These are construction documents consisting of mechanical design drawings and general notes for the renovation of Building 9A at Carl Vinson VA Medical Center in Dublin, Georgia. The project, numbered 557-21-703, is being completed by Spees Design Build with A/E of record services. The documents are dated June 14, 2024, and represent construction document phase deliverables for renovating the building into EHRM Administrative Space.

The mechanical scope includes HVAC system design with demolition and new installation plans across multiple floor levels. Key systems specified include Variable Air Volume (VAV) boxes (009A-VAV-01 through 009A-VAV-11), exhaust fans (009A-EF-01 through 009A-EF-05), an air handling unit (009A-AHU-1), a fan coil (09A-FC-01), and a heat pump (09A-HP-01). The design establishes summer outdoor conditions of 96.9°F dry bulb and 75.6°F wet bulb, with winter design of 23.9°F and indoor office conditions of 75°F summer and 70°F winter at 30-60% relative humidity. Ductwork specifications include various rectangular and round duct sizes with supply and return configurations shown throughout office spaces, restrooms, mechanical rooms, and support areas. The documents include detailed demolition plans identifying existing HVAC systems to be removed, piping demolition requirements for hydronic systems, and new mechanical installations with isometric views of the mechanical room configuration. All drawings utilize standard mechanical symbols for dampers, diffusers, registers, and other HVAC components as defined in the project abbreviations and legends.

View the file

Other files

File Type Posted
S05-Tech Questions w responses-Amendment 0006-Dublin.pdf PDF
S06- Addendum 2-Dublin - Specifications.pdf PDF
S06-Amendment 0006 SF 30-Dublin.pdf PDF
S06-Amendment 0005-SF30-Dublin.pdf PDF
S06-Amendment 0004-Addendum-1-Specifications.pdf PDF
S06-Amendment 0004-Addendum-1-Drawings.pdf PDF
S06 - Amendment 0004-Additional Technical Responses -Dublin.pdf PDF
S06-Amendment 0004-SF30.pdf PDF
S06-Amendment 0004- Addendum 1 - Hazardous Materials Survey.pdf PDF
S06- Amendment 0004-Technical Responses - Dublin.pdf PDF
S06-Amendment 0003-due date ext-Dub.pdf PDF
S04-Site Visit Sign In Sheet-Dublin.pdf PDF
S06-36C77626R0031-Amendment 0002.pdf PDF
S02-RFP Attachment 24-Specifications- Part 2 of 5 - Section 09 06 00.pdf PDF
S06-36C77626R0031-Amendment 0001.pdf PDF
S02-RFP Attachment 5- Specifications part 1 of 5.pdf PDF
S02-RFP Attachment 7- Specifications part 3 of 5.pdf PDF
S02-RFP Attachment 15-Drawings-Dublin_Part6.pdf PDF
S02-RFP Attachment 21-Drawings-Dublin_Part12.pdf PDF
S02-RFP Attachment 22-Drawings-Dublin_Part13.pdf PDF
S02 - RFP Attachment 3 - Limitations on Subcontracting - Dublin.docx DOCX document
S02-RFP Attachment 9- Specifications part 5 of 5.pdf PDF
S02-RFP Attachment 12-Drawings-Dublin_Part3.pdf PDF
S02-RFP Attachment 17-Drawings-Dublin_Part8.pdf PDF
S02-RFP Attachment 18-Drawings-Dublin_Part9.pdf PDF
S02-RFP Attachment 20-Drawings-Dublin_Part11.pdf PDF
S02-36C77626R0031_1-final.pdf PDF
S02-RFP Attachment 1 DBA Rates-Laurens County-Dublin.pdf PDF
S02-RFP Attachment 6- Specifications part 2 of 5.pdf PDF
S02-RFP Attachment 13-Drawings-Dublin_Part4.pdf PDF
S02-RFP Attachment 16-Drawings-Dublin_Part7.pdf PDF
S02-RFP Attachment 19-Drawings-Dublin_Part10.pdf PDF
S02-RFP Attachment 2 Site Visit Information-Dublin.docx DOCX document
S02-RFP Attachment 4 Campus Map-Dublin.pdf PDF
S02-RFP Attachment 8- Specifications part 4 of 5.pdf PDF
S02-RFP Attachment 10- Drawings-Dublin_Part1.pdf PDF
S02-RFP Attachment 11-Drawings-Dublin_Part2.pdf PDF
S02-RFP Attachment 23-Drawings-Dublin_Part14.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH GUARD

HVAC BASIS OF DESIGN

SUMMER

OUTDOOR DESIGN

DB (°F)

96.9 STATE COUNTY CLIMATE ZONE

SUMMER

OUTDOOR DESIGN

WB (°F)

75.6 GEORGIA LAURENS 3A

WINTER OUTDOOR

DESIGN DB (°F)

23.9 DESIGN ALTITUDE 215 FT

INDOOR SPACE

SUMMER INDOOR DESIGN CONDITIONS WINTER INDOOR DESIGN CONDITIONS

TEMPERATURE DB

(°F)

RELATIVE

HUMIDITY (%)

TEMPERATURE DB

(°F)

RELATIVE

HUMIDITY (%)

OFFICE 75 30-60 70 30-60

W"/H"

WIDTH AND HEIGHT

IN INCHES FOR FLAT

OVAL DUCT

DUCTWORK SYMBOLS

ADDITIONAL SYMBOLS

LIMIT OF DEMOLITION

(WALL TYPE)

(WALL TYPE)

DN

DN

UP

UP

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

DNUP RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

LINEAR SLOT DIFFUSER

SQUARE 1-WAY CEILING DIFFUSERS

BACK DRAFT DAMPER

BDD

SECTION.)

FC

10X8

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

FIRE DAMPER

FD

VD

DUCT WITH SOUND LINING

FLEXIBLE DUCTWORK (INSULATED)

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

VIBRATION, OR SEISMIC

26-SF 3

26-TU-I-I

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

BUILDING NO. WHERE EQUIPMENT IS LOCATED

XxX [X] XXX,XxX,XX°

AIR OUTLET CALLOUT

CONDENSATE DRAIN LINE

REFRIGERANT SUCTION

HEATING WATER SUPPLY

REFRIGERANT LIQUID

PIPING LEGEND

C

RL

RS

HWS

ABBREVIATIONS

26-SF 3

26-TU-I-I

OR

OR

A/E

AD

AFF

AFG

AG

AP

AS

ASD

ASD

ASHRAE

REFRIGERATION, AIR CONDITIONING

ENGINEERS

ASME

ENGINEERS

ASPE

ENGINEERS

ASR

AV

AW

BFP

PREVENTER

BHP

BSP

BT

BTU

BTUH

C

CA

CGA

CFM

CI

CO

CS

CV

DCW

DFU

DHW

DHWR

DHWS

DI

DN

DOE

DS

DW

DWG

DWH

DWR

DWS

DWV

EL

EMCS

AND CENTRAL SYSTEM

EPA

EPACT

ESC

ESH

ET

EWH

EWS

EWS/SH

EX

F

FCO

FCW

FD

FDC

FM

FOP

FOR

FOS

FOV

FS

FS

FU

GAL

GCO

GPD

GPH

GPM

GPR

GRS

GT

GVTR

GWH

H&CW

HB

HD

HEX

HP

HS

HST

HWB

HWCP

HWP

HYD

ID

IE

ICW

IHW

INV

IPC

IRW

IW

IWH

IWR

IWS

KW

KWH

YCO

YH

W

WC

WCO

WG

WH

WH

WHA

WL

WM

WPD

WS

WSFU

V

VAC

VB

VCO

VP

VS

VSD

VTR

TCV

TD

TD

TDH

TEMP

TMV

TP

TSTAT

TWR

TWS

TYP

SAN

SMACNA

SCFM

SCW

SDMH

SMH

SP

SPR

SQFT/SF

SS

ST

SW

RD

RDL

RL

RP

RO

RWL

PA

PD

PDI

PG

PP

PPM

PRS

PRV

PSI

PSIA

PSIG

PTRV

PW

O2

OC

OD

OFD

OR

OVFL

N2

N20

NC

NG

NIC

NO

NOM.

NPW

NTS

M

MA

MAV

MBH

MED

MER

MGDU

MH

MOU

MSB

MV

L/S

LA

LAV

LBS/HR

LCW

LHW

LNG

LOX

LV

LW

ARCHITECT / ENGINEER

AREA DRAIN/ACCESS DOOR

ABOVE FINISH FLOOR

ABOVE FINISH GRADE

AIR GAP

ACCESS PANEL

AUTOMATIC SPRINKLER

ADJUSTABLE SPEED DRIVES

AUTOMATIC SPRINKLER DRAIN

AMERICAN SOCIETY OF HEATING,

AMERICAN SOCIETY OF ECHANICAL

AMERICAN SOCIETY OF PLUMBING

AUTOMATIC SPRINKLER RISER

ACID VENT

ACID WASTE

REDUCED PRESSURE BACKFLOW

BREAK HORSEPOWER

BLACK STEEL PIPE

BATHTUB

BRITISH THERMAL UNIT

BRITISH THERMAL UNIT PER HOUR

CELSIUS

COMPRESSED AIR

COMPRESSED GAS ASSOCIATION

CUBIC FEET PER MINUTE

CAST IRON

CLEANOUT

CLINICAL SINK

CONTROL VALVE

DOMESTIC COLD WATER

DRAINAGE FIXTURE UNITS

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER SUPPLY

DOWN

DEPARTMENT OF ENERGY

DOWNSPOUT

DISHWASHER

DRAWING

DOMESTIC WATER HEATER

DRINKING WATER RETURN

DRINKING WATER SUPPLY

DRAIN WASTE VENT

DEIONIZED WATER

ELEVATION

ENERGY MONOSERRAT

ENVIRONMENTAL PROTECTION

AGENCY

ENERGY POLICY ACT

ESCUTCHEON

EMERGENCY SHOWER

EXPANSION TANK

ELECTRIC WATER HEATER

EYE WASH STATION

EYE WASH/DRENCH SHOWER

EXISTING

FAHRENHEIT

FLOOR CLEANOUT

FILTERED COLD WATER

FLOOR DRAIN

FIRE DEPARTMENT

(HOSE) CONNECTION

FLOW METER

FUEL OIL PUMP

FUEL OIL RETURN

FUEL OIL SUPPLY

FUEL OIL VENT

FLOOR SINK

FLOW SWITCH

FIXTURE UNITS

GALLON

GRADE CLEANOUTS

GALLONS PER DAY

GALLONS PER HOUR

GALLONS PER MINUTE

GAS PRESSURE REGULATOR

GAS REGULATOR STATION

GREASE TRAP

GAS VENT THROUGH ROOF

GAS FIRED WATER HEATER

HOT AND COLD WATER

HOSE BIBB

HUB DRAIN

HEAT EXCHANGER

HORSEPOWER

HAND SINK

HOT WATER STORAGE TANK

(DOMESTIC)

HOT WATER BOILER

HOT WATER CIRCULATING PUMP

HOT WATER PUMP

HYDRANT

INSIDE DIAMETER

INVERT ELEVATION

INDUSTRIAL COLD WATER

INDUSTRIAL HOT WATER

INVERT

INTERNATIONAL PLUMBING CODE

IRRIGATION WATER

INDIRECT WASTE

INSTANTANEOUS WATER HEATER

INDUSTRIAL WATER RETURN

INDUSTRIAL WATER SUPPLY

KILOWATT

KILOWATT-HOUR

LITER PER SECOND

LABORATORY AIR

LAVATORY

POUNDS PER HOUR

LABORATORY COLD WATER

LABORATORY HOT WATER

LIQUID NATURAL GAS

LIQUID OXYGEN

LABORATORY VACUUM

LOW WATER

METER

MEDICAL AIR

MANUAL AIR VENT

1000 BTUH

MEDICAL

MECHANICAL EQUIPMENT

ROOM

MEDICAL GAS DISTRIBUTION UNIT

MANHOLE

MEMORANDUM OF

UNDERSTADING

MOP SERVICE BASIN

MEDICAL VACUUM

NITROGEN

NITROUS OXIDE

NORMALLY CLOSED

NATURAL GAS

NOT IN CONTRACT

NORMALLY OPEN

NOMINAL

NON POTABLE WATER

NOT TO SCALE

OXYGEN

ON CENTER

OUTSIDE DIAMETER

OVERFLOW DRAIN

OPERATING ROOM

OVERFLOW

PASCAL

PRESSURE DROP OR

DIFFERENCE

PLUMBING AND DRAINAGE

INSTITUTE

PRESSURE GAGE

PLUMBING PUMP

PARTS PER MILLION

PRESSURE REDUCING STATION

PRESSURE REDUCING VALVE

POUNDS PER SQUARE INCH

POUNDS PER SQUARE INCH

ATMOSPHERE

POUNDS PER SQUARE INCH GAGE

PRESSURE TEMPERATURE RELIEF

VALVE

POTABLE WATER

ROOF DRAIN

ROOF DRAIN LEADER

ROOF LEADER

RECIRCULATION PUMP

REVERSE OSMOSIS WATER

RAIN WATER LEADER

SANITARY SEWER

SHEET METAL AND AIR

CONDITIONING CONTRACTORS

NATIONAL ASSOCIATION

STANDARD CUBIC FOOT/MINUTE

SOFTENED COLD WATER

STORM DRAIN MANHOLE

SANITARY MANHOLE

SUMP PUMP

SPRINKLER LINE

SQUARE FEET

STAINLESS STEEL

STORAGE TANK

STORM WATER

TEMPERATURE CONTROL

VALVE

TEMPERATURE DIFFERENCE

TRENCH DRAIN

TOTAL DYNAMIC HEAD

TEMPERATURE

THERMOSTATIC MIXING VALVE

TRAP PRIMER

THERMOSTAT

TEMPERED WATER RETURN

TEMPERED WATER SUPPLY

TYPICAL

VENT

VACUUM

VACUUM BREAKER

VACUUM CLEANER OUTLET

VACUUM PUMP

VENT STACK

VARIABLE SPEED DRIVE

VENT THROUGH ROOF

WASTE

WATER CLOSET

WALL CLEANOUT

WATER GAGE

WALL HYDRANT

WATER HEATER

WATER HAMMER ARRESTER

WATER LINE

WATER METER

WATER PRESSURE DROP

WASTE STACK

WATER SUPPLY FIXTURE UNITS

YARD CLEANOUT

YARD HYDRANT

HWR HEATING WATER RETURN

CHILLED WATER SUPPLYCHWS

CHWR CHILLED WATER RETURN

FIRE PROTECTION

1 2 3 4 5

NECK SIZE (IN)

AIR OUTLET TYPE

AIRFLOW (CFM)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:0

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

M-001

MECHANICAL GENERAL NOTES

AND ABBREVIATIONS 009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

Revisions: Date:

6/14/2024 46 OF 102

32 5831302928272625

382120191817

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:0

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

MD100

MECHANICAL DEMO - OVERALL

PLAN 009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

Revisions: Date:

1/8" = 1'-0"

LEVEL 1 - MECHANICAL DEMO - OVERALL

SEE SHEETS MD102 & MD104 FOR ENLARGED PLAN

SEE SHEETS MD101 & MD103 FOR ENLARGED PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

6/14/2024 47 OF 102

(E)AC-9-107

(E) 9-FC-120

(E)9-FC-121

(E)9-FC-126

(E) 9-FC-130

32"x16"

16"x32"

"x

54"x12"

16"x12" 22"x12" 27"x12" 30"x12" 30"x12"

"x

"x

"x

"x

16"x8" 16"x8"

"x

24"x8"

16"x8" 16"x8"

24"x8"

"x

2120191817

1 2 3 4 5 6 7

M A

T C

H L

IN

E

M A

T C

H L

IN

E

SEE VIEW 2 ON MD101

FOR CLARITY

DETAIL AREA

PROJECT

NORTH

TRUE NORTH

(DASHED)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:0

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

MD101

MECHANICAL DEMO - WEST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

3/16" = 1'-0"

LEVEL 1 - MECHANICAL DEMO - WEST

PROJECT

NORTH

TRUE NORTH

(DASHED)

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN

SHOWN LIGHT.

KEYNOTES

KEY PLAN

Revisions: Date:

EXISTING HVAC SYSTEM TO REMAIN.

DEMOLISH EXISTING FAN COILS

MECHANICAL ROOM ISOMETRIC DEMO

SUPPLY AIR

DEMOLISHED AT

PENETRATION

THROUGH WALL

RETURN AIR DUCT

DEMOLISHED

AFTER VERTICAL

6/14/2024 48 OF 102

DETAIL AREA

PROJECT

NORTH

TRUE NORTH

(DASHED)

32 5831302928272625

9 10 11 12 13 14 15 16 60 61 62 63 64

(E) 9-FC-136

(E) 9-FC-109

(E) 9-FC-108

(E) 9-FC-107

(E)9-FC-137

(E) 9-FC-140

(E) 9-FC-104

(E) AC-9-108

25"x12" 19"x12" 13"x12"

"x

"x

"x

"x

"x

"x

"x

"x

"x

"x

"x

"x

"x

"x

"x

"x

26"x8"

"x

"x

"x

"1

M A

T C

H L

IN

E

M A

T C

H L

IN

E

DEMO

EXISTING

WINDOW

EXHAUST FAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:0

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

MD102

MECHANICAL DEMO - EAST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN

SHOWN LIGHT.

KEYNOTES

KEY PLAN

DEMOLISH EQUIPMENT, MECHANICAL PAD AND DUCTWORK.

DEMOLISH EXISTING FAN COILS

3/16" = 1'-0"

LEVEL 1 - MECHANICAL DEMO - EAST

PROJECT

NORTH

TRUE NORTH

(DASHED)

Revisions: Date:

6/14/2024 49 OF 102

NORTH

TRUE NORTH

(DASHED)

(E)AC-9-107

(E) 9-FC-120

(E)9-FC-121

(E)9-FC-126

(E) 9-FC-130H

W

S

HWR

C W

S

C

CWR

C

CWR

CWS

HWR

HWS

C

C

2120191817

1 2 3 4 5 6 7

M A

T C

H L

IN

E

M A

T C

H L

IN

E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:1

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

MD103

MECHANICAL PIPING DEMO -

WEST 009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/24/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN

SHOWN LIGHT.

KEYNOTES

KEY PLAN

Revisions: Date:

3/16" = 1'-0"

LEVEL 1 - MECHANICAL PIPING DEMO - WEST

PROJECT

NORTH

TRUE NORTH

(DASHED)

EXISTING HVAC SYSTEM TO REMAIN.

DEMOLISH HYDRONIC PIPING AND CAP BACK TO PIPING MAIN. COORDINATE EXTENT

OF DEMOLITION WITH NEW WORK

6/14/2024 50 OF 102

NORTH

TRUE NORTH

(DASHED)

32 5831302928272625

9 10 11 12 13 14 15 16 60 61 62 63 64

(E) 9-FC-136

(E)9-FC-137

(E) 9-FC-140

(E) 9-FC-109 (E) 9-FC-108 (E) 9-FC-107 (E) 9-FC-104

(E) AC-9-108

C

CWR

CWS

HWR

HWS

M A

T C

H L

IN

E

M A

T C

H L

IN

E

DEMO CWS/CWR FROM AHU BACK TO MAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:1

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

MD104

MECHANICAL PIPING DEMO - EAST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/24/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN

SHOWN LIGHT.

KEYNOTES

KEY PLAN

DEMOLISH HYDRONIC PIPING AND CAP BACK TO PIPING MAIN. COORDINATE EXTENT

OF DEMOLITION WITH NEW WORK

3/16" = 1'-0"

LEVEL 1 - MECHANICAL PIPING DEMO - EAST

PROJECT

NORTH

TRUE NORTH

(DASHED)

6/14/2024 51 OF 102

32 5831302928272625

382120191817

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:1

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

M-100

MECHANICAL - OVERALL PLAN

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

Revisions: Date:

1/8" = 1'-0"

LEVEL 1 - MECHANICAL - OVERALL

SEE SHEETS M-102 & M-104 FOR ENLARGED PLAN

SEE SHEETS M-101 & M-103 FOR ENLARGED PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

6/14/2024 52 OF 102

NORTH

TRUE NORTH

(DASHED)

32"x16"

16"x32"

"x

(E)AC-9-107

2120191817

1 2 3 4 5 6 7

14"x10"

24"/10"16"/8"16"/10"

10"ø 10"ø

009A-VAV-04

009A-VAV-03

009A-VAV-02

009A-VAV-01

009A-VAV-05

10"ø

10"ø 8"ø

009A-VAV-06

"ø

10"ø

009A-EF-01

009A-EF-02

009A-EF-03

009A-EF-04

STORAGE

RESTROOM

RESTROOM

RESTROOM

IV TESTING

STAFF BREAK

CHANGE MGMT

USER

M A

T C

H L

IN

E

M A

T C

H L

IN

E

T

TT

T

"x

ELECTRICAL

CLOSET

WAITING ALCOVE

CORRIDOR

CR11-9

MECHANICAL

RESTROOM

"x

"x

10"ø

10"x8"

8"ø

"ø

"ø

10"ø

8"ø

10"x8"

10"ø

18"x10"12"x10"

6"ø

6"ø 6"ø

6"ø 6"ø

"x

6"ø

6"ø

6"ø

6"ø

"x

1 1

10"ø

10"ø

"ø

10"ø

6"ø

SEE VIEW 2 ON

M101 FOR

CLARITY

28"x16" 6"ø

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:1

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

M-101

MECHANICAL - WEST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

Revisions: Date:

GENERAL NOTES

1. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

KEYNOTES

KEY PLAN

3/16" = 1'-0"

LEVEL 1 - MECHANICAL - WEST

PROJECT

NORTH

TRUE NORTH

(DASHED)

6" EXHAUST DUCT TO RUN TO UP CHASE TO EXISTING 36X46 LOUVER IN ATTIC

REBALANCE AHU TO NEW AIRFLOWS ON DRAWINGS

MECHANICAL ROOM ISOMETRIC

SA/RA THRU WALL

NEW 16X36 SA TO CONNECT

TO (E) 16X36 SA

NEW 10"X18" RA

TO CONNECT TO 28X16 RA

NEW 28x16 RA

TO CONNECT TO (E)

28X16 RA

TO CORRIDOR

CR11-9

NEW 30"/10"SA

6/14/2024 53 OF 102

NORTH

TRUE NORTH

(DASHED)

32 5831302928272625

9 10 11 12 13 14 15 16 60 61 62 63 64

009A-AHU-1

009A-VAV-11

009A-VAV-10

009A-VAV-08

10"ø

16"/10"

"ø

"x

10"ø

34"/10"

34"/10"

28"/10"

"x

24"x10"

009A-VAV-07

12"x10" 8"ø

009A-VAV-09

TR

CORRIDOR

CR11-9

IV TESTING

ELECTRICAL

ROOM

IV SUPPORT

09A-FC-01

09A-HP-01

M A

T C

H L

IN

E

M A

T C

H L

IN

E

8" DIA

WALL CAP.

09A-EF-05

"x

T T

T

R

H

HAC

MECHANICAL

CORRIDOR

CR11-9

STG

103A

"ø

10"ø

14"x10"

20"/10"

"ø

"ø

10"ø

14"x10" 14"x10"

10"ø

10"ø

10"ø

10"ø

14"x10"

10"x10"

8"ø

10"/10"

SEE ARCH

DRAWINGS FOR

IN FILL DETAIL

M

"ø

24"x10"

T

28"x18"

"x

24X18 DN

TO 48X20

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:1

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

M-102

MECHANICAL - EAST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

Revisions: Date:

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

KEYNOTES

KEY PLAN

3/16" = 1'-0"

LEVEL 1 - MECHANICAL -EAST

PROJECT

NORTH

TRUE NORTH

(DASHED)

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE THAN 1FT. ABOVE

FINISHED FLOOR.

6/14/2024 54 OF 102

2120191817

1 2 3 4 5 6 7

10x10[1]340

(TYP.2)

22x10[3]680

22x10[1]300

10x10[1]370

(TYP.4)

22x22[3]1480

6X6[1]50

(TYP.2)

10x10[1]335

10x10[1]250

10x10[1]210 10x10[1]210

M A

T C

H L

IN

E

M A

T C

H L

IN

E

IV TESTING

CHANGE MGMT

USER

STAFF BREAK

CORRIDOR

CR11-9

WAITING ALCOVE

MECHANICAL

ELECTRICAL

CLOSET

STORAGE

RESTROOM

RESTROOM

RESTROOM

RESTROOM

10x10[3]300

6X6[1]50

(TYP.3)

10x10[1]250

22x10[3]350

6X6[4]50

DETAIL AREA

PROJECT

NORTH

TRUE NORTH

(DASHED)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:3

:1

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /M

E C

H B

L D

G

A

.r v t

M-103

MECHANICAL RCP - WEST

009A

MGH/JW NBH

CONSTRUCTION

DOCUMENTS

06/14/2024

557-21-703

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

3/16" = 1'-0"

LEVEL 1 - MECHANICAL NEW RCP - WEST

GENERAL NOTES

1. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

KEY PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

6/14/2024 55 OF 102

File details come from the government source that posted it. Updated .