S02-RFP Attachment 15-Drawings-Dublin_Part6.pdf

PDF 2 MB Posted

Attached to
Y1DZ--Renovate Building 9A for EHRM Administration- EHRM Project 557-21-703 Carl Vinson VA Medical Center Dublin, GA 31021
Solicitation number
36C77626R0031_1
Issued by

About this file

This document set comprises construction drawings and mechanical/plumbing specifications for the renovation of Building 9A at Carl Vinson VA Medical Center in Dublin, Georgia, to create EHRM (Electronic Health Records Management) administrative space. The project is identified as 557-21-703 and prepared by SPEES Design Build (architect/engineer of record located in Kent, Washington).

The mechanical systems include variable air volume (VAV) terminal units serving multiple spaces with hot water and chilled water distribution, an air handling unit (AHU-01) with economizer controls, mini-split ductless heat pump systems for dedicated spaces, and restroom exhaust fans. Mechanical details specify pipe sizing ranging from 3/4 inch to 1-1/2 inches for heating/cooling loops, with connections to existing risers in the crawl space. The plumbing system involves domestic cold water, hot water, sanitary sewer, and vent piping with fixtures including water closets, lavatories, a service sink, and a bottle filler. Key piping sizes for plumbing range from 1/2 inch to 4 inches. Demolition work requires removal of existing fixtures and capping of discontinued water supply, sewer, and vent lines within two pipe diameters of the main. Control sequences detail temperature and humidity management via DDC (direct digital control) controllers with integration to the building management system. The drawings indicate "fully sprinklered" construction and show match lines indicating continuation across multiple plan sheets. All new work is shown in dark lines with existing work in light lines per standard convention.

View the file

Other files

File Type Posted
S05-Tech Questions w responses-Amendment 0006-Dublin.pdf PDF
S06- Addendum 2-Dublin - Specifications.pdf PDF
S06-Amendment 0006 SF 30-Dublin.pdf PDF
S06-Amendment 0005-SF30-Dublin.pdf PDF
S06-Amendment 0004-Addendum-1-Specifications.pdf PDF
S06-Amendment 0004-Addendum-1-Drawings.pdf PDF
S06 - Amendment 0004-Additional Technical Responses -Dublin.pdf PDF
S06-Amendment 0004-SF30.pdf PDF
S06-Amendment 0004- Addendum 1 - Hazardous Materials Survey.pdf PDF
S06- Amendment 0004-Technical Responses - Dublin.pdf PDF
S06-Amendment 0003-due date ext-Dub.pdf PDF
S04-Site Visit Sign In Sheet-Dublin.pdf PDF
S06-36C77626R0031-Amendment 0002.pdf PDF
S02-RFP Attachment 24-Specifications- Part 2 of 5 - Section 09 06 00.pdf PDF
S06-36C77626R0031-Amendment 0001.pdf PDF
S02-RFP Attachment 5- Specifications part 1 of 5.pdf PDF
S02-RFP Attachment 7- Specifications part 3 of 5.pdf PDF
S02-RFP Attachment 21-Drawings-Dublin_Part12.pdf PDF
S02-RFP Attachment 22-Drawings-Dublin_Part13.pdf PDF
S02 - RFP Attachment 3 - Limitations on Subcontracting - Dublin.docx DOCX document
S02-RFP Attachment 9- Specifications part 5 of 5.pdf PDF
S02-RFP Attachment 12-Drawings-Dublin_Part3.pdf PDF
S02-RFP Attachment 14-Drawings-Dublin_Part5.pdf PDF
S02-RFP Attachment 17-Drawings-Dublin_Part8.pdf PDF
S02-RFP Attachment 18-Drawings-Dublin_Part9.pdf PDF
S02-RFP Attachment 20-Drawings-Dublin_Part11.pdf PDF
S02-36C77626R0031_1-final.pdf PDF
S02-RFP Attachment 1 DBA Rates-Laurens County-Dublin.pdf PDF
S02-RFP Attachment 6- Specifications part 2 of 5.pdf PDF
S02-RFP Attachment 13-Drawings-Dublin_Part4.pdf PDF
S02-RFP Attachment 16-Drawings-Dublin_Part7.pdf PDF
S02-RFP Attachment 19-Drawings-Dublin_Part10.pdf PDF
S02-RFP Attachment 2 Site Visit Information-Dublin.docx DOCX document
S02-RFP Attachment 4 Campus Map-Dublin.pdf PDF
S02-RFP Attachment 8- Specifications part 4 of 5.pdf PDF
S02-RFP Attachment 10- Drawings-Dublin_Part1.pdf PDF
S02-RFP Attachment 11-Drawings-Dublin_Part2.pdf PDF
S02-RFP Attachment 23-Drawings-Dublin_Part14.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

DETAIL AREA

PROJECT

NORTH

TRUE NORTH

(DASHED)

32 5831302928272625

9 10 11 12 13 14 15 16 60 61 62 63 64

5710X10[1]325

(TYP 2)

10X10[1]335

(TYP.3)

10X10[1]355

(TYP 4)

22X22[3]1340

22X22[3]1440

M A

T C

H L

IN

E

M A

T C

H L

IN

E

6X6[3]140

IV SUPPORT

IV TESTING

STG

103A

MECHANICAL

TR

CORRIDOR

CR11-9

CORRIDOR

CR11-9

ELECTRICAL

ROOM

22X10[3]395 8X6[4]140

8X6[4]150

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

M-104

MECHANICAL RCP - EAST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

Revisions: Date:

GENERAL NOTES

1. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

KEY PLAN

3/16" = 1'-0"

LEVEL 1 - MECHANICAL NEW RCP - EAST

PROJECT

NORTH

TRUE NORTH

(DASHED)

6/14/2024 56 OF 102

32 5831302928272625

382120191817

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

MP100

MECHANICAL PIPING - OVERALL

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

1/8" = 1'-0"

LEVEL 1 - MECHANICAL PIPING - OVERALL

Revisions: Date:

PROJECT

NORTH

TRUE NORTH

(DASHED)

SEE SHEETS MP102 FOR ENLARGED PLAN

SEE SHEETS MP101 FOR ENLARGED PLAN

6/14/2024 57 OF 102

PROJECT

NORTH

TRUE NORTH

(DASHED)

(E)AC-9-107

2120191817

1 2 3 4 5 6 7

HWR

HWS

HWR

HWS

009A-VAV-03

009A-VAV-04

009A-VAV-02

009A-VAV-05

009A-VAV-01

M A

T C

H L

IN

E

M A

T C

H L

IN

E

3/4" HWS/HWR

3/4" HWS/HWR

1"HWS/HWR

3/4" HWS/HWR1-1/4" HWS/HWR

3/4" HWS/HWR

3/4" HWS/HWR

IV TESTING

CHANGE MGMT

USER

STAFF BREAK

CORRIDOR

CR11-9

CORRIDOR

CR11-9

ELECTRICAL

CLOSET

STORAGE

MECHANICAL

RESTROOM

RESTROOM

RESTROOM

RESTROOM

WAITING ALCOVE

3/4" HWS/HWR

009A-VAV-06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

MP101

MECHANICAL PIPING - WEST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

KEYNOTES

KEY PLAN

Revisions: Date:

3/16" = 1'-0"

LEVEL 1 - MECHANICAL PIPING - WEST

PROJECT

NORTH

TRUE NORTH

(DASHED)

CONNECT HWS/HWR TO NEW VAV BOX. PROVIDE ISOLATION VALVES TO EACH BOX.

CONNECT NEW HYDRONIC HEATING PIPING TO EXISTING 1-1/4" HWS AND 1-1/4"

RISERS FROM CRAWL SPACE

CONNECT NEW HYDRONIC HEATING PIPING TO EXISTING 3/4" HWS AND 3/4" HWR

RISERS FROM CRAWL SPACE

6/14/2024 58 OF 102

NORTH

TRUE NORTH

(DASHED)

32 5831302928272625

9 10 11 12 13 14 15 16 60 61 62 63 64

HWR

HWS

HWR

HWS

009A-VAV-09

009A-VAV-07

009A-VAV-08

HWR

HWS

HWR

HWS

009A-VAV-10

009A-VAV-11

M A

T C

H L

IN

E

M A

T C

H L

IN

E

3/4" HWS/HWR

3/4" HWS/HWR

3/4" HWS/HWR

3/4" HWS/HWR

3/4" HWS/HWR

1-1/2" HWS/HWR

CONNECT NEW 2" CWS/CWR TO EXISTING

3" CWS/CWR LINES IN CRAWL SPACE.

INSTALL VALVES AT BRANCH TAP

CORE AND SLEEVE WALL AS NEEDED

FOR NEW PIPE PENETRATIONS.

CONNECT NEW 1-1/2"

HWS/HWR TO EXISTING

1-1/2" HWS/HWR LINES

IN PLACE

009A-AHU-1

IV SUPPORT

IV TESTING

STG

103A

HAC

MECHANICAL

TR

CORRIDOR

CR11-9

CORRIDOR

CR11-9

ELECTRICAL

ROOM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

MP102

MECHANICAL PIPING - EAST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

KEYNOTES

KEY PLAN

CONNECT HWS/HWR TO NEW VAV BOX. PROVIDE ISOLATION VALVES TO EACH BOX.

CONNECT NEW HYDRONIC HEATING PIPING TO EXISTING 1-1/4" HWS AND 1-1/4" RISERS

FROM CRAWL SPACE

3/16" = 1'-0"

LEVEL 1 - MECHANICAL PIPING - EAST

PROJECT

NORTH

TRUE NORTH

(DASHED)

Revisions: Date:

6/14/2024 59 OF 102

SCALE: NOT TO SCALE

INDIRECT SINK DRAIN DETAIL

PIPE THRU FIRE RATED WALL DETAIL

PIPE THRU WALL DETAIL

PIPE THRU FLOOR DETAIL

SCALE: NTS SCALE: NTS SCALE: NTS

2 AIR HANDLING UNIT DRAIN TRAP DETAIL

SCALE: NTS

HEAT PUMP REFRIGERANT ISO

SCALE: NTS

7 RECTANGULAR DUCT THRU WALL DETAIL

SCALE: NTS

8 VOLUME DAMPER DETAIL

SCALE: NTS

9 DUCT CONNECTIONS - AIR TERMINAL UNITS

SCALE: NTS

A B

1"

EXIST MASONRY

WALL

PIPE SLEEVE

PIPE

INSULATION

PIPE

MINERAL WOOL

INSIDEOUTSIDE

FIRE RATED CAULKING

PIPE

INSULATION

WITH JACKET

FIRE RATED CAULKING

EXIST MASONRY

WALL

PIPE SLEEVE

PIPE

INSULATION

PIPE

MINERAL WOOL

INSIDEOUTSIDE

CAULK (TYP)

PIPE

INSULATION

WITH JACKET

CAULK (TYP)

1/2"

1/2"

FIRE RESISTANT

SEALANT

PIPE RISER

PIPE SLEEVE

FLOOR OPENING

DRAW THRU

BLOW THRU

2" PLUS X

1" MINIMUM

X

2X

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

DRAIN LINE SHALL BE AT LEAST THE SAME

SIZE AS THE NIPPLE ON THE DRAIN PAN

PIPING SHALL BE RIGID COPPER TYPE L OR

TYPE M UNLESS NOTE BELOW IS MET

PITCH DOWN

TOWARD DRAIN

CLEAN OUT

FLOOR SINK

DRAIN

PAN

NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY

LOCAL VA AND IS INDOORS AND DOES NOT PASS THROUGH

RATED BARRIERS.

2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR

METALS ARE TO BE CONNECTED.

DIELECTRIC

FITTING

NOTE:

1.

2.

DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR

MULTI-BLADE DAMPERS & ROUND DAMPERS.

INSULATION SEE

SPECIFICATION

DAMPER BLADE

1/8" CLEARANCE

ALL AROUND

OUTSIDE END BEARING

INSIDE END BEARING

HANDLE WITH LOCKING

QUADRANT

INSULATION

STAND-OFF

1/2" ROUND ROD PIN

DUCT

STIFFEN BLADE

AS REQUIRED

SIDE ELEVATION SECTION

NOTE:

1.

2.

3.

4.

5.

RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A

MINIMUM OF 3 TIMES THE DIAMETER OF INLET

A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT ALLOWED

TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0".

A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET,

PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10

FEET. FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A DUCT TRANSITION TO

MAINTAIN THE DUCT STATIC PRESSURE DROP AT OR BELOW 0.2"/100'.

FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT TO

DIFFUSER, SHALL NOT EXCEED 5'-0". USE RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER

THAN 45°.

COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE

INSULATION W/ VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.

AIR TERMINAL UNIT

(VAV)

DIFFUSER (TYP.)

SEE SPECIFICATIONS FOR

CLAMPS AND SEALANT (TYP.)

SEE NOTE 5

SEE NOTE 3

SEE NOTE 2

SEE NOTE 1

OUTDOOR

HEAT PUMP

W

ALL MOUNT

FAN COIL UNIT

4" CONCRETE BASE

ELECTRICAL/REFRIGERANT

LINE SET BUNDLE

(TYP OF 2,3 OR 4 PORT

SYSTEMS, 3 PORT SHOWN)

SUPPORT ON WALL

20 GAGE SHEET METAL PAN AROUND REFRIGERANT LINES

FROM BOTTOM WALL ANCHOR TO EAVE. PAINT PAN TO

MATCH BUILDING COLOR WITH PRIMER AND TWO COATS OF

OIL BASE PAINT. FASTEN SECURELY TO WALL.

CONTRACTOR HAS OPTION TO RUN LINES IN WALL.

4" DIA. HOLE THRU WALL OR SOFFIT

SEAL WEATHER TIGHT

CONDENSATE DRAIN LINE DN TO MOP SINK

IN HAC

EXIST MASONRY WALL

MIN. 1" THICKNESS

MINERAL WOOL PACKING.

(TYP)

CAULK (TYP)

1" CAULK (TYP)

STEEL DUCT.

STEEL SLEEVE. (TYP) 1" MAX.

ANNULAR SPACE

FINISH WALL

TYPICAL EXISTING SINK

1-1/2" TRAP AND

TRAP ARM

3/4" CONDENSATE

DRAIN TUBING

WATER TIGHT SEAL

WORM DRIVE CLAMP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

M-500

MECHANICAL DETAILS

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

6/14/2024 60 OF 102

MINI SPLIT SYSTEM SCHEDULE

OUTDOOR HEAT PUMP INDOOR FAN COIL

EQUIP# MFR MODEL #

OPERATING

WEIGHT

(LBS)

SEER2

@ 95° F

COOLING

@ 95° F

(MBH)

HSPF

@ 47° F

HEATING

@ 7° F

(MBH)

ELECTRICAL

NOTES EQUIP# MFR MODEL # TYPE SERVING

AIRFLOW

(CFM)

SPEED

ESP

TOTAL

COOLING

@ 95° F

(MBH)

SENSIBLE

COOLING

@ 95° F

(MBH)

TOTAL

HEATING

@ 7° F

(MBH)

ELECTRICAL

WEIGHT (LB) NOTES

MCA MOCP VOLTS PHASE MCA / MOCP VOLT PHASE

LG LSU30 250 20 30.4 11.5 18.2 23 30 208 1 1, 2, 3 LG LSN30 WALL MOUNTED TR 1130 HIGH 0 30.4 22.1 18.2

POWERED

BY OUTDOOR

UNIT

208 1 70 1, 2, 3, 4, 509A-HP-01

09A-FC01

INDOOR NOTES:

1. PROVIDE FACTORY WALL MOUNTING HARDWARE

2. PROVIDE FACTORY WALL MOUNTED T-STAT WITH BMS CAPABILITIES

3. PROVIDE SLIDE-IN AIR FILTER.

4. ROUTE CONDENSATE TO NEAREST TO MOP SINK IN HOA. COORDINATE LOCATIONS WITH PLUMBING CONTRACTOR.

5. PROVIDE REFRIGERANT LINE SET

OUTDOOR NOTES:

1. PROVIDE 12" GROUND STAND AND PREFABED PAD

2. ROUTE CONDENSATE LINE DOWN ONTO ROOF

3. PROVIDE LOW AMBIENT CONTROLS & CRANK CASE HEATER

1. GRAVITY BACKDRAFT DAMPER WITH THE MAXIMUM 40 CFM PER S.F. LEAKAGE RATE AT 1" WATER COLUMN PER AMCA 500 D.

2. PROVIDE FAN MOUNTED SPEED CONTROL

3. INTERLOCK WITH LIGHT SWITCH

RESTROOM EXHAUST FAN SCHEDULE

# MFG MODEL SERVICE DRIVE

AIRFLOW

(CFM)

ESP

FAN

RPM

SONE

LEVEL

MOTOR

NOTES

WATTs VOLTS PHASE AMPS

PANASONIC FV-05-11VSK2

RESTROOM

DIRECT 105 0.2 1164 0.7 13.1 120 1 0.2 1, 2, 3

PANASONIC FV-05-11VSK2

RESTROOM

DIRECT 110 0.2 1164 0.7 13.1 120 1 0.2 1, 2, 3

PANASONIC FV-05-11VSK2

RESTROOM

DIRECT 100 0.2 1164 0.7 13.1 120 1 0.2 1, 2, 3

PANASONIC FV-20VQ3

RESTROOM

DIRECT 140 0.2 1164 0.7 13.1 120 1 0.2 1, 2, 3

NOTES:

VAV AIR HANDLER UNIT SCHEDULE

# SERVICE MFG MODEL

SUPPLY

AIRFLOW

(CFM)

AIRFLOW

OSA

(CFM)

SUPPLY

ESP (")

SUPPLY

RPM /

SPEED

SUPPLY

MOTOR

BHP

RETURN

AIRFLOW

(CFM)

RETURN

ESP (IN

WC)

RETURN

RPM /

SPEED

RETURN

MOTOR

BHP

COOLING COIL PERFORMANCE HEATING COIL PERFORMANCE ELECTRICAL

RTU

WEIGHT

(LBS)

CURB

WEIGHT

(LBS)

TOTAL

WEIGHT

(LBS)

NOTES

NET TOTAL

(MBH)

NET SENS

(MBH)

EWT

(F)

LWT

(F)

FLUID

VELOCITY

(FPS)

EAT

(DB)

EAT

(WB)

LAT

(DB)

LAT

(WB)

COIL

FACE

VELOCITY(FPS)

NET

TOTAL

(MBH)

EWT

(F)

LWT

(F)

FLUID

VELOCITY

(FPS)

EAT

(DB)

LAT

(DB)

COIL

FACE

VELOCITY(FPS)

MCA MOCP VOLT PHASE

SEE PLAN YORK XTO-51X48 3475 1530 2 2120 4.5 3175 2 1750 3.5 327 182 44 54.1 3.3 93 75.8 46.5 46.4 327 141 180 159.9 1.5 27 60.1 327 34.6 60 208 3 4267 0 4267 1, 2, 3, 4, 5, 6

SEE PLAN EXISTING 2,870 995 EXISTING 2,420 EXISTING 7

NOTES:

1. PROVIDE FULL ECONOMIZER

2. PROVIDE 14" FACTORY GROUND MOUNTED STAND

3. PROVIDE FACTORY DISCONNECT

4. PROVIDE BAROMETRIC RELIEF

5. PROVIDE FACTORY INSTALLED SMOKE DETECTOR IN RETURN DUCT

6. PROVIDE ULTRA LOW LEAK DAMPERS ON OUTSIDE AIR. MOTORIZED DAMPERS SHALL HAVE A TESTED MAXIMUM LEAKAGE RATE NOT TO EXCEED 4 CFM/S

7. RE-BALANCE SYSTEM TO LISTED CFMS

AIR TERMINAL SCHEDULE

009A-AHU-1

009A-EF-1

009A-EF-2

AIR OUTLET SCHEDULE

TAG MNUFACTURER MODEL NO. SERVICE TYPE MATERIAL MOUNTING BORDER PATTERN

BLADE

SPACING

(INCH)

BLADE

POSITION

BLADE

DEFLECTION

NOTES

[1] PRICE SMCD SUPPLY DIFFUSER STEEL LAY-IN 3P

4-WAY

ADJUSTABLE

N/A N/A N/A 1, 2, 3, 4

[2] PRICE SMCD SUPPLY DIFFUSER STEEL SURFACE F

4-WAY

ADJUSTABLE

N/A N/A N/A 1, 2, 3

[3] PRICE 530 RL RETURN GRILLE STEEL LAY-IN F FIXED 3/4"

FRONT

HORIZONTAL

45° 1, 2, 3, 5

[4] PRICE 300 RS SUPPLY GRILLE STEEL SURFACE TYPE 1

DOUBLE

DEFLECTION

3/4" - ADJUSTABLE 1, 2, 3

NOTES:

1. COLOR TO BE MANUFACTURER TO BE APPROVED BY VA

2. PROVIDE BALANCING DAMPER IN BRANCH DUCT SERVING AIR OUTLET AT TAKEOFF FROM TRUNK DUCT. (ADDITIONAL DAMPERS FOR SYSTEM BALANCING ARE SHOWN ON

DRAWINGS)

3. PROVIDE SQUARE TO ROUND ADAPTER AS REQUIRED

4. PROVIDE 24"X24" PAN FOR LAY-IN CEILING INSTALLATION AS REQUIRED (SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR LOCATION)

5. PROVIDE RETURN GRILLE WITHOUT SCREW HOLES FOR LAY-IN CEILING APPLICATION (SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR LOCATION)

009A-EF-3

009A-EF-4

INLINE EXHAUST FAN SCHEDULE

# MFG MODEL SERVICE DRIVE CFM ESP (")

FAN

RPM

SONE

LEVEL

MOTOR

NOTES

HP VOLTS PHASE

COOK 100 SQN-D MECH/ HOA DIRECT 200 0.5 1708 8 0.08 208 1 1, 2, 3

NOTES:

1. PROVIDE W/ FAN SPEED CONTROL.

2. PROVIDE MOTORIZED DAMPER WITH 24-VOLT ACTUATOR.

3. TO RUN CONTINUOUSLY

009A-EF-5

(E)AC-9-107

EQUIPMENT TAG

MANUFACTURER

BASIS OF

DESIGN

BASIS

OF

DESIGN

MODEL

AREA SERVED TYPE UNIT SIZE

DESIGN AIRFLOW

(CFM)

MINIMUN AIRFLOW

(CFM)

ESP (IN WC)

HOT WATER REHEAT COIL

COIL ROWS FLOW (GPM)

FLUID HEAD

LOSS (FT H2O)

AIR PRESSURE

DROP OVER COIL

(IN W.C.)

HEATING

PERFORMANCE (MBH)

LEAVING AIR

TEMP. (F)

VAV-01 ENVIRO-TEC SDR CHANGE MANAGEMENT 108 VARIABLE VOLUME REHEAT 8 680 250 0.2 1 3.7 1 0.2 36.7 95.0

VAV-02 ENVIRO-TEC SDR STAFF BREAKROOM 107 VARIABLE VOLUME REHEAT 8 300 250 0.1 1 1.6 0.8 0.1 16.2 95.0

VAV-03 ENVIRO-TEC SDR IV TESTING 106 VARIABLE VOLUME REHEAT 8 740 250 0.2 1 4.0 1 0.2 40.0 95.0

VAV-04 ENVIRO-TEC SDR IV TESTING 106 VARIABLE VOLUME REHEAT 8 740 250 0.2 1 4.0 1 0.2 40.0 95.0

VAV-05 ENVIRO-TEC SDR CORRIDOR VARIABLE VOLUME REHEAT 8 410 250 0.15 1 2.2 0.8 0.2 22.1 95.0

VAV-06 ENVIRO-TEC SDR RESTROOM/CORRIDOR VARIABLE VOLUME REHEAT 8 700 250 0.2 1 3.8 1 0.2 37.8 95.0

VAV-07 ENVIRO-TEC SDR IV SUPPORT 104 VARIABLE VOLUME REHEAT 8 670 250 0.2 1 3.6 1 0.2 36.2 95.0

VAV-08 ENVIRO-TEC SDR IV SUPPORT 104 VARIABLE VOLUME REHEAT 8 670 250 0.2 1 3.6 1 0.2 36.2 95.0

VAV-09 ENVIRO-TEC SDR CORRIDOR VARIABLE VOLUME REHEAT 8 695 250 0.2 1 3.8 1 0.2 37.5 95.0

VAV-10 ENVIRO-TEC SDR IV TESTING 103 VARIABLE VOLUME REHEAT 8 720 250 0.2 1 3.9 1 0.2 38.9 95.0

VAV-11 ENVIRO-TEC SDR IV TESTING 103 VARIABLE VOLUME REHEAT 8 720 250 0.2 1 3.9 1 0.2 38.9 95.0

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

M-600

MECHANICAL SCHEDULES

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

6/14/2024 61 OF 102

GATE VALVE WITH GLOBE-VALVED BYPASS

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE HOSE

CONNECTOR

VALVE SYMBOLSCONTROLS SYMBOLS

T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT

TT TEMPERATURE TRANSMITTER

M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT

MT MOISTURE (HUMIDITY) TRANSMITTER

PT PRESSURE TRANSMITTER

TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT

FT FLOW TRANSMITTER

IT CURRENT TRANSMITTER

CT CONDUCTIVITY TRANSMITTER

SPS STATIC PRESSURE SENSOR

SD SMOKE DETECTOR

PDT PRESSURE DIFFERENTIAL TRANSMITTER

KR LOCAL RECORDING TIME CLOCK (RUNTIME)

HS HAND SWITCH (HAND-OFF-AUTO SWITCH)

ZC VALVE OR DAMPER POSITION CONTROLLER

PDS PRESSURE DIFFERENTIAL SWITCH

CONTROLS SYMBOLS

EPT ELECTRONIC TO PNEUMATIC TRANSDUCER

AT CARBON DIOXIDE TRANSMITTER

CARBON MONOXIDE TRANSMITTER

CO2

AT

CO

OCCUPANCY SENSORAT

OC

LTCP LOCAL TEMPERATURE CONTROL PANEL

HVAC HVAC CONTROL PANEL

ECC

INTEGRATE CONTROL POINT ON REMOTE GRAPHICS

WORKSTATION AT ENERGY CONTROL CENTER

TC

TEMPERATURE CONTROLLER. SEE SEQUENCE

OF OPERATION

VSMC VARIABLE SPEED MOTOR CONTROLLER

PC

PRESSURE CONTROLLER. SEE SEQUENCE OF

OPERATION

SC

SPEED CONTROLLER. SEE SEQUENCE OF

OPERATION

FC

FLOW CONTROLLER. SEE SEQUENCE OF

OPERATION

PSH PRESSURE SWITCH HIGH

FSH FLOW SWITCH HIGH

PSL PRESSURE SWITCH LOW

CONTROLS SYMBOLS

A

TEMPERATURE SENSING ELEMENT FOR

TRANSMITTING TEMPERATURE TO EMCS

(PROVIDE 12 INCHES [200mm] MINIMUM

LENGTH IN DUCT WHEN SPACE

PERMITS.)

M

SENSOR WITH AVERAGING ELEMENT TO

TRANSMIT TEMPERATURE TO EMCS

MOTOR STARTER

ELECTRIC OPERATED CONTROL DAMPER/OR VALVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

M-700

MECHANICAL CONTROLS

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

6/14/2024 62 OF 102

DDC

CONTROLLER

FLOOR MOISTURE

TIE INTO EXISTING BMS

FLOOR

W A

L L

SPACE HUMIDITY

SPACE TEMP

A.I.

A.I.

A.I.

D.O.

A.I.

A.I.

POINTS LIST FOR VAV AIR HANDLING UNIT (AHU-01)

SCALE: NTS

VARIABLE AIR VOLUME AIR HANDLING UNIT CONTROL DIAGRAM (AHU-01)

SEQUENCE OF OPERATION FOR AIR HANDLING UNIT (AHU-01)

SCALE: NTS

SCALE: NTS

CONTROL DIAGRAM

SCALE: NTS

TELECOMMUNICATION ROOM CONTROL DIAGRAM

SCALE: NTS

CONSTANT VOLUME AIR TERMINAL UNIT

PRESSURE SWITCH

HIGH

TO DISABLE FAN

WHEN HIGH

PRESSURE LIMIT

SETPOINT IS

REACHED

RELIEF AIR

D -4

P R

E

F

IL

T E

R

OUTSIDE AIR

D-1

C O

IL

P

R E

H E

A T

HW

V-2

V-1

CHWS

CWHR

RETURN FAN

SUPPLY FAN

A F

M D

A F

M D

SUPPLY AIR TO

TERMINAL UNIT

TT

TT

TT

FT

A F

T E

R

F

IL

T E

R

TT MT

HS

IT

VSMC

HSVSMC

FT

5 3 6

H-1

SD

CURRENT

TRANSMITTER

FOR FAN

STATUS ,TYP.

PSH

SMOKE

DETECTOR

VARIABLE SPEED

MOTOR

CONTROLLER, TYP.

ZC

ZC ZC

PDS PDS

TT

SST

IT

SST

SD

SPSTSL

TSL-1

NO

ECC

ECC

1. GENERAL

1.1

1.2

UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE ECC. H-O-A SWITCH SHALL BE

KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR

MAINTENANCE. WHEN THE UNIT IS "OFF" D-1 AND D-3, SHALL BE FULLY CLOSED. WHEN THE UNIT

IS "ON" D-1, D-2 AND D-3 SHALL MODULATE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE:

2. TEMPERATURE CONTROL

2.1

2.2

2.3

2.4

3. AIR FLOW CONTROL

3.1

3.2

3.3

3.3

3.4

4. FREEZE PROTECTION

4.1

6. AUTOMATIC SHUTDOWN/RESTART

6.1

6.2

7. EMERGENCY CONSTANT SPEED OPERATION

7.1

SUPPLY AIR TEMPERATURE, SENSED BY TT-1, SHALL BE MAINTAINED AT SETPOINT VIA DIGITAL

CONTROL PANEL BY MODULATING V-1 OR D-2 AND D-3 OR V-2 IN SEQUENCE.

WHEN THE OUTDOOR TEMPERATURE, SENSED BY TT-2 IS ABOVE 72°F, THE UNIT SHALL OPERATE

AT SCHEDULED MINIMUM OUTDOOR AIR FLOW RATE.

WHEN THE OUTDOOR TEMPERATURE, SENSED BY TT-2 IS BETWEEN 72°F AND 60°F, THE UNIT

SHALL BE IN FULL ECONOMIZING MODE. D-2 SHALL BE FULLY CLOSED, AND D-3 SHALL BE FULLY

OPEN.

WHEN THE OUTDOOR TEMPERATURE, SENSED BY TT-2, IS BELOW 60°F, THE UNIT SHALL

MODULATE D-1 AND D-2 TO MAINTAIN A 60°F DISCHARGE AIR SETPOINT. D-3 SHALL BE FULLY

OPEN. D-1 AND D-2 POSITIONS SHALL BE MODIFIED WITH A 2 MINUTE DELAY (VAR) FOR EACH 5

DEGREE (VAR) ADJUSTMENT. FINAL CONSTANTS DETERMINED BY TAB CONTRACTOR. MAINTAIN

MINIMUM OUTDOOR AIRFLOW RATE.

THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL MODULATING

THE SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER TO MAINTAIN 1.0" OF DUCT STATIC

PRESSURE (FIELD ADJUSTABLE), SENSED BY SPS-1. RESET STATIC PRESSURE BASED ON ACTUAL

BUILDING LOAD BY POLLING ALL VAV.

RETURN FAN SHALL MODULATE TO TRACK THE SUPPLY FAN LESS THE QUANTITY OF AIR

REQUIRED TO MAINTAIN A SPACE PRESSURE AS SENSED BY PS OF 0.02" W.C. (VAR)

THE OUTSIDE AIR, RETURN, AND RELIEF DAMPERS SHALL MODULATE TO MAINTAIN THE

SCHEDULED OUTSIDE AIRFLOW.

USING HIGH PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY FAN DISCHARGE SHALL

PREVENT THE SUPPLY FAN FROM DEVELOPING OVER 3" OF STATIC PRESSURE (VAR). IF STATIC

PRESSURE AT SPS-2 DOES EXCEED 3" THE SUPPLY AIR FAN SHALL STOP. SPS-2 SHALL BE

HARDWIRED TO THE SUPPLY FAN VSMC AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR

BYPASS MODE. SPS-2 WILL REQUIRE MANUAL RESET AT THE DEVICE.

THE HIGH PRESSURE SENSOR SPS-2, LOCATED AT THE SUPPLY FAN DISCHARGE SHALL PREVENT

THE RETURN FAN FROM DEVELOPING OVER 3" OF STATIC PRESSURE (VAR). IF STATIC PRESSURE

AT SPS-2 DOES EXCEED 3" THE RETURN SHALL STOP. SPS-2 SHALL BE HARDWIRED TO THE

RETURN FAN VSMC AND UNIT SHALL BE SHUTDOWN IN HAND, AUTO OR BYPASS MODE. SPS-2

WILL REQUIRE MANUAL RESET AT THE DEVICE. RETURN FAN SHALL BE STARTED BY D-4

ENDSWITCH.

UPON FAILURE OF THE VSMC, THE SUPPLY AND RETURN FANS SHALL BE STARTED/STOPPED

MANUALLY AT THE DIGITAL CONTROL PANEL OR THE ECC THROUGH THE BY-PASS STARTER.

FANS SHALL THEN BE OPERATED AT CONSTANT SPEED.

IF THE AIR TEMPERATURE AS SENSED BY TT-5 FALLS BELOW 45°F [7°C], AN ALARM SIGNAL SHALL

INDICATE AT THE DCP AND ECC. IF THIS TEMPERATURE FALLS BELOW 40°F [4.4°C], AS SENSED BY

THE TSL THE SUPPLY AND RETURN FANS SHALL SHUT DOWN AND A CRITICAL ALARM SHALL

INDICATE AT THE DIGITAL CONTROL PANEL AND ECC. TSL SHALL BE HARDWIRED TO THE SUPPLY

FAN VFD AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR BYPASS MODE. TSL WILL REQUIRE

MANUAL RESET AT THE DEVICE.

WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR, SD, THE SUPPLY FAN SHALL SHUT "OFF"

AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM. ALL SMOKE

DAMPERS IN THE SUPPLY AND RETURN DUCTS SHALL CLOSE.

RETURN FANS SERVING AREA OF THE SUPPLY FAN SHALL CONTINUE TO RUN. SUPPLY AND

RETURN FANS SHALL RESTART AND SMOKE DAMPERS SHALL OPEN WHEN FIRE ALARM CIRCUIT IS

RESET.

ALARM

PROCESSING

D U

T Y

C Y

C L E

F U

N C

T

IO

N

S C

H E

D U

L E

S T A

R T /S

T O

P

HUMIDITY HIGH LIMIT

RETURN FAN VSMC ALARM

SUPPLY FAN VSMC ALARM

RETURN FAN STATUS

STATIC PRESSURE HIGH LIMIT

RETURN LOW PRESSURE

S T A

T U

S

SYSTEM

A L A R

M

PR

IO

R

IT

Y/

AD

D -A

LT

ER

N

AT

E N

O

E L E

C T R

IC

D

E V

IC

E

S P

E E

D C

O M

M A

N D

P O

IN

T

ID

SYSTEM COMPONENT: -- O

P

E N

/C L O

S E

S T A

R T /S

T O

P -- V

A

LV

E P

O S

IT

IO

N

D A

M P

E R

P O

S

IT

IO

N

JOB: 590-22-703

VAV AIR HANDLER

SYSTEM:

BUILDING:

LEGEND

POINT

BINARY

T E

M P

E R

A T U

R E

T I)

L o ca l A la rm P a n e l

M a st e r A la rm

P a n e l

A re a A la rm

P a n e l

H

IG

H S

T A

T

IC

P R

E S

S U

R E

H

IG

H H

U M

ID

IT

Y

P R

E S

S U

R E

--L O

W T

E M

P E R

A T U

R E

P E

R C

E N

T

P R

E S

S U

R E

P O

S

IT

IO

N

F

LO

W

H

IG

H L

IM

IT

L O

W L

IM

IT

SYSTEM INPUTS

ANA- BINARY ANALOG

S P

A C

E T

E M

P . C

O N

T R

O L

--S T A

T

IC

P R

E S

S U

R E

R E

S E

T

--D E

M A

N D

L

IM

IT

IN

G

T E

M P

E R

A T U

R E

R E

S E

T

T E

M P

E R

A T U

R E

O V

E R

R

ID

E

E N

T H

A L P

Y E

C O

N O

M

IZ

E R

T E

M P

E R

A T U

R E E

C O

N O

M

IZ

E R

F A

IL

U

R E

M O

D E

PR

ES

SU

R

E/

VO

LU

M

E C

O N

TR

O

L

REMARKS

F U

LL

C

O M

M U

N

IC

A T

IO

N

SYSTEM SOFTWARE/CONTROL

APPLICATION/FUNCTION

PAGE:

SUPPLY FAN STATUS

MIXED AIR LOW LIMIT

RETURN AIR DAMPER

RETURN FAN START/STOP

COOLING VALVE V-1

PRE-HEAT VALVE V-2

EXHAUST AIR DAMPER

MINIMUM OUTSIDE AIR DAMPER

SUPPLY FAN VSMC

OUTSIDE AIR DAMPER

RETURN FAN VSMC

S T A

T

IC

P R

E S

S U

R E

C A

R B

O N

M O

N O

X

ID

E

H U

M

ID

IT

Y

V A

C U

U M

SUPPLY FAN START/STOP

AI-1

AI-2

AI-3

AI-4

AI-5

AI-6

AI-7

AI-8

AI-9

AI-10

T R

E N

D

IN

G

OUTSIDE AIR TEMPERATURE AI-11

BI-1

BI-2

BI-3

BI-4

BI-5

BI-6

BI-7

BI-8

AO-1

AO-2

AO-3

AO-4

AO-5

AO-7

AO-8

AO-9

BO-1

BO-2

FULL COMMUNICATION

FULL COMMUNICATION

A B

B R

E V

IA

T

IO

N

RAT

RAH

RAF

MAT

PHT

CCT

DAT

DASP

DAH

SAF

OAT

RLP

RF-STS

SF-STS

TSL-1

SPS-1

HHL

SF-ALA

RF-ALA

RF-SPD

SF-SPD

OAD

RAD

EAD

MIN-OAD

PHT-V2

CLG-V1

RF-SST

SF-SST

OUTPUTS

LOG

5. VALVING

5.1 MODULATE COOLING VALVE V-1 AND STEAM VALVE V-2 TO MAINTAIN A TEMPERATURE DISCHARGE

TEMPERATURE OF 60°F.

SUPPLY AIR FLOW (CFM)

DISCHARGE AIR HUMIDITY

DISCHARGE STATIC PRESSURE

DISCHARGE AIR TEMPERATURE

COOLING COIL TEMPERATURE

PRE-HEAT TEMPERATURE

MIXED AIR TEMPERATURE

RETURN AIR FLOW (CFM)

RETURN AIR HUMIDITY

RETURN AIR TEMPERATURE

M

D-3

ZC

PSL

SD

RETURN AIR

D-2

ZC

C O

IL

C

O O

L

IN

G

HWR

NOTE: LOCATE 2/3 OF WAY DOWN DUCTWORK

SPACE

PS

VAV HOT WATER VALVE V-3 AO-11 VAV-V3

ROOM THERMOSTAT/SENSOR

WALL MOUNTED

48" AFF.

TU

RHCHWS

HWR

V-2

REHEAT

COIL

AIR

TERMINAL UNIT

AIR

FLOW

TE

ATU

CONTROLLER

PC

TE

A

IR

F L O

W (C

F M

ROOM TEMPERATURE (°F)

CV

CFM

CONSTANT VOLUME WITH REHEAT

CONTROL SEQUENCE

W/DEADBAND

SP

FE

R E H E

AT FLO

W

A. SET POINTS SHALL SET AS FOLLOWS:

COOLING 75° F (VAR)

HEATING 70° F (VAR)

DEADBAND OF 5° F BETWEEN HEATING

AND COOLING SET POINT WILL BE

MAINTAINED.

B. UPON FALL IN SPACE TEMPERATURE

BELOW SET POINT VALVE V-3 WILL

MODULATE TO MAINTAIN SET POINT +

.5°,THE ADJUSTABLE TOLERANCE OF +

.5° HAS BEEN SELECTED TO PREVENT

VALVE HUNTING.

C. THE REVERSE SHALL OCCUR ON RISE

IN SPACE TEMPERATURE.

ALL CONTROL VALVES SHALL COMMUNICATE WITH THE BACNET CONTROL SYSTEM.

LOCATE SENSOR

OUTSIDE UNDER

SHIELD

TT

D -3

A F

M D

FT

OUTSIDE AIRFLOW AI-12 AFMD

NEW

SEQUENCE OF OPERATION

THE DUCTLESS SPLIT SHALL OPERATE CONTINUOUSLY TO

MAINTAIN A SPACE TEMPERATURE OF 75°(ADJ).SHOW

TEMPERATURE AND HUMIDITY AT THE GRAPHIC DISPLAY. PROVIDE

TEMPERATURE TRENDS. PROVIDE ALARM FOR TEMPERATURE

ABOVE 80F.

PROVIDE ALARM FOR MOISTURE SENSED ON FLOOR.

SHOW RACK TEMPERATURE AND HUMIDITY (SEE

TELECOMMUNICATION PLANS FOR NUMBER OF RACKS PER TR)

DUCTLESS SPLIT

MOUNTED HIGH

ON WALL

(COORDINATE MOUNTING

HEIGHT WITH CONDITIONS

OF THE SPACE)

M

T1 H

H

T1

M

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

M-701

MECHANICAL CONTROLS

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

05/24/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

6/14/2024 63 OF 102

CO

FE

SCALE:

SCALE:

SCALE:

CONCENTRIC REDUCER/INCREASER

ECCENTRIC REDUCER/INCREASER

UNION

TOP CONNECTION, 45° OR 90°

EXTENSION & CONTINUATION

CAPPED OUTLET

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

LIMIT OF DEMOLITION

ANCHOR

DIRECTION OF FLOW

DIRECTION OF PIPE PITCH (DOWN)

BOTTOM CONNECTION, 45° OR 90°

PIPE UP

SIDE CONNECTION

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

INVERTED BUCKET TRAP SET INCLUDING PIPING ACCESSORIES

FLOAT & THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES

STRAINER

PRESSURE GAGE

THERMOMETER

CLEAN-OUT

PTRAP

HOSE BIB

FLOW ELEMENT

FLOOR CLEANOUT (FCO)

CLEANOUT NOT TO BE

LOCATED IN

CARPETED AREA

1/8" BEND IF CLEANOUT

OCCURS AT END OF LINE.

WASTE LINE

LENGTH TO SUIT.

16" SQUARE CONC. PAD.

TROWEL SMOOTH AND

EDGE.

FINISH GRADE.

BRASS CLEANOUT PLUG

W/ COUNTER SUNK HEAD.

CLEANOUT AND ACCESS

COVER. TOP OF COVER

TO BE FLUSH W/ TOP OF

FLOOR.

FLOOR LINE

BALANCE OF PIPING

SAME AS CLEANOUT

TO GRADE.

BALL VALVE

CIRCUIT SETTER VALVE

CLEAN OUT

SS

SS

D

SD

SD

SCW

FCW

DWS

DWR

TWS

TWR

WATER BALANCING VALVE

PLUMBING ABBREVIATIONS PLUMBING FIXTURE SCHEDULE

SYMBOL DESCRIPTION

MANUFACTURER AND CATALOG #

(BASIS OF DESIGN ONLY OTHER

MANUFACTURES THAT MEET THE

SPECIFICATIONS ARE ACCEPTABLE)

FAUCET/FLUSH VALVE

CONNECTIONS

NOTES

HW CW W V

WATER CLOSET, WALL

MOUNT MOUNT, FLUSH

VALVE (ACCESSIBLE)

KOHLER KINGSTON ULTRA K-84325-0

SLOAN ROYAL OPTIMA 111-1.28

ES-S (1.28 GPF) SENSOR FLUSH

VALVE, ELONGATED OPEN FRONT

SEAT

- 1-1/2" 3" 2"

PROVIDE 120/24V CONTROL TRANSFORMER. SEE ARCHITECTURAL FOR

MOUNTING HEIGHT

LAVATORY WALL MOUNT

(ACCESSIBLE)

KOHLER KINGSTON K-2007-0 21"X18"

KOLHER K-13468-CP, SENSOR,

HARD WIRED, 0.5 GPM FLOW

1/2" 1/2" 1-1/2" 1-1/2"

GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, 120V-24V

TRANSFORMER. SEE ARCHITECTURAL PLANS FOR LOCATION OF ABA

FIXTURES, PROVIDE INSULATION ON SUPPLIES AND DRAIN ON ABA

FIXTURES, PROVIDE MANUAL MIXING VALVE TO LIMIT HOT WATER

SUPPLY TO 105°F. SEE ARCHITECTURAL FOR MOUNTING HEIGHT

SINGLE COMPARTMENT,

COUNTER MOUNT,

STAINLESS STEEL

ELKAY

LRAD222255

22"X22"X5.5"

CHCAGO 434-ABCP, 1.5 GPM, 9"

SPOUT WITH PULL-DOWN OUTLET,

DUAL-PATTERN OUTLET, SINGLE

ABA HANDLE

1/2" 1/2" 2" 2"

BASKET STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, INSULATION

ON SUPPLIES AND DRAIN ON ABA FIXTURES, PROVIDE MANUAL MIXING

VALVE TO LIMIT HOT WATER SUPPLY TO 105°F. SEE ARCHITECTURAL

FOR MOUNTING HEIGHT

FLOOR DRAIN JR SMITH FIG 2005

ROUND STRAINER, NICKEL BRONZE

STRAINER, TRAP PRIMER

CONNECTION

SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP

WITH TRAP PRIMER CONNECTION.

SERVICE SINK

FIAT TSB100, 24"X24"X12" CORNER

MOUNT

FIAT 830-AA, WALL MOUNTED WITH

SUPPORT AND VACUUM BREAKER

1/2" 1/2" 3" 2"

832AA 4' HOSE & HOSE HANGER, WALL GUARDS FOR TWO WALLS,

STAINLESS STEEL CURB CAPS

BOTTLE FILLER

ELKAY T9F806246 WITH FILTER

AND BOTTLE FILLER

WALL CARRIER, STOP, SUPPLY,

TAIL PIECE, P-TRAP

- 1/2" 2" 2"

8.0 GPH, 115 V, 1 PH, 3.8 FLA, 260 WATTS. SEE ARCHITECTURAL FOR

MOUNTING HEIGHT

GENERAL PLUMBING SYMBOLS

PLUMBING PIPING SYMBOLS

DEFINITIONSYMBOL

DOMESTIC COLD WATER, COLD WATER

DOMESTIC HOT WATER, HOT WATER

DOMESTIC HOT WATER RETURN, HOT WATER RETURN

VENT (SANITARY)

SOIL, WASTE, OR SANITARY SEWER

SANITARY SEWER, BELOW GRADE (SHOWN ON FLOOR PLAN)

DRAIN

STORM WATER

STORM WATER, BELOW GRADE (SHOWN ON FLOOR PLAN)

SOFTEN COLD WATER

FILTERED COLD WATER

DRINKING WATER SUPPLY

DRINKING WATER RETURN

TEMPERED WATER SUPPLY

TEMPERED WATER RETURN

A/E ARCHITECT / ENGINEER

AD AREA DRAIN/ACCESS DOOR

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

ASD ADJUSTABLE SPEED DRIVES

ASD AUTOMATIC SPRINKLER DRAIN

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AIR CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BFP REDUCED PRESSURE BACKFLOW

PREVENTER

BHP BREAK HORSEPOWER

BSP BLACK STEEL PIPE

BT BATHTUB

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CELSIUS

CA COMPRESSED AIR

CGA COMPRESSED GAS ASSOCIATION

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CO CLEANOUT

CS CLINICAL SINK

CV CONTROL VALVE

DCW DOMESTIC COLD WATER

DFU DRAINAGE FIXTURE UNITS

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL SYSTEM

EPA ENVIROMENTAL PROTECTION AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

EWS EYE WASH STATION

EWS/SH EYE WASH/DRENCH SHOWER

EX EXISTING

F FAHRENHEIT

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE) CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FS FLOW SWITCH

FU FIXTURE UNITS

GAL GALLON

GCO GRADE CLEANOUTS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK (DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ID INSIDE DIAMETER

IE INVERT ELEVATION

ICW INDUSTRIAL COLD WATER

IHW INDUSTRIAL HOT WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWH KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH 1000 BTUH

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MGDU MEDICAL GAS DISTRIBUTION UNIT

MH MANHOLE

MOU MEMORANDUM OF UNDERSTADING

MSB MOP SERVICE BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N20 NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM. NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW LEADER

PA PASCAL

PBPU PREFABRICATED BEDSIDE PATIENT UNIT

PD PRESSURE DROP OR DIFFERENCE

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAGE

PTRV PRESSURE TEMPERATURE RELIEF VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RP RECIRCULATION PUMP

RO REVERSE OSMOSIS WATER

SAN SANITARY SEWER

SMACNA SHEET METAL AND AIR CONDITIONING

CONTRACTORS NATIONAL ASSOCIATION

SCFM STANDARD CUBIC FOOT/MINUTE

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SMH SANITARY MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT/SF SQUARE FEET

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL

VALVE

TD TEMPERATURE DIFFERENCE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

V VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VSD VARIABLE SPEED DRIVE

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WALL HYDRANT

WH WATER HEATER

WHA WATER HAMMER ARRESTER

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

WSFU WATER SUPPLY FIXTURE UNITS

YCO YARD CLEANOUT

YH YARD HYDRANT

P-418

P-528

FD-C

P-103

P-502

P-608

NOTE:

ALL EXPOSED PIPING AND VALVES TO BE HIDDEN BELOW SINK OR COUNTER TOP.

FAUCET

COUNTER TOP

SINK

ANGLE STOP VALVE

DRAIN WITH P-TRAP

HOT WATER

LOOP IN WALL

24" MAXIMUM

PIPING LENGTH

COLD WATER

UP IN WALL

NON-SENSORED

FAUCET

COUNTER TOP

SINK

NOTE:

ALL EXPOSED PIPING AND VALVES TO BE HIDDEN BELOW SINK OR COUNTER TOP.

ANGLE STOP VALVE

DRAIN WITH P-TRAP

24" MAXIMUM

PIPING LENGTH

HOT WATER

LOOP IN WALL

COLD WATER

IN WALL

COUNTER TOP

SINK

COLD WATER

IN WALL

HOT WATER

LOOP IN WALL

CLEANOUT TO FLOOR DETAIL2

NOT TO SCALE

LAVATORY HOT WATER CIRCULATION LOOP DETAIL1

NOT TO SCALE

MULTIPLE LAV HOT WATER CIRCULATION LOOP DETAIL3

NOT TO SCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

P-001

PLUMBING SYMBOLS, LEGENDS

AND SCHEDULES 009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

6/14/2024 64 OF 102

382120191817

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

PD100

PLUMBING DEMO - OVERALL

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

Revisions: Date:

1/8" = 1'-0"

LEVEL 1 - PLUMBING DEMO - OVERALL

PROJECT

NORTH

TRUE NORTH

(DASHED)

SEE SHEETS PD102 & PD104 FOR ENLARGED PLAN

SEE SHEETS PD101 & PD103 FOR ENLARGED PLAN

6/14/2024 65 OF 102

NORTH

TRUE NORTH

(DASHED)

2120191817

1 2 3 4 5 6 7

M A

T C

H L

IN

E

M A

T C

H L

IN

E

TO (E) HOSE BIBB

TO (E) HOSE BIBB

EXISTING CW SERVICE

EXISTING SANITARY

SEWER SERVICE

EXISTING HW SERVICE

(E) 1-1/2" HWR UP

(E) 4" SAN AND

(E) 1-1/2" CW UP

TO 2ND FLOOR

RELOCATE (E) CW

AND HW LINE. SEE

NEW WORK FOR

CONTINUATION

S S

S S

SS

SS

SSSSSS SS

(E) 3" SAN

1 2

(E) 4" SAN UP

(E) 1-1/4" HWR

(E) 1-1/4" CW

(E) 1" CW UP

(E) 4" SAN UP

(E) 4" W UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

PD101

CRAWL SPACE PLUMBING DEMO -

WEST 009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN

SHOWN LIGHT.

KEYNOTES

KEY PLAN

3/16" = 1'-0"

LEVEL 1 - CRAWL SPACE PLUMBING DEMO - WEST

Revisions: Date:

1 DEMO CW AND HW BACK TO MAIN. CAP WITHIN TWO PIPE DIAMETERS.

DEMO AND CAP SANITARY AND VENT LINE

PROJECT

NORTH

TRUE NORTH

(DASHED)

6/14/2024 66 OF 102

NORTH

TRUE NORTH

(DASHED)

32 5831302928272625

9 10 11 12 13 14 15 16 60 61 62 63 64

EXISTING CW SERVICE

EXISTING SANITARY SEWER SERVICE

EXISTING DOMESTIC HWR SERVICE

M A

T C

H L

IN

E

M A

T C

H L

IN

E

RELOCATE (E)

CW AND HWR

LINES. SEE NEW

WORK PLAN

FOR DETAILS

RELOCATE (E)

CW AND HWR

LINES. SEE NEW

WORK PLAN

FOR DETAILS

4" SAN UP

3" SAN UP

SSSSSS SS

3" SAN UP

3/4" HWR

UP

1/2" HWR,

1-1/2" CW,

2" SAN UP

4" SAN UP

1" HWR, 1"

CW, 2"

SAN UP

4" SAN UP

1" CW/HWR

1" CW

1 " CW

3"

SAN

UP

3"

SAN

S S

4" SAN UP

1/2" HWR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

PD102

CRAWL SPACE PLUMBING DEMO -

EAST 009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

PROJECT

NORTH

TRUE NORTH

(DASHED)

3/16" = 1'-0"

LEVEL 1 - CRAWL SPACE PLUMBING DEMO - EAST

Revisions: Date:

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN

SHOWN LIGHT.

KEYNOTES

KEY PLAN

DEMO CW AND HW BACK TO MAIN. CAP WITHIN TWO PIPE DIAMETERS.

DEMO AND CAP SANITARY AND VENT LINE

6/14/2024 67 OF 102

NORTH

TRUE NORTH

(DASHED)

2120191817

1 2 3 4 5 6 7

M A

T C

H L

IN

E

M A

T C

H L

IN

E

2 1

(E) 3"SAN UP

(E) 2"V UP

(E) 2"V UP

(E) 2"V UP

(E) 3"SAN UP

(E) 4"SAN UP

(E) 4" SAN

(E) 4" SAN

(E) 4" SAN

DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:3

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

PD103

PLUMBING DEMO - WEST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

Revisions: Date:

3/16" = 1'-0"

LEVEL 1 - PLUMBING DEMO - WEST

PROJECT

NORTH

TRUE NORTH

(DASHED)

1 REMOVE EXISTING WATER CLOSET. DEMO CW BACK TO MAIN. CAP WITHIN

TWO PIPE DIAMETERS. EXISTING SANITARY AND VENT LINE TO REMAIN.

DEMO WALL CARRIERS.

REMOVE EXISTING WATER CLOSET. DEMO CW BACK TO MAIN. CAP WITHIN

TWO PIPE DIAMETERS. DEMO AND CAP WASTE AND VENT LINE. DEMO WALL

CARRIERS.

REMOVE EXISTING LAVATORY AND ASSOCIATED PIPING. DEMO CW AND HW

BACK TO MAIN. CAP WITHIN TWO PIPE DIAMETERS. DEMO AND CAP

SANITARY AND VENT LINE. DEMO WALL CARRIERS.

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN

SHOWN LIGHT.

KEYNOTES

KEY PLAN

6/14/2024 68 OF 102

NORTH

TRUE NORTH

(DASHED)

32 5831302928272625

9 10 11 12 13 14 15 16 60 61 62 63 64

M A

T C

H L

IN

E

M A

T C

H L

IN

E

(E) 2"V UP

(E) 4" SAN UP

(E) 2" SAN UP (E) 2"V UP

(E) 4" SAN UP

(E) 1-1/2" V UP

(E) 2"V UP

(E) 1-1/2" V UP

(E) 3" SAN UP

(E) 4" SAN

(E) 2"V UP

(E) 4" SAN DOWN

(E) 3" SAN UP

(E) 1-1/2" V UP

(E) 2"V UP

(E) 4" SAN UP

(E) 4" SAN UP

(E) 3" SAN UP

(E) 2"V UP

(E) 3" SAN UP

(E) 2" V UP

(E) 2" SAN UP

(E) 4"SAN UP

(E) 3" SAN UP

(E) 3" SAN DN

(E) 4" SAN UP

(E) 3" SAN DN

(E) 1" HW UP

(E) 3/4" CW

AND HW UP

(E) 1" CW

AND 3/4"HW

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:3

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

PD104

PLUMBING DEMO - EAST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN

SHOWN LIGHT.

KEYNOTES

KEY PLAN

3/16" = 1'-0"

LEVEL 1 - PLUMBING DEMO - EAST

Revisions: Date:

PROJECT

NORTH

TRUE NORTH

(DASHED)

REMOVE EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING. DEMO

CW AND HW BACK TO MAIN. CAP WITHIN TWO PIPE DIAMETERS. DEMO AND

CAP SANITARY AND VENT LINE. DEMO WALL CARRIERS.

DEMO (E) SANITARY LINE. MAINTAIN VENT CONNECTION AS REQUIRED.

REMOVE EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING. DEMO

CW BACK TO MAIN. CAP WITHIN TWO PIPE DIAMETERS. DEMO AND CAP

SANITARY AND VENT LINE. DEMO WALL CARRIERS.

6/14/2024 69 OF 102

382120191817

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:4

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

P-100

PLUMBING - OVERALL

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

1/8" = 1'-0"

LEVEL 1 - PLUMBING - OVERALL

PROJECT

NORTH

TRUE NORTH

(DASHED)

Revisions: Date:

SEE SHEETS P-102 & P-104 FOR ENLARGED PLAN

SEE SHEETS P-101 & P-103 FOR ENLARGED PLAN

6/14/2024 70 OF 102

NORTH

TRUE NORTH

(DASHED)

2120191817

1 2 3 4 5 6 7

M A

T C

H L

IN

E

M A

T C

H L

IN

E

(E) CW LINE. SEE

P-102 FOR

CONTINUATION

(E) HWR LINE. SEE

P-102 FOR

CONTINUATION

(E) SS LINE. SEE

P-102 FOR

CONTINUATION

(E) 3" CW

(E) 1-1/2" HWR

(E) 4"CW

(E) 1-1/2" HWR

CO

TO (E)

HOSE

BIBB

TO (E)

HOSE

BIBB

2" W & 1/2"CW/HW UP

TO SINK

PROVIDE SHUT OFF

VALVE AT FIXTURE

1/2" CW & 2" W

UP TO BOTTLE

FILLER.

PROVIDE SHUT

OFF VAVLE AT

FIXTURE

CO

RELOCATE (E) 1"

CW AND HWR

LINES THAT SERVE

2ND FLOOR INTO

WALL.

CO

1/2" HWR FROM

ABOVE

(E) 4"W

(E) 1-1/2" CW

CIRCUIT

SETTER

CIRCUIT

SETTER

1/2" HWR

FROM

ABOVE

SS SS SS

S S

S S

SS

SS

SS

SS

3" SAN

3" SAN

(E) 4"W

(E) 1-1/2"

CW/HWR

(E) 2" CW

(E) 4" W

SHUT

OFF

VAVLE

CO

(E) 4"SAN

(E) 4"

SAN

FROM

ABOVE

S S S

S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:4

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

P-101

CRAWL SPACE PLUMBING - WEST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

Revisions: Date:

KEY PLAN

3/16" = 1'-0"

LEVEL 1 - CRAWL SPACE PLUMBING - WEST

PROJECT

NORTH

TRUE NORTH

(DASHED)

GENERAL NOTES

1. DRAWINGS ARE DIAGRAMMATICAL TO ENSURE LEGIBILITY AND CLEANLINESS.

CONTRACTOR SHALL CONFIRM DIMENSIONS AND EQUIPMENT FIT AS NEEDED FOR

COMPLETE INSTALL

2. ALL WORK SHALL BE COMPLY WITH PLUMBING CODE RECOGNIZED BY AUTHORITY

HAVING JURISDICTION

3. SLOPE ALL SANITARY SEWER LINES @ 1/4" PER FOOT UNLESS APPROVED BY

AUTHORITY HAVING JURISDICTION . LINES EQUAL TO OR GREATER THAN 4" MAY BE

SLOPED AT 1/8" UPON APPROVAL AND IN ACCORDANCE WITH IPC

4. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER RECOMMENDATION

UNLESS OTHERWISE DIRECTED

5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.

6. SANITARY PIPING SHALL BE DWV CAST IRON. USE APPROPRIATE FITTINGS AS

INDICATED IN IPC.

7. PROVIDE CLEANOUTS AS SHOWN ON DRAWINGS, LINES FROM MAIN PIPE LONGER

THAN 5 FT UNLESS EXEMPT IN UPC, MAINS OVER 100 FT IN HORIZONTAL LENGTH, OR

CHANGE IN DIRECTION GREATER THAN 135 DEGREES

KEYNOTES

KEY PLAN

1 (E) 3" SAN & 1-1/2"CW UP TO WC. PROVIDE SHUT OFF VALVE AT FIXTURE IN WET WALL

2" SAN & 1/2"CW UP TO LAV

2" SAN UP TO FD & 2" V UP WALL

3" SAN & 1-1/2"CW UP TO WCPROVIDE CW SHUT OFF VALVE AT FIXTURE

INSTALL NEW WALL CARRIERS FOR WATER CLOSET.

INSTALL NEW CONCEALED ARM CARRIERS FOR LAVATORY.

6/14/2024 71 OF 102

NORTH

TRUE NORTH

(DASHED)

32 5831302928272625

9 10 11 12 13 14 15 16 60 61 62 63 64

M A

T C

H L

IN

E

M A

T C

H L

IN

E

(E) CW TO WEST SIDE OF BUILDING.

SEE P-101 FOR CONTINUATION

(E) HWR TO WEST SIDE OF

BUILDING. SEE P-101 FOR

CONTINUATION

(E) SAN TO WEST SIDE OF BUILDING.

SEE P-101 FOR CONTINUATION

(E) CW,HWR, SS FROM

BUILDING MAIN SERVICE

2" SAN UP TO FD, 2" V UP TO WALL

RELOCATED 1-1/4"

HWR AND 1" CW UP

3/4" HWR

UP

4" SAN UP

3" SAN UP

(E) 4" SAN UP

4" SAN

DN/UP

4" SAN UP

CO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:4

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

P-102

CRAWL SPACE PLUMBING - EAST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

3/16" = 1'-0"

LEVEL 1 - CRAWL SPACE PLUMBING - EAST

PROJECT

NORTH

TRUE NORTH

(DASHED)

Revisions: Date:

GENERAL NOTES

1. DRAWINGS ARE DIAGRAMMATICAL TO ENSURE LEGIBILITY AND CLEANLINESS.

CONTRACTOR SHALL CONFIRM DIMENSIONS AND EQUIPMENT FIT AS NEEDED FOR

COMPLETE INSTALL

2. ALL WORK SHALL BE COMPLY WITH PLUMBING CODE RECOGNIZED BY AUTHORITY

HAVING JURISDICTION

3. SLOPE ALL SANITARY SEWER LINES @ 1/4" PER FOOT UNLESS APPROVED BY

AUTHORITY HAVING JURISDICTION . LINES EQUAL TO OR GREATER THAN 4" MAY BE

SLOPED AT 1/8" UPON APPROVAL AND IN ACCORDANCE WITH IPC

4. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER RECOMMENDATION

UNLESS OTHERWISE DIRECTED

5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.

6. SANITARY PIPING SHALL BE DWV CAST IRON. USE APPROPRIATE FITTINGS AS

INDICATED IN IPC.

7. PROVIDE CLEANOUTS AS SHOWN ON DRAWINGS, LINES FROM MAIN PIPE LONGER

THAN 5 FT UNLESS EXEMPT IN UPC, MAINS OVER 100 FT IN HORIZONTAL LENGTH, OR

CHANGE IN DIRECTION GREATER THAN 135 DEGREES

KEYNOTES

KEY PLAN

3" SAN, 2" V & 1/2" CW UP TO P502. PROVE SHUT OFF VALVES AT FIXTURE1

6/14/2024 72 OF 102

File details come from the government source that posted it. Updated .