S02-RFP Attachment 17-Drawings-Dublin_Part8.pdf

PDF 2 MB Posted

Attached to
Y1DZ--Renovate Building 9A for EHRM Administration- EHRM Project 557-21-703 Carl Vinson VA Medical Center Dublin, GA 31021
Solicitation number
36C77626R0031_1
Issued by

About this file

These are construction design documents for the renovation of Building 9A at Carl Vinson VA Medical Center in Dublin, Georgia, prepared by SPEES Design Build as the Architect/Engineer of Record. The project (557-21-703) involves converting Building 9A into EHRM (Employee Health Records Management) Administrative Space across two phases, with the documents dated June 14, 2024.

The electrical construction documents include lighting plans (EL101-EL102) for Level 01 showing fixture locations, control systems, and emergency lighting provisions; power plans (EP100-EP101) detailing panelboard locations, branch circuits, equipment connections, and feeder routing across multiple buildings (03, 09A, and 11); and general electrical notes addressing coordination requirements, existing equipment modifications, conduit routing, circuit directory updates, and fire rating compliance. Key specifications require low-voltage dimmable lighting controls with occupancy sensors, emergency transfer switches for designated fixtures, coordination of all electrical work with construction phasing and other trades, protection of existing systems from damage, maintenance of power to essential equipment during construction with backup power provisions, sealing of wall and ceiling penetrations to match fire ratings, and updated circuit panel directories for affected panels. The drawings reference panelboards 9LNA1-9LNA6, 9LCA1-9LCA2, and emergency panel 11LCC1, with conduit routing directed overhead to accessible ceilings where available and core-drilled floor penetrations requiring X-ray scanning to avoid structural members.

View the file

Other files

File Type Posted
S06- Addendum 2-Dublin - Specifications.pdf PDF
S06-Amendment 0006 SF 30-Dublin.pdf PDF
S05-Tech Questions w responses-Amendment 0006-Dublin.pdf PDF
S06-Amendment 0005-SF30-Dublin.pdf PDF
S06- Amendment 0004-Technical Responses - Dublin.pdf PDF
S06-Amendment 0004- Addendum 1 - Hazardous Materials Survey.pdf PDF
S06-Amendment 0004-Addendum-1-Specifications.pdf PDF
S06-Amendment 0004-Addendum-1-Drawings.pdf PDF
S06 - Amendment 0004-Additional Technical Responses -Dublin.pdf PDF
S06-Amendment 0004-SF30.pdf PDF
S06-Amendment 0003-due date ext-Dub.pdf PDF
S04-Site Visit Sign In Sheet-Dublin.pdf PDF
S06-36C77626R0031-Amendment 0002.pdf PDF
S06-36C77626R0031-Amendment 0001.pdf PDF
S02-RFP Attachment 24-Specifications- Part 2 of 5 - Section 09 06 00.pdf PDF
S02-RFP Attachment 5- Specifications part 1 of 5.pdf PDF
S02-RFP Attachment 7- Specifications part 3 of 5.pdf PDF
S02-RFP Attachment 15-Drawings-Dublin_Part6.pdf PDF
S02-RFP Attachment 21-Drawings-Dublin_Part12.pdf PDF
S02-RFP Attachment 22-Drawings-Dublin_Part13.pdf PDF
S02-RFP Attachment 2 Site Visit Information-Dublin.docx DOCX document
S02-RFP Attachment 4 Campus Map-Dublin.pdf PDF
S02-RFP Attachment 8- Specifications part 4 of 5.pdf PDF
S02-RFP Attachment 10- Drawings-Dublin_Part1.pdf PDF
S02-RFP Attachment 11-Drawings-Dublin_Part2.pdf PDF
S02-RFP Attachment 23-Drawings-Dublin_Part14.pdf PDF
S02-36C77626R0031_1-final.pdf PDF
S02-RFP Attachment 1 DBA Rates-Laurens County-Dublin.pdf PDF
S02-RFP Attachment 6- Specifications part 2 of 5.pdf PDF
S02-RFP Attachment 13-Drawings-Dublin_Part4.pdf PDF
S02-RFP Attachment 16-Drawings-Dublin_Part7.pdf PDF
S02-RFP Attachment 19-Drawings-Dublin_Part10.pdf PDF
S02 - RFP Attachment 3 - Limitations on Subcontracting - Dublin.docx DOCX document
S02-RFP Attachment 9- Specifications part 5 of 5.pdf PDF
S02-RFP Attachment 12-Drawings-Dublin_Part3.pdf PDF
S02-RFP Attachment 14-Drawings-Dublin_Part5.pdf PDF
S02-RFP Attachment 18-Drawings-Dublin_Part9.pdf PDF
S02-RFP Attachment 20-Drawings-Dublin_Part11.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

aMo

M o

M oM o M o

Mo tt b f Mo c e b a hi ihgfg

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

MoOS

OS OS

OS

OS OS OS

OS

aMo

M o

M oM o M o

Mo tt b f Mo c e b a hi ihgfg

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

MoOS

OS OS

OS

OS OS OS

OS

AREA OF WORK

BLDG 09A

BLDG 03BLDG 11

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

E-502

HAC

TR

CORRIDOR

CR11-9

IV TESTING

IV SUPPORT

WAITING

ALCOVE

IV TESTING

CORRIDOR

CR11-9

STAFF BREAK

MECHANICAL

RESTROOM

RESTROOM

RESTROOM

RESTROOM

STORAGE

CORRIDOR

CR11-9

L1 c

L1 c

L1

L1

L1 c

L2 c

L1 c

L1 c

L1 c

L1

L1 g

L1 g

L1 g

L1 g

L1 g

L1 f

L1 f

L1 f

L1 f

L1 f

L1

L1

L1

L1

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1

L3

MECHANICAL

ELECTRICAL ROOM

E-401

L4

L4

L4

L1

L1

L1 L1

X

X

X

X

X a L1 a L1 a L1 a L1 a L1 a L1 a L1 a L1 a L1 b L1 b L1 b L1 b L1 b L1 b L1 b L1 b L1 b L1 h L1 h L1 h L1 h L1 h L1 h L1 h L1 h L1 h L1 i L1 i L1 i L1 i L1 i L1 i L1 i L1 i L1 i L1

L3 tt

L3 tt

L3 tt

L3 tt g

L4 L4

L4

L4 L4 L4

L2

L2

L1

L1

L1

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c L1 f

L1 f

L1 f

L1 L1 g

L1L1

ELECTRICAL

CLOSET

STG

103A e e a a b b f f g g h h i i

E-502TYP.

TYP.

PNL '9LNA6'

PNL '9LNA4'

PNL '9LNA3'

PNL '9LCA2'

9LNA6-4

9LNA6-6

9LNA6-8

9LNA6-10

9LNA6-20

9LNA6-20

9LNA6-20

9LNA6-229LNA6-24

c

9LNA6-24

CHANGE

MGMT USER

9LNA6-24

9LNA5-40

(TYPICAL FOR ALL

LIGHTING IN CORRIDOR

"CR11-9")

9LNA5-42

9LNA5-449LNA6-45 9LNA6-47 9LNA6-49 9LNA6-51

3 TYP.

L1 c

X e e e e e e e e c c c c c

PNL '9LNA5'

c c

L1 f g g c c

X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:2

:4

P

M

A u to d e s k D o c s /5

-2

-7

V A

G A

D u b lin

E H

R M

T A

S S

/V A

D U

C

E N

T R

A L

E

L

S D

B .r v t

EL101

BLDG 09A - LEVEL 01 - LIGHTING

PLAN - PHASE 1 09A

JPB/WNM BCL

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA

KEY PLAN

GENERAL NOTES

TRUE

NORTH

KEY NOTES

- 1" = 10'-0"

1 BLDG 09A - LEVEL 01 - LIGHTING PLAN - PHASE 1

Revisions: Date:

0 10' 20'

PROJECT

NORTH

TRUE NORTH

(DASHED)

EXISTING LUMINAIRES SHALL BE SWITCHED BY ROOM WALL OCCUPANCY SWITCH;

UTILIZE EXISING RACEWAYS AND CONDUCTORS AS REQUIRED.

EXISTING LUMINAIRES SHALL MAINTAIN EXISTING OPERABILITY. IF NECESSARY,

EXTEND EXISTING CONDUIT AND WIRE AS REQUIRED.

ALL LUMINAIRES WITH SHADED SYMBOLS SHALL BE PROVIDED WITH NORMAL AND

EMERGENCY POWER VIA EMERGENCY LIGHTING UL-1008 TRANSFER SWITCH.

PROVIDE RACEWAYS AND WIRING TO INTERFACE WITH FIRE ALARM SYSTEM AS

REQUIRED. LOCATE TRANSFER SWITCH(ES) WITHIN ELECTRICAL CLOSET 115.

REFERENCE PANELBOARD SCHEDULE "9LCA2" FOR ADDITIONAL EMERGENCY

CIRCUITING INFORMATION.

1. COORDINATE LIGHTING INSTALLATIONS WITH ALL OBSTRUCTIONS AND EQUIPMENT.

2. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED WITH THE CONTRACTORS

PHASING OF THE PROJECT. COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER

TRADES.

3. MAKE ALL CONNECTIONS TO EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.

4. ROUTE ALL CONDUIT HOME RUNS TO PANELS OVERHEAD AND ABOVE ACCESSIBLE

CEILINGS WHERE AVAILABLE.

5. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

6. ALL FINAL LOCATIONS AND ARRANGEMENTS OF CEILING LIGHTING FIXTURES SHALL

BE COORDINATED WITH ALL OTHER TRADES.

7. ALL LIGHTING CONTROLS SHALL BE LOW-VOLTAGE AND PROVIDE DIMMABLE

CONTROL UNLESS OTHERWISE NOTED. LINE VOLTAGE WALL MOUNTED OCCUPANCY

SWITCHES SHALL BE NON-DIMMABLE.

8. LOCATION AND QUANTITIES OF OCCUPANCY SENSORS ARE SHOWN FOR

FUNCTIONAL PURPOSES ONLY. POWER PACKS ARE NOT SHOWN FOR CLARITY

REASONS; PROVIDE POWER PACKS AS REQUIRED. CONTRACTOR SHALL PROVIDE

ALL REQUIRED LIGHTING CONTROL DEVICES (QUANTITIES AND TYPES) AS REQUIRED

FOR A COMPLETE AND FULLY FUNCTIONAL SYSTEM.

aMo

M o

M oM o M o

Mo tt b f Mo c e b a hi ihgf

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

MoOS

OS OS

OS

OS OS OS

OS

aMo

M o

M oM o M o

Mo tt b f Mo c e b a hi ihgfg

Mo

AREA OF WORK

BLDG 09A

BLDG 03BLDG 11

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

L1 c

L1 c

L1

L1

L1 c

L4

L1 c

L2 c

L1 c

L1 c

L1 c

L1 c

L1 c

L4

L1 c

HAC

TR ROOM

CORRIDOR

CR11-9

CLASSROOM

103A

CLASSROOM

103B

CLASSROOM

104A

CLASSROOM

106A

CLASSROOM

106B

CORRIDOR

CR11-9

STAFF BREAK

MECH

RESTROOM

RESTROOM

RESTROOM

RESTROOM

STORAGE

CORRIDOR

CR11-9

L1 g

L1 g

L1 g

L1 g

L1 g

L1 g

L1 g

L1 g

L1 g

L1 f

L1 f

L1 f

L1 f

L1 f

L1 f

L1 f

L1 f

L1 f

L1

L1

L1

L1

L1 c

L1 c

L1 c

L1 c

L1 c

L1 cL1

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1 c

L1

L3

L1

ELECTRICAL

L4 a L1 a L1 a L1 a L1 a L1 a L1 a L1 a L1 a L1 b L1 b L1 b L1 b L1 b L1 b L1 b L1 b L1 b L1 h L1 h L1 h L1 h L1 h L1 h L1 h

L1 h L1 h L1 i L1 i L1 i L1 i L1 i L1 i L1 i L1 i L1 i L1

L1

L1L1

L1 L1

L1L1

L4

L4

L4 L4

CLASSROOM

104B

MECHANICAL

102A e e a a b b f f g g h h i i c ccc c c

L3 tt

L3 tt

L3 tt

L3 tt e e e e e e e e c c

L4

L4

X

X c

X

L2

L2 X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:5

:1

P

M

A u to d e s k D o c s /5

-2

-7

V A

G A

D u b lin

E H

R M

T A

S S

/V A

D U

C

E N

T R

A L

E

L

S D

B .r v t

EL102

BLDG 09A - LEVEL 01 - LIGHTING

PLAN - PHASE 2 09A

JPB/WNM BCL

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA

KEY PLAN

GENERAL NOTES

TRUE

NORTH

KEY NOTES

0 10' 20'

PROJECT

NORTH

TRUE NORTH

(DASHED)

- 1" = 10'-0"

1 BLDG 09A - LEVEL 01 - LIGHTING PLAN - PHASE 2

Revisions: Date:

1. SHEET INCLUDED TO DEPICT FINAL LIGHTING LAYOUT WITH ARCHITECTURAL

EXTENDABLE WALLS.

ARCHITECTURAL EXTENDABLE WALL.1

CONSTRUCTION

DOCUMENTS

X c t

AREA OF WORK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

3LNC1

MS-3LNC1

CONTINUES TO PANEL '9LNA5'.

REFERENCE SHEET EP101 FOR

CONTINUATION.

APPROX. LOCATION

PANEL '11LCC1'

APPROXIMATE FOOTPRINT OF

TR 100 ON LEVEL 01 ABOVE

CONTINUES TO PANEL '9LCA3'.

REFERENCE SHEET E-401 FOR

CONTINUATION.

1 CONTINUED FROM PANEL '9LNA5'.

REFERENCE SHEET EP101 FOR

CONTINUATION.

CONTINUES TO PANEL '9LNA7'.

REFERENCE SHEET E-401 FOR

CONTINUATION.

09-P-10

09-P-03

09-P-01

09-P-04

CONTINUES TO SOUTH

SIDE OF BUILDING 11

CORRIDOR

BUILDING 03

BUILDING 11

CORRIDOR

BUILDING 9A CORRIDOR

5 4

BM116-3

CORRIDOR BUILDING 11BUILDING 9A

PRIMARY BONDING

BUSBAR (PBB)

E-503

APPROXIMATE FOOTPRINT OF

ELECTRICAL ROOM 116 ON

LEVEL 01 ABOVE

CONTINUE TO PANEL '9LNA1'.

REFERENCE SHEET EP101 FOR

CONTINUATION.

A SIDE POWER

B SIDE POWER

SHEET SHALL PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

BLDG 09A

BLDG 03BLDG 11

CORRIDOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:5

:2

P

M

A u to d e s k D o c s /5

-2

-7

V A

G A

D u b lin

E H

R M

T A

S S

/V A

D U

C

E N

T R

A L

E

L

S D

B .r v t

EP100

BLDG 03, 09A, AND 11 - LEVEL 00 -

POWER PLAN - PHASE 1 03, 09A, 11

JPB/WNM BCL

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA

KEY PLAN

GENERAL NOTES

TRUE

NORTH

KEY NOTES

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

7. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

8. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED WITH THE CONTRACTORS

PHASING OF THE PROJECT. COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER

TRADES.

9. MAKE ALL CONNECTIONS TO EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.

10. ROUTE ALL CONDUIT HOME RUNS TO PANELS OVERHEAD AND ABOVE ACCESSIBLE

CEILINGS WHERE AVAILABLE.

CORE-DRILLED CONDUIT FLOOR PENETRATION. PROVIDE XRAY SCAN OF AREA

PRIOR TO DRILLING TO AVOID STRUCTURAL MEMBERS; COORDINATE WITH

STRUCTURAL AS REQUIRED.

EXISTING SWITCHBOARD 'MS-3LNC1' TO BE MODIFIED. REFER TO ONE-LINE DIAGRAM

ON SHEET EP602 FOR MORE INFORMATION.

EXISTING EMERGENCY PANEL '11LCC1' TO BE MODIFIED. REFER TO ONE-LINE

DIAGRAM ON SHEET EP601 FOR MORE INFORMATION.

PROVIDE TBC AS SHOWN. REFERENCE TELECOMMUNICATIONS BONDING RISER

DIAGRAM ON SHEET ET601 FOR ADDITIONAL INFORMATION.

CONTINUE TBB TO TR SBBs. REFERENCE TELECOMMUNICATIONS BONDING RISER

DIAGRAM ON SHEET ET601 FOR ADDITIONAL INFORMATION.

- 1/16" = 1'-0"

1 BLDG 03, 09A, AND 11 - LEVEL 00 - POWER PLAN - PHASE 1 8'0 16' 32'

PROJECT

NORTH

TRUE NORTH

(DASHED)

Revisions: Date:

CONSTRUCTION

DOCUMENTS

OS

OS

AREA OF WORK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

FA EQUIPMENT

FACP (ABOVE)

FACP BATTERY BOX (BELOW)

PNL '9LCA1'

PNL '9LNA1'

PNL '9LNA2'

PULL BOX

PULL BOX

POWER SUPPLY EXPANDER

TYP.

CHANGE MGMT USER

IV SUPPORT

MECHANICAL

HAC

STORAGE

IV TESTING

IV TESTING

TR

STAFF BREAK

WAITING ALCOVE

RESTROOM

CORRIDOR

CR11-9

ELECTRICAL ROOM

RESTROOM

RESTROOM

RESTROOM

009A-EF-03

9LNA6-23

009A-EF-04

9LNA6-25

009A-EF-02

9LNA6-15

009A-EF-01

9LNA6-4

E-401

FRIDGE

9LNA6-29

AC

MICROWAVE

9LNA6-25

P-103B

9LNA6-12

P-418B

9LNA6-14

P-418D

9LNA6-14

P-103D

9LNA6-12

P-103A

9LNA6-12

P-418A

9LNA6-14

PNL '9LNA5'

9LNA6-7

9LNA6-39

9LNA6-41

9LNA6-2

9LNA6-41

9LNA6-41

9LNA6-41

9LNA6-35

9LNA5-31 9LNA5-31 9LNA5-10 9LNA5-10 9LNA5-39

09A-EF-05

9LNA5-41

ELECTRICAL

CLOSET

009A-VAV-11

9LNA5-41

009A-VAV-10

9LNA5-41

009A-VAV-06

9LNA6-30

009A-VAV-05

9LNA6-30

009A-VAV-01

9LNA6-30

009A-VAV-03

9LNA6-30

009A-VAV-04

9LNA6-30

009A-VAV-09

9LNA5-41

009A-VAV-08

9LNA5-41

AC

AC

P-103C

9LNA6-12

P-418C

9LNA6-14

09-P-02

09-P-07 09-P-06

TV TV TV TV TVTV TV

TV

TV

TYP.

TV

TV

TV

009A-VAV-02

9LNA6-30

009A-VAV-07

9LNA5-41

9LNA6-1

9LNA6-3

9LNA6-5

9LNA6-9

9LNA6-11

9LNA6-13

9LNA6-17

9LNA6-15

9LNA6-19

9LNA6-21

9LNA6-23

PNL '9LCA2'

PNL '9LNA6'

PNL '9LNA4'

PNL '9LNA3'

COFFEE MAKER

9LNA6-27

9LNA6-31

9LNA6-33

9LNA6-33

9LNA6-37

9LNA6-35

TYP.

8 9LNA6-39

9LNA5-15

9LNA5-13

9LNA5-17

9LNA5-19

9LNA5-25

9LNA5-23

9LNA5-21

9LNA5-29

9LNA5-27

009A-AHU-1

9LNA5-12

9LNA5-10

9LNA5-8

9LNA5-16

9LNA5-14

9LNA5-18

9LNA5-20

9LNA5-22

9LNA5-24

9LNA5-28

9LNA5-26 9LNA5-32

9LNA5-30

9LNA5-33

9LNA5-37

9LNA5-35 9LNA5-34 9LNA5-36

9LNA5-37

STG

103A 9LNA5-39

MECHANICAL

9LNA5-39

9LNA5-37

9LNA6-18

9LNA6-16

9LNA6-16

9LNA6-16

9LNA6-18

9LNA5-43

09-P-01 7

09-P-08

09-P-09APROXIMATE

FOOTPRINT

OF RM 220

ABOVE

BLDG 09A

BLDG 03BLDG 11

A SIDE POWER

B SIDE POWER

SHEET SHALL PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:5

:1

P

M

A u to d e s k D o c s /5

-2

-7

V A

G A

D u b lin

E H

R M

T A

S S

/V A

D U

C

E N

T R

A L

E

L

S D

B .r v t

EP101

BLDG 09A - LEVEL 01 - POWER

PLAN - PHASE 1 09A

JPB/WNM BCL

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA

KEY PLAN

GENERAL NOTES

TRUE

NORTH

KEY NOTES

1. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

6. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED WITH THE CONTRACTORS

PHASING OF THE PROJECT. COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER

TRADES.

7. MAKE ALL CONNECTIONS TO EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.

8. ROUTE ALL CONDUIT HOME RUNS TO PANELS OVERHEAD AND ABOVE ACCESSIBLE

CEILINGS WHERE AVAILABLE.

9. COORDINATE WITH OWNERS AGENT FOR FINAL LOCATIONS OF ALL RECEPTACLES

AND SPECIAL CONNECTIONS FOR EQUIPMENT PRIOR TO ROUGH-IN. COORDINATE

RECEPTACLE INSTALLATION WITH MILLWORK AND BACKSPLASH INSTALLERS TO

AVOID INTERFERENCES.

10. PROVIDE LOCAL DISCONNECTS RATED FOR EQUIPMENT LOAD FOR ALL MECHANICAL

EQUIPMENT. REFERENCE "EQUIPMENT SCHEDULE" LOCATED ON SHEET E-701 FOR

ADDITIONAL EQUIPMENT INFORMATION INCLUDING CONDUIT AND WIRE

REQUIREMENTS.

11. ALL EXTERIOR MOUNTED STARTERS OR DISCONNECTS SHALL BE NEMA 3R OR

GREATER.

12. NOT ALL CONDUIT TAGS MAY BE SHOWN. REFERENCE CONDUIT AND WIRE SCHEDULE

AND ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

- 1" = 10'-0"

1 BLDG 09A - LEVEL 01 - POWER PLAN - PHASE 1

EACH SET OF (2) WORKSTATIONS SHALL BE PROVIDED WITH (1) QUAD

RECEPTACLE. EXACT LOCATION OF RECEPTACLE SHALL BE COORDINATED WITH

VA PRIOR TO INSTALLATION TO CONFORM WITH VA WORKSTATION / FURNITURE

LAYOUT.

REPLACEMENT PANELBOARD. ALL EXISTING BRANCH CIRCUITS AND

PANELBOARD FEEDER SHALL BE EXTENDED TO REVISED LOCATION AS

REQUIRED.

RELOCATED EQUIPMENT. ALL EXISTING RACEWAYS AND CABLING SHALL

EXTEND TO REVISED LOCATION AS REQUIRED.

PROVIDE 120V CIRCUIT AS INDICATED TO CONNECT TO DIVISION 23 FURNISHED

120-24VAC TRANSFORMER. REFERENCE ASSOCIATED PANEL SCHEDULE AND

EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION.

EXHAUST FAN CIRCUITED TO ROOM LIGHTING CIRCUIT.

CONTINUED FROM PANEL '9HLS1' ON FLOOR ABOVE. REFER TO ONE-LINE

DIAGRAM ON SHEET EP601 FOR MORE INFORMATION.

CONTINUED FROM SWITCHBOARD 'MS-3LNC1' ON SHEET EP100. REFER TO ONE-

LINE DIAGRAM ON SHEET EP602 FOR MORE INFORMATION.

COORDINATE TV RECEPTACLE MOUNTING HEIGHT WITH ARCHITECTURAL.

Revisions: Date:

0 10' 20'

PROJECT

NORTH

TRUE NORTH

(DASHED)

CONSTRUCTION

DOCUMENTS

File details come from the government source that posted it. Updated .