This document is a construction drawing set for a renovation project at a U.S. Department of Veterans Affairs facility. The drawings are prepared by Spees Design Build (625 1st Ave, Suite 301, Seattle, WA 98104) and include Addendum 1 dated 3/25/2026.
The construction project involves two phased renovations on Level I: Phase I focuses on intravenous (IV) testing infrastructure, while Phase II adds classroom spaces. The facility includes 16 rooms with diverse functions including IV testing (rooms 103, 106), IV support (104), HAC (102), staff break area (107), mechanical and electrical spaces (101, 109, 116), restrooms (110-113), storage (114), change management (108), waiting alcove (105), and corridors (CR11-9, CR11-10). The drawings specify detailed finish schedules with materials including acoustic ceiling tiles, luxury vinyl tile (LVT-1, LVT-2), ceramic floor and base tiles, carpet tiles, painted finishes (PT-1, PT-2, PT-3), epoxy flooring, and rubber base in various configurations by room. Door schedules detail 20 doors ranging from 1'6" to 7'4" in width and 7'0" in height, with specifications for glazing types, hardware sets, and frame materials (wood or hollow metal). Wall construction includes standard metal stud framing with gypsum board in various configurations, with fire ratings and sound transmission class (STC) ratings specified. The project is fully sprinklered per the notation on the construction documents.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
CHANGE MGMT
USER
IV SUPPORT
MECHANICAL
HAC
STORAGE
IV TESTING
IV TESTING
TR
STAFF BREAK
WAITING ALCOVE
RESTROOM
CORRIDOR
CR11-9
ELECTRICAL ROOM
RESTROOM
RESTROOM
RESTROOM
MECHANICAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
ELECTRICAL
MECH
CHANGE MGMT
USER
RESTROOM
TR ROOM
HAC
CLASSROOM
103A
CLASSROOM
103B
CLASSROOM
104A
CLASSROOM
106A
CLASSROOM
106B
STAFF BREAK
RESTROOM
RESTROOM
RESTROOM
STORAGE
CORRIDOR
CR11-9
MECHANICAL
102A
ELECTRICAL
CLOSET
WAITING
ALCOVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GS201
PHASING PLAN
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
GENERAL NOTES
1. MAINTAIN STAFF ACCESS TO LEVEL 02 THROUGH STAIR
ENTRANCE.
2. PROJECT TO BE COMPLETED IN ONE PHASE - REFER TO
PHASE II FOR SIGNAGE AND FURNITURE CONFIGURATIONS.
Revisions: Date:
ADDENDUM 1 3/25/2026
3/32" = 1'-0"
LEVEL I - PHASE I - IV TESTING
3/32" = 1'-0"
LEVEL 1 - PHASE II - CLASSROOMS
PROJECT
NORTH
TRUE NORTH
(DASHED)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
CHANGE
MGMT
USER
IV
SUPPORT
MECHANICAL
HAC
STORAGE
IV
TESTING
IV
TESTING
TR
STAFF
BREAK
WAITING
ALCOVE
RESTROOM
ELECTRICAL
ROOM
CORRIDOR
CR11-9
RESTROOM
RESTROOM
RESTROOM
MECHANICAL
ELECTRICAL
CLOSET
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-2
LVT-2
LVT-2
LVT-2
ACT ACOUSTICAL CEILING TILE
CBT CERAMIC BASE TILE
CFT CERAMIC FLOOR TILE
CPT CARPET TILE
CWT CERAMIC WALL TILE
GYP GYPSUM BOARD
LVT LUXURY VINYL TILE
PT PAINT
EP EPOXY
EXP EXPOSED
RB RUBBER BASE
PRB PREMIUM RUBBER BASE
WC WALL COVERING
PLAM PLASTIC LAMINATE
SDSF SOLID SURFACE
FINISH ABBREVIATIONS
FINISH PLAN LEGEND
LVT-1
LVT-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-601
FINISH SCHEDULE
009A
MC EB
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
Revisions: Date:
ADDENDUM 1 3/25/2026
PHASE I - ROOM FINISH SCHEDULE
ROOM # ROOM NAME
CEILING
FINISH
FLOOR
FINISH
BASE WAINSCOT WALL FINISH
COMMENTSMAT HT MAT HT EAST NORTH SOUTH WEST
100 TR -- EXP RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2 APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOORING
101 MECHANICAL -- EXP RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2
102 HAC ACT-1 EP-1 RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2
103 IV TESTING ACT-1 CPT-1 RB-1 4" -- -- PT-2 PT-2 PT-3 PT-2 PT-3 (ACCENT) ON SOUTH WALL
103A STG
104 IV SUPPORT ACT-1 CPT-1 RB-1 4" -- -- PT-2 PT-2 PT-3 PT-2 PT-3 (ACCENT) ON SOUTH WALL
105 WAITING ALCOVE GYP LVT-1 RB-1 4" -- -- PT-1 PT-1 PT-1 PT-1
106 IV TESTING ACT-1 CPT-1 RB-1 4" -- -- PT-2 PT-2 PT-3 PT-2 PT-3 (ACCENT) ON SOUTH WALL
107 STAFF BREAK ACT-1 LVT-2 RB-1 4" -- -- PT-3 PT-1 PT-1 PT-1 PLAM-1, SDSF-1, PT-3 (ACCENT) ON EAST WALL
108 CHANGE MGMT USER ACT-1 CPT-1 RB-1 4" -- -- PT-2 PT-2 PT-3 PT-2 PT-3, (ACCENT) ON SOUTH WALL
109 MECHANICAL -- EXP RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2
110 RESTROOM ACT-1 CFT-1 CTB-1 4" CWT-1 4' - 0" PT-2 PT-2 PT-2 PT-2 REFERENCE AE424 FOR TILE ELEVATIONS
111 RESTROOM ACT-1 CFT-1 CTB-1 4" CWT-1 4' - 0" PT-2 PT-2 PT-2 PT-2 REFERENCE AE424 FOR TILE ELEVATIONS
112 RESTROOM ACT-1 CFT-1 CTB-1 4" CWT-1 4' - 0" PT-2 PT-2 PT-2 PT-2 REFERENCE AE424 FOR TILE ELEVATIONS
113 RESTROOM ACT-1 CFT-1 CTB-1 4" CWT-1 4' - 0" PT-2 PT-2 PT-2 PT-2 REFERENCE AE424 FOR TILE ELEVATIONS
114 STORAGE ACT-1 EP-1 RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2
115 ELECTRICAL CLOSET -- EP-1 RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2
116 ELECTRICAL ROOM -- EP-1 RB-1 4" -- -- PT-2 PT-2 PT-2 PT-2
CR11-9 CORRIDOR ACT-1 LVT-1 / LVT-2 PRB-1 4" -- -- PT-1 PT-1 PT-1 PT-1
CR11-10 CORRIDOR ACT-1 LVT-1 / LVT-2 PRB-1 4" -- -- PT-1 PT-1 PT-1 PT-1
1/8" = 1'-0"
FLOOR PLAN - PHASE I - FINISH PLAN
PROJECT
NORTH
TRUE NORTH
(DASHED)
01 03
5/8" 3 5/8" 5/8"
STRUCTURE ABV
5/8" 3 5/8" 5/8"
" FINISH CLG
FINISH FLOOR
TYPE 'X' GYP
STEEL STUD
FRAMING
TYPE 'X' GYP
TYPE 'X' GYP
STEEL STUD
FRAMING
TYPE 'X' GYP
TYPE 'X' GYP
STEEL STUD
FRAMING
5/8" 3 5/8"
1A
9" 4"
2A
GLAZING
1B
LOUVER PER
SCHEDULE
DOOR HEIGHTS AND WIDTHS PER SCHEDULE
9" 9"
2B
9" 9"
GLAZING
TYPE 'X' GYP
CT-3
CT-2
CONCRETE
BACKER BOARD
STEEL STUD
FRAMING
CT-1
EXISTING WALL
CT-3
CT-2
CONCRETE
BACKER BOARD
TYPE 'X' GYP
CT-1
STEEL STUD
FRAMING
TYPE 'X' GYP
TYPE 'X' GYP
STRUCTURE ABV
FINISH CEILING
FINISH FLOOR
5/8" 5 5/8" 5/8" 5/8" 5/8" 3 5/8" 5/8"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-602
DOOR AND ASSEMBLY SCHEDULE
009A
MC EB
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
GENERAL NOTES
2. ROOM FINISHES WILL NOT BE IMPACTED BY PHASE II
SCOPE OF WORK. CONTRACTORS SHOULD BE CAREFUL
NOT TO DAMAGE ROOM FINISHES WHEN TRANSITIONING TO
PHASE II.
Revisions: Date:
ADDENDUM 1 3/25/2026
PHASE I - DOOR SCHEDULE
MARK ROOM # ROOM NAME
DOOR SIZE DOOR
TYPE
GLAZING
TYPE
HW
SET
MATERIAL FIRE
RATING
STC
RATING COMMENTSWIDTH HT DOOR FRAME
100 100 TR 3' - 0" 7' - 0" 1A 5D HM HM
101 101 MECHANICAL 3' - 0" 7' - 0" 1B 5D HM HM
102 102 HAC 3' - 6" 7' - 0" 1A 5D WOOD HM
103A 103 IV TESTING 3' - 0" 7' - 0" 2A 4 WOOD HM
103B 103 IV TESTING 3' - 0" 7' - 0" 2A 4 WOOD HM
104A 104 IV SUPPORT 3' - 0" 7' - 0" 2A 4 WOOD HM
104B 104 IV SUPPORT 3' - 0" 7' - 0" 2A 4 WOOD HM
106A 106 IV TESTING 3' - 0" 7' - 0" 2A 4 WOOD HM
106B 106 IV TESTING 3' - 0" 7' - 0" 2A 4 WOOD HM
107 107 STAFF BREAK 3' - 0" 7' - 0" 2A 1 WOOD HM
108 108 CHANGE MGMT USER 5' - 0" 7' - 0" 2A 4 WOOD HM
109 109 MECHANICAL 3' - 0" 7' - 0" 1B 5D HM HM
110 110 RESTROOM 3' - 0" 7' - 0" 1A 2 WOOD HM
111 111 RESTROOM 3' - 0" 7' - 0" 1A 2 WOOD HM
112 112 RESTROOM 3' - 0" 7' - 0" 1A 2 WOOD HM
113 113 RESTROOM 3' - 10" 7' - 0" 1A 2 WOOD HM
114 114 STORAGE 3' - 8" 7' - 0" 1A 5 WOOD HM
115 115 ELECTRICAL CLOSET 5' - 0" 7' - 0" 1A 11 HM HM
116 116 ELECTRICAL ROOM 3' - 0" 7' - 0" 1A 5D HM HM
117 103A STG 5' - 0" 7' - 0" 1A 11 WOOD HM
118 CR11-9 CORRIDOR 1' - 8" 7' - 0" 1A EXST HM HM REPLACE DOOR LEAF, USE EXISTING DOOR HARDWARE OR REPLACE WITH LIKE
119 CR11-9 CORRIDOR 1' - 6" 7' - 0" 1A EXST HM HM REPLACE DOOR LEAF, USE EXISTING DOOR HARDWARE OR REPLACE WITH LIKE
120 CR11-9 CORRIDOR 3' - 8" 7' - 0" 2B EXST HM HM REPLACE DOOR LEAF, USE EXISTING DOOR HARDWARE OR REPLACE WITH LIKE
121 CR11-9 CORRIDOR 7' - 4" 7' - 0" 2B FR EXST HM HM 1-1/2 HR REPLACE DOOR LEAF, USE EXISTING DOOR HARDWARE OR REPLACE WITH LIKE, DOUBLE EGRESS
1. EXAMPLE PARTITION CODE: 09P4107b
09 - SPECIFICATION CATEGORY
P - DETAIL TYPE CATEGORY
4 - NOMINAL SIZE
1 - PARTITION CATEGORY
07 - SEQUENCE NUMBER
b - FIRE / SMOKE RATING
SPECIFICATION CATEGORY
03 CONCRETE
04 MASONRY
09 METAL STUD
DETAIL TYPE CATEGORY
P PARTITION
NOMINAL SIZE
1 SIZE 1"
2 SIZE 2"
4 SIZE 4"
6 SIZE 6"
8 SIZE 8"
PARTITION CATEGORY
1 WITHOUT INSULATION
2 WITH INSULATION
3 TILE
4 LEAD LINED
5 SECURITY MESH
6 USER DEFINED/COMBOS
7 USER DEFINED/COMBOS
FIRE / SMOKE / SOUND RATING
a SMOKE RATED b 1HR FIRE RATED c 1HR FIRE & SMOKED RATED d 2HR FIRE RATED e 2HR FIRE & SMOKE RATED f SOUND RATED g SOUND & SMOKE RATED h SOUND & 1HR FIRE RATED i SOUND & 1HR FIRE & SMOKE RATED j SOUND & 2HR FIRE RATED k SOUND & 2HR FIRE & SMOKE RATED
WALL SCHEDULE
MARK
PARTITION
CODE DESCRIPTION WIDTH
FIRE RATING SOUND RATING
COMMENTSFR SOURCE STC SOURCE
01 09P4101 3-5/8" MTL STUD, 5/8" GYP EA SIDE, "6 ABV CLG 0' - 4 7/8"
03 09P4103 3-5/8" MTL STUD, 5/8" GYP EA SIDE, FULL HEIGHT 0' - 4 7/8"
04 09P4104 3-5/8" MTL STUD, 5/8" GYP ONE SIDE, FULL
HEIGHT
0' - 4 1/4"
05 09P4103 5-5/8" MTL STUD, 5/8" GYP EA SIDE, FULL HEIGHT 0' - 6 7/8"
90 09P4101 EXISTING WALL, 5/8" GYP ONE SIDE, TILE ONE
SIDE, "6 ABV CLG
<varies>
93 09P4101 3-5/8" MTL STUD, 5/8" GYP EA SIDE, TILE ONE
SIDE, "6 ABV CLG
0' - 5 3/16"
1" = 1'-0"
WALL TYPES
1/4" = 1'-0"
DOOR TYPES
1" = 1'-0"
WALL TYPES CONT.
| Sheets |
| A-601 - FINISH SCHEDULE |
| A-602 - DOOR AND ASSEMBLY SCHEDULE |
| GS201 - PHASING PLAN |
File details come from the government source that posted it. Updated .