIFICATIONS:

Evaluator:_______________________________________ Date:________________