SECT-57_INLETS_MANHOLES_AND_JUNCTION_BOXES.docx

DOCX document 15 KB Posted

Attached to
Grant Funded Construction of Rummell Road Trail
Solicitation number
2025-131
Issued by
Polk County, Florida

About this file

The document is a technical specification section (Section 57) for construction of inlets, manholes, and junction boxes, prepared in alignment with Florida Department of Transportation (F.D.O.T.) specifications. The scope of work details the construction requirements for concrete structures, including precast or cast-in-place options, with specific guidelines for materials, installation, concrete placement, and finishing. The specification mandates concrete with a minimum 28-day compressive strength of 4,000 psi, reinforcing steel (#4 Rebar installed 12 inches on-center), and cast iron traffic-bearing grates and metal frames for rights-of-way and traffic areas.

The technical specification provides comprehensive construction standards, emphasizing precise material composition, installation techniques, and quality control measures. Key material requirements include Type III concrete, Type I Portland Cement mortar, clay brick conforming to ASTM C-55 Grade P-II, and specific reinforcement techniques. The document outlines detailed processes for form construction, concrete placement, curing, and surface finishing, with particular attention to structural integrity, joint preparation, and post-construction cleaning. While not directly linked to a specific bid, the specification serves as a technical guide for constructing critical infrastructure components with stringent quality and performance expectations.

View the file

Other files

File Type Posted
Grant_Funded_Construction_of_Rummell_Road_Trail_(Addendum_#1_Revision).pdf PDF
Sect-20_Special_Conditions_Rummell_Road_Trail_UPDATED.pdf PDF
Grant_Funded_Construction_of_Rummell_Road_Trail.pdf PDF
Sect-20_Special_Conditions_Rummell_Road_Trail.pdf PDF
Performance_Bond.pdf PDF
Payment_Bond.pdf PDF
[D]_Payment_And_ContractCompletion_Forms.pdf PDF
Sample_Certificate_of_Insurance.pdf PDF
[C]_Contractual_Documents.pdf PDF
FDEP_Agreement_Attachment_8.pdf PDF
SECT-39_GRASSING_AND_SEEDING.docx DOCX document
FDEP_Agreement_Attachment_9.pdf PDF
Insurance_Requirements_.pdf PDF
SECT-61_PAVEMENT_MARKING_REMOVAL_(THERMPLASTIC).docx DOCX document
FDEP_Agreement_Exhibit_H.pdf PDF
SECT-38_CONCRETE.docx DOCX document
SECT-59_REFLECTIVE_PAVEMENT_MARKERS.docx DOCX document
FDEP_Agreement_Exhibit_F.pdf PDF
SECT-36_PAVEMENT_REMOVAL_AND_RESTORATION.doc DOC document
SECT-56_CULVERTS_AND_STORM_SEWERS.docx DOCX document
Building_Fees_Schedule_2025-004R.pdf PDF
SECT-60_THERMOPLASTIC_TRAFFIC_STRIPES_AND_MARKINGS.docx DOCX document
FDEP_Agreement_Exhibit_G.pdf PDF
SECT-32_EXCAVATION_BACKFILL_COMPACTION_GRADING.docx DOCX document
SECT-31_SITE_PREP_SURF_REMOVE.docx DOCX document
SECT-58_HIGHWAY_SIGNING.docx DOCX document
SECT-37_ROADWAY_CONSTRUCTION_STANDARDS.doc DOC document
SECT-30_GENERAL.docx DOCX document
PLANS_APPROVED-SDP23-0139_2025-02-27.pdf PDF
SECT-42_MANHOLES.docx DOCX document
SECT-34_PRESSURE_PIPE_RESTRAINT.docx DOCX document
SECT-52_VALVES_HYDRANTS_&_ACCESS_FOR_WATER_MAINS.DOC DOC document
SECT-44_TESTING_OF_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-41_GRAVITY_SEWER_PIPE_LAYING_JOINTING_AND_MISC_CONSTRUCTION_DETAILS.doc DOC document
SECT-55_VALVES_AND_ACCESS_FOR_RECLAIMED_WATER_MAINS.doc DOC document
SECT-49_Blank.DOC DOC document
SECT-50_WATER_DISTRIBUTION.DOC DOC document
SECT-35_PRESSURE_CONNECTION.doc DOC document
SECT-53_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-45_WASTEWATER_FORCE_MAINS.DOC DOC document
SECT-40_PIPE_MATERIAL_FOR_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-51_PIPE_INSTALLATION_FOR_WATER_MAINS.DOC DOC document
SECT-54_PIPE_INSTALLATION_FOR_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-47_SUBMERSIBLE_WASTEWATER_PUMPS.DOC DOC document
SECT-33_BORING_&_JACKING.docx DOCX document
SECT-48_PUMP_STATION_ELECTRICAL_POWER_&_CONTROL_SYSTEM.DOC DOC document
SECT-43_SERVICE_LATERALS.docx DOCX document
SECT-46_SEWAGE_PUMPING_STATIONS.rtf RTF text file
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 57 – INLETS, MANHOLES, AND JUNCTION BOXES

Item No. Title

57.1 SCOPE OF WORK

57.2 MATERIALS

57.3 FORMS

57.4 INSTALLATION

57.5 PLACING AND CURING CONCRETE

57.6 FINISHING STRUCTURES

57.1 SCOPE OF WORK

The work specified herein shall consist of constructing inlets, manholes, and junction boxes. These structures shall be made of Portland Cement Concrete and reinforcing steel with the necessary metal frames and gratings, and shall be constructed in conformity with the detailed plans and these specifications. All inlets, manholes, and junction boxes shall meet Florida Department of Transportation (F.D.O.T.) specifications. Masonry construction shall be limited to the completion of doghouses around pipes, adjusting manhole covers, etc., or as approved by the PROJECT ENGINEER. It is the intent of the specifications that structures be constructed of precast concrete or cast-in-place concrete.

57.2 MATERIALS

Concrete shall have a minimum 28 day compressive strength of 4,000 psi, Type III. The mortar for masonry shall be of Type I Portland Cement and sand mixed in the proportions of one part cement to two parts of sand. At the option of the contractor, high early strength cement may be used.

Reinforcing steel shall consist of #4 Rebar installed 12 inches on-center each way in all walls, bases, and tops (where appropriate).

Grates and metal frames shall be cast iron traffic bearing in all rights-of-way and other traffic areas.

All clay brick shall conform to the current ASTM designation C-55, Grade P-II.

57.3 FORMS

Forms for cast-in-place structures shall be built true to line and grade, braced in a substantial and unyielding manner and so designed and constructed that they may be removed without injury to the concrete.

57.4 INSTALLATION

Pipes shall extend through the walls and be flush with the inside wall. Masonry shall be constructed around them neatly. All surfaces at pipe junctions shall be plastered with mortar as specified in Item 57.2, this Section. Plastered areas should not crack and be properly prepared to bond to old surfaces. Masonry inverts are required.

57.5 PLACING AND CURING CONCRETE

For cast-in-place structures, the concrete shall be placed in the forms to the depth shown on the plans and thoroughly vibrated, tamped, and/or spaded. After the concrete has hardened sufficiently, it shall be covered with a suitable material and kept moist for a minimum of seventy-two (72) hours. The concrete shall be protected in a satisfactory manner from the elements until thoroughly cured.

57.6 FINISHING STRUCTURES

For all concrete structures, all fins, and irregular projections shall be chipped off flush with the surface immediately following the removal of the forms. All projecting wires, nails, etc., shall be cut off at least one-half inch under the surface.

All cavities produced by metal spacers, form ties, bolts, honeycomb spots, etc., shall be carefully cleaned, saturated with water, and the carefully painted with mortar. All construction and expansion joints in the completed work shall be left carefully tooled and free from excessive mortar and/or concrete. Joint filler will be left exposed for its full length and display clean edges. Mortar "topping" for upper horizontal surfaces shall not be used.

For all concrete surfaces, which are to receive a surface finish, the CONTRACTOR shall remove the forms and finish the concrete immediately after the concrete has set sufficiently.

All inlets, manholes, and junctions boxes shall be thoroughly cleaned prior to inspection and/or final acceptance.

File details come from the government source that posted it. Updated .