SECT-43_SERVICE_LATERALS.docx

DOCX document 18 KB Posted

Attached to
Grant Funded Construction of Rummell Road Trail
Solicitation number
2025-131
Issued by
Polk County, Florida

About this file

This document is a technical specification section (Section 43) for service lateral construction, prepared by a municipal engineering department, likely for a public works or utility infrastructure project. The specification provides detailed requirements for constructing gravity sewer service laterals, including pipe materials, dimensions, and installation standards. Service laterals are defined as branch gravity sewers extending from main sewer lines to property right-of-way lines, with specific guidelines for residential and commercial/industrial areas. The document outlines requirements for 4-inch diameter pipes in residential areas and 6-inch diameter pipes for dual services and commercial/industrial zones.

The specification covers comprehensive technical details including material specifications (PVC or ductile iron pipes), construction methods, excavation and backfill procedures, pipe laying techniques, and termination requirements. Key technical provisions include a mandatory minimum grade of one foot per 100 feet, provisions for connecting to existing sewer mains, requirements for water-tight end plugs, and mandates for electronic and visual markers at service lateral terminations. While not directly linked to the related state and local contract opportunity for the Rummell Road Trail project, this specification represents standard municipal infrastructure documentation that would likely be applicable to utility work associated with road and trail construction projects.

View the file

Other files

File Type Posted
Grant_Funded_Construction_of_Rummell_Road_Trail_(Addendum_#1_Revision).pdf PDF
Sect-20_Special_Conditions_Rummell_Road_Trail_UPDATED.pdf PDF
Grant_Funded_Construction_of_Rummell_Road_Trail.pdf PDF
Sect-20_Special_Conditions_Rummell_Road_Trail.pdf PDF
Performance_Bond.pdf PDF
Payment_Bond.pdf PDF
[D]_Payment_And_ContractCompletion_Forms.pdf PDF
Sample_Certificate_of_Insurance.pdf PDF
[C]_Contractual_Documents.pdf PDF
FDEP_Agreement_Attachment_8.pdf PDF
SECT-39_GRASSING_AND_SEEDING.docx DOCX document
FDEP_Agreement_Attachment_9.pdf PDF
Insurance_Requirements_.pdf PDF
SECT-61_PAVEMENT_MARKING_REMOVAL_(THERMPLASTIC).docx DOCX document
FDEP_Agreement_Exhibit_H.pdf PDF
SECT-38_CONCRETE.docx DOCX document
SECT-59_REFLECTIVE_PAVEMENT_MARKERS.docx DOCX document
FDEP_Agreement_Exhibit_F.pdf PDF
SECT-36_PAVEMENT_REMOVAL_AND_RESTORATION.doc DOC document
SECT-56_CULVERTS_AND_STORM_SEWERS.docx DOCX document
Building_Fees_Schedule_2025-004R.pdf PDF
SECT-60_THERMOPLASTIC_TRAFFIC_STRIPES_AND_MARKINGS.docx DOCX document
FDEP_Agreement_Exhibit_G.pdf PDF
SECT-32_EXCAVATION_BACKFILL_COMPACTION_GRADING.docx DOCX document
SECT-31_SITE_PREP_SURF_REMOVE.docx DOCX document
SECT-58_HIGHWAY_SIGNING.docx DOCX document
SECT-37_ROADWAY_CONSTRUCTION_STANDARDS.doc DOC document
SECT-30_GENERAL.docx DOCX document
SECT-57_INLETS_MANHOLES_AND_JUNCTION_BOXES.docx DOCX document
PLANS_APPROVED-SDP23-0139_2025-02-27.pdf PDF
SECT-42_MANHOLES.docx DOCX document
SECT-34_PRESSURE_PIPE_RESTRAINT.docx DOCX document
SECT-52_VALVES_HYDRANTS_&_ACCESS_FOR_WATER_MAINS.DOC DOC document
SECT-44_TESTING_OF_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-41_GRAVITY_SEWER_PIPE_LAYING_JOINTING_AND_MISC_CONSTRUCTION_DETAILS.doc DOC document
SECT-55_VALVES_AND_ACCESS_FOR_RECLAIMED_WATER_MAINS.doc DOC document
SECT-49_Blank.DOC DOC document
SECT-50_WATER_DISTRIBUTION.DOC DOC document
SECT-35_PRESSURE_CONNECTION.doc DOC document
SECT-53_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-45_WASTEWATER_FORCE_MAINS.DOC DOC document
SECT-40_PIPE_MATERIAL_FOR_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-51_PIPE_INSTALLATION_FOR_WATER_MAINS.DOC DOC document
SECT-54_PIPE_INSTALLATION_FOR_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-47_SUBMERSIBLE_WASTEWATER_PUMPS.DOC DOC document
SECT-33_BORING_&_JACKING.docx DOCX document
SECT-48_PUMP_STATION_ELECTRICAL_POWER_&_CONTROL_SYSTEM.DOC DOC document
SECT-46_SEWAGE_PUMPING_STATIONS.rtf RTF text file
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 43 - SERVICE LATERALS

Item No. Title

43.1 GENERAL

43.2MATERIALS
43.2.1Pipe, Fittings & Joints
43.3CONSTRUCTION DETAILS
43.3.1General
43.3.2Excavation and Backfill
43.3.3Pipe Laying and Jointing
43.3.4Line and Grade

43.4 TERMINATION OF SERVICE LATERALS

43.5 INSPECTION

43.6 RESTORATION, FINISHING AND CLEANUP

43.7 LOCATION

43.1 GENERAL

A service lateral is a branch gravity sewer constructed from the main gravity sewer to the right-of-way line or to a point established by the CITY.

The general requirements for construction of gravity sewers in Sections 40 and 41 of these Specifications shall apply for service laterals unless they are inconsistent with the provisions of this section.

Service laterals and fittings shall be four (4) inches in diameter for single services in residential areas and six (6) inches in diameter for all dual services and in all commercial/industrial areas.

43.2 MATERIALS

43.2.1 PIPE, FITTINGS & JOINTS

Pipe, fittings and joints shall be PVC or DI pipe and shall conform to the requirement for gravity sewer construction in Section 40 of these specifications.

Service laterals shall be connected to the wye, provided in the gravity sewer where such is available, utilizing approved fittings or adapters.

On existing mains where no wye is provided or available, connection shall be made by either cutting in a wye with a solid sleeve, or a dog house type manhole.

43.3 CONSTRUCTION DETAILS

43.3.1 GENERAL

Service lateral connections shall conform to these specifications and STANDARD DRAWINGS. All necessary approvals for service sewer construction shall be obtained prior to beginning the work.

43.3.2 EXCAVATION AND BACKFILL

Excavation and backfilling for service sewers shall conform to the requirements of Section 32 and 41, excepting that no backfill in excess of that required to hold the pipe in true alignment shall be placed prior to inspection.

43.3.3 PIPE LAYING AND JOINTING

Pipe laying and jointing, except as hereinafter provided, shall in general conform to the requirements of Section 41. During the pipe laying and jointing, the service lateral shall be kept free of any water, dirt or objectionable matter.

43.3.4 LINE AND GRADE

Pipe shall be laid with a minimum grade of one foot per 100 feet. The CONTRACTOR shall establish such alignment and grade control as is necessary to properly install the service sewer. Pipe shall be laid in a straight line at a uniform grade between fittings.

43.4 TERMINATION OF SERVICE LATERALS

Service laterals shall terminate at the right-of-way line in accordance with the STANDARD DRAWINGS. Water-tight factory made plug(s) shall be installed at the end of each service lateral. Clean-out shall be provided at the end of each service lateral as per the standard drawings. [All services shall be of the single connection type and be marked by a buried electronic marker, and a vertical PVC or wood 2”X4” visual marker (above ground.)]

43.5 INSPECTION

Service sewers shall meet the inspection requirements specified in Section 40.5.

43.6 RESTORATION, FINISHING AND CLEANUP

The CONTRACTOR shall restore all paved surfaces, curbing, sidewalks or other surfaces to their original condition. All surplus material and temporary structures, as well as all excess excavation shall be removed and the entire site shall be left in a neat and clean condition.

43.7 LOCATION

The exact location of the termination point of each installed service lateral shall be marked by etching or cutting an "S" in the concrete curb or pavement. (Termination point shall be per Section 43.4 of these specifications.)

File details come from the government source that posted it. Updated .