This document comprises electrical design and construction details for the renovation of Building 9A at Carl Vinson VA Medical Center in Dublin, Georgia, specifically for EHRM Administrative Space (Project 557-21-703). The drawings, prepared by SPEES Design Build, detail telecommunications infrastructure, lighting systems, and power distribution requirements for the facility. Key telecommunications specifications include Category 6A cabling terminating to T568B standards, with work area outlets configured in both standard density (two RJ45 connectors) and high-density (four RJ45 connectors) arrangements. The telecommunications room requires wire basket cable trays with dividers (Cablofil COT54 or equivalent), proper bonding conductors, and a structured bonding busbar system with connections to building steel and primary service entry points. All labeling must comply with ANSI/TIA/EIA/606C standards using black lettering on white fields with machine printing.

Lighting systems specified include recessed luminaires mounted at 9'6" above finished floor with dimmable controls and occupancy sensors integrated through a lighting control wiring diagram. Exit signs require typical recessed installations with fire stop sleeves (4" Hilti or approved equal). Power distribution for telecommunications racks utilizes 208V three-phase circuits with NEMA L21-30R receptacles for zone PDUs and L21-20R receptacles for individual rack PDUs, with detailed schematics showing dual-redundant power supply configurations. Cable tray bonding requires minimum 6 AWG conductors with green insulation and yellow tracer routed to primary or secondary bonding busbars. The construction documents establish comprehensive specifications for telecommunications room elevation, rack isolation pad mounting, and electrostatic discharge flooring bonding at 12 AWG minimum conductors per manufacturer instructions. All work must comply with VA standards and TIA/ANSI telecommunications bonding requirements with coordination requirements for exact device placement and lighting control manufacturer specifications.

View the file

Other files

File Type Posted
S05-Tech Questions w responses-Amendment 0006-Dublin.pdf PDF
S06- Addendum 2-Dublin - Specifications.pdf PDF
S06-Amendment 0006 SF 30-Dublin.pdf PDF
S06-Amendment 0005-SF30-Dublin.pdf PDF
S06-Amendment 0004-Addendum-1-Specifications.pdf PDF
S06-Amendment 0004-Addendum-1-Drawings.pdf PDF
S06 - Amendment 0004-Additional Technical Responses -Dublin.pdf PDF
S06-Amendment 0004-SF30.pdf PDF
S06- Amendment 0004-Technical Responses - Dublin.pdf PDF
S06-Amendment 0004- Addendum 1 - Hazardous Materials Survey.pdf PDF
S06-Amendment 0003-due date ext-Dub.pdf PDF
S04-Site Visit Sign In Sheet-Dublin.pdf PDF
S06-36C77626R0031-Amendment 0002.pdf PDF
S06-36C77626R0031-Amendment 0001.pdf PDF
S02-RFP Attachment 24-Specifications- Part 2 of 5 - Section 09 06 00.pdf PDF
S02 - RFP Attachment 3 - Limitations on Subcontracting - Dublin.docx DOCX document
S02-RFP Attachment 9- Specifications part 5 of 5.pdf PDF
S02-RFP Attachment 12-Drawings-Dublin_Part3.pdf PDF
S02-RFP Attachment 14-Drawings-Dublin_Part5.pdf PDF
S02-RFP Attachment 17-Drawings-Dublin_Part8.pdf PDF
S02-RFP Attachment 18-Drawings-Dublin_Part9.pdf PDF
S02-RFP Attachment 20-Drawings-Dublin_Part11.pdf PDF
S02-RFP Attachment 5- Specifications part 1 of 5.pdf PDF
S02-RFP Attachment 7- Specifications part 3 of 5.pdf PDF
S02-RFP Attachment 15-Drawings-Dublin_Part6.pdf PDF
S02-RFP Attachment 21-Drawings-Dublin_Part12.pdf PDF
S02-RFP Attachment 22-Drawings-Dublin_Part13.pdf PDF
S02-RFP Attachment 2 Site Visit Information-Dublin.docx DOCX document
S02-RFP Attachment 4 Campus Map-Dublin.pdf PDF
S02-RFP Attachment 8- Specifications part 4 of 5.pdf PDF
S02-RFP Attachment 10- Drawings-Dublin_Part1.pdf PDF
S02-RFP Attachment 11-Drawings-Dublin_Part2.pdf PDF
S02-RFP Attachment 23-Drawings-Dublin_Part14.pdf PDF
S02-36C77626R0031_1-final.pdf PDF
S02-RFP Attachment 1 DBA Rates-Laurens County-Dublin.pdf PDF
S02-RFP Attachment 6- Specifications part 2 of 5.pdf PDF
S02-RFP Attachment 13-Drawings-Dublin_Part4.pdf PDF
S02-RFP Attachment 16-Drawings-Dublin_Part7.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CABLING TO

TELECOMMUNICATIONS ROOM

CAT-6A FROM OUTLET BACK TO SOURCE

CONDUIT, 1-1/4"

SUSPENDED CEILING

FLOOR

FACEPLATE

LABEL WINDOW

JACK MODULES

PROVIDE CAT-6A MODULES

PROVIDE BLANK MODULES TO

FILL UNUSED PORT OPENINGS

HIGH DENSITY WAO

CONFIGURATION

STANDARD DENSITY WAO

CONFIGURATION

T568B 8P8C

T568B

B N

/W H

B N

O R

/W H

O R

G N

/W H

G N

B L /W

H

B L

SINGLE GANG

WORKBOX WITH

TWO CONNECTOR

CHASSIS

FOUR CATEGORY 6A

8P8C OUTLETS

ACTIVE FOR

TELEPHONY/DATA

FOUR POSITION

FACEPLATE

MOUNTED ON

SINGLE GANG

WORKBOX.

1 2

3 4

SINGLE GANG

WORKBOX WITH

ONE CONNECTOR

CHASSIS.

TWO CATEGORY 6A

8P8C OUTLETS

ACTIVE FOR

TELEPHONY/DATA

FOUR POSITION

FACEPLATE

MOUNTED ON

SINGLE GANG

WORKBOX.

1 2

3 4

LENGTH AS

REQUIRED

CABLE TRAY DIVIDER,

CABLOFIL COT54 OR

EQUIVALENT

DIVIDER JUNCTION,

CABLOFIL COTJ OR

EQUIVALENT

NOTE 2

MANUFACTURER

APPROVED FASTENER

NOTE 1

NOTE 1

DETAILS NOTES

NOTE 1. REFERENCE TELECOMMUNICATIONS

WAO AND CABLE TRAY SCHEDULE ON

ET701 FOR DIMENSIONS.

NOTE 2. CABLE TRAY DIVIDER SHALL BE EQUAL

HEIGHT OF CABLE TRAY. QUANTITY OF

DIVIDERS TO BE DETERMINED BY

NUMBER OF SPECIAL SYSTEMS

ROUTED THROUGH CABLE TRAY.

CONTRACTOR SHALL ASSUME A

MINIMUM OF 4 DIVIDERS PER TRAY.

FRONT PROFILE

NOTE 1

NOTE 1

CABLOFIL WIRE BASKET CABLE TRAY

BY LEGRAND, OR APPROVED EQUAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:5

:2

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /V

A D

U

G E

N S

H E

E T

S

E L

S

D B

.r v t

E-501

ELECTRICAL DETAILS

JPB/WNM BCL

CONSTRUCTION

DOCUMENT

06/14/2024

557-21-703RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA

NTS

WORK AREA OUTLET WALL INSTALLATION DETAIL

ET101

1. ALL LABELING SHALL BE ANSI/TIA/EIA/606C COMPLIANT. BLACK LETTERING ON WHITE FIELD.

MACHINE PRINTED. FURTHER GUIDANCE ON ADMINISTRATION MAY BE SPECIFIED IN OTHER

SECTIONS OF THIS DESIGN PACKAGE.

2. TYPICAL WORK AREA OUTLET FACEPLATE WILL BE INSTALLED WITH CATEGORY 6A COMPONENT- COMPLIANT 8P8C MEDIA INTERFACE CONNECTORS (RJ45). EACH CONNECTOR WILL BE TERMINATED

TO HIGH QUALITY CATEGORY 6A HORIZONTAL CABLING WHICH WILL TERMINATE IN THE

TELECOMMUNICATIONS ROOM AS SPECIFIED ELSEWHERE IN THIS DESIGN PACKAGE. ALL

HORIZONTAL UTP SHALL BE CATEGORY 6A AND TERMINATED TO T568B.

3. TYPICAL FACEPLATE WILL BE INSTALLED WITH TWO (2) RJ45s. HIGH DENSITY FACEPLATES WILL BE INSTALLED WITH FOUR (4) RJ45s.

4. FACEPLATE MATERIAL AND COLOR TO MATCH EXISTING.

GENERAL NOTES

- NTS

2 DATA CABLING TERMINATION DETAIL

FIRE STOP SPEED

SLEEVE, 4" HILTI, OR

APPROVED EQUAL

INSTALL PER THE

SPECIFICATIONS AND

MANUFACTURER'S

REQUIREMENTS AS REQUIRED

- NTS

4 TYPICAL HIGH DENSITY WALL MOUNTED WORK AREA OUTLET CONFIGURATION

- NTS

5 STANDARD DENSITY WALL MOUNTED WORK AREA OUTLET CONFIGURATION

NTS

WIRE BASKET CABLE TRAY WITH DIVIDER

ET101

E-402

NTS

TYPICAL FIRE STOP SLEEVE DETAIL

E-402

Revisions: Date:

CONSTRUCTION

DOCUMENTS

WHEN USING CONTROLS IN

SINGLE LOCATION

INSTALLATIONS, TIGHTEN THE

BLUE TERMINAL OR CAP BLUE

WIRE. DO NOT CONNECT THE

BLUE TERMINAL/WIRE TO ANY

OTHER WIRE OR TO GROUND.

BLUE

BLACK BLACK

BARE

OCCUPANCY

SENSOR SWITCH

LOAD

WHITE

GROUND

HOT/LIVE

120 V~ 50/60 Hz

NEUTRAL

BARE

BLACK

BLUE

WHITE WIRE WITH

GREEN SLEVE

DETAILS NOTE(S):

1. WHERE INDICATED ON PLANS, OCCUPANCY SWITCH SHALL HAVE DIMMING AND/OR 3-WAY CONTROLS.

TYPICAL

DATA

RACK

FIN. FLOOR

HORIZONTAL CAT6A

DISTRIBUTION AND

FIBER-OPTIC BACKBONE

CABLE TRAY, TYPICAL.

BOTTOM OF FLOOR OR ROOF ABOVE

LIGHT FIXTURE: LUMINAIRE SHALL BE +9'6" AFF.

LIGHT MOUNTING LOCATION IS DIAGRAMMATIC;

CONTRACTOR SHALL COORDINATE EXACT

MOUNTING HEIGHT AND PLACEMENT WITH ALL

OBSTRUCTIONS INCLUDING CABLE TRAY, RACKS

AND ARCHITECTURAL FEATURES.

84"

6" MIN

F L O

O R

T O

U N

D E

R S

ID

E

S T

R U

C T

U R

E

TERMINATION

PLUG

CAT OS CAT

OCCUPANCY

SENSOR

(QTY AS

NEEDED)

POWER

PACK

A-SIDE

SWITCHING

(QTY AS

NEEDED)

A-SIDE

LIGHTING

LOAD

(QTY AS

NEEDED)

POWER AND

0-10V CONTROL

CAT

POWER

PACK

B-SIDE

SWITCHING

(QTY AS

NEEDED)

B-SIDE

LIGHTING

LOAD

(QTY AS

NEEDED)

POWER AND

0-10V CONTROL

CAT

PROGRAMMING

INTERFACE

MODULE

CAT

WALL STATION

(QTY AS

NEEDED)

CAT

TERMINATION

PLUG

DETAIL NOTE(S):

1.DETAIL IS FOR REFERENCE ONLY TO INDICATE FUNCTIONALITY. COORDINATE WITH LIGHTING CONTROL MANUFACTURER FOR EXACT DEVICE AND WIRING REQUIREMENTS. PLANS INDICATE CONTROL DEVICES SUCH AS WALL STATIONS AND OCCUPANCY SENSORS; POWER PACKS ARE NOT INCLUDED ON PLANS AND SHALL BE PROVIDED AS REQUIRED FOR SELECTED CONTROL SYSTEM. PROVIDE ALL DEVICES AND WIRING AS REQUIRED

FOR A COMPLETE AND FULLY FUNCTIONAL LIGHTING CONTROL SYSTEM.

2. ALL SPACES SHALL INCLUDE DIMMABLE CONTROLS AND LUMINAIRES.

120-277V 120-277V

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:5

:3

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /V

A D

U

G E

N S

H E

E T

S

E L

S

D B

.r v t

E-502

ELECTRICAL DETAILS

JPB/WNM BCL

CONSTRUCTION

DOCUMENT

06/14/2024

557-21-703RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA

NTS

TYPICAL RECESSED LIGHTING INSTALLATION

EL101

NTS

TYPICAL EXIT SIGN INSTALLATION

EL101

NTS

WALL SWITCH OCCUPANCY SENSOR

EL101

E-401

Revisions: Date:

3/4" = 1'-0"

TYPICAL TELECOMMUNICATIONS ROOM ELEVATION

E-401

NTS

TYPICAL LIGHTING CONTROL WIRING DIAGRAM

EL101

- NTS

1 NOT USED

IRREVERSIBLE

COMPRESSION

CONNECTION

RACK BONDING

CONDUCTOR

(6 AWG)

TEBC

(TELECOMMUNICATIONS

EQUIPMENT BONDING

CONDUCTOR - 4 AWG)

RACK BONDING CONDUCTOR (6 AWG)

UNIT BONDING CONDUCTOR (6 AWG)

TOP-MOUNTED

RACK BONDING

BUSBAR

IRREVERSIBLE CRIMP

CONNECTOR, TYP.

GROUND TO PRIMARY

BONDING BUSBAR.

COORDINATE WITH VA

FOR EXACT

CONDUCTOR ROUTING

TWO-HOLE COMPRESSION LUGS (RACKS SHALL NOT

BE MODIFIED IF ONLY ONE-HOLE IS PROVIDED; USE

ONE-HOLE COMPRESSION LUGS IN THIS CASE)

TWO-HOLE

COMPRESSION LUGS (RACKS

SHALL NOT BE MODIFIED IF

ONLY ONE-HOLE IS PROVIDED;

USE ONE-HOLE COMPRESSION

LUGS IN THIS CASE)

RACK ISOLATION PADS

CHATSWORTH PRODUCTS

#40158-012, OR APPROVED

EQUAL

MOUNTING BRACKETS

1/4" THICK

L= 12"

D

INSULATOR

TELECOMMUNICATIONS

EQUIPMENT BONDING

CONDUCTOR (TEBC) AWG

IRREVERSIBLE CRIMP

CONNECTOR, TYP.

CABLE TRAY BONDING

CONDUCTOR. TYPICAL AT

EACH SECTION

CONNECTION POINT

TO PRIMARY OR SECONDARY

BONDING BUSBAR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:5

:3

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /V

A D

U

G E

N S

H E

E T

S

E L

S

D B

.r v t

E-503

ELECTRICAL DETAILS

JPB/WNM BCL

CONSTRUCTION

DOCUMENT

06/14/2024

557-21-703RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA

TELECOMMUNICATIONS

BONDING BUSBAR

ALL CONNECTIONS TO

BUSBAR SHALL BE (2) BOLT

MECHANICAL LUGS, TYP.

BONDING CONDUCTOR TO

BUILDING STEEL, #3/0 AWG

GREEN INSULATION W/YELLOW

TRACER

BONDING CONDUCTOR TO

RACEWAYS, CONDUITS,

WIREWAYS, CABLE TRAYS, #6

AWG GREEN INSULATION W/

YELLOW TRACER

BONDING CONDUCTOR TO

PANELBOARD(S) IN ROOM

PRESENT, #6 AWG GREEN

INSULATION W/ YELLOW TRACER

BONDING CONDUCTOR FROM

TELECOMMUNICATIONS

SECONDARY BONDING

BUSBAR TO

TELECOMMUNICATIONS

BONDING BACKBONE (IF NOT

PRESENT, BOND TO PRIMARY

SERVICE ENTRY MAIN

BUSBAR), #3/0 AWG GREEN

INSULATION W/YELLOW

TRACER

TELECOMMUNICATIONS BONDING

BACKBONE CONDUCTOR. PROVIDE WITH

GREEN INSULATION AND YELLOW

TRACER, SIZE PER TIA/ANSI STANDARDS

AS REQUIRED. WHERE EXISTING,

EXTEND AND REROUTE BACKBONE TO

AND FROM RELOCATED/EXPANDED

TELECOMMUNICATIONS ROOMS. IF NEW,

PROVIDE AS REQUIRED.

IRREVERSIBLE

CRIMP CONNECTOR,

UL LISTED

NTS

TELECOMMUNICATION RACK BONDING DETAIL

E-401

NTS

TELECOMMUNICATIONS BONDING BUSBAR

E-401

NTS

CABLE TRAY GROUNDING/BONDING REQUIREMENTS

ET101

E-402

- NTS

3 TELECOMMUNICATIONS ROOM BONDING DETAIL

4 NOT USED

PROVIDE BOND TO ELECTRO-

STATIC DISCHARGE FLOORING.

BONDING CONDUCTOR SHALL BE

12 AWG MIN'. PROVIDE AND

INSTALL PER MANUFACTURER'S

INSTRUCTIONS.

Revisions: Date:

LEG 1 LEG 2 LEG 1 LEG 2

AGROUPA

B

BGROUP AGROUP BGROUP

L21-30P SIDE B

REQUIRES A 208V, 30A, THREE-PHASE

CIRCUIT, TERMINATING IN A NEMA L21-30R

LOCKING RECEPTACLE.

L21-30P SIDE A

REQUIRES A 208V, 30A, THREE-PHASE

CIRCUIT, TERMINATING IN A NEMA

L21-30R LOCKING RECEPTACLE.

30A 3-PHASE ZONE PDU BASE

UNIT - REQUIRES TWO 30A 3-

PHASE (WYE) CIRCUITS WITH

L21-30R RECEPTACLES

PHASE Z PHASE Y PHASE X

RACK-MOUNTED 5KW, 208V UNINTERRUPTIBLE

POWER SUPPLY (UPS) WITH NEMA 20A L21-20P

INPUT AND L21-20R OUTPUT

RACK-MOUNT

UPS

RACKED

EQUIPMENT

RACKED

EQUIPMENT

PDU

A

PDU

B

PDU

A

PDU

BPSA PSB PSA PSB

LEG A LEG B

ZONE PDU

RACK-MOUNT

UPS

RACK/ENCLOSURE RACK/ENCLOSURE

SOURCE A 30A

RECEPTACLE

SOURCE B 30A

RECEPTACLE

REFERENCE

TN DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

REFERENCE

TN DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

- TYP.

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W ar ni n g C ri tic al

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W ar ni n g C ri tic al

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W ar ni n g C ri tic al

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

REQUIRES ONE (1) L21-20R

20A 120/208V 3øY

APC AP8861 RPDU OR EQUIVALENT; RACK

PDU 2G, METERED; L21-20 PLUG; THREE

PHASE; 120/208V INPUT; 20A; ZERO U, 5.7 KW,

208V, (36) C13 & (6) C19 & (2) 5-20 OUTLETS;

FOR USE IN TELECOMMUNICATION ROOMS

AND LOCATIONS WITH LEGACY 110V ONLY

EQUIPMENT

NOTE: USED IN TELECOMMUNICATIONS

ROOMS WHERE 110V DISTRIBUTION

USING NEMA 5-15 OR NEMA 5-20

RECEPTACLES ARE REQUIRED IN

ADDITION TO THE STANDARD 208V

FIGURE 1: IEC 60320 C14 PLUG CONNECTOR.

SOURCE: CISCO SYSTEMS INC. ILLUSTRATION

#113165

FIGURE 2: IEC 60320 C15 PLUG.

SOURCE: CISCO SYSTEMS INC. ILLUSTRATION

#113165

FOR INFORMATIONAL REFERENCE ONLY:

208V PDU TO BE COMPATIBLE WITH CISCO IEC C14-C15 CABINET JUMPER POWER CORD,

DEVICE CORDSET PART NUMBER CAB-C15-CBN.

RACK PDU END DEVICE END

CAB-C15-CBN DETAILS:

1. CORDSET RATED FOR 250VAC, 13A, 60 HZ, 120° C (248° F) AT COUPLER PINS.

2. MAXIMUM OVERALL LENGTH OF 4 FT.

3. VERIFY CORDSET COMPATIBILITY WITH 208VAC SOURCE POWER BEFORE CONNECTING

4. VERIFY DEVICE COMPATIBILITY WITH 208VAC INPUT POWER BEFORE CONNECTING.

DEVICE CORDSET

L21-20R

ENERGIZES

FIRST

TR RACK

PDU A

L21-20R

ENERGIZES

FIRST

TR RACK

PDU B

L21-20R

ENERGIZES

SECOND

TR RACK

PDU A

L21-20R

ENERGIZES

SECOND

TR RACK

PDU B

WHEN ONLY ONE ENCLOSURE IS

POWERED AT STANDARD

DENSITY, ONE A/B PAIR OF

L21-20 RECEPTACLES WILL

REMAIN UNUSED

GROUP

A

GROUP

B

GROUP

A

GROUP

B

O X

O Y

O Z

LEG 1 LEG 2 LEG 1 LEG 2

O Z

O X

O Y

O Y

O Z

O X

O X

O Y

O Z

PHASE

Z

PHASE

Y

PHASE

X

LEG 2

LEG 1

GRP A

GRP B

LEG 2

LEG 1

GRP A

GRP B

LEG 2

LEG 1

GRP A

GRP B

L21-30P

ZONE PDU

INPUT A

L21-30R

FIXED

POWER

SOURCE A

L21-30P

ZONE PDU

INPUT B

L21-30R

FIXED

POWER

SOURCE B

A

B

NOTE:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/1

/2

:5

:4

P

M

A u to d e s k D o c s /5

-2

-7

V

A G

A D u b lin E

H R

M T

A S

S /V

A D

U

G E

N S

H E

E T

S

E L

S

D B

.r v t

E-504

ELECTRICAL DETAILS

JPB/WNM BCL

CONSTRUCTION

DOCUMENT

06/14/2024

557-21-703RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER _ DUBLIN, GA

NTS

POWER ELEVATION AND SCHEMATIC FOR A TWO RACK TR

E-401

- NTS

2 208V RACK PDU FOR TRs

- NTS

CONNECTION DETAIL FOR 30A ZONE PDU UNIT SUPPLYING THREE-PHASE

20A (L21-20P) RACK PDU'S IN STANDARD DENSITY ENCLOSURES

- NTS

4 NOT USED