S02-RFP Attachment 12-Drawings-Dublin_Part3.pdf

PDF 2 MB Posted

Attached to
Y1DZ--Renovate Building 9A for EHRM Administration- EHRM Project 557-21-703 Carl Vinson VA Medical Center Dublin, GA 31021
Solicitation number
36C77626R0031_1
Issued by

About this file

This document is a construction set of architectural drawings for a renovation project at a U.S. Department of Veterans Affairs facility. The project involves a phased renovation of building administrative and support spaces, designed by SPEES Design Build of Seattle, Washington under the supervision of the VA's Office of Construction and Facilities Management.

The drawings depict two construction phases with detailed floor plans, ceiling plans, interior elevations, and construction details. Phase I includes renovation of the east wing with rooms such as treatment rooms (IV Testing, IV Support), mechanical areas, restrooms, electrical closets, a staff break room, and a change management user space, totaling approximately 7,000 gross square feet. Phase II covers the west wing with classroom spaces, restrooms, mechanical areas, and a change management facility. The design features 2x2 acoustic ceiling tiles at 8 feet above finished floor elevation, gypsum wall board partitions with typical blocking details, modular furniture systems including workstations and chairs, and various finishes specified for casework, countertops, and fixtures. Key technical specifications include partition framing at doors, casework details with MDF construction and plastic laminate finishes, wall connections to existing structure, fire extinguisher locations, and typical mounting heights for fixtures throughout the facility. The drawings are fully sprinklered and indicate both existing doors to remain and new door locations throughout the renovation scope.

View the file

Other files

File Type Posted
S06- Addendum 2-Dublin - Specifications.pdf PDF
S06-Amendment 0006 SF 30-Dublin.pdf PDF
S05-Tech Questions w responses-Amendment 0006-Dublin.pdf PDF
S06-Amendment 0005-SF30-Dublin.pdf PDF
S06-Amendment 0004- Addendum 1 - Hazardous Materials Survey.pdf PDF
S06- Amendment 0004-Technical Responses - Dublin.pdf PDF
S06-Amendment 0004-Addendum-1-Specifications.pdf PDF
S06-Amendment 0004-Addendum-1-Drawings.pdf PDF
S06 - Amendment 0004-Additional Technical Responses -Dublin.pdf PDF
S06-Amendment 0004-SF30.pdf PDF
S06-Amendment 0003-due date ext-Dub.pdf PDF
S06-36C77626R0031-Amendment 0002.pdf PDF
S04-Site Visit Sign In Sheet-Dublin.pdf PDF
S02-RFP Attachment 24-Specifications- Part 2 of 5 - Section 09 06 00.pdf PDF
S06-36C77626R0031-Amendment 0001.pdf PDF
S02-36C77626R0031_1-final.pdf PDF
S02-RFP Attachment 1 DBA Rates-Laurens County-Dublin.pdf PDF
S02-RFP Attachment 6- Specifications part 2 of 5.pdf PDF
S02-RFP Attachment 13-Drawings-Dublin_Part4.pdf PDF
S02-RFP Attachment 16-Drawings-Dublin_Part7.pdf PDF
S02-RFP Attachment 19-Drawings-Dublin_Part10.pdf PDF
S02-RFP Attachment 5- Specifications part 1 of 5.pdf PDF
S02-RFP Attachment 7- Specifications part 3 of 5.pdf PDF
S02-RFP Attachment 15-Drawings-Dublin_Part6.pdf PDF
S02-RFP Attachment 21-Drawings-Dublin_Part12.pdf PDF
S02-RFP Attachment 22-Drawings-Dublin_Part13.pdf PDF
S02-RFP Attachment 2 Site Visit Information-Dublin.docx DOCX document
S02-RFP Attachment 4 Campus Map-Dublin.pdf PDF
S02-RFP Attachment 8- Specifications part 4 of 5.pdf PDF
S02-RFP Attachment 10- Drawings-Dublin_Part1.pdf PDF
S02-RFP Attachment 11-Drawings-Dublin_Part2.pdf PDF
S02-RFP Attachment 23-Drawings-Dublin_Part14.pdf PDF
S02 - RFP Attachment 3 - Limitations on Subcontracting - Dublin.docx DOCX document
S02-RFP Attachment 9- Specifications part 5 of 5.pdf PDF
S02-RFP Attachment 14-Drawings-Dublin_Part5.pdf PDF
S02-RFP Attachment 17-Drawings-Dublin_Part8.pdf PDF
S02-RFP Attachment 18-Drawings-Dublin_Part9.pdf PDF
S02-RFP Attachment 20-Drawings-Dublin_Part11.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

EXISTING DOOR TO REMAIN

NEW DOOR

8 9 10 11 12 13 14 15 16 60 61 62 63 64

25 26 27 28 29 30 31 32

1270 SF

IV SUPPORT

99 SF

HAC

1021375 SF

IV TESTING

101 SF

TR

121 SF

ELECTRICAL ROOM

1677 SF

CORRIDOR

CR11-9

57' - 6 1/8" 19' - 7" 10' - 3"

5'

5"

135.00°

191 SF

MECHANICAL

103B 103A 102

AE422

AE421

AE421

4 2

8 6

4 2

.0

104A

A0001 ACCORDIAN WALL

E0042 WORKSTATION

F-1

M0512 TELEVISION, 60"

F0275 CHAIR

AE400

14' - 11"

8' - 1"

STG

103A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE102

FLOOR PLAN - PHASE I - EAST

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

PHASE I - ROOM PROGRAM

ROOM # ROOM NAME

PROGRAM

NET

DESIGNED

NET

100 TR 100 SF 101 SF

101 MECHANICAL 100 SF 191 SF

102 HAC 600 SF 99 SF

103 IV TESTING 1800 SF 1375 SF

103A STG 85 SF

104 IV SUPPORT 1200 SF 1270 SF

105 WAITING ALCOVE 600 SF 106 SF

106 IV TESTING 1800 SF 1234 SF

107 STAFF BREAK 150 SF 199 SF

108 CHANGE MGMT USER 300 SF 440 SF

109 MECHANICAL 50 SF 86 SF

110 RESTROOM 55 SF 73 SF

111 RESTROOM 55 SF 80 SF

112 RESTROOM 40 SF 77 SF

113 RESTROOM 55 SF 106 SF

114 STORAGE 55 SF 72 SF

115 ELECTRICAL CLOSET 51 SF

116 ELECTRICAL ROOM 100 SF 121 SF

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

3/16" = 1'-0"

FLOOR PLAN - PHASE I - EAST

1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS

BETWEEN EXISTING CONDITIONS AND THE CONTRACT

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF

THE COR IMMEDIATELY.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF

STUD, CENTERLINE OF STRUCTURAL COLUMNS, AND

CENTERLINE OF OPENINGS, UNO.

3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"

FROM THE INTERECTING WALL, OR CENTERED ON THE

WALL, UNO.

4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INSTALLING DRYWALL.

Megan Matt's Stamp

Megan Text Box 6/14/24

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

EXISTING DOOR TO REMAIN

NEW DOOR

1 2 3 4 5 6 7 8

17 18 19 20 21

86 SF

MECH

440 SF

CHANGE MGMT

USER

52' - 9"

73 SF

RESTROOM

601 SF

CLASSROOM

106A

633 SF

CLASSROOM

106B

199 SF

STAFF BREAK

80 SF

RESTROOM

77 SF

RESTROOM

106 SF

RESTROOM

S

F

S T

O R

A G

E

51 SF

ELECTRICAL

CLOSET

106 SF

WAITING

ALCOVE

F0275CHAIR

E0042WORKSTATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE103

FLOOR PLAN - PHASE II - WEST

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

3/16" = 1'-0"

FLOOR PLAN - PHASE II - WEST

PHASE II - ROOM PROGRAM

ROOM # ROOM NAME

PROGRAM

NET

DESIGNED

NET

103A CLASSROOM 600 SF 682 SF

103B CLASSROOM 600 SF 692 SF

104A CLASSROOM 600 SF 634 SF

104B CLASSROOM 635 SF

105 CLASSROOM 600 SF Not Placed

105 WAITING ALCOVE 106 SF

106 STG 85 SF

106A CLASSROOM 600 SF 601 SF

106B CLASSROOM 600 SF 633 SF

115 ELECTRICAL CLOSET 51 SF

ACCORDIAN STYLE WALL PARTITION TO BE DEPLOYED,

SEPERATING THE CLASSROOMS.

1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS

BETWEEN EXISTING CONDITIONS AND THE CONTRACT

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF

THE COR IMMEDIATELY.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF

STUD, CENTERLINE OF STRUCTURAL COLUMNS, AND

CENTERLINE OF OPENINGS, UNO.

3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"

FROM THE INTERECTING WALL, OR CENTERED ON THE

WALL, UNO.

4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INSTALLING DRYWALL.

Megan Matt's Stamp

Megan

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

EXISTING DOOR TO REMAIN

NEW DOOR

8 9 10 11 12 13 14 15 16 60 61 62 63 64

25 26 27 28 29 30 31 32

121 SF

ELECTRICAL

28' - 10 1/8" 28' - 8"

101 SF

TR ROOM

99 SF

HAC

682 SF

CLASSROOM

103A

692 SF

CLASSROOM

103B

634 SF

CLASSROOM

104A

106 SF

RESTROOM

S

F

S T

O R

A G

E

1677 SF

CORRIDOR

CR11-9

191 SF

MECHANICAL

102A

F0275CHAIR

E0042WORKSTATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE104

FLOOR PLAN - PHASE II - EAST

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

PHASE I - ROOM PROGRAM

ROOM # ROOM NAME

PROGRAM

NET

DESIGNED

NET

100 TR 100 SF 101 SF

101 MECHANICAL 100 SF 191 SF

102 HAC 600 SF 99 SF

103 IV TESTING 1800 SF 1375 SF

103A STG 85 SF

104 IV SUPPORT 1200 SF 1270 SF

105 WAITING ALCOVE 600 SF 106 SF

106 IV TESTING 1800 SF 1234 SF

107 STAFF BREAK 150 SF 199 SF

108 CHANGE MGMT USER 300 SF 440 SF

109 MECHANICAL 50 SF 86 SF

110 RESTROOM 55 SF 73 SF

111 RESTROOM 55 SF 80 SF

112 RESTROOM 40 SF 77 SF

113 RESTROOM 55 SF 106 SF

114 STORAGE 55 SF 72 SF

115 ELECTRICAL CLOSET 51 SF

116 ELECTRICAL ROOM 100 SF 121 SF

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1.

Revisions: Date:

3/16" = 1'-0"

FLOOR PLAN - PHASE II - EAST

1 ACCORDIAN STYLE WALL PARTITION TO BE DEPLOYED,

SEPERATING THE CLASSROOMS.

1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS

BETWEEN EXISTING CONDITIONS AND THE CONTRACT

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF

THE COR IMMEDIATELY.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF

STUD, CENTERLINE OF STRUCTURAL COLUMNS, AND

CENTERLINE OF OPENINGS, UNO.

3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"

FROM THE INTERECTING WALL, OR CENTERED ON THE

WALL, UNO.

4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INSTALLING DRYWALL.

Megan Matt's Stamp

Megan

WAP

WAP

WAP

WAP WAP

WAP

2x2 ACOUSTICAL CEILING TILE

2x4 ACOUSTICAL CEILING TILE

GYPSUM BOARD ON METAL STUDS

GRILLE PER MECHANICAL

(SIZE & PROPORTION MAY VARY)

LIGHT FIXTURE PER ELECTRICAL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

440 SF

CHANGE MGMT

USER

1270 SF

IV SUPPORT

86 SF

MECHANICAL

99 SF

HAC

10272 SF

STORAGE

1234 SF

IV TESTING

1375 SF

IV TESTING

101 SF

TR

199 SF

STAFF BREAK

106 SF

WAITING ALCOVE

73 SF

RESTROOM

1677 SF

CORRIDOR

CR11-9

80 SF

RESTROOM

77 SF

RESTROOM

106 SF

RESTROOM

191 SF

MECHANICAL

121 SF

ELECTRICAL ROOM

/1 AC102/1 AC101

51 SF

ELECTRICAL

CLOSET

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

GYP

7' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AC001

CEILING PLAN - PHASE I -

OVERALL 009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

Revisions: Date:

LEGEND

PROJECT

NORTH

TRUE NORTH

(DASHED)

1/8" = 1'-0"

CEILING PLAN - PHASE I - OVERALL

Megan Matt's Stamp

Megan

2x2 ACOUSTICAL CEILING TILE

2x4 ACOUSTICAL CEILING TILE

GYPSUM BOARD ON METAL STUDS

GRILLE PER MECHANICAL

(SIZE & PROPORTION MAY VARY)

LIGHT FIXTURE PER ELECTRICAL

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

1 2 3 4 5 6 7 8

17 18 19 20 21

440 SF

CHANGE MGMT

USER

86 SF

MECHANICAL

109 72 SF

STORAGE

1234 SF

IV TESTING

199 SF

STAFF BREAK

106 SF

WAITING ALCOVE

73 SF

RESTROOM

80 SF

RESTROOM

77 SF

RESTROOM

106 SF

RESTROOM

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

GYP

7' - 0" AFF

51 SF

ELECTRICAL

CLOSET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AC101

CEILING PLAN - PHASE I - WEST

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

3/16" = 1'-0"

CEILING PLAN - PHASE I - WEST

1.

CEILING IN THIS ROOM IS OPEN TO STRUCTURE.

Megan Matt's Stamp

Megan

2x2 ACOUSTICAL CEILING TILE

2x4 ACOUSTICAL CEILING TILE

GYPSUM BOARD ON METAL STUDS

GRILLE PER MECHANICAL

(SIZE & PROPORTION MAY VARY)

LIGHT FIXTURE PER ELECTRICAL

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

8 9 10 11 12 13 14 15 16 60 61 62 63 64

25 26 27 28 29 30 31 32

1270 SF

IV SUPPORT

99 SF

HAC

72 SF

STORAGE

1375 SF

IV TESTING

101 SF

TR

1677 SF

CORRIDOR

CR11-9

106 SF

RESTROOM

191 SF

MECHANICAL

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

ACT 2x2

8' - 0" AFF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AC102

CEILING PLAN - PHASE I - EAST

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1.

Revisions: Date:

3/16" = 1'-0"

CEILING PLAN - PHASE I - EAST

Megan Matt's Stamp

Megan

A1067 MIRROR - ADA

AE420

A5075 SOAPA5082PAPER TOWELS - AUTO

F2010WASTEPAPER

WALL MOUNTED SINK

PER PLUMBING

C L E

A R

CLEAR

2' - 6"

EQ EQ

AE420 3

3' - 0" 6"

A5109GRAB BAR

A5109 GRAB BAR

A5090 SANITARY NAPKIN

A5200 TOILET TISSUE

WALL MOUNTED TOILET

PER PLUMBING

C L E

A R

CLEAR

5' - 0"

1' - 5"

1. RATED WALLS NOT SHOWN ON ENLARGED PLANS. SEE

OVERALL PLANS FOR LOCATIONS OF RATED WALLS.

2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL

BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,

GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED

BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.

SEE TYPICAL BLOCKING DETAIL.

3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH

HALF-TONED GRAY LINEWORK FOR CLARITY. SEE

SPECIALTY EQUIPMENT SCHEDULE.

AE423

199 SF

STAFF BREAK

14' - 3"

F0795 TABLE

F0225 CHAIR

F2015WASTEPAPER

R7250REFRIGERATOR

A5075SOAP

A5082PAPER TOWELS - AUTO

K1552COFFEE

K4665MICROWAVE

AE421

4 2

8' - 1"

99 SF

HAC

.0

F0500 JANITOR'S CART

MOP SINK PER

PLUMBING

F0505 MOP BUCKET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE400

ENLARGED FLOOR PLANS

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

1/2" = 1'-0"

TYP SINK @ TOILET

1/2" = 1'-0"

TYP TOILET @ PUBLIC

GENERAL NOTES

Revisions: Date:

1/2" = 1'-0"

RM 107 - ENLARGED PLAN

1/2" = 1'-0"

RM 102 - ENLARGED PLAN

Megan Matt's Stamp

Megan

A5075 SOAP

A5077 SANITIZER

A5082PAPER TOWELS - AUTO

A1067MIRROR - ADA

A5107GLOVES DISPENSER

A1509GRAB BAR

A5200 TOILET TISSUE

A5090 SANITARY NAPKIN

WALL MOUNTED SINK

PER PLUMBING

M0512 TELEVISION, 60"

WALL MOUNTED

BOTTLE FILLING

STATION PER

PLUMBING

A5200 TOILET TISSUE

A5090SANITARY NAPKIN

A5109GRAB BAR

WALL MOUNTED TOILET

PER PLUMBING

A5109 GRAB BAR

2" 2"

A5109GRAB BAR

WALL MOUNTED TOILET

PER PLUMBING

A5109 GRAB BAR

A5090 SANITARY NAPKIN

WALL MOUNTED SINK

PER PLUMBING

2"

A5082PAPER TOWELS - AUTO

F2010WASTEPAPER

A1067MIRROR - ADA

A5075 SOAP

2"

1. RATED WALLS NOT SHOWN ON ENLARGED PLANS. SEE

OVERALL PLANS FOR LOCATIONS OF RATED WALLS.

2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL

BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,

GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED

BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.

SEE TYPICAL BLOCKING DETAIL.

3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH

HALF-TONED GRAY LINEWORK FOR CLARITY. SEE

SPECIALTY EQUIPMENT SCHEDULE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE420

TYP INTERIOR ELEVATIONS

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

1/2" = 1'-0"

TYP MOUNTING HEIGHTS

1/2" = 1'-0"

TYP TOILET @ PUBLIC - SIDE WALL

1/2" = 1'-0"

TYP TOILET @ PUBLIC - BACK WALL

1/2" = 1'-0"

TYP SINK @ TOILET

GENERAL NOTES

Revisions: Date: 26 OF 102

Megan Matt's Stamp

Megan

1. RATED WALLS NOT SHOWN ON ENLARGED PLANS. SEE

OVERALL PLANS FOR LOCATIONS OF RATED WALLS.

2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL

BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,

GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED

BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.

SEE TYPICAL BLOCKING DETAIL.

3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH

HALF-TONED GRAY LINEWORK FOR CLARITY. SEE

SPECIALTY EQUIPMENT SCHEDULE.

LEVEL 1

0' - 0"

1632 58

99 SF

HAC

LEVEL 1

0' - 0"

99 SF

HAC

MOP SINK PER

PLUMBING

LEVEL 1

0' - 0"

163258

99 SF

HAC

MOP SINK PER

PLUMBING

A5135 UTILITY SHELF

LEVEL 1

0' - 0"

99 SF

HAC

A5135 UTILITY SHELF

F0500 JANITOR'S CART

MOP SINK PER

PLUMBING

F0505MOP BUCKET

M2050 WIRE SHELF

LEVEL 1

0' - 0"

11 12 13 1427 28 29 30 31

1375 SF

IV TESTING

103B 103A

A0001ACCORDIAN WALL

E0042WORKSTATION

F0275CHAIR

M0512 TELEVISION, 60"

LEVEL 1

0' - 0"

11121314 2728293031

1375 SF

IV TESTING

F0275CHAIR E0042 WORKSTATION

LEVEL 1

0' - 0"

1375 SF

IV TESTING

E0042 WORKSTATION

F0275 CHAIR

A0001ACCORDIAN WALL

LEVEL 1

0' - 0"

1375 SF

IV TESTING

E0042 WORKSTATION

F0275 CHAIR

A0001 ACCORDIAN WALL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE421

INTERIOR ELEVATIONS

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

GENERAL NOTES

Revisions: Date:

3/8" = 1'-0"

RM 102 - NORTH

3/8" = 1'-0"

RM 102 - EAST

3/8" = 1'-0"

RM 102 - SOUTH

3/8" = 1'-0"

RM 102 - WEST

3/8" = 1'-0"

RM 103 - NORTH

3/8" = 1'-0"

RM 103 - SOUTH

3/8" = 1'-0"

RM 103 - WEST

3/8" = 1'-0"

RM 103 - EAST

Megan Matt's Stamp

Megan

2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL

BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,

GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED

BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.

SEE TYPICAL BLOCKING DETAIL.

3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH

HALF-TONED GRAY LINEWORK FOR CLARITY. SEE

SPECIALTY EQUIPMENT SCHEDULE.

LEVEL 1

0' - 0"

8 9 1025 26

1270 SF

IV SUPPORT

104B 104A

M0512TELEVISION, 60"

E0042 WORKSTATIONF0275 CHAIR

A0001 ACCORDIAN WALL

LEVEL 1

0' - 0"

1270 SF

IV SUPPORT

E0042 WORKSTATION

F0275 CHAIR

LEVEL 1

0' - 0"

8910 2526

1270 SF

IV SUPPORT

E0042 WORKSTATION

F0275 CHAIR

LEVEL 1

0' - 0"

1270 SF

IV SUPPORT

A0001ACCORDIAN WALL

E0042 WORKSTATION

F0275 CHAIR

LEVEL 1

0' - 0"

106 SF

WAITING ALCOVE

F0305CHAIR

LEVEL 1

0' - 0"

106 SF

WAITING ALCOVE

F0305 CHAIR

WALL MOUNTED

BOTTLE FILLING

STATION PER

PLUMBING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE422

INTERIOR ELEVATIONS

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

GENERAL NOTES

Revisions: Date:

3/8" = 1'-0"

RM 104 - NORTH

3/8" = 1'-0"

RM 104 - EAST

3/8" = 1'-0"

RM 104 - SOUTH

3/8" = 1'-0"

RM 104 - WEST

3/8" = 1'-0"

RM 105 - NORTH

3/8" = 1'-0"

RM 105 - EAST

Megan Matt's Stamp

Megan

2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL

BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,

GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED

BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.

SEE TYPICAL BLOCKING DETAIL.

3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH

HALF-TONED GRAY LINEWORK FOR CLARITY. SEE

SPECIALTY EQUIPMENT SCHEDULE.

LEVEL 1

0' - 0"

3 4 5 620 21

1234 SF

IV TESTING

106B 106A

M0512 TELEVISION, 60"

E0042 WORKSTATION

F0275 CHAIR

A0001 ACCORDIAN WALL

LEVEL 1

0' - 0"

1234 SF

IV TESTING

A0001 ACCORDIAN WALL

E0042 WORKSTATION

F0275 CHAIR

LEVEL 1

0' - 0"

3456 2021

1234 SF

IV TESTING

F0275CHAIR E0042 WORKSTATION

LEVEL 1

0' - 0"

1234 SF

IV TESTING

M0512TELEVISION, 60"

F0275 CHAIR

E0042 WORKSTATION

LEVEL 1

0' - 0"

199 SF

STAFF BREAK

F0795 TABLE

F0225 CHAIR

F2015 WASTEPAPER

LEVEL 1

0' - 0"

199 SF

STAFF BREAK

F2015 WASTEPAPER

R7250REFRIGERATOR

A5082

PAPER TOWELS -

AUTO

A5075 SOAP

K1552 COFFEE

K4665 MICROWAVE

LEVEL 1

0' - 0"

199 SF

STAFF BREAK

A5082

PAPER TOWELS -

AUTO

K1552 COFFEE

F0795TABLE

F0225 CHAIR

LEVEL 1

0' - 0"

199 SF

STAFF BREAK

F0795 TABLE

F0225 CHAIR

F2015WASTEPAPER

LEVEL 1

0' - 0"

440 SF

CHANGE MGMT

USER

E0042 WORKSTATION

F0275 CHAIR

LEVEL 1

0' - 0"

440 SF

CHANGE MGMT

USER

E0042WORKSTATION

F0275CHAIR

LEVEL 1

0' - 0"

440 SF

CHANGE MGMT

USER

E0042WORKSTATION

F0275 CHAIR

LEVEL 1

0' - 0"

440 SF

CHANGE MGMT

USER

E0042WORKSTATION

F0275 CHAIR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE423

INTERIOR ELEVATIONS

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

GENERAL NOTES

Revisions: Date:

3/8" = 1'-0"

RM 106 - NORTH

3/8" = 1'-0"

RM 106 - EAST

3/8" = 1'-0"

RM 106 - SOUTH

3/8" = 1'-0"

RM 106 - WEST

3/8" = 1'-0"

RM 107 - NORTH

3/8" = 1'-0"

RM 107 - EAST

3/8" = 1'-0"

RM 107 - SOUTH

3/8" = 1'-0"

RM 107 - WEST

3/8" = 1'-0"

RM 108 - NORTH

3/8" = 1'-0"

RM 108 - EAST

3/8" = 1'-0"

RM 108 - SOUTH

3/8" = 1'-0"

RM 108 - WEST

Megan Matt's Stamp

Megan

2. ALL WALL MOUNTED EQUIPMENT SHALL HAVE METAL

BLOCKING IN WALL BEHIND. THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS, DISPENSERS, PHONES,

GARMENT HOOKS, ETC. ENSURE THAT ALL REQUIRED

BACKING IS INSTALLED PRIOR TO INSTALLING DRYWALL.

SEE TYPICAL BLOCKING DETAIL.

3. VA FURNISHED, VA INSTALLED EQUIPMENT IS SHOW WITH

HALF-TONED GRAY LINEWORK FOR CLARITY. SEE

SPECIALTY EQUIPMENT SCHEDULE.

LEVEL 1

0' - 0"

73 SF

RESTROOM

AE420

AE420

CT-3

CT-2

CT-1

EQ EQ

OPP OPP

LEVEL 1

0' - 0"

73 SF

RESTROOM

2' - 0"

CT-3

CT-1

CT-2

LEVEL 1

0' - 0"

73 SF

RESTROOM

EQ EQ

CT-2

CT-3

CT-1

LEVEL 1

0' - 0"

73 SF

RESTROOM

AE420

2' - 0"

CT-1

CT-2

CT-3

EXISTING WINDOW

TO REMAIN

OPP

LEVEL 1

0' - 0"

80 SF

RESTROOM

EQEQ

AE420

AE420

CT-3

CT-2

CT-1

OPPOPP

LEVEL 1

0' - 0"

80 SF

RESTROOM

1' - 0 1/2"

CT-2

CT-3

CT-1

LEVEL 1

0' - 0"

80 SF

RESTROOM

EQEQ

CT-1

CT-2

CT-3

LEVEL 1

0' - 0"

80 SF

RESTROOM

AE420

CT-3

CT-2

CT-1

EXISTING WINDOW

TO REMAIN

OPP

LEVEL 1

0' - 0"

77 SF

RESTROOM

CT-3

CT-2

CT-1 LEVEL 1

0' - 0"

77 SF

RESTROOM

AE420

CT-3

CT-2

CT-1

LEVEL 1

0' - 0"

77 SF

RESTROOM

AE420

AE420

LEVEL 1

0' - 0"

77 SF

RESTROOM

CT-3

CT-2

CT-1

LEVEL 1

0' - 0"

106 SF

RESTROOM

AE420

AE420

EQEQ

CT-3

CT-2

LEVEL 1

0' - 0"

106 SF

RESTROOM

4"

EXISTING WINDOW

TO REMAIN

CT-3

CT-2

CT-1

AE420

LEVEL 1

0' - 0"

106 SF

RESTROOM

EQEQ

CT-3

CT-2

CT-1

LEVEL 1

0' - 0"

106 SF

RESTROOM

2' - 0"

CT-3

CT-2

CT-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE424

INTERIOR ELEVATIONS

009A

MK AB

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

GENERAL NOTES

Revisions: Date:

3/8" = 1'-0"

RM 110 - NORTH

3/8" = 1'-0"

RM 110 - EAST

3/8" = 1'-0"

RM 110 - SOUTH

3/8" = 1'-0"

RM 110 - WEST

3/8" = 1'-0"

RM 111 - NORTH

3/8" = 1'-0"

RM 111 - EAST

3/8" = 1'-0"

RM 111 - SOUTH

3/8" = 1'-0"

RM 111 - WEST

3/8" = 1'-0"

RM 112 - NORTH

3/8" = 1'-0"

RM 112 - EAST

3/8" = 1'-0"

RM 112 - SOUTH

3/8" = 1'-0"

RM 112 - WEST

3/8" = 1'-0"

RM 113 - NORTH

3/8" = 1'-0"

RM 113 - EAST

3/8" = 1'-0"

RM 113 - SOUTH

3/8" = 1'-0"

RM 113 - WEST

Megan Matt's Stamp

Megan

FASTEN AT BOTH

ENDS WITH MIN 4

TAPPING SCREWS

GENERAL NOTE:

CONTRACTOR SHALL COORDINATE

LOCATIONS OF HORIZONTAL FASTENERS

PLAN VIEW

ISOMETRIC VIEW

WALL FINISH

VERTICAL WALL STUDS

@ 16" OR 24" OC

CUT HORIZONTAL

FASTENER FROM STUD

WALL ASSEMBLY AS NOTED

SEMI-RECESSED FIRE

EXTINGUISHER CABINET

LINE OF WALL BEYOND

FIRE EXTINGUISHER PER

MANUFACTURER

CAULKING AT PERIMETER,

TYP.MTL DOOR

FRAME

SHIM AS

REQ'D

RUNNER

BETWEEN

STUDS

1/2"

CONST

JOINT

SEE NOTE 1

VERTICAL STUDS @ 2'-0" MAX. W/

GYPSUM WALL BOARD. 1'-4" W/ GYPSUM

LATH & PLASTER DOUBLE STUDS FOR

SUPPORTING CONC. BACKER BOARD

PROVIDE CONTINUOUS BRACING

WHEN STUDS EXCEED 10'-0" AND

ARE FINISHED BOTH SIDES

JAMB ANCHOR CLIPS 3 PER

SIDE - COORDINATE W/

HINGE REINFORCEMENT

NOTE 1: OMIT BRACE WHEN 'D' DIMENSION

IS LESS THAN 2'-0" FOR GYP. WALL BOARD

OR 16" FOR PLASTER PARTITION

ELEVATION AT DOOR FRAME

DETAIL D

JAMB ANCHORS

(FURNISHED W/ FRAME)

DETAIL C

FRAME FACE

MIN

US 3/16"

E Q

E Q

D

E Q

E Q

V A

R

IE

S S

E E

D O

O R

S C

H E

D

VARIES SEE

DOOR SCHED

DETAIL B

A A

1/2" M

IN

5/8" M

AX

FRAME FACE

MIN

US 3/16"

/4

M

IN

STUD

W

IDTH

/4

M

IN

JAMB DEPTH

MINUS 3/16"

STUD

W

IDTH

1/2"

DETAIL D, TYP

M A

X

DETAIL B

PROVIDE SOUND

DEADENING WHERE

REQUIRED

/2

SECTION A

DOUBLE STUDS JAMB ANCHOR

GYPSUM WALL

BOARD PANELS

CONTROL JOINT

ISOMETRIC OF CONSTRUCT JOINT

/4

M

IN

DETAIL C

SANITARY

STOP

MTL DOOR FRAME

MTL ANCHOR CLIP

SHIM AS

REQ'D

CRIPPLE STUD, DO NOT

ANCHOR TO BEARING STUD

1/2" M

IN

METAL TOP RUNNER

STRUCTURE ABV

ANGLE BRACE

METAL STUD

CEILING

WALL FINISH PER WALL TYPES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

A-501

DETAILS

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

GENERAL NOTES

1. ALL WALL MOUNTED EQUIPMENT SHALL HAVE BLOCKING IN

WALL BEHIND. THIS INCLUDES BACKING FOR WALL

MOUNTED DOOR STOPS, DISPENSERS, PHONES, ETC.

ENSURE THAT ALL REQUIRED BACKING IS INSTALLED PRIOR

TO INSTALLING DRYWALL. SEE TYPICAL BLOCKING DETAIL.

NOT TO SCALE

TYPICAL BLOCKING DETAIL

3" = 1'-0"

FIRE EXTINGUISHER - PLAN VIEW

Revisions: Date:

NOT TO SCALE

PARTITION FRAMING AT DOORS

1 1/2" = 1'-0"

TYP WALL CONNECTION TO STRUCTURE

Megan Matt's Stamp

Megan

COUNTERTOP, MATERIAL AS NOTED

ON CASEWORK ELEVATIONS

4" x 3/8" DIA

WIRE PULL, TYP

3/4" MDF TOE KICK WITH

PLAM FINISH & BASE PER

FINISH SCHEDULE

5/8" x 2 1/2" MDF FRAME

ANCHORED TO BLOCKING, TYP

3/4" MDF BOTTOM WITH

PLAM FINISH

2x4 PRESSURE

TREATED FRAME

BLOCKING

1/4" MDF BACK WITH

PLAM FINISH

3/4" MDF END OR DIVIDER

PANEL WITH PLAM FINISH

FACE OF WALL

1/2" MDF DRAWER

FRONT WITH PLAM

FINISH, TYP

1/2" MDF DRAWER BACK,

SIDES & BOTTOM WITH

PLAM FINISH, TYP

2' - 0"

E Q

E Q

E Q

E Q

3"

EASED EDGE

BASE CABINET

SOLID SURFACE

COUNTERTOP

1" OVERHANG

R 1/4"

1"

2' - 0" UNO

COUNTERTOP, MATERIAL AS NOTED

ON CASEWORK ELEVATIONS

4" x 3/8" DIA WIRE PULL

3/4" MDF DOOR

WITH PLAM FINISH

3/4" MDF TOE KICK WITH

PLAM FINISH & BASE PER

FINISH SCHEDULE

5/8" x 2 1/2" MDF FRAME

ANCHORED TO BLOCKING, TYP

3/4" MDF BOTTOM WITH

PLAM FINISH

2x4 PRESSURE

TREATED FRAME

BLOCKING

1/4" MDF BACK WITH PLAM

FINISH

RECESSED ADJUSTABLE

SHELF STANDARDS, TYP

3/4" MDF ADJUSTABLE SHELF

WITH PLAM FINISH

3/4" MDF END OR DIVIDER

PANEL WITH PLAM FINISH

FACE OF WALL

1/2" MDF DRAWER FRONT

WITH PLAM FINISH 1/2" MDF DRAWER

BACK, SIDES & BOTTOM

WITH PLAM FINISH

NYLON LOCK CLIP, TYP

2' - 0"

3"

COUNTERTOP, MATERIAL AS NOTED

ON CASEWORK ELEVATIONS

4" x 3/8" DIA WIRE PULL

3/4" MDF DOOR

WITH PLAM FINISH

3/4" MDF TOE KICK WITH

PLAM FINISH & BASE PER

FINISH SCHEDULE

5/8" x 2 1/2" MDF FRAME

ANCHORED TO BLOCKING, TYP

3/4" MDF BOTTOM WITH

PLAM FINISH

2x4 PRESSURE

TREATED FRAME

BLOCKING AT TOP, BOTTOM,

AND MIDDLE

1/4" MDF BACK WITH PLAM

FINISH

3/4" MDF END OR DIVIDER

PANEL WITH PLAM FINISH

FACE OF WALL

1/2" MDF FAUX DRAWER

FRONT WITH PLAM FINISH

PIPING PER PLUMBING

3"

5/8" x 2 1/2" MDF FRAME

ANCHORED TO BLOCKING

BLOCKING

1/4" MDF BACK WITH PLAM

FINISH

RECESSED ADJUSTABLE

SHELF STANDARDS, TYP

3/4" MDF ADJUSTABLE SHELF

WITH PLAM FINISH

3/4" MDF END OR DIVIDER

PANEL WITH PLAM FINISH

FACE OF WALL

3/4" MDF BOTTOM WITH

PLAM FINISH

3/4" MDF SLOPED TOP

WITH PLAM FINISH

3/4" MDF DOOR WITH PLAM

4" x 3/8" DIA WIRE PULL

1' - 3"

E1501 RAIL, MOD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

A-502

CASEWORK DETAILS

009A

MK AB

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

Revisions: Date:

1 1/2" = 1'-0"

BASE CABINET DETAIL - 4 EQ DRAWERS

3" = 1'-0"

COUNTERTOP DETAIL - SOLID SURFACE (SDSF)

1 1/2" = 1'-0"

BASE CABINET DETAIL - DRAWER & DOOR

1 1/2" = 1'-0"

BASE CABINET DETAIL - SINK & DOOR

1 1/2" = 1'-0"

WALL CABINET DETAIL - PLAM SLOPED TOP

Megan Matt's Stamp

Megan

Sheets
AC001 - CEILING PLAN - PHASE I - OVERALL
AC101 - CEILING PLAN - PHASE I - WEST
AC102 - CEILING PLAN - PHASE I - EAST
AE102 - FLOOR PLAN - PHASE I - EAST
AE103 - FLOOR PLAN - PHASE II - WEST
AE104 - FLOOR PLAN - PHASE II - EAST
AE400 - ENLARGED FLOOR PLANS

File details come from the government source that posted it. Updated .