S06-Amendment 0004-Addendum-1-Drawings.pdf

PDF 379 KB Posted

Attached to
Y1DZ--Renovate Building 9A for EHRM Administration- EHRM Project 557-21-703 Carl Vinson VA Medical Center Dublin, GA 31021
Solicitation number
36C77626R0031_1
Issued by

About this file

This document is a construction drawing set for a renovation project at a U.S. Department of Veterans Affairs facility. The drawings are prepared by Spees Design Build (625 1st Ave, Suite 301, Seattle, WA 98104) and include Addendum 1 dated 3/25/2026.

The construction project involves two phased renovations on Level I: Phase I focuses on intravenous (IV) testing infrastructure, while Phase II adds classroom spaces. The facility includes 16 rooms with diverse functions including IV testing (rooms 103, 106), IV support (104), HAC (102), staff break area (107), mechanical and electrical spaces (101, 109, 116), restrooms (110-113), storage (114), change management (108), waiting alcove (105), and corridors (CR11-9, CR11-10). The drawings specify detailed finish schedules with materials including acoustic ceiling tiles, luxury vinyl tile (LVT-1, LVT-2), ceramic floor and base tiles, carpet tiles, painted finishes (PT-1, PT-2, PT-3), epoxy flooring, and rubber base in various configurations by room. Door schedules detail 20 doors ranging from 1'6" to 7'4" in width and 7'0" in height, with specifications for glazing types, hardware sets, and frame materials (wood or hollow metal). Wall construction includes standard metal stud framing with gypsum board in various configurations, with fire ratings and sound transmission class (STC) ratings specified. The project is fully sprinklered per the notation on the construction documents.

View the file

Other files

File Type Posted
S05-Tech Questions w responses-Amendment 0006-Dublin.pdf PDF
S06- Addendum 2-Dublin - Specifications.pdf PDF
S06-Amendment 0006 SF 30-Dublin.pdf PDF
S06-Amendment 0005-SF30-Dublin.pdf PDF
S06-Amendment 0004-Addendum-1-Specifications.pdf PDF
S06 - Amendment 0004-Additional Technical Responses -Dublin.pdf PDF
S06-Amendment 0004-SF30.pdf PDF
S06- Amendment 0004-Technical Responses - Dublin.pdf PDF
S06-Amendment 0004- Addendum 1 - Hazardous Materials Survey.pdf PDF
S06-Amendment 0003-due date ext-Dub.pdf PDF
S04-Site Visit Sign In Sheet-Dublin.pdf PDF
S06-36C77626R0031-Amendment 0002.pdf PDF
S06-36C77626R0031-Amendment 0001.pdf PDF
S02-RFP Attachment 24-Specifications- Part 2 of 5 - Section 09 06 00.pdf PDF
S02-RFP Attachment 5- Specifications part 1 of 5.pdf PDF
S02-RFP Attachment 7- Specifications part 3 of 5.pdf PDF
S02-RFP Attachment 15-Drawings-Dublin_Part6.pdf PDF
S02-RFP Attachment 21-Drawings-Dublin_Part12.pdf PDF
S02-RFP Attachment 22-Drawings-Dublin_Part13.pdf PDF
S02 - RFP Attachment 3 - Limitations on Subcontracting - Dublin.docx DOCX document
S02-RFP Attachment 9- Specifications part 5 of 5.pdf PDF
S02-RFP Attachment 12-Drawings-Dublin_Part3.pdf PDF
S02-RFP Attachment 14-Drawings-Dublin_Part5.pdf PDF
S02-RFP Attachment 17-Drawings-Dublin_Part8.pdf PDF
S02-RFP Attachment 18-Drawings-Dublin_Part9.pdf PDF
S02-RFP Attachment 20-Drawings-Dublin_Part11.pdf PDF
S02-RFP Attachment 2 Site Visit Information-Dublin.docx DOCX document
S02-RFP Attachment 4 Campus Map-Dublin.pdf PDF
S02-RFP Attachment 8- Specifications part 4 of 5.pdf PDF
S02-RFP Attachment 10- Drawings-Dublin_Part1.pdf PDF
S02-RFP Attachment 11-Drawings-Dublin_Part2.pdf PDF
S02-RFP Attachment 23-Drawings-Dublin_Part14.pdf PDF
S02-36C77626R0031_1-final.pdf PDF
S02-RFP Attachment 1 DBA Rates-Laurens County-Dublin.pdf PDF
S02-RFP Attachment 6- Specifications part 2 of 5.pdf PDF
S02-RFP Attachment 13-Drawings-Dublin_Part4.pdf PDF
S02-RFP Attachment 16-Drawings-Dublin_Part7.pdf PDF
S02-RFP Attachment 19-Drawings-Dublin_Part10.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

CHANGE MGMT

USER

IV SUPPORT

MECHANICAL

HAC

STORAGE

IV TESTING

IV TESTING

TR

STAFF BREAK

WAITING ALCOVE

RESTROOM

CORRIDOR

CR11-9

ELECTRICAL ROOM

RESTROOM

RESTROOM

RESTROOM

MECHANICAL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

ELECTRICAL

MECH

CHANGE MGMT

USER

RESTROOM

TR ROOM

HAC

CLASSROOM

103A

CLASSROOM

103B

CLASSROOM

104A

CLASSROOM

106A

CLASSROOM

106B

STAFF BREAK

RESTROOM

RESTROOM

RESTROOM

STORAGE

CORRIDOR

CR11-9

MECHANICAL

102A

ELECTRICAL

CLOSET

WAITING

ALCOVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS201

PHASING PLAN

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

GENERAL NOTES

1. MAINTAIN STAFF ACCESS TO LEVEL 02 THROUGH STAIR

ENTRANCE.

2. PROJECT TO BE COMPLETED IN ONE PHASE - REFER TO

PHASE II FOR SIGNAGE AND FURNITURE CONFIGURATIONS.

Revisions: Date:

ADDENDUM 1 3/25/2026

3/32" = 1'-0"

LEVEL I - PHASE I - IV TESTING

3/32" = 1'-0"

LEVEL 1 - PHASE II - CLASSROOMS

PROJECT

NORTH

TRUE NORTH

(DASHED)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

CHANGE

MGMT

USER

IV

SUPPORT

MECHANICAL

HAC

STORAGE

IV

TESTING

IV

TESTING

TR

STAFF

BREAK

WAITING

ALCOVE

RESTROOM

ELECTRICAL

ROOM

CORRIDOR

CR11-9

RESTROOM

RESTROOM

RESTROOM

MECHANICAL

ELECTRICAL

CLOSET

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-2

LVT-2

LVT-2

LVT-2

ACT ACOUSTICAL CEILING TILE

CBT CERAMIC BASE TILE

CFT CERAMIC FLOOR TILE

CPT CARPET TILE

CWT CERAMIC WALL TILE

GYP GYPSUM BOARD

LVT LUXURY VINYL TILE

PT PAINT

EP EPOXY

EXP EXPOSED

RB RUBBER BASE

PRB PREMIUM RUBBER BASE

WC WALL COVERING

PLAM PLASTIC LAMINATE

SDSF SOLID SURFACE

FINISH ABBREVIATIONS

FINISH PLAN LEGEND

LVT-1

LVT-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

A-601

FINISH SCHEDULE

009A

MC EB

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

Revisions: Date:

ADDENDUM 1 3/25/2026

PHASE I - ROOM FINISH SCHEDULE

ROOM # ROOM NAME

CEILING

FINISH

FLOOR

FINISH

BASE WAINSCOT WALL FINISH

COMMENTSMAT HT MAT HT EAST NORTH SOUTH WEST

100 TR -- EXP RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2 APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOORING

101 MECHANICAL -- EXP RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2

102 HAC ACT-1 EP-1 RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2

103 IV TESTING ACT-1 CPT-1 RB-1 4" -- -- PT-2 PT-2 PT-3 PT-2 PT-3 (ACCENT) ON SOUTH WALL

103A STG

104 IV SUPPORT ACT-1 CPT-1 RB-1 4" -- -- PT-2 PT-2 PT-3 PT-2 PT-3 (ACCENT) ON SOUTH WALL

105 WAITING ALCOVE GYP LVT-1 RB-1 4" -- -- PT-1 PT-1 PT-1 PT-1

106 IV TESTING ACT-1 CPT-1 RB-1 4" -- -- PT-2 PT-2 PT-3 PT-2 PT-3 (ACCENT) ON SOUTH WALL

107 STAFF BREAK ACT-1 LVT-2 RB-1 4" -- -- PT-3 PT-1 PT-1 PT-1 PLAM-1, SDSF-1, PT-3 (ACCENT) ON EAST WALL

108 CHANGE MGMT USER ACT-1 CPT-1 RB-1 4" -- -- PT-2 PT-2 PT-3 PT-2 PT-3, (ACCENT) ON SOUTH WALL

109 MECHANICAL -- EXP RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2

110 RESTROOM ACT-1 CFT-1 CTB-1 4" CWT-1 4' - 0" PT-2 PT-2 PT-2 PT-2 REFERENCE AE424 FOR TILE ELEVATIONS

111 RESTROOM ACT-1 CFT-1 CTB-1 4" CWT-1 4' - 0" PT-2 PT-2 PT-2 PT-2 REFERENCE AE424 FOR TILE ELEVATIONS

112 RESTROOM ACT-1 CFT-1 CTB-1 4" CWT-1 4' - 0" PT-2 PT-2 PT-2 PT-2 REFERENCE AE424 FOR TILE ELEVATIONS

113 RESTROOM ACT-1 CFT-1 CTB-1 4" CWT-1 4' - 0" PT-2 PT-2 PT-2 PT-2 REFERENCE AE424 FOR TILE ELEVATIONS

114 STORAGE ACT-1 EP-1 RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2

115 ELECTRICAL CLOSET -- EP-1 RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2

116 ELECTRICAL ROOM -- EP-1 RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2

CR11-9 CORRIDOR ACT-1 LVT-1 / LVT-2 PRB-1 4" -- -- PT-1 PT-1 PT-1 PT-1

CR11-10 CORRIDOR ACT-1 LVT-1 / LVT-2 PRB-1 4" -- -- PT-1 PT-1 PT-1 PT-1

1/8" = 1'-0"

FLOOR PLAN - PHASE I - FINISH PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

01 03

5/8" 3 5/8" 5/8"

STRUCTURE ABV

5/8" 3 5/8" 5/8"

" FINISH CLG

FINISH FLOOR

TYPE 'X' GYP

STEEL STUD

FRAMING

TYPE 'X' GYP

TYPE 'X' GYP

STEEL STUD

FRAMING

TYPE 'X' GYP

TYPE 'X' GYP

STEEL STUD

FRAMING

5/8" 3 5/8"

1A

9" 4"

2A

GLAZING

1B

LOUVER PER

SCHEDULE

DOOR HEIGHTS AND WIDTHS PER SCHEDULE

9" 9"

2B

9" 9"

GLAZING

TYPE 'X' GYP

CT-3

CT-2

CONCRETE

BACKER BOARD

STEEL STUD

FRAMING

CT-1

EXISTING WALL

CT-3

CT-2

CONCRETE

BACKER BOARD

TYPE 'X' GYP

CT-1

STEEL STUD

FRAMING

TYPE 'X' GYP

TYPE 'X' GYP

STRUCTURE ABV

FINISH CEILING

FINISH FLOOR

5/8" 5 5/8" 5/8" 5/8" 5/8" 3 5/8" 5/8"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

A-602

DOOR AND ASSEMBLY SCHEDULE

009A

MC EB

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

GENERAL NOTES

2. ROOM FINISHES WILL NOT BE IMPACTED BY PHASE II

SCOPE OF WORK. CONTRACTORS SHOULD BE CAREFUL

NOT TO DAMAGE ROOM FINISHES WHEN TRANSITIONING TO

PHASE II.

Revisions: Date:

ADDENDUM 1 3/25/2026

PHASE I - DOOR SCHEDULE

MARK ROOM # ROOM NAME

DOOR SIZE DOOR

TYPE

GLAZING

TYPE

HW

SET

MATERIAL FIRE

RATING

STC

RATING COMMENTSWIDTH HT DOOR FRAME

100 100 TR 3' - 0" 7' - 0" 1A 5D HM HM

101 101 MECHANICAL 3' - 0" 7' - 0" 1B 5D HM HM

102 102 HAC 3' - 6" 7' - 0" 1A 5D WOOD HM

103A 103 IV TESTING 3' - 0" 7' - 0" 2A 4 WOOD HM

103B 103 IV TESTING 3' - 0" 7' - 0" 2A 4 WOOD HM

104A 104 IV SUPPORT 3' - 0" 7' - 0" 2A 4 WOOD HM

104B 104 IV SUPPORT 3' - 0" 7' - 0" 2A 4 WOOD HM

106A 106 IV TESTING 3' - 0" 7' - 0" 2A 4 WOOD HM

106B 106 IV TESTING 3' - 0" 7' - 0" 2A 4 WOOD HM

107 107 STAFF BREAK 3' - 0" 7' - 0" 2A 1 WOOD HM

108 108 CHANGE MGMT USER 5' - 0" 7' - 0" 2A 4 WOOD HM

109 109 MECHANICAL 3' - 0" 7' - 0" 1B 5D HM HM

110 110 RESTROOM 3' - 0" 7' - 0" 1A 2 WOOD HM

111 111 RESTROOM 3' - 0" 7' - 0" 1A 2 WOOD HM

112 112 RESTROOM 3' - 0" 7' - 0" 1A 2 WOOD HM

113 113 RESTROOM 3' - 10" 7' - 0" 1A 2 WOOD HM

114 114 STORAGE 3' - 8" 7' - 0" 1A 5 WOOD HM

115 115 ELECTRICAL CLOSET 5' - 0" 7' - 0" 1A 11 HM HM

116 116 ELECTRICAL ROOM 3' - 0" 7' - 0" 1A 5D HM HM

117 103A STG 5' - 0" 7' - 0" 1A 11 WOOD HM

118 CR11-9 CORRIDOR 1' - 8" 7' - 0" 1A EXST HM HM REPLACE DOOR LEAF, USE EXISTING DOOR HARDWARE OR REPLACE WITH LIKE

119 CR11-9 CORRIDOR 1' - 6" 7' - 0" 1A EXST HM HM REPLACE DOOR LEAF, USE EXISTING DOOR HARDWARE OR REPLACE WITH LIKE

120 CR11-9 CORRIDOR 3' - 8" 7' - 0" 2B EXST HM HM REPLACE DOOR LEAF, USE EXISTING DOOR HARDWARE OR REPLACE WITH LIKE

121 CR11-9 CORRIDOR 7' - 4" 7' - 0" 2B FR EXST HM HM 1-1/2 HR REPLACE DOOR LEAF, USE EXISTING DOOR HARDWARE OR REPLACE WITH LIKE, DOUBLE EGRESS

1. EXAMPLE PARTITION CODE: 09P4107b

09 - SPECIFICATION CATEGORY

P - DETAIL TYPE CATEGORY

4 - NOMINAL SIZE

1 - PARTITION CATEGORY

07 - SEQUENCE NUMBER

b - FIRE / SMOKE RATING

SPECIFICATION CATEGORY

03 CONCRETE

04 MASONRY

09 METAL STUD

DETAIL TYPE CATEGORY

P PARTITION

NOMINAL SIZE

1 SIZE 1"

2 SIZE 2"

4 SIZE 4"

6 SIZE 6"

8 SIZE 8"

PARTITION CATEGORY

1 WITHOUT INSULATION

2 WITH INSULATION

3 TILE

4 LEAD LINED

5 SECURITY MESH

6 USER DEFINED/COMBOS

7 USER DEFINED/COMBOS

FIRE / SMOKE / SOUND RATING

a SMOKE RATED b 1HR FIRE RATED c 1HR FIRE & SMOKED RATED d 2HR FIRE RATED e 2HR FIRE & SMOKE RATED f SOUND RATED g SOUND & SMOKE RATED h SOUND & 1HR FIRE RATED i SOUND & 1HR FIRE & SMOKE RATED j SOUND & 2HR FIRE RATED k SOUND & 2HR FIRE & SMOKE RATED

WALL SCHEDULE

MARK

PARTITION

CODE DESCRIPTION WIDTH

FIRE RATING SOUND RATING

COMMENTSFR SOURCE STC SOURCE

01 09P4101 3-5/8" MTL STUD, 5/8" GYP EA SIDE, "6 ABV CLG 0' - 4 7/8"

03 09P4103 3-5/8" MTL STUD, 5/8" GYP EA SIDE, FULL HEIGHT 0' - 4 7/8"

04 09P4104 3-5/8" MTL STUD, 5/8" GYP ONE SIDE, FULL

HEIGHT

0' - 4 1/4"

05 09P4103 5-5/8" MTL STUD, 5/8" GYP EA SIDE, FULL HEIGHT 0' - 6 7/8"

90 09P4101 EXISTING WALL, 5/8" GYP ONE SIDE, TILE ONE

SIDE, "6 ABV CLG

<varies>

93 09P4101 3-5/8" MTL STUD, 5/8" GYP EA SIDE, TILE ONE

SIDE, "6 ABV CLG

0' - 5 3/16"

1" = 1'-0"

WALL TYPES

1/4" = 1'-0"

DOOR TYPES

1" = 1'-0"

WALL TYPES CONT.

Sheets
A-601 - FINISH SCHEDULE
A-602 - DOOR AND ASSEMBLY SCHEDULE
GS201 - PHASING PLAN

File details come from the government source that posted it. Updated .