S02-RFP Attachment 11-Drawings-Dublin_Part2.pdf

PDF 2 MB Posted

Attached to
Y1DZ--Renovate Building 9A for EHRM Administration- EHRM Project 557-21-703 Carl Vinson VA Medical Center Dublin, GA 31021
Solicitation number
36C77626R0031_1
Issued by

About this file

This is a set of architectural construction documents for a renovation project at a U.S. Department of Veterans Affairs facility. The documents comprise demolition plans, ceiling plans, and floor plans across two phases of construction, prepared by SPEES Design Build located in Seattle, Washington, with Ray Spees listed as the Architect/Engineer of Record.

Phase I consists of medical spaces including IV testing rooms (1,234-1,375 SF each), IV support (1,270 SF), mechanical rooms, staff break areas, waiting alcoves, restrooms, storage, and electrical closets, with total programmed net areas ranging from 40-1,800 SF per room type. Phase II repurposes much of the same footprint into classroom spaces (600-635 SF each), maintaining support areas including mechanical, storage, restrooms, waiting alcoves, and electrical closets. The demolition plans indicate areas designated for removal in the western and eastern sections of the building, with existing doors to remain or be demolished clearly marked. The ceiling plans detail existing and new systems to be installed, with notes requiring removal of previously installed fixtures and coordination with ongoing work. All drawings are prepared at 3/16" = 1'-0" scale for Phase I and Phase II demolition and ceiling plans, and 1/8" = 1'-0" scale for overall floor plans. The construction document is designated as fully sprinklered and includes VA Form 08-6231 approval documentation.

View the file

Other files

File Type Posted
S06- Addendum 2-Dublin - Specifications.pdf PDF
S06-Amendment 0006 SF 30-Dublin.pdf PDF
S05-Tech Questions w responses-Amendment 0006-Dublin.pdf PDF
S06-Amendment 0005-SF30-Dublin.pdf PDF
S06- Amendment 0004-Technical Responses - Dublin.pdf PDF
S06-Amendment 0004- Addendum 1 - Hazardous Materials Survey.pdf PDF
S06-Amendment 0004-Addendum-1-Specifications.pdf PDF
S06-Amendment 0004-Addendum-1-Drawings.pdf PDF
S06 - Amendment 0004-Additional Technical Responses -Dublin.pdf PDF
S06-Amendment 0004-SF30.pdf PDF
S06-Amendment 0003-due date ext-Dub.pdf PDF
S04-Site Visit Sign In Sheet-Dublin.pdf PDF
S06-36C77626R0031-Amendment 0002.pdf PDF
S06-36C77626R0031-Amendment 0001.pdf PDF
S02-RFP Attachment 24-Specifications- Part 2 of 5 - Section 09 06 00.pdf PDF
S02-RFP Attachment 5- Specifications part 1 of 5.pdf PDF
S02-RFP Attachment 7- Specifications part 3 of 5.pdf PDF
S02-RFP Attachment 15-Drawings-Dublin_Part6.pdf PDF
S02-RFP Attachment 21-Drawings-Dublin_Part12.pdf PDF
S02-RFP Attachment 22-Drawings-Dublin_Part13.pdf PDF
S02-RFP Attachment 2 Site Visit Information-Dublin.docx DOCX document
S02-RFP Attachment 4 Campus Map-Dublin.pdf PDF
S02-RFP Attachment 8- Specifications part 4 of 5.pdf PDF
S02-RFP Attachment 10- Drawings-Dublin_Part1.pdf PDF
S02-RFP Attachment 23-Drawings-Dublin_Part14.pdf PDF
S02-36C77626R0031_1-final.pdf PDF
S02-RFP Attachment 1 DBA Rates-Laurens County-Dublin.pdf PDF
S02-RFP Attachment 6- Specifications part 2 of 5.pdf PDF
S02-RFP Attachment 13-Drawings-Dublin_Part4.pdf PDF
S02-RFP Attachment 16-Drawings-Dublin_Part7.pdf PDF
S02-RFP Attachment 19-Drawings-Dublin_Part10.pdf PDF
S02 - RFP Attachment 3 - Limitations on Subcontracting - Dublin.docx DOCX document
S02-RFP Attachment 9- Specifications part 5 of 5.pdf PDF
S02-RFP Attachment 12-Drawings-Dublin_Part3.pdf PDF
S02-RFP Attachment 14-Drawings-Dublin_Part5.pdf PDF
S02-RFP Attachment 17-Drawings-Dublin_Part8.pdf PDF
S02-RFP Attachment 18-Drawings-Dublin_Part9.pdf PDF
S02-RFP Attachment 20-Drawings-Dublin_Part11.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OUT OF SCOPE

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

TO DEMOLISH

EXISTING TO REMAIN

1. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED,

PRIOR TO BEGINNING ANY WORK. NO WORK SHALL BE

DONE WITHOUT PROPERLY MEETING ALL ICRA

REQUIREMENTS, REF ICRA PLAN(S) AND SPECIFICATION

SECTION 01 35 25 'SAFETY REQUIREMENTS' FOR SPECIFIC

ICRA CLASS LOCATIONS & REQUIREMENTS.

2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION OF

ANY EXISTING EQUIPMENT.

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

1 2 3 4 5 6 7 8

17 18 19 20 21

1 TYP.

440 SF

CHANGE

MGMT

USER

86 SF

MECHANICAL

72 SF

STORAGE

1234 SF

IV TESTING

199 SF

STAFF BREAK

106 SF

WAITING ALCOVE

73 SF

RESTROOM

80 SF

RESTROOM

77 SF

RESTROOM

106 SF

RESTROOM

113 1 REMOVE FURNITURE PREVIOUSLY INSTALLED DURING

PHASE I, COORDINATE WITH COR PRIOR TO REMOVAL.

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AD103

DEMO PLAN - PHASE II - WEST

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

3/16" = 1'-0"

DEMO PLAN - PHASE II - WEST

Megan Matt's Stamp

Megan Text Box 6/14/24

OUT OF SCOPE

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

TO DEMOLISH

EXISTING TO REMAIN

1. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED,

PRIOR TO BEGINNING ANY WORK. NO WORK SHALL BE

DONE WITHOUT PROPERLY MEETING ALL ICRA

REQUIREMENTS, REF ICRA PLAN(S) AND SPECIFICATION

SECTION 01 35 25 'SAFETY REQUIREMENTS' FOR SPECIFIC

ICRA CLASS LOCATIONS & REQUIREMENTS.

2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION OF

ANY EXISTING EQUIPMENT.

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

8 9 10 11 12 13 14 15 16 60 61 62 63 64

25 26 27 28 29 30 31 32

1 TYP.

1270 SF

IV SUPPORT

99 SF

HAC

1375 SF

IV TESTING

101 SF

TR

1677 SF

CORRIDOR

CR11-9

121 SF

ELECTRICAL ROOM

191 SF

MECHANICAL

1 REMOVE FURNITURE PREVIOUSLY INSTALLED DURING

PHASE I, COORDINATE WITH COR PRIOR TO REMOVAL.

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AD104

DEMO PLAN - PHASE II - EAST

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

3/16" = 1'-0"

DEMO PLAN - PHASE II - EAST

Megan Matt's Stamp

Megan

C

S

C

S

C

S

C

S

C

S

C

S

C

S

C

S

WAP

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

TO DEMOLISH

OUT OF SCOPE

1 2 3 4 5 6 7 8

17 18 19 20 21

TYP.

1 1

1 1

PROSTHETICS

STOR

VERTICAL SPACE

CHASE

RCC103C

PROSTHETICS

WRK RM

PROSTHETICS

STOR

PROSTHETICS

PURCHASING

AGENT OFF

PROSTHETICS

PURCHASING

AGENT SUPV

PROSTHETICS

STOR

VERTICAL SPACE

PIPE CHASE

RCC101C

PROSTHETICS PIPE

CLO

RCC101R

COMMON MECH RM

PROSTHETICS PGM

ANALYST NETWRK

EMPLOYEE

VERTICAL SPACE

PIPE CHASE

RCC104C

COMMON TLT

PROSTHETICS FILE

RM

129A

VERTICAL SPACE

PIPE CHASE

RCC105C

COMMON FEMALE

TLT

VERTICAL SPACE

PIPE CHASE

RCC106C

GERIATRICS COMM

/ NH NRS GE AND C

OFF

GERIATRICS PIPE

CLO

131A

GERIATRICS BRK

RM

COMMON CORR

CR15-9

PROSTHETICS OFF

COMMON CORR

CR12-9

PROSTHETICS

RECEPTION AND

WAIT

PROSTHETICS PGM

MGR PROSTHETIC

PROSTHETICS

PURCHASING

116A

PROSTHETICS

CORR

CR14-9

PROSTHETICS

PURCHASING

116B

COMMON FEC

121A

VERTICAL SPACE

STAIR

ST11-9

VERTICAL SPACE

CHASE

RCC107C

1 REMOVE CEILINGS AND ANY ASSOCIATE GRID IN WORK

AREA. COORDINATE REMOVAL OF CEILING MOUNTED

EQUIPMENT WITH COR. TYP.

PRESERVE GRID, REMOVE CEILING TILES AND PREP FOR

UPDATED FIXTURES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AD111

DEMO CEILING PLAN - PHASE I -

WEST 009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1. MAINTAIN EXISTING SPRINKLER HEADS AND SYSYEM

WHILE COMPLETING DEMO WORK.

2. REMOVE ANY CEILING MOUNTED ACCESSORIES

REQUIRED TO COMPLETE ANY CONSTRUCTION TASK.

3. DEMO EXISTING FINISHES AS REQ'D TO INSTALL NEW PER

FINISH SCHEDULE.

Revisions: Date:

3/16" = 1'-0"

DEMO CEILING PLAN - PHASE I - WEST

Megan Matt's Stamp

Megan

C

S

C

S

C

S

C

S

C

S

C

S

WAP

WAP

WAP WAP

WAP

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

TO DEMOLISH

OUT OF SCOPE

8 9 10 11 12 13 14 15 16 60 61 62 63 64

25 26 27 28 29 30 31 32

TYP.

1 1 1 1 1 1

GERIATRICS

SPECIAL PGMS

CO-ORDER SCI /

TBI / VISIT OFF

GERIATRICS SOC

WRK SUPV COMM

CARE PGMS OFF

GERIATRICS

RECREATION OFF

GERIATRICS G AND

EC PHY

GERIATRICS

EXTENDED CARE

OFF

GERIATRICS ACOS

AND EXTENDED

CARE OFF

GERIATRICS CLO

137B

GERIATRICS TLT

137A

COMMON MALE

TLT

COMMON TEL CLO

GERIATRICS SOC

WRK EXTERNAL

CARE

VERTICAL SPACE

CHASE

RCC102C

GERIATRICS

MULTIPURPOSE

RM

GERIATRICS STOR

142 COMMON FEC

142A

VERTICAL SPACE

ELEV

RCC102R

COMMON VEST

100 ENVIR MGMT HAC

CLO

CANTEEN SVC

VENDING AREA

ENGINEERING

MECH RM

NUTRITION/FOOD

DIETICIAN OFF

GERIATRICS

FEMALE TLT

GERIATRICS OFF

GERIATRICS G AND

EC PSA

GERIATRICS

DIETICIAN AND

EXTENDED CARE

OFF

GERIATRICS

DIETICIAN AND

EXTENDED CARE

OFF

NUTRITION/FOOD

DIETICIAN OFF

GERIATRICS OFF

GERIATRICS COMM

HEALTH NRS

CO-ORDR

COMMON CORR

CR13-9

PROSTHETICS OFF

COMMON CORR

CR11-9

1 REMOVE CEILINGS AND ANY ASSOCIATE GRID IN WORK

AREA. COORDINATE REMOVAL OF CEILING MOUNTED

EQUIPMENT WITH COR. TYP.

PRESERVE GRID, REMOVE CEILING TILES AND PREP FOR

UPDATED FIXTURES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AD112

DEMO CEILING PLAN - PHASE I -

EAST 009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

3/16" = 1'-0"

DEMO CEILING PLAN - PHASE I - EAST

1. MAINTAIN EXISTING SPRINKLER HEADS AND SYSYEM

WHILE COMPLETING DEMO WORK.

2. REMOVE ANY CEILING MOUNTED ACCESSORIES

REQUIRED TO COMPLETE ANY CONSTRUCTION TASK.

3. DEMO EXISTING FINISHES AS REQ'D TO INSTALL NEW PER

FINISH SCHEDULE.

Megan Matt's Stamp

Megan

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

440 SF

CHANGE

MGMT

USER

1270 SF

IV SUPPORT

86 SF

MECHANICAL

99 SF

HAC

10272 SF

STORAGE

1234 SF

IV TESTING

1375 SF

IV TESTING

101 SF

TR

199 SF

STAFF BREAK

106 SF

WAITING ALCOVE

73 SF

RESTROOM

121 SF

ELECTRICAL ROOM

1677 SF

CORRIDOR

CR11-9

80 SF

RESTROOM

77 SF

RESTROOM

106 SF

RESTROOM

191 SF

MECHANICAL

AE423

AE423

AE422

AE422

AE421

AE421

4 25

8 6

4 2

4 2

AE424

AE424

AE424

AE424

12 10

16 14

AE423

/1 AE102/1 AE101

51 SF

ELECTRICAL

CLOSET

85 SF

STG

103A

8" MIN. INT. DIM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE001

FLOOR PLAN - PHASE I - OVERALL

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

PHASE I - ROOM PROGRAM

ROOM # ROOM NAME

PROGRAM

NET

DESIGNED

NET

100 TR 100 SF 101 SF

101 MECHANICAL 100 SF 191 SF

102 HAC 600 SF 99 SF

103 IV TESTING 1800 SF 1375 SF

103A STG 85 SF

104 IV SUPPORT 1200 SF 1270 SF

105 WAITING ALCOVE 600 SF 106 SF

106 IV TESTING 1800 SF 1234 SF

107 STAFF BREAK 150 SF 199 SF

108 CHANGE MGMT USER 300 SF 440 SF

109 MECHANICAL 50 SF 86 SF

110 RESTROOM 55 SF 73 SF

111 RESTROOM 55 SF 80 SF

112 RESTROOM 40 SF 77 SF

113 RESTROOM 55 SF 106 SF

114 STORAGE 55 SF 72 SF

115 ELECTRICAL CLOSET 51 SF

116 ELECTRICAL ROOM 100 SF 121 SF

Revisions: Date:

1/8" = 1'-0"

FLOOR PLAN - PHASE I - OVERALL

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY

CONFLICTS BETWEEN EXISTING CONDITIONS AND THE

CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THEATTENTION OF THE COR.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE

OF STUD, CENTERLINE OF STRUCTURAL COLUMNS, AND

CENTERLINE OF OPENINGS, UNO.

3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"

FROM THE INTERSECTING WALL OR CENTERED ON THE

WALL, UNO.

4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INSTALLING DRYWALL.

Megan Matt's Stamp

Megan

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

121 SF

ELECTRICAL

86 SF

MECH

440 SF

CHANGE

MGMT

USER

52' - 9"

73 SF

RESTROOM

101 SF

TR ROOM

99 SF

HAC

102682 SF

CLASSROOM

103A

692 SF

CLASSROOM

103B

634 SF

CLASSROOM

104A

601 SF

CLASSROOM

106A633 SF

CLASSROOM

106B

199 SF

STAFF BREAK

80 SF

RESTROOM

77 SF

RESTROOM

106 SF

RESTROOM

72 SF

STORAGE

1677 SF

CORRIDOR

CR11-9

191 SF

MECHANICAL

102A

/1 AE104/1 AE103

51 SF

ELECTRICAL

CLOSET

635 SF

CLASSROOM

104B

106 SF

WAITING ALCOVE

STG

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE002

FLOOR PLAN - PHASE II - OVERALL

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

GENERAL NOTES

Revisions: Date:

1/8" = 1'-0"

FLOOR PLAN - PHASE II - OVERALL

PHASE II - ROOM PROGRAM

ROOM # ROOM NAME

PROGRAM

NET

DESIGNED

NET

103A CLASSROOM 600 SF 682 SF

103B CLASSROOM 600 SF 692 SF

104A CLASSROOM 600 SF 634 SF

104B CLASSROOM 635 SF

105 CLASSROOM 600 SF Not Placed

105 WAITING ALCOVE 106 SF

106 STG 85 SF

106A CLASSROOM 600 SF 601 SF

106B CLASSROOM 600 SF 633 SF

115 ELECTRICAL CLOSET 51 SF

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY

CONFLICTS BETWEEN EXISTING CONDITIONS AND THE

CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THEATTENTION OF THE COR.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE

OF STUD, CENTERLINE OF STRUCTURAL COLUMNS, AND

CENTERLINE OF OPENINGS, UNO.

3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"

FROM THE INTERSECTING WALL OR CENTERED ON THE

WALL, UNO.

4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INSTALLING DRYWALL.

Megan Matt's Stamp

Megan

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

EXISTING DOOR TO REMAIN

NEW DOOR

1 2 3 4 5 6 7 8

17 18 19 20 21

440 SF

CHANGE

MGMT

USER

86 SF

MECHANICAL

72 SF

STORAGE

1234 SF

IV TESTING

199 SF

STAFF BREAK

106 SF

WAITING ALCOVE

73 SF

RESTROOM

6' - 6"

160.00°

80 SF

RESTROOM

77 SF

RESTROOM

106 SF

RESTROOM

106A106B107

104B

AE423

AE423

AE422

4 2

AE424

AE424

AE424

AE424

12 10

16 14

AE423

AE400

AE400

AE400

AE400

AE400

AE400

AE400

F0275 CHAIR

E0042 WORKSTATION

A0001ACCORDIAN WALL

, TYP.

, TYP.

90 90

51 SF

ELECTRICAL

CLOSET

03114

F0305 CHAIR

WALL MOUNTED

BOTTLE FILLING

STATION PER

PLUMBING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE101

FLOOR PLAN - PHASE I - WEST

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

PHASE I - ROOM PROGRAM

ROOM # ROOM NAME

PROGRAM

NET

DESIGNED

NET

100 TR 100 SF 101 SF

101 MECHANICAL 100 SF 191 SF

102 HAC 600 SF 99 SF

103 IV TESTING 1800 SF 1375 SF

103A STG 85 SF

104 IV SUPPORT 1200 SF 1270 SF

105 WAITING ALCOVE 600 SF 106 SF

106 IV TESTING 1800 SF 1234 SF

107 STAFF BREAK 150 SF 199 SF

108 CHANGE MGMT USER 300 SF 440 SF

109 MECHANICAL 50 SF 86 SF

110 RESTROOM 55 SF 73 SF

111 RESTROOM 55 SF 80 SF

112 RESTROOM 40 SF 77 SF

113 RESTROOM 55 SF 106 SF

114 STORAGE 55 SF 72 SF

115 ELECTRICAL CLOSET 51 SF

116 ELECTRICAL ROOM 100 SF 121 SF

Revisions: Date:

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

3/16" = 1'-0"

FLOOR PLAN - PHASE I - WEST

1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS

BETWEEN EXISTING CONDITIONS AND THE CONTRACT

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF

THE COR IMMEDIATELY.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF

STUD, CENTERLINE OF STRUCTURAL COLUMNS, AND

CENTERLINE OF OPENINGS, UNO.

3. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"

FROM THE INTERECTING WALL, OR CENTERED ON THE

WALL, UNO.

4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INSTALLING DRYWALL.

Megan Matt's Stamp

Megan

Sheets
AD103 - DEMO PLAN - PHASE II - WEST
AD104 - DEMO PLAN - PHASE II - EAST
AD111 - DEMO CEILING PLAN - PHASE I - WEST
AD112 - DEMO CEILING PLAN - PHASE I - EAST
AE001 - FLOOR PLAN - PHASE I - OVERALL
AE002 - FLOOR PLAN - PHASE II - OVERALL
AE101 - FLOOR PLAN - PHASE I - WEST

File details come from the government source that posted it. Updated .