S02-RFP Attachment 12-Drawings-Dublin_Part3.pdf
PDF 2 MB Posted
- Solicitation number
- 36C77626R0031_1
About this file
This document is a construction set of architectural drawings for a renovation project at a U.S. Department of Veterans Affairs facility. The project involves a phased renovation of building administrative and support spaces, designed by SPEES Design Build of Seattle, Washington under the supervision of the VA's Office of Construction and Facilities Management.
The drawings depict two construction phases with detailed floor plans, ceiling plans, interior elevations, and construction details. Phase I includes renovation of the east wing with rooms such as treatment rooms (IV Testing, IV Support), mechanical areas, restrooms, electrical closets, a staff break room, and a change management user space, totaling approximately 7,000 gross square feet. Phase II covers the west wing with classroom spaces, restrooms, mechanical areas, and a change management facility. The design features 2x2 acoustic ceiling tiles at 8 feet above finished floor elevation, gypsum wall board partitions with typical blocking details, modular furniture systems including workstations and chairs, and various finishes specified for casework, countertops, and fixtures. Key technical specifications include partition framing at doors, casework details with MDF construction and plastic laminate finishes, wall connections to existing structure, fire extinguisher locations, and typical mounting heights for fixtures throughout the facility. The drawings are fully sprinklered and indicate both existing doors to remain and new door locations throughout the renovation scope.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA SHOWN
PROJECT
NORTH
TRUE NORTH
(DASHED)
BUILDING 9A
EXISTING DOOR TO REMAIN
NEW DOOR
8 9 10 11 12 13 14 15 16 60 61 62 63 64
25 26 27 28 29 30 31 32
1270 SF
IV SUPPORT
99 SF
HAC
1021375 SF
IV TESTING
101 SF
TR
121 SF
ELECTRICAL ROOM
1677 SF
CORRIDOR
CR11-9
57' - 6 1/8" 19' - 7" 10' - 3"
5'
5"
135.00°
191 SF
MECHANICAL
103B 103A 102
AE422
AE421
AE421
4 2
8 6
4 2
.0
104A
A0001 ACCORDIAN WALL
E0042 WORKSTATION
F-1
M0512 TELEVISION, 60"
F0275 CHAIR
AE400
14' - 11"
8' - 1"
STG
103A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE102
FLOOR PLAN - PHASE I - EAST
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
PHASE I - ROOM PROGRAM
ROOM # ROOM NAME
PROGRAM
NET
DESIGNED
NET
100 TR 100 SF 101 SF
101 MECHANICAL 100 SF 191 SF
102 HAC 600 SF 99 SF
103 IV TESTING 1800 SF 1375 SF
103A STG 85 SF
104 IV SUPPORT 1200 SF 1270 SF
105 WAITING ALCOVE 600 SF 106 SF
106 IV TESTING 1800 SF 1234 SF
107 STAFF BREAK 150 SF 199 SF
108 CHANGE MGMT USER 300 SF 440 SF
109 MECHANICAL 50 SF 86 SF
110 RESTROOM 55 SF 73 SF
111 RESTROOM 55 SF 80 SF
112 RESTROOM 40 SF 77 SF
113 RESTROOM 55 SF 106 SF
114 STORAGE 55 SF 72 SF
115 ELECTRICAL CLOSET 51 SF
116 ELECTRICAL ROOM 100 SF 121 SF
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
Revisions: Date:
3/16" = 1'-0"
FLOOR PLAN - PHASE I - EAST
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS
BETWEEN EXISTING CONDITIONS AND THE CONTRACT
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF
THE COR IMMEDIATELY.
2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF
STUD, CENTERLINE OF STRUCTURAL COLUMNS, AND
CENTERLINE OF OPENINGS, UNO.
3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"
FROM THE INTERECTING WALL, OR CENTERED ON THE
WALL, UNO.
4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN
WALLS PRIOR TO INSTALLING DRYWALL.
Megan Matt's Stamp
Megan Text Box 6/14/24
NORTH
TRUE NORTH
(DASHED)
BUILDING 9A
EXISTING DOOR TO REMAIN
NEW DOOR
1 2 3 4 5 6 7 8
17 18 19 20 21
86 SF
MECH
440 SF
CHANGE MGMT
USER
52' - 9"
73 SF
RESTROOM
601 SF
CLASSROOM
106A
633 SF
CLASSROOM
106B
199 SF
STAFF BREAK
80 SF
RESTROOM
77 SF
RESTROOM
106 SF
RESTROOM
S
F
S T
O R
A G
E
51 SF
ELECTRICAL
CLOSET
106 SF
WAITING
ALCOVE
F0275CHAIR
E0042WORKSTATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE103
FLOOR PLAN - PHASE II - WEST
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
Revisions: Date:
3/16" = 1'-0"
FLOOR PLAN - PHASE II - WEST
PHASE II - ROOM PROGRAM
ROOM # ROOM NAME
PROGRAM
NET
DESIGNED
NET
103A CLASSROOM 600 SF 682 SF
103B CLASSROOM 600 SF 692 SF
104A CLASSROOM 600 SF 634 SF
104B CLASSROOM 635 SF
105 CLASSROOM 600 SF Not Placed
105 WAITING ALCOVE 106 SF
106 STG 85 SF
106A CLASSROOM 600 SF 601 SF
106B CLASSROOM 600 SF 633 SF
115 ELECTRICAL CLOSET 51 SF
ACCORDIAN STYLE WALL PARTITION TO BE DEPLOYED,
SEPERATING THE CLASSROOMS.
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS
BETWEEN EXISTING CONDITIONS AND THE CONTRACT
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF
THE COR IMMEDIATELY.
2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF
STUD, CENTERLINE OF STRUCTURAL COLUMNS, AND
CENTERLINE OF OPENINGS, UNO.
3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"
FROM THE INTERECTING WALL, OR CENTERED ON THE
WALL, UNO.
4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN
WALLS PRIOR TO INSTALLING DRYWALL.
Megan Matt's Stamp
Megan
NORTH
TRUE NORTH
(DASHED)
BUILDING 9A
EXISTING DOOR TO REMAIN
NEW DOOR
8 9 10 11 12 13 14 15 16 60 61 62 63 64
25 26 27 28 29 30 31 32
121 SF
ELECTRICAL
28' - 10 1/8" 28' - 8"
101 SF
TR ROOM
99 SF
HAC
682 SF
CLASSROOM
103A
692 SF
CLASSROOM
103B
634 SF
CLASSROOM
104A
106 SF
RESTROOM
S
F
S T
O R
A G
E
1677 SF
CORRIDOR
CR11-9
191 SF
MECHANICAL
102A
F0275CHAIR
E0042WORKSTATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE104
FLOOR PLAN - PHASE II - EAST
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
PHASE I - ROOM PROGRAM
ROOM # ROOM NAME
PROGRAM
NET
DESIGNED
NET
100 TR 100 SF 101 SF
101 MECHANICAL 100 SF 191 SF
102 HAC 600 SF 99 SF
103 IV TESTING 1800 SF 1375 SF
103A STG 85 SF
104 IV SUPPORT 1200 SF 1270 SF
105 WAITING ALCOVE 600 SF 106 SF
106 IV TESTING 1800 SF 1234 SF
107 STAFF BREAK 150 SF 199 SF
108 CHANGE MGMT USER 300 SF 440 SF
109 MECHANICAL 50 SF 86 SF
110 RESTROOM 55 SF 73 SF
111 RESTROOM 55 SF 80 SF
112 RESTROOM 40 SF 77 SF
113 RESTROOM 55 SF 106 SF
114 STORAGE 55 SF 72 SF
115 ELECTRICAL CLOSET 51 SF
116 ELECTRICAL ROOM 100 SF 121 SF
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1.
Revisions: Date:
3/16" = 1'-0"
FLOOR PLAN - PHASE II - EAST
1 ACCORDIAN STYLE WALL PARTITION TO BE DEPLOYED,
SEPERATING THE CLASSROOMS.
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS
BETWEEN EXISTING CONDITIONS AND THE CONTRACT
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF
THE COR IMMEDIATELY.
2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF
STUD, CENTERLINE OF STRUCTURAL COLUMNS, AND
CENTERLINE OF OPENINGS, UNO.
3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"
FROM THE INTERECTING WALL, OR CENTERED ON THE
WALL, UNO.
4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN
WALLS PRIOR TO INSTALLING DRYWALL.
Megan Matt's Stamp
Megan
WAP
WAP
WAP
WAP WAP
WAP
2x2 ACOUSTICAL CEILING TILE
2x4 ACOUSTICAL CEILING TILE
GYPSUM BOARD ON METAL STUDS
GRILLE PER MECHANICAL
(SIZE & PROPORTION MAY VARY)
LIGHT FIXTURE PER ELECTRICAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
440 SF
CHANGE MGMT
USER
1270 SF
IV SUPPORT
86 SF
MECHANICAL
99 SF
HAC
10272 SF
STORAGE
1234 SF
IV TESTING
1375 SF
IV TESTING
101 SF
TR
199 SF
STAFF BREAK
106 SF
WAITING ALCOVE
73 SF
RESTROOM
1677 SF
CORRIDOR
CR11-9
80 SF
RESTROOM
77 SF
RESTROOM
106 SF
RESTROOM
191 SF
MECHANICAL
121 SF
ELECTRICAL ROOM
/1 AC102/1 AC101
51 SF
ELECTRICAL
CLOSET
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
GYP
7' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AC001
CEILING PLAN - PHASE I -
OVERALL 009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
Revisions: Date:
LEGEND
PROJECT
NORTH
TRUE NORTH
(DASHED)
1/8" = 1'-0"
CEILING PLAN - PHASE I - OVERALL
Megan Matt's Stamp
Megan
2x2 ACOUSTICAL CEILING TILE
2x4 ACOUSTICAL CEILING TILE
GYPSUM BOARD ON METAL STUDS
GRILLE PER MECHANICAL
(SIZE & PROPORTION MAY VARY)
LIGHT FIXTURE PER ELECTRICAL
AREA SHOWN
PROJECT
NORTH
TRUE NORTH
(DASHED)
BUILDING 9A
1 2 3 4 5 6 7 8
17 18 19 20 21
440 SF
CHANGE MGMT
USER
86 SF
MECHANICAL
109 72 SF
STORAGE
1234 SF
IV TESTING
199 SF
STAFF BREAK
106 SF
WAITING ALCOVE
73 SF
RESTROOM
80 SF
RESTROOM
77 SF
RESTROOM
106 SF
RESTROOM
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
GYP
7' - 0" AFF
51 SF
ELECTRICAL
CLOSET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AC101
CEILING PLAN - PHASE I - WEST
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
Revisions: Date:
3/16" = 1'-0"
CEILING PLAN - PHASE I - WEST
1.
CEILING IN THIS ROOM IS OPEN TO STRUCTURE.
Megan Matt's Stamp
Megan
2x2 ACOUSTICAL CEILING TILE
2x4 ACOUSTICAL CEILING TILE
GYPSUM BOARD ON METAL STUDS
GRILLE PER MECHANICAL
(SIZE & PROPORTION MAY VARY)
LIGHT FIXTURE PER ELECTRICAL
AREA SHOWN
PROJECT
NORTH
TRUE NORTH
(DASHED)
BUILDING 9A
8 9 10 11 12 13 14 15 16 60 61 62 63 64
25 26 27 28 29 30 31 32
1270 SF
IV SUPPORT
99 SF
HAC
72 SF
STORAGE
1375 SF
IV TESTING
101 SF
TR
1677 SF
CORRIDOR
CR11-9
106 SF
RESTROOM
191 SF
MECHANICAL
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
ACT 2x2
8' - 0" AFF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AC102
CEILING PLAN - PHASE I - EAST
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1.
Revisions: Date:
3/16" = 1'-0"
CEILING PLAN - PHASE I - EAST
Megan Matt's Stamp
Megan
A1067 MIRROR - ADA
AE420
A5075 SOAPA5082PAPER TOWELS - AUTO
F2010WASTEPAPER
WALL MOUNTED SINK
PER PLUMBING
C L E
A R
CLEAR
2' - 6"
EQ EQ
AE420 3
3' - 0" 6"
A5109GRAB BAR
A5109 GRAB BAR
A5090 SANITARY NAPKIN
A5200 TOILET TISSUE
WALL MOUNTED TOILET
PER PLUMBING
C L E
A R
CLEAR
5' - 0"
1' - 5"
1. RATED WALLS NOT SHOWN ON ENLARGED PLANS. SEE
OVERALL PLANS FOR LOCATIONS OF RATED WALLS.
2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL
BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,
GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED
BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.
SEE TYPICAL BLOCKING DETAIL.
3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH
HALF-TONED GRAY LINEWORK FOR CLARITY. SEE
SPECIALTY EQUIPMENT SCHEDULE.
AE423
199 SF
STAFF BREAK
14' - 3"
F0795 TABLE
F0225 CHAIR
F2015WASTEPAPER
R7250REFRIGERATOR
A5075SOAP
A5082PAPER TOWELS - AUTO
K1552COFFEE
K4665MICROWAVE
AE421
4 2
8' - 1"
99 SF
HAC
.0
F0500 JANITOR'S CART
MOP SINK PER
PLUMBING
F0505 MOP BUCKET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE400
ENLARGED FLOOR PLANS
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
1/2" = 1'-0"
TYP SINK @ TOILET
1/2" = 1'-0"
TYP TOILET @ PUBLIC
GENERAL NOTES
Revisions: Date:
1/2" = 1'-0"
RM 107 - ENLARGED PLAN
1/2" = 1'-0"
RM 102 - ENLARGED PLAN
Megan Matt's Stamp
Megan
A5075 SOAP
A5077 SANITIZER
A5082PAPER TOWELS - AUTO
A1067MIRROR - ADA
A5107GLOVES DISPENSER
A1509GRAB BAR
A5200 TOILET TISSUE
A5090 SANITARY NAPKIN
WALL MOUNTED SINK
PER PLUMBING
M0512 TELEVISION, 60"
WALL MOUNTED
BOTTLE FILLING
STATION PER
PLUMBING
A5200 TOILET TISSUE
A5090SANITARY NAPKIN
A5109GRAB BAR
WALL MOUNTED TOILET
PER PLUMBING
A5109 GRAB BAR
2" 2"
A5109GRAB BAR
WALL MOUNTED TOILET
PER PLUMBING
A5109 GRAB BAR
A5090 SANITARY NAPKIN
WALL MOUNTED SINK
PER PLUMBING
2"
A5082PAPER TOWELS - AUTO
F2010WASTEPAPER
A1067MIRROR - ADA
A5075 SOAP
2"
1. RATED WALLS NOT SHOWN ON ENLARGED PLANS. SEE
OVERALL PLANS FOR LOCATIONS OF RATED WALLS.
2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL
BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,
GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED
BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.
SEE TYPICAL BLOCKING DETAIL.
3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH
HALF-TONED GRAY LINEWORK FOR CLARITY. SEE
SPECIALTY EQUIPMENT SCHEDULE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE420
TYP INTERIOR ELEVATIONS
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
1/2" = 1'-0"
TYP MOUNTING HEIGHTS
1/2" = 1'-0"
TYP TOILET @ PUBLIC - SIDE WALL
1/2" = 1'-0"
TYP TOILET @ PUBLIC - BACK WALL
1/2" = 1'-0"
TYP SINK @ TOILET
GENERAL NOTES
Revisions: Date: 26 OF 102
Megan Matt's Stamp
Megan
1. RATED WALLS NOT SHOWN ON ENLARGED PLANS. SEE
OVERALL PLANS FOR LOCATIONS OF RATED WALLS.
2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL
BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,
GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED
BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.
SEE TYPICAL BLOCKING DETAIL.
3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH
HALF-TONED GRAY LINEWORK FOR CLARITY. SEE
SPECIALTY EQUIPMENT SCHEDULE.
LEVEL 1
0' - 0"
1632 58
99 SF
HAC
LEVEL 1
0' - 0"
99 SF
HAC
MOP SINK PER
PLUMBING
LEVEL 1
0' - 0"
163258
99 SF
HAC
MOP SINK PER
PLUMBING
A5135 UTILITY SHELF
LEVEL 1
0' - 0"
99 SF
HAC
A5135 UTILITY SHELF
F0500 JANITOR'S CART
MOP SINK PER
PLUMBING
F0505MOP BUCKET
M2050 WIRE SHELF
LEVEL 1
0' - 0"
11 12 13 1427 28 29 30 31
1375 SF
IV TESTING
103B 103A
A0001ACCORDIAN WALL
E0042WORKSTATION
F0275CHAIR
M0512 TELEVISION, 60"
LEVEL 1
0' - 0"
11121314 2728293031
1375 SF
IV TESTING
F0275CHAIR E0042 WORKSTATION
LEVEL 1
0' - 0"
1375 SF
IV TESTING
E0042 WORKSTATION
F0275 CHAIR
A0001ACCORDIAN WALL
LEVEL 1
0' - 0"
1375 SF
IV TESTING
E0042 WORKSTATION
F0275 CHAIR
A0001 ACCORDIAN WALL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE421
INTERIOR ELEVATIONS
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
GENERAL NOTES
Revisions: Date:
3/8" = 1'-0"
RM 102 - NORTH
3/8" = 1'-0"
RM 102 - EAST
3/8" = 1'-0"
RM 102 - SOUTH
3/8" = 1'-0"
RM 102 - WEST
3/8" = 1'-0"
RM 103 - NORTH
3/8" = 1'-0"
RM 103 - SOUTH
3/8" = 1'-0"
RM 103 - WEST
3/8" = 1'-0"
RM 103 - EAST
Megan Matt's Stamp
Megan
2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL
BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,
GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED
BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.
SEE TYPICAL BLOCKING DETAIL.
3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH
HALF-TONED GRAY LINEWORK FOR CLARITY. SEE
SPECIALTY EQUIPMENT SCHEDULE.
LEVEL 1
0' - 0"
8 9 1025 26
1270 SF
IV SUPPORT
104B 104A
M0512TELEVISION, 60"
E0042 WORKSTATIONF0275 CHAIR
A0001 ACCORDIAN WALL
LEVEL 1
0' - 0"
1270 SF
IV SUPPORT
E0042 WORKSTATION
F0275 CHAIR
LEVEL 1
0' - 0"
8910 2526
1270 SF
IV SUPPORT
E0042 WORKSTATION
F0275 CHAIR
LEVEL 1
0' - 0"
1270 SF
IV SUPPORT
A0001ACCORDIAN WALL
E0042 WORKSTATION
F0275 CHAIR
LEVEL 1
0' - 0"
106 SF
WAITING ALCOVE
F0305CHAIR
LEVEL 1
0' - 0"
106 SF
WAITING ALCOVE
F0305 CHAIR
WALL MOUNTED
BOTTLE FILLING
STATION PER
PLUMBING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE422
INTERIOR ELEVATIONS
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
GENERAL NOTES
Revisions: Date:
3/8" = 1'-0"
RM 104 - NORTH
3/8" = 1'-0"
RM 104 - EAST
3/8" = 1'-0"
RM 104 - SOUTH
3/8" = 1'-0"
RM 104 - WEST
3/8" = 1'-0"
RM 105 - NORTH
3/8" = 1'-0"
RM 105 - EAST
Megan Matt's Stamp
Megan
2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL
BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,
GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED
BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.
SEE TYPICAL BLOCKING DETAIL.
3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH
HALF-TONED GRAY LINEWORK FOR CLARITY. SEE
SPECIALTY EQUIPMENT SCHEDULE.
LEVEL 1
0' - 0"
3 4 5 620 21
1234 SF
IV TESTING
106B 106A
M0512 TELEVISION, 60"
E0042 WORKSTATION
F0275 CHAIR
A0001 ACCORDIAN WALL
LEVEL 1
0' - 0"
1234 SF
IV TESTING
A0001 ACCORDIAN WALL
E0042 WORKSTATION
F0275 CHAIR
LEVEL 1
0' - 0"
3456 2021
1234 SF
IV TESTING
F0275CHAIR E0042 WORKSTATION
LEVEL 1
0' - 0"
1234 SF
IV TESTING
M0512TELEVISION, 60"
F0275 CHAIR
E0042 WORKSTATION
LEVEL 1
0' - 0"
199 SF
STAFF BREAK
F0795 TABLE
F0225 CHAIR
F2015 WASTEPAPER
LEVEL 1
0' - 0"
199 SF
STAFF BREAK
F2015 WASTEPAPER
R7250REFRIGERATOR
A5082
PAPER TOWELS -
AUTO
A5075 SOAP
K1552 COFFEE
K4665 MICROWAVE
LEVEL 1
0' - 0"
199 SF
STAFF BREAK
A5082
PAPER TOWELS -
AUTO
K1552 COFFEE
F0795TABLE
F0225 CHAIR
LEVEL 1
0' - 0"
199 SF
STAFF BREAK
F0795 TABLE
F0225 CHAIR
F2015WASTEPAPER
LEVEL 1
0' - 0"
440 SF
CHANGE MGMT
USER
E0042 WORKSTATION
F0275 CHAIR
LEVEL 1
0' - 0"
440 SF
CHANGE MGMT
USER
E0042WORKSTATION
F0275CHAIR
LEVEL 1
0' - 0"
440 SF
CHANGE MGMT
USER
E0042WORKSTATION
F0275 CHAIR
LEVEL 1
0' - 0"
440 SF
CHANGE MGMT
USER
E0042WORKSTATION
F0275 CHAIR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE423
INTERIOR ELEVATIONS
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
GENERAL NOTES
Revisions: Date:
3/8" = 1'-0"
RM 106 - NORTH
3/8" = 1'-0"
RM 106 - EAST
3/8" = 1'-0"
RM 106 - SOUTH
3/8" = 1'-0"
RM 106 - WEST
3/8" = 1'-0"
RM 107 - NORTH
3/8" = 1'-0"
RM 107 - EAST
3/8" = 1'-0"
RM 107 - SOUTH
3/8" = 1'-0"
RM 107 - WEST
3/8" = 1'-0"
RM 108 - NORTH
3/8" = 1'-0"
RM 108 - EAST
3/8" = 1'-0"
RM 108 - SOUTH
3/8" = 1'-0"
RM 108 - WEST
Megan Matt's Stamp
Megan
2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL
BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,
GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED
BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.
SEE TYPICAL BLOCKING DETAIL.
3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH
HALF-TONED GRAY LINEWORK FOR CLARITY. SEE
SPECIALTY EQUIPMENT SCHEDULE.
LEVEL 1
0' - 0"
73 SF
RESTROOM
AE420
AE420
CT-3
CT-2
CT-1
EQ EQ
OPP OPP
LEVEL 1
0' - 0"
73 SF
RESTROOM
2' - 0"
CT-3
CT-1
CT-2
LEVEL 1
0' - 0"
73 SF
RESTROOM
EQ EQ
CT-2
CT-3
CT-1
LEVEL 1
0' - 0"
73 SF
RESTROOM
AE420
2' - 0"
CT-1
CT-2
CT-3
EXISTING WINDOW
TO REMAIN
OPP
LEVEL 1
0' - 0"
80 SF
RESTROOM
EQEQ
AE420
AE420
CT-3
CT-2
CT-1
OPPOPP
LEVEL 1
0' - 0"
80 SF
RESTROOM
1' - 0 1/2"
CT-2
CT-3
CT-1
LEVEL 1
0' - 0"
80 SF
RESTROOM
EQEQ
CT-1
CT-2
CT-3
LEVEL 1
0' - 0"
80 SF
RESTROOM
AE420
CT-3
CT-2
CT-1
EXISTING WINDOW
TO REMAIN
OPP
LEVEL 1
0' - 0"
77 SF
RESTROOM
CT-3
CT-2
CT-1 LEVEL 1
0' - 0"
77 SF
RESTROOM
AE420
CT-3
CT-2
CT-1
LEVEL 1
0' - 0"
77 SF
RESTROOM
AE420
AE420
LEVEL 1
0' - 0"
77 SF
RESTROOM
CT-3
CT-2
CT-1
LEVEL 1
0' - 0"
106 SF
RESTROOM
AE420
AE420
EQEQ
CT-3
CT-2
LEVEL 1
0' - 0"
106 SF
RESTROOM
4"
EXISTING WINDOW
TO REMAIN
CT-3
CT-2
CT-1
AE420
LEVEL 1
0' - 0"
106 SF
RESTROOM
EQEQ
CT-3
CT-2
CT-1
LEVEL 1
0' - 0"
106 SF
RESTROOM
2' - 0"
CT-3
CT-2
CT-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE424
INTERIOR ELEVATIONS
009A
MK AB
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
GENERAL NOTES
Revisions: Date:
3/8" = 1'-0"
RM 110 - NORTH
3/8" = 1'-0"
RM 110 - EAST
3/8" = 1'-0"
RM 110 - SOUTH
3/8" = 1'-0"
RM 110 - WEST
3/8" = 1'-0"
RM 111 - NORTH
3/8" = 1'-0"
RM 111 - EAST
3/8" = 1'-0"
RM 111 - SOUTH
3/8" = 1'-0"
RM 111 - WEST
3/8" = 1'-0"
RM 112 - NORTH
3/8" = 1'-0"
RM 112 - EAST
3/8" = 1'-0"
RM 112 - SOUTH
3/8" = 1'-0"
RM 112 - WEST
3/8" = 1'-0"
RM 113 - NORTH
3/8" = 1'-0"
RM 113 - EAST
3/8" = 1'-0"
RM 113 - SOUTH
3/8" = 1'-0"
RM 113 - WEST
Megan Matt's Stamp
Megan
FASTEN AT BOTH
ENDS WITH MIN 4
TAPPING SCREWS
GENERAL NOTE:
CONTRACTOR SHALL COORDINATE
LOCATIONS OF HORIZONTAL FASTENERS
PLAN VIEW
ISOMETRIC VIEW
WALL FINISH
VERTICAL WALL STUDS
@ 16" OR 24" OC
CUT HORIZONTAL
FASTENER FROM STUD
WALL ASSEMBLY AS NOTED
SEMI-RECESSED FIRE
EXTINGUISHER CABINET
LINE OF WALL BEYOND
FIRE EXTINGUISHER PER
MANUFACTURER
CAULKING AT PERIMETER,
TYP.MTL DOOR
FRAME
SHIM AS
REQ'D
RUNNER
BETWEEN
STUDS
1/2"
CONST
JOINT
SEE NOTE 1
VERTICAL STUDS @ 2'-0" MAX. W/
GYPSUM WALL BOARD. 1'-4" W/ GYPSUM
LATH & PLASTER DOUBLE STUDS FOR
SUPPORTING CONC. BACKER BOARD
PROVIDE CONTINUOUS BRACING
WHEN STUDS EXCEED 10'-0" AND
ARE FINISHED BOTH SIDES
JAMB ANCHOR CLIPS 3 PER
SIDE - COORDINATE W/
HINGE REINFORCEMENT
NOTE 1: OMIT BRACE WHEN 'D' DIMENSION
IS LESS THAN 2'-0" FOR GYP. WALL BOARD
OR 16" FOR PLASTER PARTITION
ELEVATION AT DOOR FRAME
DETAIL D
JAMB ANCHORS
(FURNISHED W/ FRAME)
DETAIL C
FRAME FACE
MIN
US 3/16"
E Q
E Q
D
E Q
E Q
V A
R
IE
S S
E E
D O
O R
S C
H E
D
VARIES SEE
DOOR SCHED
DETAIL B
A A
1/2" M
IN
5/8" M
AX
FRAME FACE
MIN
US 3/16"
/4
M
IN
STUD
W
IDTH
/4
M
IN
JAMB DEPTH
MINUS 3/16"
STUD
W
IDTH
1/2"
DETAIL D, TYP
M A
X
DETAIL B
PROVIDE SOUND
DEADENING WHERE
REQUIRED
/2
SECTION A
DOUBLE STUDS JAMB ANCHOR
GYPSUM WALL
BOARD PANELS
CONTROL JOINT
ISOMETRIC OF CONSTRUCT JOINT
/4
M
IN
DETAIL C
SANITARY
STOP
MTL DOOR FRAME
MTL ANCHOR CLIP
SHIM AS
REQ'D
CRIPPLE STUD, DO NOT
ANCHOR TO BEARING STUD
1/2" M
IN
METAL TOP RUNNER
STRUCTURE ABV
ANGLE BRACE
METAL STUD
CEILING
WALL FINISH PER WALL TYPES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-501
DETAILS
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
GENERAL NOTES
1. ALL WALL MOUNTED EQUIPMENT SHALL HAVE BLOCKING IN
WALL BEHIND. THIS INCLUDES BACKING FOR WALL
MOUNTED DOOR STOPS, DISPENSERS, PHONES, ETC.
ENSURE THAT ALL REQUIRED BACKING IS INSTALLED PRIOR
TO INSTALLING DRYWALL. SEE TYPICAL BLOCKING DETAIL.
NOT TO SCALE
TYPICAL BLOCKING DETAIL
3" = 1'-0"
FIRE EXTINGUISHER - PLAN VIEW
Revisions: Date:
NOT TO SCALE
PARTITION FRAMING AT DOORS
1 1/2" = 1'-0"
TYP WALL CONNECTION TO STRUCTURE
Megan Matt's Stamp
Megan
COUNTERTOP, MATERIAL AS NOTED
ON CASEWORK ELEVATIONS
4" x 3/8" DIA
WIRE PULL, TYP
3/4" MDF TOE KICK WITH
PLAM FINISH & BASE PER
FINISH SCHEDULE
5/8" x 2 1/2" MDF FRAME
ANCHORED TO BLOCKING, TYP
3/4" MDF BOTTOM WITH
PLAM FINISH
2x4 PRESSURE
TREATED FRAME
BLOCKING
1/4" MDF BACK WITH
PLAM FINISH
3/4" MDF END OR DIVIDER
PANEL WITH PLAM FINISH
FACE OF WALL
1/2" MDF DRAWER
FRONT WITH PLAM
FINISH, TYP
1/2" MDF DRAWER BACK,
SIDES & BOTTOM WITH
PLAM FINISH, TYP
2' - 0"
E Q
E Q
E Q
E Q
3"
EASED EDGE
BASE CABINET
SOLID SURFACE
COUNTERTOP
1" OVERHANG
R 1/4"
1"
2' - 0" UNO
COUNTERTOP, MATERIAL AS NOTED
ON CASEWORK ELEVATIONS
4" x 3/8" DIA WIRE PULL
3/4" MDF DOOR
WITH PLAM FINISH
3/4" MDF TOE KICK WITH
PLAM FINISH & BASE PER
FINISH SCHEDULE
5/8" x 2 1/2" MDF FRAME
ANCHORED TO BLOCKING, TYP
3/4" MDF BOTTOM WITH
PLAM FINISH
2x4 PRESSURE
TREATED FRAME
BLOCKING
1/4" MDF BACK WITH PLAM
FINISH
RECESSED ADJUSTABLE
SHELF STANDARDS, TYP
3/4" MDF ADJUSTABLE SHELF
WITH PLAM FINISH
3/4" MDF END OR DIVIDER
PANEL WITH PLAM FINISH
FACE OF WALL
1/2" MDF DRAWER FRONT
WITH PLAM FINISH 1/2" MDF DRAWER
BACK, SIDES & BOTTOM
WITH PLAM FINISH
NYLON LOCK CLIP, TYP
2' - 0"
3"
COUNTERTOP, MATERIAL AS NOTED
ON CASEWORK ELEVATIONS
4" x 3/8" DIA WIRE PULL
3/4" MDF DOOR
WITH PLAM FINISH
3/4" MDF TOE KICK WITH
PLAM FINISH & BASE PER
FINISH SCHEDULE
5/8" x 2 1/2" MDF FRAME
ANCHORED TO BLOCKING, TYP
3/4" MDF BOTTOM WITH
PLAM FINISH
2x4 PRESSURE
TREATED FRAME
BLOCKING AT TOP, BOTTOM,
AND MIDDLE
1/4" MDF BACK WITH PLAM
FINISH
3/4" MDF END OR DIVIDER
PANEL WITH PLAM FINISH
FACE OF WALL
1/2" MDF FAUX DRAWER
FRONT WITH PLAM FINISH
PIPING PER PLUMBING
3"
5/8" x 2 1/2" MDF FRAME
ANCHORED TO BLOCKING
BLOCKING
1/4" MDF BACK WITH PLAM
FINISH
RECESSED ADJUSTABLE
SHELF STANDARDS, TYP
3/4" MDF ADJUSTABLE SHELF
WITH PLAM FINISH
3/4" MDF END OR DIVIDER
PANEL WITH PLAM FINISH
FACE OF WALL
3/4" MDF BOTTOM WITH
PLAM FINISH
3/4" MDF SLOPED TOP
WITH PLAM FINISH
3/4" MDF DOOR WITH PLAM
4" x 3/8" DIA WIRE PULL
1' - 3"
E1501 RAIL, MOD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-502
CASEWORK DETAILS
009A
MK AB
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
Revisions: Date:
1 1/2" = 1'-0"
BASE CABINET DETAIL - 4 EQ DRAWERS
3" = 1'-0"
COUNTERTOP DETAIL - SOLID SURFACE (SDSF)
1 1/2" = 1'-0"
BASE CABINET DETAIL - DRAWER & DOOR
1 1/2" = 1'-0"
BASE CABINET DETAIL - SINK & DOOR
1 1/2" = 1'-0"
WALL CABINET DETAIL - PLAM SLOPED TOP
Megan Matt's Stamp
Megan
| Sheets |
| AC001 - CEILING PLAN - PHASE I - OVERALL |
| AC101 - CEILING PLAN - PHASE I - WEST |
| AC102 - CEILING PLAN - PHASE I - EAST |
| AE102 - FLOOR PLAN - PHASE I - EAST |
| AE103 - FLOOR PLAN - PHASE II - WEST |
| AE104 - FLOOR PLAN - PHASE II - EAST |
| AE400 - ENLARGED FLOOR PLANS |
File details come from the government source that posted it. Updated .