This document set comprises construction drawings and mechanical/plumbing specifications for the renovation of Building 9A at Carl Vinson VA Medical Center in Dublin, Georgia, to create EHRM (Electronic Health Records Management) administrative space. The project is identified as 557-21-703 and prepared by SPEES Design Build (architect/engineer of record located in Kent, Washington).
The mechanical systems include variable air volume (VAV) terminal units serving multiple spaces with hot water and chilled water distribution, an air handling unit (AHU-01) with economizer controls, mini-split ductless heat pump systems for dedicated spaces, and restroom exhaust fans. Mechanical details specify pipe sizing ranging from 3/4 inch to 1-1/2 inches for heating/cooling loops, with connections to existing risers in the crawl space. The plumbing system involves domestic cold water, hot water, sanitary sewer, and vent piping with fixtures including water closets, lavatories, a service sink, and a bottle filler. Key piping sizes for plumbing range from 1/2 inch to 4 inches. Demolition work requires removal of existing fixtures and capping of discontinued water supply, sewer, and vent lines within two pipe diameters of the main. Control sequences detail temperature and humidity management via DDC (direct digital control) controllers with integration to the building management system. The drawings indicate "fully sprinklered" construction and show match lines indicating continuation across multiple plan sheets. All new work is shown in dark lines with existing work in light lines per standard convention.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
DETAIL AREA
PROJECT
NORTH
TRUE NORTH
(DASHED)
32 5831302928272625
9 10 11 12 13 14 15 16 60 61 62 63 64
5710X10[1]325
(TYP 2)
10X10[1]335
(TYP.3)
10X10[1]355
(TYP 4)
22X22[3]1340
22X22[3]1440
M A
T C
H L
IN
E
M A
T C
H L
IN
E
6X6[3]140
IV SUPPORT
IV TESTING
STG
103A
MECHANICAL
TR
CORRIDOR
CR11-9
CORRIDOR
CR11-9
ELECTRICAL
ROOM
22X10[3]395 8X6[4]140
8X6[4]150
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
M-104
MECHANICAL RCP - EAST
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
Revisions: Date:
GENERAL NOTES
1. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
KEY PLAN
3/16" = 1'-0"
LEVEL 1 - MECHANICAL NEW RCP - EAST
PROJECT
NORTH
TRUE NORTH
(DASHED)
6/14/2024 56 OF 102
32 5831302928272625
382120191817
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
MP100
MECHANICAL PIPING - OVERALL
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
1/8" = 1'-0"
LEVEL 1 - MECHANICAL PIPING - OVERALL
Revisions: Date:
PROJECT
NORTH
TRUE NORTH
(DASHED)
SEE SHEETS MP102 FOR ENLARGED PLAN
SEE SHEETS MP101 FOR ENLARGED PLAN
6/14/2024 57 OF 102
PROJECT
NORTH
TRUE NORTH
(DASHED)
(E)AC-9-107
2120191817
1 2 3 4 5 6 7
HWR
HWS
HWR
HWS
009A-VAV-03
009A-VAV-04
009A-VAV-02
009A-VAV-05
009A-VAV-01
M A
T C
H L
IN
E
M A
T C
H L
IN
E
3/4" HWS/HWR
3/4" HWS/HWR
1"HWS/HWR
3/4" HWS/HWR1-1/4" HWS/HWR
3/4" HWS/HWR
3/4" HWS/HWR
IV TESTING
CHANGE MGMT
USER
STAFF BREAK
CORRIDOR
CR11-9
CORRIDOR
CR11-9
ELECTRICAL
CLOSET
STORAGE
MECHANICAL
RESTROOM
RESTROOM
RESTROOM
RESTROOM
WAITING ALCOVE
3/4" HWS/HWR
009A-VAV-06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
MP101
MECHANICAL PIPING - WEST
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
KEYNOTES
KEY PLAN
Revisions: Date:
3/16" = 1'-0"
LEVEL 1 - MECHANICAL PIPING - WEST
PROJECT
NORTH
TRUE NORTH
(DASHED)
CONNECT HWS/HWR TO NEW VAV BOX. PROVIDE ISOLATION VALVES TO EACH BOX.
CONNECT NEW HYDRONIC HEATING PIPING TO EXISTING 1-1/4" HWS AND 1-1/4"
RISERS FROM CRAWL SPACE
CONNECT NEW HYDRONIC HEATING PIPING TO EXISTING 3/4" HWS AND 3/4" HWR
RISERS FROM CRAWL SPACE
6/14/2024 58 OF 102
NORTH
TRUE NORTH
(DASHED)
32 5831302928272625
9 10 11 12 13 14 15 16 60 61 62 63 64
HWR
HWS
HWR
HWS
009A-VAV-09
009A-VAV-07
009A-VAV-08
HWR
HWS
HWR
HWS
009A-VAV-10
009A-VAV-11
M A
T C
H L
IN
E
M A
T C
H L
IN
E
3/4" HWS/HWR
3/4" HWS/HWR
3/4" HWS/HWR
3/4" HWS/HWR
3/4" HWS/HWR
1-1/2" HWS/HWR
CONNECT NEW 2" CWS/CWR TO EXISTING
3" CWS/CWR LINES IN CRAWL SPACE.
INSTALL VALVES AT BRANCH TAP
CORE AND SLEEVE WALL AS NEEDED
FOR NEW PIPE PENETRATIONS.
CONNECT NEW 1-1/2"
HWS/HWR TO EXISTING
1-1/2" HWS/HWR LINES
IN PLACE
009A-AHU-1
IV SUPPORT
IV TESTING
STG
103A
HAC
MECHANICAL
TR
CORRIDOR
CR11-9
CORRIDOR
CR11-9
ELECTRICAL
ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
MP102
MECHANICAL PIPING - EAST
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
KEYNOTES
KEY PLAN
CONNECT HWS/HWR TO NEW VAV BOX. PROVIDE ISOLATION VALVES TO EACH BOX.
CONNECT NEW HYDRONIC HEATING PIPING TO EXISTING 1-1/4" HWS AND 1-1/4" RISERS
FROM CRAWL SPACE
3/16" = 1'-0"
LEVEL 1 - MECHANICAL PIPING - EAST
PROJECT
NORTH
TRUE NORTH
(DASHED)
Revisions: Date:
6/14/2024 59 OF 102
SCALE: NOT TO SCALE
INDIRECT SINK DRAIN DETAIL
PIPE THRU FIRE RATED WALL DETAIL
PIPE THRU WALL DETAIL
PIPE THRU FLOOR DETAIL
SCALE: NTS SCALE: NTS SCALE: NTS
2 AIR HANDLING UNIT DRAIN TRAP DETAIL
SCALE: NTS
HEAT PUMP REFRIGERANT ISO
SCALE: NTS
7 RECTANGULAR DUCT THRU WALL DETAIL
SCALE: NTS
8 VOLUME DAMPER DETAIL
SCALE: NTS
9 DUCT CONNECTIONS - AIR TERMINAL UNITS
SCALE: NTS
A B
1"
EXIST MASONRY
WALL
PIPE SLEEVE
PIPE
INSULATION
PIPE
MINERAL WOOL
INSIDEOUTSIDE
FIRE RATED CAULKING
PIPE
INSULATION
WITH JACKET
FIRE RATED CAULKING
EXIST MASONRY
WALL
PIPE SLEEVE
PIPE
INSULATION
PIPE
MINERAL WOOL
INSIDEOUTSIDE
CAULK (TYP)
PIPE
INSULATION
WITH JACKET
CAULK (TYP)
1/2"
1/2"
FIRE RESISTANT
SEALANT
PIPE RISER
PIPE SLEEVE
FLOOR OPENING
DRAW THRU
BLOW THRU
2" PLUS X
1" MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME
SIZE AS THE NIPPLE ON THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L OR
TYPE M UNLESS NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
FLOOR SINK
DRAIN
PAN
NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY
LOCAL VA AND IS INDOORS AND DOES NOT PASS THROUGH
RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR
METALS ARE TO BE CONNECTED.
DIELECTRIC
FITTING
NOTE:
1.
2.
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR
MULTI-BLADE DAMPERS & ROUND DAMPERS.
INSULATION SEE
SPECIFICATION
DAMPER BLADE
1/8" CLEARANCE
ALL AROUND
OUTSIDE END BEARING
INSIDE END BEARING
HANDLE WITH LOCKING
QUADRANT
INSULATION
STAND-OFF
1/2" ROUND ROD PIN
DUCT
STIFFEN BLADE
AS REQUIRED
SIDE ELEVATION SECTION
NOTE:
1.
2.
3.
4.
5.
RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A
MINIMUM OF 3 TIMES THE DIAMETER OF INLET
A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT ALLOWED
TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0".
A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET,
PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10
FEET. FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A DUCT TRANSITION TO
MAINTAIN THE DUCT STATIC PRESSURE DROP AT OR BELOW 0.2"/100'.
FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT TO
DIFFUSER, SHALL NOT EXCEED 5'-0". USE RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER
THAN 45°.
COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE
INSULATION W/ VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.
AIR TERMINAL UNIT
(VAV)
DIFFUSER (TYP.)
SEE SPECIFICATIONS FOR
CLAMPS AND SEALANT (TYP.)
SEE NOTE 5
SEE NOTE 3
SEE NOTE 2
SEE NOTE 1
OUTDOOR
HEAT PUMP
W
ALL MOUNT
FAN COIL UNIT
4" CONCRETE BASE
ELECTRICAL/REFRIGERANT
LINE SET BUNDLE
(TYP OF 2,3 OR 4 PORT
SYSTEMS, 3 PORT SHOWN)
SUPPORT ON WALL
20 GAGE SHEET METAL PAN AROUND REFRIGERANT LINES
FROM BOTTOM WALL ANCHOR TO EAVE. PAINT PAN TO
MATCH BUILDING COLOR WITH PRIMER AND TWO COATS OF
OIL BASE PAINT. FASTEN SECURELY TO WALL.
CONTRACTOR HAS OPTION TO RUN LINES IN WALL.
4" DIA. HOLE THRU WALL OR SOFFIT
SEAL WEATHER TIGHT
CONDENSATE DRAIN LINE DN TO MOP SINK
IN HAC
EXIST MASONRY WALL
MIN. 1" THICKNESS
MINERAL WOOL PACKING.
(TYP)
CAULK (TYP)
1" CAULK (TYP)
STEEL DUCT.
STEEL SLEEVE. (TYP) 1" MAX.
ANNULAR SPACE
FINISH WALL
TYPICAL EXISTING SINK
1-1/2" TRAP AND
TRAP ARM
3/4" CONDENSATE
DRAIN TUBING
WATER TIGHT SEAL
WORM DRIVE CLAMP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
M-500
MECHANICAL DETAILS
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
6/14/2024 60 OF 102
MINI SPLIT SYSTEM SCHEDULE
OUTDOOR HEAT PUMP INDOOR FAN COIL
EQUIP# MFR MODEL #
OPERATING
WEIGHT
(LBS)
SEER2
@ 95° F
COOLING
@ 95° F
(MBH)
HSPF
@ 47° F
HEATING
@ 7° F
(MBH)
ELECTRICAL
NOTES EQUIP# MFR MODEL # TYPE SERVING
AIRFLOW
(CFM)
SPEED
ESP
TOTAL
COOLING
@ 95° F
(MBH)
SENSIBLE
COOLING
@ 95° F
(MBH)
TOTAL
HEATING
@ 7° F
(MBH)
ELECTRICAL
WEIGHT (LB) NOTES
MCA MOCP VOLTS PHASE MCA / MOCP VOLT PHASE
LG LSU30 250 20 30.4 11.5 18.2 23 30 208 1 1, 2, 3 LG LSN30 WALL MOUNTED TR 1130 HIGH 0 30.4 22.1 18.2
POWERED
BY OUTDOOR
UNIT
208 1 70 1, 2, 3, 4, 509A-HP-01
09A-FC01
INDOOR NOTES:
1. PROVIDE FACTORY WALL MOUNTING HARDWARE
2. PROVIDE FACTORY WALL MOUNTED T-STAT WITH BMS CAPABILITIES
3. PROVIDE SLIDE-IN AIR FILTER.
4. ROUTE CONDENSATE TO NEAREST TO MOP SINK IN HOA. COORDINATE LOCATIONS WITH PLUMBING CONTRACTOR.
5. PROVIDE REFRIGERANT LINE SET
OUTDOOR NOTES:
1. PROVIDE 12" GROUND STAND AND PREFABED PAD
2. ROUTE CONDENSATE LINE DOWN ONTO ROOF
3. PROVIDE LOW AMBIENT CONTROLS & CRANK CASE HEATER
1. GRAVITY BACKDRAFT DAMPER WITH THE MAXIMUM 40 CFM PER S.F. LEAKAGE RATE AT 1" WATER COLUMN PER AMCA 500 D.
2. PROVIDE FAN MOUNTED SPEED CONTROL
3. INTERLOCK WITH LIGHT SWITCH
RESTROOM EXHAUST FAN SCHEDULE
# MFG MODEL SERVICE DRIVE
AIRFLOW
(CFM)
ESP
FAN
RPM
SONE
LEVEL
MOTOR
NOTES
WATTs VOLTS PHASE AMPS
PANASONIC FV-05-11VSK2
RESTROOM
DIRECT 105 0.2 1164 0.7 13.1 120 1 0.2 1, 2, 3
PANASONIC FV-05-11VSK2
RESTROOM
DIRECT 110 0.2 1164 0.7 13.1 120 1 0.2 1, 2, 3
PANASONIC FV-05-11VSK2
RESTROOM
DIRECT 100 0.2 1164 0.7 13.1 120 1 0.2 1, 2, 3
PANASONIC FV-20VQ3
RESTROOM
DIRECT 140 0.2 1164 0.7 13.1 120 1 0.2 1, 2, 3
NOTES:
VAV AIR HANDLER UNIT SCHEDULE
# SERVICE MFG MODEL
SUPPLY
AIRFLOW
(CFM)
AIRFLOW
OSA
(CFM)
SUPPLY
ESP (")
SUPPLY
RPM /
SPEED
SUPPLY
MOTOR
BHP
RETURN
AIRFLOW
(CFM)
RETURN
ESP (IN
WC)
RETURN
RPM /
SPEED
RETURN
MOTOR
BHP
COOLING COIL PERFORMANCE HEATING COIL PERFORMANCE ELECTRICAL
RTU
WEIGHT
(LBS)
CURB
WEIGHT
(LBS)
TOTAL
WEIGHT
(LBS)
NOTES
NET TOTAL
(MBH)
NET SENS
(MBH)
EWT
(F)
LWT
(F)
FLUID
VELOCITY
(FPS)
EAT
(DB)
EAT
(WB)
LAT
(DB)
LAT
(WB)
COIL
FACE
VELOCITY(FPS)
NET
TOTAL
(MBH)
EWT
(F)
LWT
(F)
FLUID
VELOCITY
(FPS)
EAT
(DB)
LAT
(DB)
COIL
FACE
VELOCITY(FPS)
MCA MOCP VOLT PHASE
SEE PLAN YORK XTO-51X48 3475 1530 2 2120 4.5 3175 2 1750 3.5 327 182 44 54.1 3.3 93 75.8 46.5 46.4 327 141 180 159.9 1.5 27 60.1 327 34.6 60 208 3 4267 0 4267 1, 2, 3, 4, 5, 6
SEE PLAN EXISTING 2,870 995 EXISTING 2,420 EXISTING 7
NOTES:
1. PROVIDE FULL ECONOMIZER
2. PROVIDE 14" FACTORY GROUND MOUNTED STAND
3. PROVIDE FACTORY DISCONNECT
4. PROVIDE BAROMETRIC RELIEF
5. PROVIDE FACTORY INSTALLED SMOKE DETECTOR IN RETURN DUCT
6. PROVIDE ULTRA LOW LEAK DAMPERS ON OUTSIDE AIR. MOTORIZED DAMPERS SHALL HAVE A TESTED MAXIMUM LEAKAGE RATE NOT TO EXCEED 4 CFM/S
7. RE-BALANCE SYSTEM TO LISTED CFMS
AIR TERMINAL SCHEDULE
009A-AHU-1
009A-EF-1
009A-EF-2
AIR OUTLET SCHEDULE
TAG MNUFACTURER MODEL NO. SERVICE TYPE MATERIAL MOUNTING BORDER PATTERN
BLADE
SPACING
(INCH)
BLADE
POSITION
BLADE
DEFLECTION
NOTES
[1] PRICE SMCD SUPPLY DIFFUSER STEEL LAY-IN 3P
4-WAY
ADJUSTABLE
N/A N/A N/A 1, 2, 3, 4
[2] PRICE SMCD SUPPLY DIFFUSER STEEL SURFACE F
4-WAY
ADJUSTABLE
N/A N/A N/A 1, 2, 3
[3] PRICE 530 RL RETURN GRILLE STEEL LAY-IN F FIXED 3/4"
FRONT
HORIZONTAL
45° 1, 2, 3, 5
[4] PRICE 300 RS SUPPLY GRILLE STEEL SURFACE TYPE 1
DOUBLE
DEFLECTION
3/4" - ADJUSTABLE 1, 2, 3
NOTES:
1. COLOR TO BE MANUFACTURER TO BE APPROVED BY VA
2. PROVIDE BALANCING DAMPER IN BRANCH DUCT SERVING AIR OUTLET AT TAKEOFF FROM TRUNK DUCT. (ADDITIONAL DAMPERS FOR SYSTEM BALANCING ARE SHOWN ON
DRAWINGS)
3. PROVIDE SQUARE TO ROUND ADAPTER AS REQUIRED
4. PROVIDE 24"X24" PAN FOR LAY-IN CEILING INSTALLATION AS REQUIRED (SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR LOCATION)
5. PROVIDE RETURN GRILLE WITHOUT SCREW HOLES FOR LAY-IN CEILING APPLICATION (SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR LOCATION)
009A-EF-3
009A-EF-4
INLINE EXHAUST FAN SCHEDULE
# MFG MODEL SERVICE DRIVE CFM ESP (")
FAN
RPM
SONE
LEVEL
MOTOR
NOTES
HP VOLTS PHASE
COOK 100 SQN-D MECH/ HOA DIRECT 200 0.5 1708 8 0.08 208 1 1, 2, 3
NOTES:
1. PROVIDE W/ FAN SPEED CONTROL.
2. PROVIDE MOTORIZED DAMPER WITH 24-VOLT ACTUATOR.
3. TO RUN CONTINUOUSLY
009A-EF-5
(E)AC-9-107
EQUIPMENT TAG
MANUFACTURER
BASIS OF
DESIGN
BASIS
OF
DESIGN
MODEL
AREA SERVED TYPE UNIT SIZE
DESIGN AIRFLOW
(CFM)
MINIMUN AIRFLOW
(CFM)
ESP (IN WC)
HOT WATER REHEAT COIL
COIL ROWS FLOW (GPM)
FLUID HEAD
LOSS (FT H2O)
AIR PRESSURE
DROP OVER COIL
(IN W.C.)
HEATING
PERFORMANCE (MBH)
LEAVING AIR
TEMP. (F)
VAV-01 ENVIRO-TEC SDR CHANGE MANAGEMENT 108 VARIABLE VOLUME REHEAT 8 680 250 0.2 1 3.7 1 0.2 36.7 95.0
VAV-02 ENVIRO-TEC SDR STAFF BREAKROOM 107 VARIABLE VOLUME REHEAT 8 300 250 0.1 1 1.6 0.8 0.1 16.2 95.0
VAV-03 ENVIRO-TEC SDR IV TESTING 106 VARIABLE VOLUME REHEAT 8 740 250 0.2 1 4.0 1 0.2 40.0 95.0
VAV-04 ENVIRO-TEC SDR IV TESTING 106 VARIABLE VOLUME REHEAT 8 740 250 0.2 1 4.0 1 0.2 40.0 95.0
VAV-05 ENVIRO-TEC SDR CORRIDOR VARIABLE VOLUME REHEAT 8 410 250 0.15 1 2.2 0.8 0.2 22.1 95.0
VAV-06 ENVIRO-TEC SDR RESTROOM/CORRIDOR VARIABLE VOLUME REHEAT 8 700 250 0.2 1 3.8 1 0.2 37.8 95.0
VAV-07 ENVIRO-TEC SDR IV SUPPORT 104 VARIABLE VOLUME REHEAT 8 670 250 0.2 1 3.6 1 0.2 36.2 95.0
VAV-08 ENVIRO-TEC SDR IV SUPPORT 104 VARIABLE VOLUME REHEAT 8 670 250 0.2 1 3.6 1 0.2 36.2 95.0
VAV-09 ENVIRO-TEC SDR CORRIDOR VARIABLE VOLUME REHEAT 8 695 250 0.2 1 3.8 1 0.2 37.5 95.0
VAV-10 ENVIRO-TEC SDR IV TESTING 103 VARIABLE VOLUME REHEAT 8 720 250 0.2 1 3.9 1 0.2 38.9 95.0
VAV-11 ENVIRO-TEC SDR IV TESTING 103 VARIABLE VOLUME REHEAT 8 720 250 0.2 1 3.9 1 0.2 38.9 95.0
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
M-600
MECHANICAL SCHEDULES
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
6/14/2024 61 OF 102
GATE VALVE WITH GLOBE-VALVED BYPASS
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE HOSE
CONNECTOR
VALVE SYMBOLSCONTROLS SYMBOLS
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
CT CONDUCTIVITY TRANSMITTER
SPS STATIC PRESSURE SENSOR
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
KR LOCAL RECORDING TIME CLOCK (RUNTIME)
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
PDS PRESSURE DIFFERENTIAL SWITCH
CONTROLS SYMBOLS
EPT ELECTRONIC TO PNEUMATIC TRANSDUCER
AT CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
CO2
AT
CO
OCCUPANCY SENSORAT
OC
LTCP LOCAL TEMPERATURE CONTROL PANEL
HVAC HVAC CONTROL PANEL
ECC
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TC
TEMPERATURE CONTROLLER. SEE SEQUENCE
OF OPERATION
VSMC VARIABLE SPEED MOTOR CONTROLLER
PC
PRESSURE CONTROLLER. SEE SEQUENCE OF
OPERATION
SC
SPEED CONTROLLER. SEE SEQUENCE OF
OPERATION
FC
FLOW CONTROLLER. SEE SEQUENCE OF
OPERATION
PSH PRESSURE SWITCH HIGH
FSH FLOW SWITCH HIGH
PSL PRESSURE SWITCH LOW
CONTROLS SYMBOLS
A
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
LENGTH IN DUCT WHEN SPACE
PERMITS.)
M
SENSOR WITH AVERAGING ELEMENT TO
TRANSMIT TEMPERATURE TO EMCS
MOTOR STARTER
ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
M-700
MECHANICAL CONTROLS
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
6/14/2024 62 OF 102
DDC
CONTROLLER
FLOOR MOISTURE
TIE INTO EXISTING BMS
FLOOR
W A
L L
SPACE HUMIDITY
SPACE TEMP
A.I.
A.I.
A.I.
D.O.
A.I.
A.I.
POINTS LIST FOR VAV AIR HANDLING UNIT (AHU-01)
SCALE: NTS
VARIABLE AIR VOLUME AIR HANDLING UNIT CONTROL DIAGRAM (AHU-01)
SEQUENCE OF OPERATION FOR AIR HANDLING UNIT (AHU-01)
SCALE: NTS
SCALE: NTS
CONTROL DIAGRAM
SCALE: NTS
TELECOMMUNICATION ROOM CONTROL DIAGRAM
SCALE: NTS
CONSTANT VOLUME AIR TERMINAL UNIT
PRESSURE SWITCH
HIGH
TO DISABLE FAN
WHEN HIGH
PRESSURE LIMIT
SETPOINT IS
REACHED
RELIEF AIR
D -4
P R
E
F
IL
T E
R
OUTSIDE AIR
D-1
C O
IL
P
R E
H E
A T
HW
V-2
V-1
CHWS
CWHR
RETURN FAN
SUPPLY FAN
A F
M D
A F
M D
SUPPLY AIR TO
TERMINAL UNIT
TT
TT
TT
FT
A F
T E
R
F
IL
T E
R
TT MT
HS
IT
VSMC
HSVSMC
FT
5 3 6
H-1
SD
CURRENT
TRANSMITTER
FOR FAN
STATUS ,TYP.
PSH
SMOKE
DETECTOR
VARIABLE SPEED
MOTOR
CONTROLLER, TYP.
ZC
ZC ZC
PDS PDS
TT
SST
IT
SST
SD
SPSTSL
TSL-1
NO
ECC
ECC
1. GENERAL
1.1
1.2
UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE ECC. H-O-A SWITCH SHALL BE
KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR
MAINTENANCE. WHEN THE UNIT IS "OFF" D-1 AND D-3, SHALL BE FULLY CLOSED. WHEN THE UNIT
IS "ON" D-1, D-2 AND D-3 SHALL MODULATE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE:
2. TEMPERATURE CONTROL
2.1
2.2
2.3
2.4
3. AIR FLOW CONTROL
3.1
3.2
3.3
3.3
3.4
4. FREEZE PROTECTION
4.1
6. AUTOMATIC SHUTDOWN/RESTART
6.1
6.2
7. EMERGENCY CONSTANT SPEED OPERATION
7.1
SUPPLY AIR TEMPERATURE, SENSED BY TT-1, SHALL BE MAINTAINED AT SETPOINT VIA DIGITAL
CONTROL PANEL BY MODULATING V-1 OR D-2 AND D-3 OR V-2 IN SEQUENCE.
WHEN THE OUTDOOR TEMPERATURE, SENSED BY TT-2 IS ABOVE 72°F, THE UNIT SHALL OPERATE
AT SCHEDULED MINIMUM OUTDOOR AIR FLOW RATE.
WHEN THE OUTDOOR TEMPERATURE, SENSED BY TT-2 IS BETWEEN 72°F AND 60°F, THE UNIT
SHALL BE IN FULL ECONOMIZING MODE. D-2 SHALL BE FULLY CLOSED, AND D-3 SHALL BE FULLY
OPEN.
WHEN THE OUTDOOR TEMPERATURE, SENSED BY TT-2, IS BELOW 60°F, THE UNIT SHALL
MODULATE D-1 AND D-2 TO MAINTAIN A 60°F DISCHARGE AIR SETPOINT. D-3 SHALL BE FULLY
OPEN. D-1 AND D-2 POSITIONS SHALL BE MODIFIED WITH A 2 MINUTE DELAY (VAR) FOR EACH 5
DEGREE (VAR) ADJUSTMENT. FINAL CONSTANTS DETERMINED BY TAB CONTRACTOR. MAINTAIN
MINIMUM OUTDOOR AIRFLOW RATE.
THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL MODULATING
THE SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER TO MAINTAIN 1.0" OF DUCT STATIC
PRESSURE (FIELD ADJUSTABLE), SENSED BY SPS-1. RESET STATIC PRESSURE BASED ON ACTUAL
BUILDING LOAD BY POLLING ALL VAV.
RETURN FAN SHALL MODULATE TO TRACK THE SUPPLY FAN LESS THE QUANTITY OF AIR
REQUIRED TO MAINTAIN A SPACE PRESSURE AS SENSED BY PS OF 0.02" W.C. (VAR)
THE OUTSIDE AIR, RETURN, AND RELIEF DAMPERS SHALL MODULATE TO MAINTAIN THE
SCHEDULED OUTSIDE AIRFLOW.
USING HIGH PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY FAN DISCHARGE SHALL
PREVENT THE SUPPLY FAN FROM DEVELOPING OVER 3" OF STATIC PRESSURE (VAR). IF STATIC
PRESSURE AT SPS-2 DOES EXCEED 3" THE SUPPLY AIR FAN SHALL STOP. SPS-2 SHALL BE
HARDWIRED TO THE SUPPLY FAN VSMC AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR
BYPASS MODE. SPS-2 WILL REQUIRE MANUAL RESET AT THE DEVICE.
THE HIGH PRESSURE SENSOR SPS-2, LOCATED AT THE SUPPLY FAN DISCHARGE SHALL PREVENT
THE RETURN FAN FROM DEVELOPING OVER 3" OF STATIC PRESSURE (VAR). IF STATIC PRESSURE
AT SPS-2 DOES EXCEED 3" THE RETURN SHALL STOP. SPS-2 SHALL BE HARDWIRED TO THE
RETURN FAN VSMC AND UNIT SHALL BE SHUTDOWN IN HAND, AUTO OR BYPASS MODE. SPS-2
WILL REQUIRE MANUAL RESET AT THE DEVICE. RETURN FAN SHALL BE STARTED BY D-4
ENDSWITCH.
UPON FAILURE OF THE VSMC, THE SUPPLY AND RETURN FANS SHALL BE STARTED/STOPPED
MANUALLY AT THE DIGITAL CONTROL PANEL OR THE ECC THROUGH THE BY-PASS STARTER.
FANS SHALL THEN BE OPERATED AT CONSTANT SPEED.
IF THE AIR TEMPERATURE AS SENSED BY TT-5 FALLS BELOW 45°F [7°C], AN ALARM SIGNAL SHALL
INDICATE AT THE DCP AND ECC. IF THIS TEMPERATURE FALLS BELOW 40°F [4.4°C], AS SENSED BY
THE TSL THE SUPPLY AND RETURN FANS SHALL SHUT DOWN AND A CRITICAL ALARM SHALL
INDICATE AT THE DIGITAL CONTROL PANEL AND ECC. TSL SHALL BE HARDWIRED TO THE SUPPLY
FAN VFD AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR BYPASS MODE. TSL WILL REQUIRE
MANUAL RESET AT THE DEVICE.
WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR, SD, THE SUPPLY FAN SHALL SHUT "OFF"
AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM. ALL SMOKE
DAMPERS IN THE SUPPLY AND RETURN DUCTS SHALL CLOSE.
RETURN FANS SERVING AREA OF THE SUPPLY FAN SHALL CONTINUE TO RUN. SUPPLY AND
RETURN FANS SHALL RESTART AND SMOKE DAMPERS SHALL OPEN WHEN FIRE ALARM CIRCUIT IS
RESET.
ALARM
PROCESSING
D U
T Y
C Y
C L E
F U
N C
T
IO
N
S C
H E
D U
L E
S T A
R T /S
T O
P
HUMIDITY HIGH LIMIT
RETURN FAN VSMC ALARM
SUPPLY FAN VSMC ALARM
RETURN FAN STATUS
STATIC PRESSURE HIGH LIMIT
RETURN LOW PRESSURE
S T A
T U
S
SYSTEM
A L A R
M
PR
IO
R
IT
Y/
AD
D -A
LT
ER
N
AT
E N
O
E L E
C T R
IC
D
E V
IC
E
S P
E E
D C
O M
M A
N D
P O
IN
T
ID
SYSTEM COMPONENT: -- O
P
E N
/C L O
S E
S T A
R T /S
T O
P -- V
A
LV
E P
O S
IT
IO
N
D A
M P
E R
P O
S
IT
IO
N
JOB: 590-22-703
VAV AIR HANDLER
SYSTEM:
BUILDING:
LEGEND
POINT
BINARY
T E
M P
E R
A T U
R E
T I)
L o ca l A la rm P a n e l
M a st e r A la rm
P a n e l
A re a A la rm
P a n e l
H
IG
H S
T A
T
IC
P R
E S
S U
R E
H
IG
H H
U M
ID
IT
Y
P R
E S
S U
R E
--L O
W T
E M
P E R
A T U
R E
P E
R C
E N
T
P R
E S
S U
R E
P O
S
IT
IO
N
F
LO
W
H
IG
H L
IM
IT
L O
W L
IM
IT
SYSTEM INPUTS
ANA- BINARY ANALOG
S P
A C
E T
E M
P . C
O N
T R
O L
--S T A
T
IC
P R
E S
S U
R E
R E
S E
T
--D E
M A
N D
L
IM
IT
IN
G
T E
M P
E R
A T U
R E
R E
S E
T
T E
M P
E R
A T U
R E
O V
E R
R
ID
E
E N
T H
A L P
Y E
C O
N O
M
IZ
E R
T E
M P
E R
A T U
R E E
C O
N O
M
IZ
E R
F A
IL
U
R E
M O
D E
PR
ES
SU
R
E/
VO
LU
M
E C
O N
TR
O
L
REMARKS
F U
LL
C
O M
M U
N
IC
A T
IO
N
SYSTEM SOFTWARE/CONTROL
APPLICATION/FUNCTION
PAGE:
SUPPLY FAN STATUS
MIXED AIR LOW LIMIT
RETURN AIR DAMPER
RETURN FAN START/STOP
COOLING VALVE V-1
PRE-HEAT VALVE V-2
EXHAUST AIR DAMPER
MINIMUM OUTSIDE AIR DAMPER
SUPPLY FAN VSMC
OUTSIDE AIR DAMPER
RETURN FAN VSMC
S T A
T
IC
P R
E S
S U
R E
C A
R B
O N
M O
N O
X
ID
E
H U
M
ID
IT
Y
V A
C U
U M
SUPPLY FAN START/STOP
AI-1
AI-2
AI-3
AI-4
AI-5
AI-6
AI-7
AI-8
AI-9
AI-10
T R
E N
D
IN
G
OUTSIDE AIR TEMPERATURE AI-11
BI-1
BI-2
BI-3
BI-4
BI-5
BI-6
BI-7
BI-8
AO-1
AO-2
AO-3
AO-4
AO-5
AO-7
AO-8
AO-9
BO-1
BO-2
FULL COMMUNICATION
FULL COMMUNICATION
A B
B R
E V
IA
T
IO
N
RAT
RAH
RAF
MAT
PHT
CCT
DAT
DASP
DAH
SAF
OAT
RLP
RF-STS
SF-STS
TSL-1
SPS-1
HHL
SF-ALA
RF-ALA
RF-SPD
SF-SPD
OAD
RAD
EAD
MIN-OAD
PHT-V2
CLG-V1
RF-SST
SF-SST
OUTPUTS
LOG
5. VALVING
5.1 MODULATE COOLING VALVE V-1 AND STEAM VALVE V-2 TO MAINTAIN A TEMPERATURE DISCHARGE
TEMPERATURE OF 60°F.
SUPPLY AIR FLOW (CFM)
DISCHARGE AIR HUMIDITY
DISCHARGE STATIC PRESSURE
DISCHARGE AIR TEMPERATURE
COOLING COIL TEMPERATURE
PRE-HEAT TEMPERATURE
MIXED AIR TEMPERATURE
RETURN AIR FLOW (CFM)
RETURN AIR HUMIDITY
RETURN AIR TEMPERATURE
M
D-3
ZC
PSL
SD
RETURN AIR
D-2
ZC
C O
IL
C
O O
L
IN
G
HWR
NOTE: LOCATE 2/3 OF WAY DOWN DUCTWORK
SPACE
PS
VAV HOT WATER VALVE V-3 AO-11 VAV-V3
ROOM THERMOSTAT/SENSOR
WALL MOUNTED
48" AFF.
TU
RHCHWS
HWR
V-2
REHEAT
COIL
AIR
TERMINAL UNIT
AIR
FLOW
TE
ATU
CONTROLLER
PC
TE
A
IR
F L O
W (C
F M
ROOM TEMPERATURE (°F)
CV
CFM
CONSTANT VOLUME WITH REHEAT
CONTROL SEQUENCE
W/DEADBAND
SP
FE
R E H E
AT FLO
W
A. SET POINTS SHALL SET AS FOLLOWS:
COOLING 75° F (VAR)
HEATING 70° F (VAR)
DEADBAND OF 5° F BETWEEN HEATING
AND COOLING SET POINT WILL BE
MAINTAINED.
B. UPON FALL IN SPACE TEMPERATURE
BELOW SET POINT VALVE V-3 WILL
MODULATE TO MAINTAIN SET POINT +
.5°,THE ADJUSTABLE TOLERANCE OF +
.5° HAS BEEN SELECTED TO PREVENT
VALVE HUNTING.
C. THE REVERSE SHALL OCCUR ON RISE
IN SPACE TEMPERATURE.
ALL CONTROL VALVES SHALL COMMUNICATE WITH THE BACNET CONTROL SYSTEM.
LOCATE SENSOR
OUTSIDE UNDER
SHIELD
TT
D -3
A F
M D
FT
OUTSIDE AIRFLOW AI-12 AFMD
NEW
SEQUENCE OF OPERATION
THE DUCTLESS SPLIT SHALL OPERATE CONTINUOUSLY TO
MAINTAIN A SPACE TEMPERATURE OF 75°(ADJ).SHOW
TEMPERATURE AND HUMIDITY AT THE GRAPHIC DISPLAY. PROVIDE
TEMPERATURE TRENDS. PROVIDE ALARM FOR TEMPERATURE
ABOVE 80F.
PROVIDE ALARM FOR MOISTURE SENSED ON FLOOR.
SHOW RACK TEMPERATURE AND HUMIDITY (SEE
TELECOMMUNICATION PLANS FOR NUMBER OF RACKS PER TR)
DUCTLESS SPLIT
MOUNTED HIGH
ON WALL
(COORDINATE MOUNTING
HEIGHT WITH CONDITIONS
OF THE SPACE)
M
T1 H
H
T1
M
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
M-701
MECHANICAL CONTROLS
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
05/24/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
6/14/2024 63 OF 102
CO
FE
SCALE:
SCALE:
SCALE:
CONCENTRIC REDUCER/INCREASER
ECCENTRIC REDUCER/INCREASER
UNION
TOP CONNECTION, 45° OR 90°
EXTENSION & CONTINUATION
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK
LIMIT OF DEMOLITION
ANCHOR
DIRECTION OF FLOW
DIRECTION OF PIPE PITCH (DOWN)
BOTTOM CONNECTION, 45° OR 90°
PIPE UP
SIDE CONNECTION
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING PIPING ACCESSORIES
FLOAT & THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES
STRAINER
PRESSURE GAGE
THERMOMETER
CLEAN-OUT
PTRAP
HOSE BIB
FLOW ELEMENT
FLOOR CLEANOUT (FCO)
CLEANOUT NOT TO BE
LOCATED IN
CARPETED AREA
1/8" BEND IF CLEANOUT
OCCURS AT END OF LINE.
WASTE LINE
LENGTH TO SUIT.
16" SQUARE CONC. PAD.
TROWEL SMOOTH AND
EDGE.
FINISH GRADE.
BRASS CLEANOUT PLUG
W/ COUNTER SUNK HEAD.
CLEANOUT AND ACCESS
COVER. TOP OF COVER
TO BE FLUSH W/ TOP OF
FLOOR.
FLOOR LINE
BALANCE OF PIPING
SAME AS CLEANOUT
TO GRADE.
BALL VALVE
CIRCUIT SETTER VALVE
CLEAN OUT
SS
SS
D
SD
SD
SCW
FCW
DWS
DWR
TWS
TWR
WATER BALANCING VALVE
PLUMBING ABBREVIATIONS PLUMBING FIXTURE SCHEDULE
SYMBOL DESCRIPTION
MANUFACTURER AND CATALOG #
(BASIS OF DESIGN ONLY OTHER
MANUFACTURES THAT MEET THE
SPECIFICATIONS ARE ACCEPTABLE)
FAUCET/FLUSH VALVE
CONNECTIONS
NOTES
HW CW W V
WATER CLOSET, WALL
MOUNT MOUNT, FLUSH
VALVE (ACCESSIBLE)
KOHLER KINGSTON ULTRA K-84325-0
SLOAN ROYAL OPTIMA 111-1.28
ES-S (1.28 GPF) SENSOR FLUSH
VALVE, ELONGATED OPEN FRONT
SEAT
- 1-1/2" 3" 2"
PROVIDE 120/24V CONTROL TRANSFORMER. SEE ARCHITECTURAL FOR
MOUNTING HEIGHT
LAVATORY WALL MOUNT
(ACCESSIBLE)
KOHLER KINGSTON K-2007-0 21"X18"
KOLHER K-13468-CP, SENSOR,
HARD WIRED, 0.5 GPM FLOW
1/2" 1/2" 1-1/2" 1-1/2"
GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, 120V-24V
TRANSFORMER. SEE ARCHITECTURAL PLANS FOR LOCATION OF ABA
FIXTURES, PROVIDE INSULATION ON SUPPLIES AND DRAIN ON ABA
FIXTURES, PROVIDE MANUAL MIXING VALVE TO LIMIT HOT WATER
SUPPLY TO 105°F. SEE ARCHITECTURAL FOR MOUNTING HEIGHT
SINGLE COMPARTMENT,
COUNTER MOUNT,
STAINLESS STEEL
ELKAY
LRAD222255
22"X22"X5.5"
CHCAGO 434-ABCP, 1.5 GPM, 9"
SPOUT WITH PULL-DOWN OUTLET,
DUAL-PATTERN OUTLET, SINGLE
ABA HANDLE
1/2" 1/2" 2" 2"
BASKET STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, INSULATION
ON SUPPLIES AND DRAIN ON ABA FIXTURES, PROVIDE MANUAL MIXING
VALVE TO LIMIT HOT WATER SUPPLY TO 105°F. SEE ARCHITECTURAL
FOR MOUNTING HEIGHT
FLOOR DRAIN JR SMITH FIG 2005
ROUND STRAINER, NICKEL BRONZE
STRAINER, TRAP PRIMER
CONNECTION
SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP
WITH TRAP PRIMER CONNECTION.
SERVICE SINK
FIAT TSB100, 24"X24"X12" CORNER
MOUNT
FIAT 830-AA, WALL MOUNTED WITH
SUPPORT AND VACUUM BREAKER
1/2" 1/2" 3" 2"
832AA 4' HOSE & HOSE HANGER, WALL GUARDS FOR TWO WALLS,
STAINLESS STEEL CURB CAPS
BOTTLE FILLER
ELKAY T9F806246 WITH FILTER
AND BOTTLE FILLER
WALL CARRIER, STOP, SUPPLY,
TAIL PIECE, P-TRAP
- 1/2" 2" 2"
8.0 GPH, 115 V, 1 PH, 3.8 FLA, 260 WATTS. SEE ARCHITECTURAL FOR
MOUNTING HEIGHT
GENERAL PLUMBING SYMBOLS
PLUMBING PIPING SYMBOLS
DEFINITIONSYMBOL
DOMESTIC COLD WATER, COLD WATER
DOMESTIC HOT WATER, HOT WATER
DOMESTIC HOT WATER RETURN, HOT WATER RETURN
VENT (SANITARY)
SOIL, WASTE, OR SANITARY SEWER
SANITARY SEWER, BELOW GRADE (SHOWN ON FLOOR PLAN)
DRAIN
STORM WATER
STORM WATER, BELOW GRADE (SHOWN ON FLOOR PLAN)
SOFTEN COLD WATER
FILTERED COLD WATER
DRINKING WATER SUPPLY
DRINKING WATER RETURN
TEMPERED WATER SUPPLY
TEMPERED WATER RETURN
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWH KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MGDU MEDICAL GAS DISTRIBUTION UNIT
MH MANHOLE
MOU MEMORANDUM OF UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM. NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW LEADER
PA PASCAL
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL
VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
P-418
P-528
FD-C
P-103
P-502
P-608
NOTE:
ALL EXPOSED PIPING AND VALVES TO BE HIDDEN BELOW SINK OR COUNTER TOP.
FAUCET
COUNTER TOP
SINK
ANGLE STOP VALVE
DRAIN WITH P-TRAP
HOT WATER
LOOP IN WALL
24" MAXIMUM
PIPING LENGTH
COLD WATER
UP IN WALL
NON-SENSORED
FAUCET
COUNTER TOP
SINK
NOTE:
ALL EXPOSED PIPING AND VALVES TO BE HIDDEN BELOW SINK OR COUNTER TOP.
ANGLE STOP VALVE
DRAIN WITH P-TRAP
24" MAXIMUM
PIPING LENGTH
HOT WATER
LOOP IN WALL
COLD WATER
IN WALL
COUNTER TOP
SINK
COLD WATER
IN WALL
HOT WATER
LOOP IN WALL
CLEANOUT TO FLOOR DETAIL2
NOT TO SCALE
LAVATORY HOT WATER CIRCULATION LOOP DETAIL1
NOT TO SCALE
MULTIPLE LAV HOT WATER CIRCULATION LOOP DETAIL3
NOT TO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
P-001
PLUMBING SYMBOLS, LEGENDS
AND SCHEDULES 009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
6/14/2024 64 OF 102
382120191817
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
PD100
PLUMBING DEMO - OVERALL
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
Revisions: Date:
1/8" = 1'-0"
LEVEL 1 - PLUMBING DEMO - OVERALL
PROJECT
NORTH
TRUE NORTH
(DASHED)
SEE SHEETS PD102 & PD104 FOR ENLARGED PLAN
SEE SHEETS PD101 & PD103 FOR ENLARGED PLAN
6/14/2024 65 OF 102
NORTH
TRUE NORTH
(DASHED)
2120191817
1 2 3 4 5 6 7
M A
T C
H L
IN
E
M A
T C
H L
IN
E
TO (E) HOSE BIBB
TO (E) HOSE BIBB
EXISTING CW SERVICE
EXISTING SANITARY
SEWER SERVICE
EXISTING HW SERVICE
(E) 1-1/2" HWR UP
(E) 4" SAN AND
(E) 1-1/2" CW UP
TO 2ND FLOOR
RELOCATE (E) CW
AND HW LINE. SEE
NEW WORK FOR
CONTINUATION
S S
S S
SS
SS
SSSSSS SS
(E) 3" SAN
1 2
(E) 4" SAN UP
(E) 1-1/4" HWR
(E) 1-1/4" CW
(E) 1" CW UP
(E) 4" SAN UP
(E) 4" W UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
PD101
CRAWL SPACE PLUMBING DEMO -
WEST 009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES
KEY PLAN
3/16" = 1'-0"
LEVEL 1 - CRAWL SPACE PLUMBING DEMO - WEST
Revisions: Date:
1 DEMO CW AND HW BACK TO MAIN. CAP WITHIN TWO PIPE DIAMETERS.
DEMO AND CAP SANITARY AND VENT LINE
PROJECT
NORTH
TRUE NORTH
(DASHED)
6/14/2024 66 OF 102
NORTH
TRUE NORTH
(DASHED)
32 5831302928272625
9 10 11 12 13 14 15 16 60 61 62 63 64
EXISTING CW SERVICE
EXISTING SANITARY SEWER SERVICE
EXISTING DOMESTIC HWR SERVICE
M A
T C
H L
IN
E
M A
T C
H L
IN
E
RELOCATE (E)
CW AND HWR
LINES. SEE NEW
WORK PLAN
FOR DETAILS
RELOCATE (E)
CW AND HWR
LINES. SEE NEW
WORK PLAN
FOR DETAILS
4" SAN UP
3" SAN UP
SSSSSS SS
3" SAN UP
3/4" HWR
UP
1/2" HWR,
1-1/2" CW,
2" SAN UP
4" SAN UP
1" HWR, 1"
CW, 2"
SAN UP
4" SAN UP
1" CW/HWR
1" CW
1 " CW
3"
SAN
UP
3"
SAN
S S
4" SAN UP
1/2" HWR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
PD102
CRAWL SPACE PLUMBING DEMO -
EAST 009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
PROJECT
NORTH
TRUE NORTH
(DASHED)
3/16" = 1'-0"
LEVEL 1 - CRAWL SPACE PLUMBING DEMO - EAST
Revisions: Date:
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES
KEY PLAN
DEMO CW AND HW BACK TO MAIN. CAP WITHIN TWO PIPE DIAMETERS.
DEMO AND CAP SANITARY AND VENT LINE
6/14/2024 67 OF 102
NORTH
TRUE NORTH
(DASHED)
2120191817
1 2 3 4 5 6 7
M A
T C
H L
IN
E
M A
T C
H L
IN
E
2 1
(E) 3"SAN UP
(E) 2"V UP
(E) 2"V UP
(E) 2"V UP
(E) 3"SAN UP
(E) 4"SAN UP
(E) 4" SAN
(E) 4" SAN
(E) 4" SAN
DN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:3
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
PD103
PLUMBING DEMO - WEST
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
Revisions: Date:
3/16" = 1'-0"
LEVEL 1 - PLUMBING DEMO - WEST
PROJECT
NORTH
TRUE NORTH
(DASHED)
1 REMOVE EXISTING WATER CLOSET. DEMO CW BACK TO MAIN. CAP WITHIN
TWO PIPE DIAMETERS. EXISTING SANITARY AND VENT LINE TO REMAIN.
DEMO WALL CARRIERS.
REMOVE EXISTING WATER CLOSET. DEMO CW BACK TO MAIN. CAP WITHIN
TWO PIPE DIAMETERS. DEMO AND CAP WASTE AND VENT LINE. DEMO WALL
CARRIERS.
REMOVE EXISTING LAVATORY AND ASSOCIATED PIPING. DEMO CW AND HW
BACK TO MAIN. CAP WITHIN TWO PIPE DIAMETERS. DEMO AND CAP
SANITARY AND VENT LINE. DEMO WALL CARRIERS.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES
KEY PLAN
6/14/2024 68 OF 102
NORTH
TRUE NORTH
(DASHED)
32 5831302928272625
9 10 11 12 13 14 15 16 60 61 62 63 64
M A
T C
H L
IN
E
M A
T C
H L
IN
E
(E) 2"V UP
(E) 4" SAN UP
(E) 2" SAN UP (E) 2"V UP
(E) 4" SAN UP
(E) 1-1/2" V UP
(E) 2"V UP
(E) 1-1/2" V UP
(E) 3" SAN UP
(E) 4" SAN
(E) 2"V UP
(E) 4" SAN DOWN
(E) 3" SAN UP
(E) 1-1/2" V UP
(E) 2"V UP
(E) 4" SAN UP
(E) 4" SAN UP
(E) 3" SAN UP
(E) 2"V UP
(E) 3" SAN UP
(E) 2" V UP
(E) 2" SAN UP
(E) 4"SAN UP
(E) 3" SAN UP
(E) 3" SAN DN
(E) 4" SAN UP
(E) 3" SAN DN
(E) 1" HW UP
(E) 3/4" CW
AND HW UP
(E) 1" CW
AND 3/4"HW
UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:3
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
PD104
PLUMBING DEMO - EAST
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES
KEY PLAN
3/16" = 1'-0"
LEVEL 1 - PLUMBING DEMO - EAST
Revisions: Date:
PROJECT
NORTH
TRUE NORTH
(DASHED)
REMOVE EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING. DEMO
CW AND HW BACK TO MAIN. CAP WITHIN TWO PIPE DIAMETERS. DEMO AND
CAP SANITARY AND VENT LINE. DEMO WALL CARRIERS.
DEMO (E) SANITARY LINE. MAINTAIN VENT CONNECTION AS REQUIRED.
REMOVE EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING. DEMO
CW BACK TO MAIN. CAP WITHIN TWO PIPE DIAMETERS. DEMO AND CAP
SANITARY AND VENT LINE. DEMO WALL CARRIERS.
6/14/2024 69 OF 102
382120191817
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:4
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
P-100
PLUMBING - OVERALL
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
1/8" = 1'-0"
LEVEL 1 - PLUMBING - OVERALL
PROJECT
NORTH
TRUE NORTH
(DASHED)
Revisions: Date:
SEE SHEETS P-102 & P-104 FOR ENLARGED PLAN
SEE SHEETS P-101 & P-103 FOR ENLARGED PLAN
6/14/2024 70 OF 102
NORTH
TRUE NORTH
(DASHED)
2120191817
1 2 3 4 5 6 7
M A
T C
H L
IN
E
M A
T C
H L
IN
E
(E) CW LINE. SEE
P-102 FOR
CONTINUATION
(E) HWR LINE. SEE
P-102 FOR
CONTINUATION
(E) SS LINE. SEE
P-102 FOR
CONTINUATION
(E) 3" CW
(E) 1-1/2" HWR
(E) 4"CW
(E) 1-1/2" HWR
CO
TO (E)
HOSE
BIBB
TO (E)
HOSE
BIBB
2" W & 1/2"CW/HW UP
TO SINK
PROVIDE SHUT OFF
VALVE AT FIXTURE
1/2" CW & 2" W
UP TO BOTTLE
FILLER.
PROVIDE SHUT
OFF VAVLE AT
FIXTURE
CO
RELOCATE (E) 1"
CW AND HWR
LINES THAT SERVE
2ND FLOOR INTO
WALL.
CO
1/2" HWR FROM
ABOVE
(E) 4"W
(E) 1-1/2" CW
CIRCUIT
SETTER
CIRCUIT
SETTER
1/2" HWR
FROM
ABOVE
SS SS SS
S S
S S
SS
SS
SS
SS
3" SAN
3" SAN
(E) 4"W
(E) 1-1/2"
CW/HWR
(E) 2" CW
(E) 4" W
SHUT
OFF
VAVLE
CO
(E) 4"SAN
(E) 4"
SAN
FROM
ABOVE
S S S
S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:4
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
P-101
CRAWL SPACE PLUMBING - WEST
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
Revisions: Date:
KEY PLAN
3/16" = 1'-0"
LEVEL 1 - CRAWL SPACE PLUMBING - WEST
PROJECT
NORTH
TRUE NORTH
(DASHED)
GENERAL NOTES
1. DRAWINGS ARE DIAGRAMMATICAL TO ENSURE LEGIBILITY AND CLEANLINESS.
CONTRACTOR SHALL CONFIRM DIMENSIONS AND EQUIPMENT FIT AS NEEDED FOR
COMPLETE INSTALL
2. ALL WORK SHALL BE COMPLY WITH PLUMBING CODE RECOGNIZED BY AUTHORITY
HAVING JURISDICTION
3. SLOPE ALL SANITARY SEWER LINES @ 1/4" PER FOOT UNLESS APPROVED BY
AUTHORITY HAVING JURISDICTION . LINES EQUAL TO OR GREATER THAN 4" MAY BE
SLOPED AT 1/8" UPON APPROVAL AND IN ACCORDANCE WITH IPC
4. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER RECOMMENDATION
UNLESS OTHERWISE DIRECTED
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. SANITARY PIPING SHALL BE DWV CAST IRON. USE APPROPRIATE FITTINGS AS
INDICATED IN IPC.
7. PROVIDE CLEANOUTS AS SHOWN ON DRAWINGS, LINES FROM MAIN PIPE LONGER
THAN 5 FT UNLESS EXEMPT IN UPC, MAINS OVER 100 FT IN HORIZONTAL LENGTH, OR
CHANGE IN DIRECTION GREATER THAN 135 DEGREES
KEYNOTES
KEY PLAN
1 (E) 3" SAN & 1-1/2"CW UP TO WC. PROVIDE SHUT OFF VALVE AT FIXTURE IN WET WALL
2" SAN & 1/2"CW UP TO LAV
2" SAN UP TO FD & 2" V UP WALL
3" SAN & 1-1/2"CW UP TO WCPROVIDE CW SHUT OFF VALVE AT FIXTURE
INSTALL NEW WALL CARRIERS FOR WATER CLOSET.
INSTALL NEW CONCEALED ARM CARRIERS FOR LAVATORY.
6/14/2024 71 OF 102
NORTH
TRUE NORTH
(DASHED)
32 5831302928272625
9 10 11 12 13 14 15 16 60 61 62 63 64
M A
T C
H L
IN
E
M A
T C
H L
IN
E
(E) CW TO WEST SIDE OF BUILDING.
SEE P-101 FOR CONTINUATION
(E) HWR TO WEST SIDE OF
BUILDING. SEE P-101 FOR
CONTINUATION
(E) SAN TO WEST SIDE OF BUILDING.
SEE P-101 FOR CONTINUATION
(E) CW,HWR, SS FROM
BUILDING MAIN SERVICE
2" SAN UP TO FD, 2" V UP TO WALL
RELOCATED 1-1/4"
HWR AND 1" CW UP
3/4" HWR
UP
4" SAN UP
3" SAN UP
(E) 4" SAN UP
4" SAN
DN/UP
4" SAN UP
CO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:3
:4
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /M
E C
H B
L D
G
A
.r v t
P-102
CRAWL SPACE PLUMBING - EAST
009A
MGH/JW NBH
CONSTRUCTION
DOCUMENTS
06/14/2024
557-21-703
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
3/16" = 1'-0"
LEVEL 1 - CRAWL SPACE PLUMBING - EAST
PROJECT
NORTH
TRUE NORTH
(DASHED)
Revisions: Date:
GENERAL NOTES
1. DRAWINGS ARE DIAGRAMMATICAL TO ENSURE LEGIBILITY AND CLEANLINESS.
CONTRACTOR SHALL CONFIRM DIMENSIONS AND EQUIPMENT FIT AS NEEDED FOR
COMPLETE INSTALL
2. ALL WORK SHALL BE COMPLY WITH PLUMBING CODE RECOGNIZED BY AUTHORITY
HAVING JURISDICTION
3. SLOPE ALL SANITARY SEWER LINES @ 1/4" PER FOOT UNLESS APPROVED BY
AUTHORITY HAVING JURISDICTION . LINES EQUAL TO OR GREATER THAN 4" MAY BE
SLOPED AT 1/8" UPON APPROVAL AND IN ACCORDANCE WITH IPC
4. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER RECOMMENDATION
UNLESS OTHERWISE DIRECTED
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. SANITARY PIPING SHALL BE DWV CAST IRON. USE APPROPRIATE FITTINGS AS
INDICATED IN IPC.
7. PROVIDE CLEANOUTS AS SHOWN ON DRAWINGS, LINES FROM MAIN PIPE LONGER
THAN 5 FT UNLESS EXEMPT IN UPC, MAINS OVER 100 FT IN HORIZONTAL LENGTH, OR
CHANGE IN DIRECTION GREATER THAN 135 DEGREES
KEYNOTES
KEY PLAN
3" SAN, 2" V & 1/2" CW UP TO P502. PROVE SHUT OFF VALVES AT FIXTURE1
6/14/2024 72 OF 102
File details come from the government source that posted it. Updated .