S02-RFP Attachment 19-Drawings-Dublin_Part10.pdf
PDF 2 MB Posted
- Solicitation number
- 36C77626R0031_1
About this file
This document comprises electrical design and construction details for the renovation of Building 9A at Carl Vinson VA Medical Center in Dublin, Georgia, specifically for EHRM Administrative Space (Project 557-21-703). The drawings, prepared by SPEES Design Build, detail telecommunications infrastructure, lighting systems, and power distribution requirements for the facility. Key telecommunications specifications include Category 6A cabling terminating to T568B standards, with work area outlets configured in both standard density (two RJ45 connectors) and high-density (four RJ45 connectors) arrangements. The telecommunications room requires wire basket cable trays with dividers (Cablofil COT54 or equivalent), proper bonding conductors, and a structured bonding busbar system with connections to building steel and primary service entry points. All labeling must comply with ANSI/TIA/EIA/606C standards using black lettering on white fields with machine printing.
Lighting systems specified include recessed luminaires mounted at 9'6" above finished floor with dimmable controls and occupancy sensors integrated through a lighting control wiring diagram. Exit signs require typical recessed installations with fire stop sleeves (4" Hilti or approved equal). Power distribution for telecommunications racks utilizes 208V three-phase circuits with NEMA L21-30R receptacles for zone PDUs and L21-20R receptacles for individual rack PDUs, with detailed schematics showing dual-redundant power supply configurations. Cable tray bonding requires minimum 6 AWG conductors with green insulation and yellow tracer routed to primary or secondary bonding busbars. The construction documents establish comprehensive specifications for telecommunications room elevation, rack isolation pad mounting, and electrostatic discharge flooring bonding at 12 AWG minimum conductors per manufacturer instructions. All work must comply with VA standards and TIA/ANSI telecommunications bonding requirements with coordination requirements for exact device placement and lighting control manufacturer specifications.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CABLING TO
TELECOMMUNICATIONS ROOM
CAT-6A FROM OUTLET BACK TO SOURCE
CONDUIT, 1-1/4"
SUSPENDED CEILING
FLOOR
FACEPLATE
LABEL WINDOW
JACK MODULES
PROVIDE CAT-6A MODULES
PROVIDE BLANK MODULES TO
FILL UNUSED PORT OPENINGS
HIGH DENSITY WAO
CONFIGURATION
STANDARD DENSITY WAO
CONFIGURATION
T568B 8P8C
T568B
B N
/W H
B N
O R
/W H
O R
G N
/W H
G N
B L /W
H
B L
SINGLE GANG
WORKBOX WITH
TWO CONNECTOR
CHASSIS
FOUR CATEGORY 6A
8P8C OUTLETS
ACTIVE FOR
TELEPHONY/DATA
FOUR POSITION
FACEPLATE
MOUNTED ON
SINGLE GANG
WORKBOX.
1 2
3 4
SINGLE GANG
WORKBOX WITH
ONE CONNECTOR
CHASSIS.
TWO CATEGORY 6A
8P8C OUTLETS
ACTIVE FOR
TELEPHONY/DATA
FOUR POSITION
FACEPLATE
MOUNTED ON
SINGLE GANG
WORKBOX.
1 2
3 4
LENGTH AS
REQUIRED
CABLE TRAY DIVIDER,
CABLOFIL COT54 OR
EQUIVALENT
DIVIDER JUNCTION,
CABLOFIL COTJ OR
EQUIVALENT
NOTE 2
MANUFACTURER
APPROVED FASTENER
NOTE 1
NOTE 1
DETAILS NOTES
NOTE 1. REFERENCE TELECOMMUNICATIONS
WAO AND CABLE TRAY SCHEDULE ON
ET701 FOR DIMENSIONS.
NOTE 2. CABLE TRAY DIVIDER SHALL BE EQUAL
HEIGHT OF CABLE TRAY. QUANTITY OF
DIVIDERS TO BE DETERMINED BY
NUMBER OF SPECIAL SYSTEMS
ROUTED THROUGH CABLE TRAY.
CONTRACTOR SHALL ASSUME A
MINIMUM OF 4 DIVIDERS PER TRAY.
FRONT PROFILE
NOTE 1
NOTE 1
CABLOFIL WIRE BASKET CABLE TRAY
BY LEGRAND, OR APPROVED EQUAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:5
:2
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /V
A D
U
G E
N S
H E
E T
S
E L
S
D B
.r v t
E-501
ELECTRICAL DETAILS
JPB/WNM BCL
CONSTRUCTION
DOCUMENT
06/14/2024
557-21-703RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA
NTS
WORK AREA OUTLET WALL INSTALLATION DETAIL
ET101
1. ALL LABELING SHALL BE ANSI/TIA/EIA/606C COMPLIANT. BLACK LETTERING ON WHITE FIELD.
MACHINE PRINTED. FURTHER GUIDANCE ON ADMINISTRATION MAY BE SPECIFIED IN OTHER
SECTIONS OF THIS DESIGN PACKAGE.
2. TYPICAL WORK AREA OUTLET FACEPLATE WILL BE INSTALLED WITH CATEGORY 6A COMPONENT- COMPLIANT 8P8C MEDIA INTERFACE CONNECTORS (RJ45). EACH CONNECTOR WILL BE TERMINATED
TO HIGH QUALITY CATEGORY 6A HORIZONTAL CABLING WHICH WILL TERMINATE IN THE
TELECOMMUNICATIONS ROOM AS SPECIFIED ELSEWHERE IN THIS DESIGN PACKAGE. ALL
HORIZONTAL UTP SHALL BE CATEGORY 6A AND TERMINATED TO T568B.
3. TYPICAL FACEPLATE WILL BE INSTALLED WITH TWO (2) RJ45s. HIGH DENSITY FACEPLATES WILL BE INSTALLED WITH FOUR (4) RJ45s.
4. FACEPLATE MATERIAL AND COLOR TO MATCH EXISTING.
GENERAL NOTES
- NTS
2 DATA CABLING TERMINATION DETAIL
FIRE STOP SPEED
SLEEVE, 4" HILTI, OR
APPROVED EQUAL
INSTALL PER THE
SPECIFICATIONS AND
MANUFACTURER'S
REQUIREMENTS AS REQUIRED
- NTS
4 TYPICAL HIGH DENSITY WALL MOUNTED WORK AREA OUTLET CONFIGURATION
- NTS
5 STANDARD DENSITY WALL MOUNTED WORK AREA OUTLET CONFIGURATION
NTS
WIRE BASKET CABLE TRAY WITH DIVIDER
ET101
E-402
NTS
TYPICAL FIRE STOP SLEEVE DETAIL
E-402
Revisions: Date:
CONSTRUCTION
DOCUMENTS
WHEN USING CONTROLS IN
SINGLE LOCATION
INSTALLATIONS, TIGHTEN THE
BLUE TERMINAL OR CAP BLUE
WIRE. DO NOT CONNECT THE
BLUE TERMINAL/WIRE TO ANY
OTHER WIRE OR TO GROUND.
BLUE
BLACK BLACK
BARE
OCCUPANCY
SENSOR SWITCH
LOAD
WHITE
GROUND
HOT/LIVE
120 V~ 50/60 Hz
NEUTRAL
BARE
BLACK
BLUE
WHITE WIRE WITH
GREEN SLEVE
DETAILS NOTE(S):
1. WHERE INDICATED ON PLANS, OCCUPANCY SWITCH SHALL HAVE DIMMING AND/OR 3-WAY CONTROLS.
TYPICAL
DATA
RACK
FIN. FLOOR
HORIZONTAL CAT6A
DISTRIBUTION AND
FIBER-OPTIC BACKBONE
CABLE TRAY, TYPICAL.
BOTTOM OF FLOOR OR ROOF ABOVE
LIGHT FIXTURE: LUMINAIRE SHALL BE +9'6" AFF.
LIGHT MOUNTING LOCATION IS DIAGRAMMATIC;
CONTRACTOR SHALL COORDINATE EXACT
MOUNTING HEIGHT AND PLACEMENT WITH ALL
OBSTRUCTIONS INCLUDING CABLE TRAY, RACKS
AND ARCHITECTURAL FEATURES.
84"
6" MIN
F L O
O R
T O
U N
D E
R S
ID
E
S T
R U
C T
U R
E
TERMINATION
PLUG
CAT OS CAT
OCCUPANCY
SENSOR
(QTY AS
NEEDED)
POWER
PACK
A-SIDE
SWITCHING
(QTY AS
NEEDED)
A-SIDE
LIGHTING
LOAD
(QTY AS
NEEDED)
POWER AND
0-10V CONTROL
CAT
POWER
PACK
B-SIDE
SWITCHING
(QTY AS
NEEDED)
B-SIDE
LIGHTING
LOAD
(QTY AS
NEEDED)
POWER AND
0-10V CONTROL
CAT
PROGRAMMING
INTERFACE
MODULE
CAT
WALL STATION
(QTY AS
NEEDED)
CAT
TERMINATION
PLUG
DETAIL NOTE(S):
1.DETAIL IS FOR REFERENCE ONLY TO INDICATE FUNCTIONALITY. COORDINATE WITH LIGHTING CONTROL MANUFACTURER FOR EXACT DEVICE AND WIRING REQUIREMENTS. PLANS INDICATE CONTROL DEVICES SUCH AS WALL STATIONS AND OCCUPANCY SENSORS; POWER PACKS ARE NOT INCLUDED ON PLANS AND SHALL BE PROVIDED AS REQUIRED FOR SELECTED CONTROL SYSTEM. PROVIDE ALL DEVICES AND WIRING AS REQUIRED
FOR A COMPLETE AND FULLY FUNCTIONAL LIGHTING CONTROL SYSTEM.
2. ALL SPACES SHALL INCLUDE DIMMABLE CONTROLS AND LUMINAIRES.
120-277V 120-277V
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:5
:3
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /V
A D
U
G E
N S
H E
E T
S
E L
S
D B
.r v t
E-502
ELECTRICAL DETAILS
JPB/WNM BCL
CONSTRUCTION
DOCUMENT
06/14/2024
557-21-703RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA
NTS
TYPICAL RECESSED LIGHTING INSTALLATION
EL101
NTS
TYPICAL EXIT SIGN INSTALLATION
EL101
NTS
WALL SWITCH OCCUPANCY SENSOR
EL101
E-401
Revisions: Date:
3/4" = 1'-0"
TYPICAL TELECOMMUNICATIONS ROOM ELEVATION
E-401
NTS
TYPICAL LIGHTING CONTROL WIRING DIAGRAM
EL101
- NTS
1 NOT USED
IRREVERSIBLE
COMPRESSION
CONNECTION
RACK BONDING
CONDUCTOR
(6 AWG)
TEBC
(TELECOMMUNICATIONS
EQUIPMENT BONDING
CONDUCTOR - 4 AWG)
RACK BONDING CONDUCTOR (6 AWG)
UNIT BONDING CONDUCTOR (6 AWG)
TOP-MOUNTED
RACK BONDING
BUSBAR
IRREVERSIBLE CRIMP
CONNECTOR, TYP.
GROUND TO PRIMARY
BONDING BUSBAR.
COORDINATE WITH VA
FOR EXACT
CONDUCTOR ROUTING
TWO-HOLE COMPRESSION LUGS (RACKS SHALL NOT
BE MODIFIED IF ONLY ONE-HOLE IS PROVIDED; USE
ONE-HOLE COMPRESSION LUGS IN THIS CASE)
TWO-HOLE
COMPRESSION LUGS (RACKS
SHALL NOT BE MODIFIED IF
ONLY ONE-HOLE IS PROVIDED;
USE ONE-HOLE COMPRESSION
LUGS IN THIS CASE)
RACK ISOLATION PADS
CHATSWORTH PRODUCTS
#40158-012, OR APPROVED
EQUAL
MOUNTING BRACKETS
1/4" THICK
L= 12"
D
INSULATOR
TELECOMMUNICATIONS
EQUIPMENT BONDING
CONDUCTOR (TEBC) AWG
IRREVERSIBLE CRIMP
CONNECTOR, TYP.
CABLE TRAY BONDING
CONDUCTOR. TYPICAL AT
EACH SECTION
CONNECTION POINT
TO PRIMARY OR SECONDARY
BONDING BUSBAR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:5
:3
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /V
A D
U
G E
N S
H E
E T
S
E L
S
D B
.r v t
E-503
ELECTRICAL DETAILS
JPB/WNM BCL
CONSTRUCTION
DOCUMENT
06/14/2024
557-21-703RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA
TELECOMMUNICATIONS
BONDING BUSBAR
ALL CONNECTIONS TO
BUSBAR SHALL BE (2) BOLT
MECHANICAL LUGS, TYP.
BONDING CONDUCTOR TO
BUILDING STEEL, #3/0 AWG
GREEN INSULATION W/YELLOW
TRACER
BONDING CONDUCTOR TO
RACEWAYS, CONDUITS,
WIREWAYS, CABLE TRAYS, #6
AWG GREEN INSULATION W/
YELLOW TRACER
BONDING CONDUCTOR TO
PANELBOARD(S) IN ROOM
PRESENT, #6 AWG GREEN
INSULATION W/ YELLOW TRACER
BONDING CONDUCTOR FROM
TELECOMMUNICATIONS
SECONDARY BONDING
BUSBAR TO
TELECOMMUNICATIONS
BONDING BACKBONE (IF NOT
PRESENT, BOND TO PRIMARY
SERVICE ENTRY MAIN
BUSBAR), #3/0 AWG GREEN
INSULATION W/YELLOW
TRACER
TELECOMMUNICATIONS BONDING
BACKBONE CONDUCTOR. PROVIDE WITH
GREEN INSULATION AND YELLOW
TRACER, SIZE PER TIA/ANSI STANDARDS
AS REQUIRED. WHERE EXISTING,
EXTEND AND REROUTE BACKBONE TO
AND FROM RELOCATED/EXPANDED
TELECOMMUNICATIONS ROOMS. IF NEW,
PROVIDE AS REQUIRED.
IRREVERSIBLE
CRIMP CONNECTOR,
UL LISTED
NTS
TELECOMMUNICATION RACK BONDING DETAIL
E-401
NTS
TELECOMMUNICATIONS BONDING BUSBAR
E-401
NTS
CABLE TRAY GROUNDING/BONDING REQUIREMENTS
ET101
E-402
- NTS
3 TELECOMMUNICATIONS ROOM BONDING DETAIL
4 NOT USED
PROVIDE BOND TO ELECTRO-
STATIC DISCHARGE FLOORING.
BONDING CONDUCTOR SHALL BE
12 AWG MIN'. PROVIDE AND
INSTALL PER MANUFACTURER'S
INSTRUCTIONS.
Revisions: Date:
LEG 1 LEG 2 LEG 1 LEG 2
AGROUPA
B
BGROUP AGROUP BGROUP
L21-30P SIDE B
REQUIRES A 208V, 30A, THREE-PHASE
CIRCUIT, TERMINATING IN A NEMA L21-30R
LOCKING RECEPTACLE.
L21-30P SIDE A
REQUIRES A 208V, 30A, THREE-PHASE
CIRCUIT, TERMINATING IN A NEMA
L21-30R LOCKING RECEPTACLE.
30A 3-PHASE ZONE PDU BASE
UNIT - REQUIRES TWO 30A 3-
PHASE (WYE) CIRCUITS WITH
L21-30R RECEPTACLES
PHASE Z PHASE Y PHASE X
RACK-MOUNTED 5KW, 208V UNINTERRUPTIBLE
POWER SUPPLY (UPS) WITH NEMA 20A L21-20P
INPUT AND L21-20R OUTPUT
RACK-MOUNT
UPS
RACKED
EQUIPMENT
RACKED
EQUIPMENT
PDU
A
PDU
B
PDU
A
PDU
BPSA PSB PSA PSB
LEG A LEG B
ZONE PDU
RACK-MOUNT
UPS
RACK/ENCLOSURE RACK/ENCLOSURE
SOURCE A 30A
RECEPTACLE
SOURCE B 30A
RECEPTACLE
REFERENCE
TN DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
REFERENCE
TN DRAWINGS
FOR RACK
MOUNTED
NETWORK
EQUIPMENT
- TYP.
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W a rn in g
C ri ti c a l
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W ar ni n g C ri tic al
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T O
N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W ar ni n g C ri tic al
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
CB1
CB1
CB2
CB2
CB3
CB3
In lO lO lO
O ut
T em p /H u m id it y
O K
W ar ni n g C ri tic al
R e se t
C H
A T
S W
O R
T H
P R
O D
U C
T
O N l
O F
F O
N l
O F
F O
N l
O F
F
CB3
CB3
CB2
CB2
REQUIRES ONE (1) L21-20R
20A 120/208V 3øY
APC AP8861 RPDU OR EQUIVALENT; RACK
PDU 2G, METERED; L21-20 PLUG; THREE
PHASE; 120/208V INPUT; 20A; ZERO U, 5.7 KW,
208V, (36) C13 & (6) C19 & (2) 5-20 OUTLETS;
FOR USE IN TELECOMMUNICATION ROOMS
AND LOCATIONS WITH LEGACY 110V ONLY
EQUIPMENT
NOTE: USED IN TELECOMMUNICATIONS
ROOMS WHERE 110V DISTRIBUTION
USING NEMA 5-15 OR NEMA 5-20
RECEPTACLES ARE REQUIRED IN
ADDITION TO THE STANDARD 208V
FIGURE 1: IEC 60320 C14 PLUG CONNECTOR.
SOURCE: CISCO SYSTEMS INC. ILLUSTRATION
#113165
FIGURE 2: IEC 60320 C15 PLUG.
SOURCE: CISCO SYSTEMS INC. ILLUSTRATION
#113165
FOR INFORMATIONAL REFERENCE ONLY:
208V PDU TO BE COMPATIBLE WITH CISCO IEC C14-C15 CABINET JUMPER POWER CORD,
DEVICE CORDSET PART NUMBER CAB-C15-CBN.
RACK PDU END DEVICE END
CAB-C15-CBN DETAILS:
1. CORDSET RATED FOR 250VAC, 13A, 60 HZ, 120° C (248° F) AT COUPLER PINS.
2. MAXIMUM OVERALL LENGTH OF 4 FT.
3. VERIFY CORDSET COMPATIBILITY WITH 208VAC SOURCE POWER BEFORE CONNECTING
4. VERIFY DEVICE COMPATIBILITY WITH 208VAC INPUT POWER BEFORE CONNECTING.
DEVICE CORDSET
L21-20R
ENERGIZES
FIRST
TR RACK
PDU A
L21-20R
ENERGIZES
FIRST
TR RACK
PDU B
L21-20R
ENERGIZES
SECOND
TR RACK
PDU A
L21-20R
ENERGIZES
SECOND
TR RACK
PDU B
WHEN ONLY ONE ENCLOSURE IS
POWERED AT STANDARD
DENSITY, ONE A/B PAIR OF
L21-20 RECEPTACLES WILL
REMAIN UNUSED
GROUP
A
GROUP
B
GROUP
A
GROUP
B
O X
O Y
O Z
LEG 1 LEG 2 LEG 1 LEG 2
O Z
O X
O Y
O Y
O Z
O X
O X
O Y
O Z
PHASE
Z
PHASE
Y
PHASE
X
LEG 2
LEG 1
GRP A
GRP B
LEG 2
LEG 1
GRP A
GRP B
LEG 2
LEG 1
GRP A
GRP B
L21-30P
ZONE PDU
INPUT A
L21-30R
FIXED
POWER
SOURCE A
L21-30P
ZONE PDU
INPUT B
L21-30R
FIXED
POWER
SOURCE B
A
B
NOTE:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/1
/2
:5
:4
P
M
A u to d e s k D o c s /5
-2
-7
V
A G
A D u b lin E
H R
M T
A S
S /V
A D
U
G E
N S
H E
E T
S
E L
S
D B
.r v t
E-504
ELECTRICAL DETAILS
JPB/WNM BCL
CONSTRUCTION
DOCUMENT
06/14/2024
557-21-703RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA
NTS
POWER ELEVATION AND SCHEMATIC FOR A TWO RACK TR
E-401
- NTS
2 208V RACK PDU FOR TRs
- NTS
CONNECTION DETAIL FOR 30A ZONE PDU UNIT SUPPLYING THREE-PHASE
20A (L21-20P) RACK PDU'S IN STANDARD DENSITY ENCLOSURES
- NTS
4 NOT USED
Revisions: Date:
File details come from the government source that posted it. Updated .