About this file
This document is a technical specification section (Section 35) related to pressure connections for water infrastructure, prepared by a municipal engineering department. The section provides detailed technical requirements for tapping sleeves, valves, and connection procedures for water mains 4 inches and larger. The specification outlines requirements for mechanical joint sleeves, steel tapping sleeves (for both potable water and sanitary sewer force main applications), and tapping valves, with specific material specifications including gray-iron, ductile-iron, carbon steel, and stainless steel components.
The specification mandates a strict notification and connection process, requiring contractors to submit written requests at least five working days prior to making connections to existing mains, with the city reviewing and approving connection procedures. Installation requirements include detailed provisions for excavation, support, cleaning, pressure testing, and documentation, with specific protocols for potable water connections such as chlorine treatment and coupon submission after tapping. The document emphasizes contractor responsibilities for proper installation, support, and repair of any damage, with provisions for pressure testing and ensuring leak-free connections at specified pressures.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 35 - PRESSURE CONNECTION
Item No.
Title 35.1
GENERAL
35.2
TAPPING SLEEVES
35.2.1
General
35.2.2
Mechanical Joint Sleeves
35.2.3
Steel Tapping Sleeves
35.2.4
Tapping Valves
35.3
NOTIFICATION AND CONNECTION TO EXISTING MAINS
35.4
INSTALLATION
35.4.1
Excavation, Backfill, Compaction and Grading
35.4.2
Construction Details
35.1
GENERAL
Installations of pressure connections 4" and larger shall be made in accordance with this section.
35.2
TAPPING SLEEVES
35.2.1
GENERAL
Tapping sleeves shall be mechanical joint sleeves or fabricated steel sleeves as specified below. All pressure connections to asbestos cement pipe and all "size on size" taps shall utilize mechanical joint sleeves.
35.2.2
MECHANICAL JOINT SLEEVES
Sleeves shall be cast of gray-iron or ductile-iron and have an outlet flange with the dimensions of the Class 125 flanges shown in ANSI B16.1 properly recessed for tapping valve. Glands shall be gray-iron or ductile iron. Gaskets shall be vulcanized natural or synthetic rubber. Bolts and nuts shall comply with ANSI/AWWA C111/A21.11. Sleeves shall be capable of withstanding a 200 psi working pressure.
35.2.3
STEEL TAPPING SLEEVES
For potable water and reuse applications:
Sleeves shall be fabricated of minimum 3/8" carbon steel meeting ASTM A285 Grade C. Outlet flange shall meet AWWA C-207, Class "D" ANSI 150 lb. drilling and be properly recessed for the tapping valve. Bolts and nuts shall be 304 stainless steel. Gaskets shall be vulcanized natural or synthetic rubber. Sleeves shall have manufacturer applied fusion bonded epoxy coating, minimum 12 mil thickness.
For sanitary sewer force main applications:
Sleeves shall be stainless steel (JCM 432 or approved equal); maximum working pressure 150 psi; maximum test pressure 200 psi.
35.2.4
TAPPING VALVES
Tapping valves shall meet the requirements of Section 52.2 except that units shall be flange by mechanical joint ends. Valves shall be compatible with tapping sleeves as specified above and specifically designed for pressure connection operations.
35.3
NOTIFICATION AND CONNECTION TO EXISTING MAINS
All connections to existing mains shall be made by the CONTRACTOR only after the connection procedure and his work scheduling has been reviewed and approved by the CITY. The CONTRACTOR shall submit a written request to the CITY a minimum of five (5) working days prior to scheduling said connections. In his request he shall outline the following:
1.)
Points of Connection, fittings to be used, and method of flushing and disinfection if applicable.
2.)
Estimated construction time for said connections.
The CITY shall review the submittal within three (3) working days after receiving it and inform the CONTRACTOR regarding approval or denial of his request. If his request is rejected by the CITY, the CONTRACTOR shall resubmit his request modifying it in a manner acceptable to the CITY.
All connections shall only be made on the agreed upon date and time. If the CONTRACTOR does not initiate and complete the connection work in the agreed upon manner, he shall be required to reschedule the said connection by following the procedure outlined above.
The CONTRACTOR shall not operate any valves in the system without prior notification to and in the presence of duly authorized CITY personnel.
35.4
INSTALLATION
35.4.1
EXCAVATION, BACKFILL, COMPACTION AND GRADING
The applicable provisions of Section 32 shall apply.
35.4.2
CONSTRUCTION DETAILS
Sufficient length of main shall be exposed to allow for installation of the tapping sleeve and valve and the operation of the tapping machinery. The main shall be supported on concrete pedestals or bedding rock at sufficient intervals to properly carry its own weight, plus the weight of the tapping sleeve valve and machinery. Any damage to the main due to improper or insufficient supports shall be repaired at the CONTRACTOR'S expense.
For potable water only, the inside of the tapping sleeve and valve, the outside of the main, and the tapping machine shall be cleaned and swabbed or sprayed with 10% liquid chlorine prior to beginning installation for water system pressure connections.
After the tapping sleeve has been mounted on the main, the tapping valve shall be bolted to the outlet flange, making a pressure tight connection. Prior to beginning the tapping operation, the sleeve and valve shall be pressure tested at 150 psi for a period of not less than fifteen (15) minutes to ensure that no leakage will occur.
For pressure connections through 12" diameter or less the minimum diameter cut shall be 2” less than the nominal diameter of the pipe to be attached. For larger taps the allowable minimum diameter shall be 2" to 3" less than the nominal diameter of the pipe being attached. After the tapping procedure is complete the CONTRACTOR shall submit the coupon to the CITY.
Adequate restrained joint fittings shall be provided to prevent movement of the installation when test pressure is applied. Provisions of Section 34 shall apply.