S02-RFP Attachment 10- Drawings-Dublin_Part1.pdf

PDF 2 MB Posted

Attached to
Y1DZ--Renovate Building 9A for EHRM Administration- EHRM Project 557-21-703 Carl Vinson VA Medical Center Dublin, GA 31021
Solicitation number
36C77626R0031_1
Issued by

About this file

This is a construction document set for the renovation of Building 9A at Carl Vinson VA Medical Center in Dublin, Georgia. The project, identified as 557-21-703, involves renovating administrative space for EHRM (Employee Health and Resource Management) and is being executed by Spees Design Build (625 1st Ave, Suite 301, Seattle, WA 98104) as the Architect/Engineer of Record. The renovation is structured in two phases: Phase I focuses on IV Testing areas, and Phase II addresses classroom spaces. The construction documents comprise 102 sheets organized by discipline, including general, architectural, structural, fire protection, mechanical, plumbing, and electrical plans.

The applicable standards and regulations governing this project include the International Building Code (2021), International Existing Building Code (2021), NFPA 101 Life Safety Code, National Electrical Code, International Plumbing Code (2021), VA Design Manual PG18-10, VA Seismic Design Requirements H-18-8, and various ASHRAE standards for ventilation and refrigeration systems. The project adheres to VA Master Construction Specifications (PG18-1), VA Design and Construction Procedures (PG18-3), and accessibility standards per the Architectural Barrier Act. Key design considerations include Infectious Control Risk Assessment (ICRA) protocols with temporary barriers and containment measures, fire life safety egress pathways with maximum travel distances of 155-175 feet to emergency exits, and smoke-rated wall separations. The documents indicate that the VA functions as the Authority Having Jurisdiction (AHJ) and is not subject to local building permit and inspection requirements, with all construction to comply with VA directives and technical specifications outlined in the Technical Information Library.

View the file

Other files

File Type Posted
S05-Tech Questions w responses-Amendment 0006-Dublin.pdf PDF
S06- Addendum 2-Dublin - Specifications.pdf PDF
S06-Amendment 0006 SF 30-Dublin.pdf PDF
S06-Amendment 0005-SF30-Dublin.pdf PDF
S06-Amendment 0004-Addendum-1-Specifications.pdf PDF
S06-Amendment 0004-Addendum-1-Drawings.pdf PDF
S06 - Amendment 0004-Additional Technical Responses -Dublin.pdf PDF
S06-Amendment 0004-SF30.pdf PDF
S06- Amendment 0004-Technical Responses - Dublin.pdf PDF
S06-Amendment 0004- Addendum 1 - Hazardous Materials Survey.pdf PDF
S06-Amendment 0003-due date ext-Dub.pdf PDF
S04-Site Visit Sign In Sheet-Dublin.pdf PDF
S06-36C77626R0031-Amendment 0002.pdf PDF
S06-36C77626R0031-Amendment 0001.pdf PDF
S02-RFP Attachment 24-Specifications- Part 2 of 5 - Section 09 06 00.pdf PDF
S02-RFP Attachment 5- Specifications part 1 of 5.pdf PDF
S02-RFP Attachment 7- Specifications part 3 of 5.pdf PDF
S02-RFP Attachment 15-Drawings-Dublin_Part6.pdf PDF
S02-RFP Attachment 21-Drawings-Dublin_Part12.pdf PDF
S02-RFP Attachment 22-Drawings-Dublin_Part13.pdf PDF
S02 - RFP Attachment 3 - Limitations on Subcontracting - Dublin.docx DOCX document
S02-RFP Attachment 9- Specifications part 5 of 5.pdf PDF
S02-RFP Attachment 12-Drawings-Dublin_Part3.pdf PDF
S02-RFP Attachment 14-Drawings-Dublin_Part5.pdf PDF
S02-RFP Attachment 17-Drawings-Dublin_Part8.pdf PDF
S02-RFP Attachment 18-Drawings-Dublin_Part9.pdf PDF
S02-RFP Attachment 20-Drawings-Dublin_Part11.pdf PDF
S02-RFP Attachment 2 Site Visit Information-Dublin.docx DOCX document
S02-RFP Attachment 4 Campus Map-Dublin.pdf PDF
S02-RFP Attachment 8- Specifications part 4 of 5.pdf PDF
S02-RFP Attachment 11-Drawings-Dublin_Part2.pdf PDF
S02-RFP Attachment 23-Drawings-Dublin_Part14.pdf PDF
S02-36C77626R0031_1-final.pdf PDF
S02-RFP Attachment 1 DBA Rates-Laurens County-Dublin.pdf PDF
S02-RFP Attachment 6- Specifications part 2 of 5.pdf PDF
S02-RFP Attachment 13-Drawings-Dublin_Part4.pdf PDF
S02-RFP Attachment 16-Drawings-Dublin_Part7.pdf PDF
S02-RFP Attachment 19-Drawings-Dublin_Part10.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECT

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

DESIGN TEAM

FIRE PROTECT

SPEES DESIGN BUILD

STRUCTURAL

REID MIDDLETON

ELECTRICAL

SPEES DESIGN BUILD

ENVIRON

SPEES DESIGN BUILD

PLUMBING

SPEES DESIGN BUILD

MECHANICAL

SPEES DESIGN BUILD

728 134TH ST SW, STE 200

EVERETT, WA 98204

PHONE: (425) 741-3800

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

PROJECT INFORMATION

STATE:

COUNTY:

JURISTICTION:

OWNER:

CODE ANALYSIS

PROJECT DESCRIPTION

THE PROPOSED DESIGN SHALL RENOVATE

EXISTING ADMINISTRATIVE SPACE WITHIN

BLDG 9A'S, FIRST FLOOR, TO FUNCTION

TEMPORARILY AS ELECTRONIC HEALTH

RECORDS MANAGEMENT (EHRM) TEACHING

AND SUPPORT SPACES (TASS) PER THE

SPACE PLANNING JOB AIDE REQUIREMENTS.

APPLICABLE BUILDING

BUILDING 9A

APPLICABLE FLOOR

FLOOR 1

APPLICABLE CLINIC

ADMINISTRATIVE

ICRA CLASS REQUIREMENTS

CONST TYPE:

CLINIC RISK:

CLASS REQS:

APPROX SQUARE FEET IN SCOPE

7,514 SF

TYPE C

LOWEST

CLASS II

GEORGIA

LAURENS

DUBLIN

GOV, VETERANS AFFAIRS

RESOURCE DOCUMENTS

ENVIRONMENTAL HAZARDOUS MATERIALS TEST REPORT PROVIDED BY TERRACON

ELECTRICAL METERING STUDY PROVIDED BY METROPOWER

CUTSHEETS PROVIDED BY SPEES

CALCULATIONS PROVIDED BY SPEES

COMMISSIONING PLAN PROVIDED BY DAVENERGY

GENERAL NOTES

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &

SPECIFICATIONS.

2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.

BRING TO THE AWARENESS OF, AND VERIFY WITH, VA COR PRIOR TO PROCEEDING.

3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE

TO VISIT THE SITE.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THE ATTENTION OF THE COR.

5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.

6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK

THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE

WITH THE CONTRACT DOCUMENTS.

APPLICABLE PUBLICATIONS

AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS OF CODE ENFORCEMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC). THE VA

SHALL FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ).

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION

GUIDE AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL). SEE ABOVE.

INTERNATIONAL BUILDING CODE (IBC) 2021.

INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021.

NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES PRECEDENCE OVER

IBC.

NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

NATIONAL ELECTRICAL CODE (NEC).

INTERNATIONAL PLUMBING CODE (IPC) 2021.

SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS

(ASME) A 17.1.

ASME BOILER AND PRESSURE VESSEL CODE.

ASME CODE FOR PRESSURE PIPING.

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR

STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).

ENERGY POLICY ACT OF 2005 (EPACT).

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR

PARTS 433,434 AND 435.

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND TRANSPORTATION

MANAGEMENT.

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS

SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2004.

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.

VAMC APPROVED HARDWARE LOCKING STANDARDS.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).

AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).

FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND STANDARDS FOR

TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION.

ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA).

INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE).

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND

INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI).

JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),

ENVIRONMENT OF CARE GUIDELINES AND STANDARDS.

FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE

DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES.

THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL

ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING

“ENVIRONMENTALLY RESPONSIBLE DESIGN”.

APPLICABLE VA STANDARDS

MASTER CONSTRUCTION SPECIFICATIONS (PG18-1)

DESIGN AND CONSTRUCTION PROCEDURES (PG18-3), TOPIC 1 - CODES, STANDARDS & EXECUTIVE ORDERS

SEPTEMBER 2013

EQUIPMENT GUIDE LISTS (PG18-5)

DESIGN MANUALS (PG18-10)

DESIGN GUIDES (PG18-12)

ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT BARRIER

FREE DESIGN GUIDE (PG18-13)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

G-001

COVER SHEET

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE BUILDING 9A FOR EHRM ADMINISTRATIVE SPACE

CARL VINSON VA MEDICAL CENTER, DUBLIN - GEORGIA

PROJECT #: 557-21-703

Revisions: Date:

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

01 OF 102 G-001 COVER SHEET

02 OF 102 GS101 FACILITY SITE PLAN

03 OF 102 GS201 PHASING PLAN

ARCHITECTURAL

04 OF 102 A-001 ARCH SYMBOLS, ABBREVIATIONS & GENERAL NOTES

05 OF 102 AS101 ICRA PLANS

06 OF 102 AS201 FIRE LIFE SAFETY

07 OF 102 AD001 DEMO PLAN - PHASE I - OVERALL

08 OF 102 AD002 DEMO PLAN - PHASE II - OVERALL

09 OF 102 AD011 DEMO CEILING PLAN - PHASE I - OVERALL

10 OF 102 AD101 DEMO PLAN - PHASE I - WEST

11 OF 102 AD102 DEMO PLAN - PHASE I - EAST

12 OF 102 AD103 DEMO PLAN - PHASE II - WEST

13 OF 102 AD104 DEMO PLAN - PHASE II - EAST

14 OF 102 AD111 DEMO CEILING PLAN - PHASE I - WEST

15 OF 102 AD112 DEMO CEILING PLAN - PHASE I - EAST

16 OF 102 AE001 FLOOR PLAN - PHASE I - OVERALL

17 OF 102 AE002 FLOOR PLAN - PHASE II - OVERALL

18 OF 102 AE101 FLOOR PLAN - PHASE I - WEST

19 OF 102 AE102 FLOOR PLAN - PHASE I - EAST

20 OF 102 AE103 FLOOR PLAN - PHASE II - WEST

21 OF 102 AE104 FLOOR PLAN - PHASE II - EAST

22 OF 102 AC001 CEILING PLAN - PHASE I - OVERALL

23 OF 102 AC101 CEILING PLAN - PHASE I - WEST

24 OF 102 AC102 CEILING PLAN - PHASE I - EAST

25 OF 102 AE400 ENLARGED FLOOR PLANS

26 OF 102 AE420 TYP INTERIOR ELEVATIONS

27 OF 102 AE421 INTERIOR ELEVATIONS

28 OF 102 AE422 INTERIOR ELEVATIONS

29 OF 102 AE423 INTERIOR ELEVATIONS

30 OF 102 AE424 INTERIOR ELEVATIONS

31 OF 102 A-501 DETAILS

32 OF 102 A-502 CASEWORK DETAILS

33 OF 102 A-601 FINISH SCHEDULE

34 OF 102 A-602 DOOR AND ASSEMBLY SCHEDULE

35 OF 102 A-603 SPECIALTY EQUIPMENT SCHEDULE

36 OF 102 AW001 SIGNAGE LOCATION PLAN & MESSAGE SCHEDULE

37 OF 102 AW002 ENLARGED SIGNAGE - IN-03.01, IN-04.02, & IN-09.03

STRUCTURAL

38 OF 102 S001 ABBREVIATIONS, SHEET INDEX & GENERAL STRUCTURAL NOTES

39 OF 102 S101 FLOOR PLAN - WEST

40 OF 102 S102 FLOOR PLAN - EAST

41 OF 102 S401 TYPICAL LIGHT-GAUGE FRAMING

42 OF 102 S501 TYPICAL CONCRETE DETAILS

FIRE PROTECTION

43 OF 102 FP101 FIRE PROTECTION

44 OF 102 FP102 FIRE PROTECTION - WEST

45 OF 102 FP103 FIRE PROTECTION - EAST

MECHANICAL

46 OF 102 M-001 MECHANICAL GENERAL NOTES AND ABBREVIATIONS

47 OF 102 MD100 MECHANICAL DEMO - OVERALL PLAN

48 OF 102 MD101 MECHANICAL DEMO - WEST

49 OF 102 MD102 MECHANICAL DEMO - EAST

DRAWING INDEX

PAGE # SHEET # SHEET NAME

50 OF 102 MD103 MECHANICAL PIPING DEMO - WEST

51 OF 102 MD104 MECHANICAL PIPING DEMO - EAST

52 OF 102 M-100 MECHANICAL - OVERALL PLAN

53 OF 102 M-101 MECHANICAL - WEST

54 OF 102 M-102 MECHANICAL - EAST

55 OF 102 M-103 MECHANICAL RCP - WEST

56 OF 102 M-104 MECHANICAL RCP - EAST

57 OF 102 MP100 MECHANICAL PIPING - OVERALL

58 OF 102 MP101 MECHANICAL PIPING - WEST

59 OF 102 MP102 MECHANICAL PIPING - EAST

60 OF 102 M-500 MECHANICAL DETAILS

61 OF 102 M-600 MECHANCIAL SCHEDULES

62 OF 102 M-700 MECHANICAL CONTROLS

63 OF 102 M-701 MECHANICAL CONTROLS

PLUMBING

64 OF 102 P-001 PLUMBING SYMBOLS, LEGENDS, AND SCHEDULES

65 OF 102 PD100 PLUMBING DEMO - OVERALL

66 OF 102 PD101 CRAWL SPACE PLUMBING DEMO - WEST

67 OF 102 PD102 CRAWL SPACE PLUMBING DEMO - EAST

68 OF 102 PD103 PLUMBING DEMO - WEST

69 OF 102 PD104 PLUMBING DEMO - EAST

70 OF 102 P-100 PLUMBING - OVERALL

71 OF 102 P-101 CRAWL SPACE PLUMBING - WEST

72 OF 102 P-102 CRAWL SPACE PLUMBING - EAST

73 OF 102 P-103 PLUMBING - WEST

74 OF 102 P-104 PLUMBING - EAST

ELECTRICAL

75 OF 102 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX

76 OF 102 E-002 ELECTRICAL LEGENDS

77 OF 102 ED101 LIGHTING DEMOLITION PLAN - PHASE 1

78 OF 102 ED102 POWER DEMOLITION PLAN - PHASE 1

79 OF 102 ED103 SPECIAL SYSTEMS DEMOLITION PLAN - PHASE 1

80 OF 102 EL101 LIGHTING PLAN - PHASE 1

81 OF 102 EL102 LIGHTING PLAN - PHASE 2

82 OF 102 EP100 POWER PLAN - PHASE 1 - NORMAL AND EMERGENCY POWER FEED

83 OF 102 EP101 POWER PLAN - PHASE 1

84 OF 102 EP102 POWER PLAN - PHASE 2

85 OF 102 ET101 SPECIAL SYSTEMS PLAN - PHASE 1

86 OF 102 ET102 SPECIAL SYSTEMS PLAN - PHASE 2

87 OF 102 EF101 FIRE ALARM SYSTEM PLAN - PHASE 1

88 OF 102 EF102 FIRE ALARM SYSTEM PLAN - PHASE 2

89 OF 102 E-401 ENLARGED TR ROOM 101 ELECTRICAL PLANS

90 OF 102 E-402 ENLARGED TR ROOM 101 TELECOMMUNICATION PLANS

91 OF 102 E-501 ELECTRICAL DETAILS

92 OF 102 E-502 ELECTRICAL DETAILS

93 OF 102 E-503 ELECTRICAL DETAILS

94 OF 102 E-504 ELECTRICAL DETAILS

95 OF 102 E-505 ELECTRICAL DETAILS

96 OF 102 E-506 ELECTRICAL DETAILS

97 OF 102 EP601 ONE-LINE DIAGRAM - EMERGENCY POWER

98 OF 102 EP602 ONELINE DIAGRAM - NORMAL POWER

99 OF 102 ET601 FIBER RISER AND TELECOMMUNICATIONS BONDING PROGRAM

100 OF 102 E-701 ELECTRICAL SCHEDULES

101 OF 102 E-702 ELECTRICAL SCHEDULES

102 OF 102 E-703 ELECTRICAL SCHEDULES

Megan Matt's Stamp

Megan Text Box 6/14/24

AREA OF WORK

LEVEL 01

TRUE

NORTH

CARL VINSON VA MEDICAL CENTER

CAMPUS BUILDINGS

AREA OF WORK / ISOLATED

CONSTRUCTION ZONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS101

FACILITY SITE PLAN

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

NOT TO SCALE

FACILITY SITE PLAN

TRUE

NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1. COORDINATE CONTRACTOR STAGING AREA WITH VA COR

AT THE PRE-CONSTRUCTION MEETING. THIS INCLUDES,

BUT IS NOT LIMITED TO, AREAS TO BE USED FOR

MATERIAL STORAGE, ACCESS FOR MATERIAL DELIVERIES

AND TRANSPORTATION ROUTES TO THE PROJECT AREA.

2. DO NOT STORE PRODUCTS, MATERIALS, TOOLS,

EQUIPMENT, VEHICLES, OR ANY OTHER NON-PERMITTED

ITEMS ON MEDICAL CENTER PROPERTY UNLESS GIVEN

PRIOR APPROVAL BY THE VA COR.

3. A LIMITED AMOUNT OF SUPPLIES MAY BE STORED IN THE

CONSTRUCTION AREA AS LONG AS SAFETY AND

CLEANLINESS ARE NOT COMPROMISED. VA COR HAS

AUTHORITY TO REQUEST RELOCATION OF ANY AND

ALL STORED ITEMS TO A DIFFERENT LOCATION.

4. VERIFY CONTRACTOR STAGING AREA AND MATERIAL /

PRODUCT DELIVERY LOCATION WITH VA COR, PRIOR TO

BRINGING OR DELIVERING ITEMS TO THE MEDICAL

CENTER.

Revisions: Date: 2 OF 102

Megan Matt's Stamp

Megan

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

CHANGE MGMT

USER

IV SUPPORT

MECHANICAL

HAC

STORAGE

IV TESTING

IV TESTING

TR

STAFF BREAK

WAITING ALCOVE

RESTROOM

CORRIDOR

CR11-9

ELECTRICAL ROOM

RESTROOM

RESTROOM

RESTROOM

MECHANICAL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

ELECTRICAL

MECH

CHANGE MGMT

USER

RESTROOM

TR ROOM

HAC

CLASSROOM

103A

CLASSROOM

103B

CLASSROOM

104A

CLASSROOM

106A

CLASSROOM

106B

STAFF BREAK

RESTROOM

RESTROOM

RESTROOM

STORAGE

CORRIDOR

CR11-9

MECHANICAL

102A

ELECTRICAL

CLOSET

WAITING

ALCOVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS201

PHASING PLAN

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

GENERAL NOTES

1. MAINTAIN STAFF ACCESS TO LEVEL 02 THROUGH STAIR

ENTRANCE.

2. THE TWO PHASES WILL BE SEPERATED BY STAFF USING

THE IV TESTING SPACE; ONLY ONCE VA IV TESTING IS

COMPLETE WILL PHASE II BEGIN CONSTRUCTION.

Revisions: Date:

3/32" = 1'-0"

LEVEL I - PHASE I - IV TESTING

3/32" = 1'-0"

LEVEL 1 - PHASE II - CLASSROOMS

PROJECT

NORTH

TRUE NORTH

(DASHED)

Megan Matt's Stamp

Megan

101A

EXTERIOR ELEVATION

INTERIOR ELEVATION

BUILDING SECTION FLAG

WALL SECTION FLAG

CALLOUT FLAG

VERTICAL GRID LINE

HORIZONTAL GRID LINE

TRUE NORTH ARROW

PROJECT NORTH ARROW

(TRUE NORTH DASHED)

ELEVATION / LEVEL MARKER

KEY NOTE

ROOM TAG

(SF OPTIONAL)

CEILING HEIGHT TAG

WALL TAG

FLOOR TAG

ROOF TAG

DOOR TAG

WINDOW TAG

SPECIALTY EQUIPMENT TAG

SIGNAGE TAG

SIGNAGE KEY NOTE

(AW SHEETS ONLY)

SIGNAGE MATERIAL TAG

(AW SHEETS ONLY)

TOILET

150 SF

A

01A

TRUE

NORTH

W1

PROJECT

NORTH

TRUE NORTH

(DASHED)

A01

D88

A5175SOAP DISH

IN-04.02-01

ACT 2x2

9' - 0" AFF

F-1

R-1

SYMBOLS

A-101

A-101

SIM

A-101

TYP

EXISTING TO REMAIN

NEW CONSTRUCTION

TO DEMOLISH

(DEMO SHEET(S) ONLY)

ABOVE

BELOW

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

(DEMO SHEET(S) ONLY)

NEW DOOR

AREA SHOWN ON SHEET

OUT OF SCOPE

INACCESSIBLE DURING PHASE

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA BOUNDRY

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA BARRIER

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA DOOR

(ICRA SHEET(S) ONLY)

ADHESIVE WALK-OFF MATS

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA AIR PRESSURE

(ICRA SHEET(S) ONLY)

CONTRACTOR PATH OF TRAVEL

(ICRA SHEET(S) ONLY)

SMOKE COMPARTMENT PERIMETER

(FIRE LIFE SAFETY SHEET(S) ONLY)

SMOKE RATED WALL

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE & 1 HR FIRE RATED WALL

FIRE EXTINGUISHER CABINET

(FIRE LIFE SAFETY SHEET(S) ONLY)

EMERGENCY EGRESS PATHWAY

(FIRE LIFE SAFETY SHEET(S) ONLY)

SUPPLY GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

RETURN GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

LIGHTING PER ELECTRICAL

(SIZE & PROPORTIONS MAY VARY)

MATERIALS

EARTH

SAND

BATT INSULATION

RIGID INSULATION

CONCRETE

STEEL

PLYWOOD, FIRE RATED

GYPSUM BOARD, TYPE 'X'

GYPSUM BOARD, LEAD LINED

ACOUSTICAL CEILING TILE, 2' x 2'

ACOUSTICAL CEILING TILE, 2' x 4'

A-101

A-101

SIM

FEC

ABBREVIATIONS

SYMBOLS

& AND

∠ ANGLE

@ AT

℄ CENTERLINE

° DEGREES

# NUMBER

A

AB ANCHOR BOLT

ABA ARCHITECTURAL BARRIERS ACT

A(C)T ACOUSTICAL (CEILING) TILE

ACM ASBESTOS CONTAINING MATERIAL

ACW ACOUSTICAL WALL

ADA AMERICANS W/ DISABILITIES ACT

ADJ ADJACENT

A/E ARCHITECT/ENGINEER

AF ACCESS FLOOR

AFF ABOVE FINISH FLOOR

AGG AGGREGATE

ALT ALTERNATE

ALUM ALUMINUM

APPROX APPROXIMATELY

ARCH ARCHITECT(URAL)

ASPH ASPHALT

A/V AUDIO / VIDEO

B

BARR BARRIER

BATH BATHROOM

BB BACKER BOARD

BLD(G) BUILDING

BLK(G) BLOCK(ING)

BLW BELOW

BM BEAM

BMT(U) BONE MARROW TRANSPLANT (UNIT)

BO BOTTOM OF

BOC BOTTOM OF CURB

BOS BOTTOM OF SLAB

BRC BRACE, BRACING

BRKT BRACKET

BRNG BEARING

BTM BOTTOM

BTWN BETWEEN

C

CAB CABINET

CC CONTRACTOR FURN, CONTRACTOR INST

CD CONSTRUCTION / CONTRACT DOCUMENTS

CJ CONTROL JOINT

CLG CEILING

CLR CLEAR(ANCE)

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

COMP COMPOSITION

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER REPRESENTATIVE

CORR CORRIDOR

CS CONCRETE SEALER

CT CERAMIC TILE

CTR CENTER

CV CONTRACTOR FURNISHED, VA INSTALLED

D

DB DESIGN BUILD

DBL DOUBLE

DC DIRECT CURRENT

DD DESIGN DEVELOPMENT

DEMO DEMOLISH(ION)

DEPT DEPARTMENT

DG DESIGN GUIDE

DIA DIAMETER

DIM DIMENSION

DM DESIGN MANUAL

DWN DOWN

DR DOOR

DTL DETAIL

DWG DRAWING(S)

E

E EAST

EA EACH

EJ EXPANSION JOINT

ELEC ELECTRIC(AL)

ELEV ELEVATION OR ELEVATOR

ENG ENGINEER(ING)

EOC EDGE OF CURB

EOP EDGE OF PAVEMENT

EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER

EQ EQUAL

EQUIP EQUIPMENT

ES EACH SIDE

ETS EXPOSED TO STRUCTURE

EX(IST) EXISTING

EXP EXPANSION

EXT EXTERIOR

F

FA FIRE ALARM

FD FLOOR DRAIN

FE(C) FIRE EXTINGUISHER (CABINET)

FF FACTORY FINISH

FFB FINISH FLOOR BREAK

FIN FINISH(ED)

FLASH FLASHING

FLR FLOOR(ING)

FLRSNT FLORESCENT

FNDN FOUNDATION

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOS FACE OF STUDS

FP FIRE PROOF

FR FIRE RATED

FRM FRAME

FT FOOT, FEET

FTG FOOTING

FUR FURRING

FURN FURNISHED

G

GA GAGE, GAUGE

GALV GALVANIZED

GE GENERAL ELECTRIC

G(W)B GYPSUM (WALL) BOARD

GC GENERAL CONTRACTOR

GL GRID LINE

GLB GLUE LAMINATED BEAM

GMU GLASS MASONRY UNIT

GOV(T) GOVERNMENT

GYP GYPSUM BOARD

H

HAC HOUSEKEEPING AIDES CLOSET

HDR HEADER

H(D)W(E) HARDWARE

HM HOLLOW METAL

HORZ HORIZONTAL

HPDL HIGH PRESSURE DECORATIVE LAM

HR HOUR

HT HEIGHT

HVAC HEATING, VENTILATION & AIR CONDITIONING

I

ICRA INFECTIOUS CONTROL RISK ASSESSMENT

ID IDENTIFICATION

ILSM INTERIM LIFE SAFETY MEASURES

INCL INCLUDE(D,ING)

INST INSTALL

INSUL INSULATION

INT INTERIOR

J

JT JOINT

K

KV KILOVOLT

L

LAM LAMINATE(D)

LAV LAVATORY

LCM LEAD CONTAINING MATERIAL(S)

LD LEAD

LT LIGHT

M

MAT MATERIAL(S)

MAX MAXIMUM

MDF MEDIUM-DENSITY FIBREBOARD

MECH MECHANIC(AL)

MEP MECHANICAL, ELECTRICAL, PLUMBING

MFR MANUFACTURE(R)

MIN MINIMUM

MISC MISCELLANEOUS

MOD MODIFIED

MTL METAL

N

N NORTH

N(/)A NOT APPLICABLE

NEG NEGATIVE

NO. NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

O.C. ON CENTER(S)

OPN(G) OPEN(ING)

OPP OPPOSITE

OPT OPTION(AL)

OVHD OVERHEAD

P

P PAINT

PCONC PRECAST CONCRETE

PCRA PRE-CONSTRUCTION RISK ASSESSMENT

PL PLATE

PLAM PLASTIC LAMINATE

PLY(WD) PLYWOOD

PNL PANEL

PR PAIR

PRFB PREFABRICATED

PS PLASTIC

PT PORCELAIN TILE

PTN(S) PARTITION(S)

PVMT PAVEMENT

Q

QTY QUANTITY

R

RAD RADIUS

RCP(S) REFLECTED CEILING PLAN(S)

REF REFERENCE

REINF REINFORCE(D,ING)

REP REPRESENTATIVE

REQ(S,(')D) REQUIRE(D,S,MENT(S))

RESIL RESILIENT

REV REVERSE

RF ROOF

RM ROOM

RMV REMOVE

RO ROUGH OPENING

S

S SOUTH

SCHED SCHEDULE

SCI(D) SPINAL CORD INJURY (& DISABILITY)

SD SCHEMATIC DESIGN

SECT SECTION

SF SQUARE FEET

SFRM SPRAY APPLIED FIRE-RESISTIVE MATERIAL

SHG SHINGLES

SHLD(G) SHEILD(ING)

SHT(G) SHEET (SHEATHING)

SIM SIMILAR

SM SEAM

SOW SCOPE OF WORK

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

ST STAIN

STDG STANDING

STF STAFF

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SURG SURGERY, SURGICAL

SUSP SUSPENDED

SV SHEET VINYL

SYS SYSTEM

T

TBD TO BE DETERMINED

TBL TABLE

TEMP TEMPORARY

T&G TONGUE AND GROOVE

THK THICK(NESS)

THRESH THRESHOLD

TOC TABLE OF CONTENTS

TOS TOP OF SLAB

TPH TOILET PAPER HOLDER

TRANS TRANSITION

TS TUBE STEEL

TYP TYPICAL

U

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

V

VA VETERANS AFFAIRS

VAR VARIES

VB VAPOR BARRIER

VC VA FURNISHED, CONTRACTOR INSTALLED

VERT VERTICAL

VIF VERIFY IN FIELD

VV VA FURNISHED, VA INSTALLED

W

W WEST

W/ WITH

WD WOOD

WDW WINDOW

WGHT WEIGHT

W/O WITHOUT

WP WATERPROOF(ING)

WR WATER RESISTANT

WRK WORK

X

XRY X-RAY

1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS

BETWEEN EXISTING CONDITIONS AND THE CONTRACT

DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE

ATTENTION OF THE COR.

2. ALL WORK DONE BY THE CONTRACTOR AND/OR SUB-

CONTRACTORS SHALL BE PERFORMED WITH A HIGH LEVEL

OF WORKMANSHIP.

3. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE.

4. DO NOT SCALE DRAWINGS.

5. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A

+/- SYMBOL. ONLY NORMAL INDUSTRY STANDARD

TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM

DIMENSIONS INDICATED.

6. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE

FULL SPACE INDICATED WITHOUT ENCROACHMENTS.

7. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH

THE CONTRACT DOCUMENTS.

8. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH

FLOOR ELEVATION, UON.

GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

A-001

ARCH SYMBOLS, ABBREVIATIONS

& GENERAL NOTES 009A

MK AB

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

Revisions: Date: 4 OF 102

Megan Matt's Stamp

Megan

OUT OF SCOPE

TEMPORARY ICRA BOUNDRY

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

2 TYP.

AREA SHOWN

TRUE

NORTH

RCC103C

120 121 122 123 124

RCC101C

RCC101R 125

RCC104C

129A

RCC105C

RCC106C

131A

CR15-9

132 133 134 135 136 137

137B

137A 139

RCC102C 141

142 142A

RCC102R

101103104105106107108109110111112

CR13-9

113114CR12-9115116116A

CR14-9

116B

121A

ST11-9

CR11-9

RCC107C

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

2 TYP.

106 103

CR11-9

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS101

ICRA PLANS

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

1" = 10'-0"

ICRA PLAN - PHASE I

1. ICRA CLASS II REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQS LISTED IN THE INFECTION

CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

1 TEMPORARILY SEAL DOOR FOR DURATION OF

CONSTRUCTION PHASE.

EXISTING WALL ACTING AS AN ICRA BOUNDRY. SEAL

OPENINGS / PENETRATIONS / HVAC DUCTS AS

REQUIRED. MAINTAIN 1-HR FIRE RATING. ALL

PENETRATIONS MUST BE FIRE-STOPPED.

Revisions: Date:

1" = 10'-0"

ICRA PLAN - PHASE II

PROJECT

NORTH

TRUE NORTH

(DASHED)

Megan Matt's Stamp

Megan

EMERGENCY EGRESS ROUTE

2 HR FIRE RATED WALL

FIRE EXTINGUISHER CABINETFEC

79' - 6" TO POINT OF TWO EGRESSES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

MAX ALLOWABLE 200'

PROVIDED 155' - 2"

MAX ALLOWABLE 200'

PROVIDED 174' - 8"

FEC

FEC

FEC

FEC

CHANGE MGMT

USER

108 IV SUPPORT

MECHANICAL

HAC

STORAGE

IV TESTING

IV TESTING

TR

STAFF BREAK

WAITING ALCOVE

RESTROOM

CORRIDOR

CR11-9

ELECTRICAL ROOM

RESTROOM

RESTROOM

RESTROOM

MECHANICAL

STG

103A

ELECTRICAL

CLOSET

AREA SHOWN

TRUE

NORTH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

51' - 6" TO POINT OF TWO EGRESSES

FEC

MAX ALLOWABLE 200'

PROVIDED 175' - 0"

MAX ALLOWABLE 200'

PROVIDED 155' - 5"

FEC

FEC

FEC

ELECTRICAL

MECH

CHANGE MGMT

USER

RESTROOM

TR ROOM

HAC

CLASSROOM

103A

CLASSROOM

103B

CLASSROOM

104A

CLASSROOM

106A

CLASSROOM

106B

STAFF BREAK

RESTROOM

RESTROOM

RESTROOM

STORAGE

CORRIDOR

CR11-9

WAITING

ALCOVE

ELECTRICAL

CLOSET

MECHANICAL

102A

STG

CLASSROOM

104B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS201

FIRE LIFE SAFETY

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

1" = 10'-0"

FIRE LIFE SAFETY PLAN - PHASE I

LEGEND

GENERAL NOTES

KEY PLAN

1. BUILDING IS FULLY SPRINKLERED.

2. EXISTING BUILDING CONSTRUCTION TYPE SHALL NOT BE

ALTERED AS PART OF THIS PROJECT.

A. NFPA 220 FIRE RESISTIVE RATING: TYPE 1 (332).

B. UBC FIRE RESISTIVE RATING: TYPE 1, FR.

3. EXISTING BUILDING OCCUPANCY TYPE SHALL NOT BE

ALTERED AS PART OF THIS PROJECT.

A. NFPA 101 OCCUPANCY TYPE: EXISTING BUSINESS

(CHAPTER 39) WITH INCIDENTAL STORAGE.

4. OCCUPANT LOADS IN AREA OF WORK ARE EQUAL OR LESS

THAN EXISTING, AND THEREFORE, EXISTING EXIT WIDTHS

ARE NOT REQUIRED TO BE ALTERED AS PART OF THIS

PROJECT.

A. 2,507 SF BUSINESS (CONCENTRATED) AT 50 SF /

OCCUPANT = 50 OCCUPANTS

B. 1,252 SF BUSINESS (GENERAL) AT 150 SF / OCCUPANT

= 8 OCCUPANTS

C. 260 SF STORAGE AT MAXIMUM PROBABLE = 2

OCCUPANTS

D. TOTAL NET OCCUPANT LOAD = 60

5. EGRESS CAPACITY:

A. OCCUPANT LOAD (60) / NUMBER OF EXITS (3) = 20

OCCUPANTS

6. # OF REQ'D EGRESS EXITS: 2.

7. MAX COMMON PATH OF TRAVEL BEFORE TWO PATHS ARE

PROVIDED SHALL NOT EXCEED 100' (EXISTING BUSINESS,

FULLY SPRINKLERED).

A. PROVIDED: 79' - 6" (PHASE I), 51' - 6" (PHASE II).

8. MAX TRAVEL DISTANCE TO EXITS SHALL NOT EXCEED

200' - 0" (EXISTING BUSINESS, FULLY SPRINKLERED).

9. MAX DISTANCE BETWEEN FIRE EXTINGUISHERS: 75' - 0".

MAX DISTANCE FROM HAZARDOUS AREAS: 50' - 0".

ALL FIRE EXTIGUISHERS TO BE CLASS ABC.

10. SEE ELECTRICAL FOR EXIT SIGNAGE LOCATIONS &

REQUIREMENTS.

11. SEE FIRE PROTECTION FOR SPRINKLER AND FIRE ALARM

LOCATIONS AND REQUIREMENTS.

Revisions: Date:

1" = 10'-0"

FIRE LIFE SAFETY PLAN - PHASE II

PROJECT

NORTH

TRUE NORTH

(DASHED)

Megan Matt's Stamp

Megan

/1 AD102/1 AD101PROSTHETICS

STOR

VERTICAL SPACE

CHASE

RCC103C

PROSTHETICS

WRK RM

PROSTHETICS

STOR

PROSTHETICS

PURCHASING

AGENT OFF

PROSTHETICS

PURCHASING

AGENT SUPV

PROSTHETICS

STOR

VERTICAL SPACE

PIPE CHASE

RCC101C

PROSTHETICS PIPE

CLO

RCC101R

COMMON MECH RM

PROSTHETICS PGM

ANALYST NETWRK

EMPLOYEE

VERTICAL SPACE

PIPE CHASE

RCC104C

COMMON TLT

PROSTHETICS FILE

RM

129A

VERTICAL SPACE

PIPE CHASE

RCC105C

COMMON FEMALE

TLT

VERTICAL SPACE

PIPE CHASE

RCC106C

GERIATRICS COMM

/ NH NRS GE AND C

OFF

GERIATRICS PIPE

CLO

131A

GERIATRICS BRK

RM

131COMMON CORR

CR15-9

GERIATRICS

SPECIAL PGMS

CO-ORDER SCI /

TBI / VISIT OFF

GERIATRICS SOC

WRK SUPV COMM

CARE PGMS OFF

GERIATRICS

RECREATION OFF

GERIATRICS G AND

EC PHY

GERIATRICS

EXTENDED CARE

OFF

GERIATRICS ACOS

AND EXTENDED

CARE OFF

GERIATRICS CLO

137B

GERIATRICS TLT

137A

COMMON MALE

TLT

COMMON TEL CLO

GERIATRICS SOC

WRK EXTERNAL

CARE

VERTICAL SPACE

CHASE

RCC102C

GERIATRICS

MULTIPURPOSE

RM

GERIATRICS STOR

COMMON FEC

142A

CANTEEN SVC

VENDING AREA

ENGINEERING

MECH RM

NUTRITION/FOOD

DIETICIAN OFF

GERIATRICS

FEMALE TLT

GERIATRICS OFF

GERIATRICS G AND

EC PSA

GERIATRICS

DIETICIAN AND

EXTENDED CARE

OFF

GERIATRICS

DIETICIAN AND

EXTENDED CARE

OFF

NUTRITION/FOOD

DIETICIAN OFF

GERIATRICS OFF

GERIATRICS COMM

HEALTH NRS

CO-ORDR

COMMON CORR

CR13-9

PROSTHETICS OFF

PROSTHETICS OFF

COMMON CORR

CR12-9

PROSTHETICS

RECEPTION AND

WAIT

PROSTHETICS PGM

MGR PROSTHETIC

PROSTHETICS

PURCHASING

116A

PROSTHETICS

CORR

CR14-9

PROSTHETICS

PURCHASING

116B

COMMON FEC

121A

VERTICAL SPACE

STAIR

ST11-9

COMMON CORR

CR11-9

VERTICAL SPACE

CHASE

RCC107C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AD001

DEMO PLAN - PHASE I - OVERALL

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

Revisions: Date:

GENERAL NOTES

1/8" = 1'-0"

DEMO PLAN - PHASE I - OVERALL

1. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED,

PRIOR TO BEGINNING ANY WORK. NO WORK SHALL BE

DONE WITHOUT PROPERLY MEETING ALL ICRA

REQUIREMENTS, REF ICRA PLAN(S) AND SPECIFICATION

SECTION 01 35 25 'SAFETY REQUIREMENTS' FOR

SPECIFIC ICRA CLASS LOCATIONS & REQUIREMENTS.

2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION

OF ANY EXISTING EQUIPMENT.

3. DEMO EXISTING FINISHES AS REQ'D TO INSTALL NEW,

REF FINISH SCHEDULE.

4. DEMO EXISITING WALLS & DOORS AS INDICATED ON

PLAN (PHASE I ONLY).

5. DEMO EXISTING FLOOR FINISH THROUGHOUT WORK

AREA (PHASE I ONLY).

6. REMOVE WALL MOUNTED ACCESSORIES REQUIRED TO

COMPLETE A CONSTRUCTION TASK. VERIFY WITH COR

BEFORE DISPOSAL (PHASE I ONLY).

Megan Matt's Stamp

Megan

/1 AD104/1 AD103

CHANGE

MGMT

USER

IV

SUPPORT

MECHANICAL

HAC

STORAGE

IV

TESTING

IV

TESTING

TR

STAFF

BREAK

WAITING

ALCOVE

RESTROOM

CORRIDOR

CR11-9

ELECTRICAL

ROOM

RESTROOM

RESTROOM

RESTROOM

MECHANICAL

ELECTRICAL

CLOSET

115 STG

103A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AD002

DEMO PLAN - PHASE II - OVERALL

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

GENERAL NOTES

Revisions: Date:

1/8" = 1'-0"

DEMO PLAN - PHASE II - OVERALL

1. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED,

PRIOR TO BEGINNING ANY WORK. NO WORK SHALL BE

DONE WITHOUT PROPERLY MEETING ALL ICRA

REQUIREMENTS, REF ICRA PLAN(S) AND SPECIFICATION

SECTION 01 35 25 'SAFETY REQUIREMENTS' FOR

SPECIFIC ICRA CLASS LOCATIONS & REQUIREMENTS.

2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION

OF ANY EXISTING EQUIPMENT.

Megan Matt's Stamp

Megan

C

S

C

S

C

S

C

S

C

S

C

S

C

S

C

S

C

S

C

S

C

S

C

S

C

S

C

S

WAP

WAP

WAP

WAP WAP

WAP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64

17 18 19 20 21 25 26 27 28 29 30 31 32

TYP. TYP.

/1 AD112/1 AD111PROSTHETICS

STOR

VERTICAL SPACE

CHASE

RCC103C

PROSTHETICS

WRK RM

PROSTHETICS

STOR

PROSTHETICS

PURCHASING

AGENT OFF

PROSTHETICS

PURCHASING

AGENT SUPV

PROSTHETICS

STOR

VERTICAL SPACE

PIPE CHASE

RCC101C

PROSTHETICS PIPE

CLO

RCC101R

COMMON MECH RM

PROSTHETICS PGM

ANALYST NETWRK

EMPLOYEE

VERTICAL SPACE

PIPE CHASE

RCC104C

COMMON TLT

PROSTHETICS FILE

RM

129A

VERTICAL SPACE

PIPE CHASE

RCC105C

COMMON FEMALE

TLT

VERTICAL SPACE

PIPE CHASE

RCC106C

GERIATRICS COMM

/ NH NRS GE AND C

OFF

GERIATRICS PIPE

CLO

131A

GERIATRICS BRK

RM

131COMMON CORR

CR15-9

GERIATRICS

SPECIAL PGMS

CO-ORDER SCI /

TBI / VISIT OFF

GERIATRICS SOC

WRK SUPV COMM

CARE PGMS OFF

GERIATRICS

RECREATION OFF

GERIATRICS G AND

EC PHY

GERIATRICS

EXTENDED CARE

OFF

GERIATRICS ACOS

AND EXTENDED

CARE OFF

GERIATRICS CLO

137B

GERIATRICS TLT

137A

COMMON MALE

TLT

COMMON TEL CLO

GERIATRICS SOC

WRK EXTERNAL

CARE

VERTICAL SPACE

CHASE

RCC102C

GERIATRICS

MULTIPURPOSE

RM

GERIATRICS STOR

COMMON FEC

142A

CANTEEN SVC

VENDING AREA

ENGINEERING

MECH RM

NUTRITION/FOOD

DIETICIAN OFF

GERIATRICS

FEMALE TLT

GERIATRICS OFF

GERIATRICS G AND

EC PSA

GERIATRICS

DIETICIAN AND

EXTENDED CARE

OFF

GERIATRICS

DIETICIAN AND

EXTENDED CARE

OFF

NUTRITION/FOOD

DIETICIAN OFF

GERIATRICS OFF

GERIATRICS COMM

HEALTH NRS

CO-ORDR

COMMON CORR

CR13-9

PROSTHETICS OFF

PROSTHETICS OFF

COMMON CORR

CR12-9

PROSTHETICS

RECEPTION AND

WAIT

PROSTHETICS PGM

MGR PROSTHETIC

PROSTHETICS

PURCHASING

116A

PROSTHETICS

CORR

CR14-9

PROSTHETICS

PURCHASING

116B

COMMON FEC

121A

VERTICAL SPACE

STAIR

ST11-9

COMMON CORR

CR11-9

VERTICAL SPACE

CHASE

RCC107C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AD011

DEMO CEILING PLAN - PHASE I -

OVERALL 009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

Revisions: Date:

GENERAL NOTES

1/8" = 1'-0"

DEMO CEILING PLAN - PHASE I - OVERALL

PROJECT

NORTH

TRUE NORTH

(DASHED)

1. MAINTAIN EXISTING SPRINKLER HEADS AND SYSYEM

WHILE COMPLETING DEMO WORK.

2. REMOVE ANY CEILING MOUNTED ACCESSORIES

REQUIRED TO COMPLETE ANY CONSTRUCTION TASK.

3. DEMO EXISTING FINISHES AS REQ'D TO INSTALL NEW

PER FINISH SCHEDULE.

Megan Matt's Stamp

Megan

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

TO DEMOLISH

EXISTING TO REMAIN

1. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED,

PRIOR TO BEGINNING ANY WORK. NO WORK SHALL BE

DONE WITHOUT PROPERLY MEETING ALL ICRA

REQUIREMENTS, REF ICRA PLAN(S) AND SPECIFICATION

SECTION 01 35 25 'SAFETY REQUIREMENTS' FOR SPECIFIC

ICRA CLASS LOCATIONS & REQUIREMENTS.

2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION OF

ANY EXISTING EQUIPMENT.

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

1 2 3 4 5 6 7 8

17 18 19 20 21

2 TYP.

TYP.

/4

PROSTHETICS

STOR

VERTICAL SPACE

CHASE

RCC103C

PROSTHETICS

WRK RM

PROSTHETICS

STOR

PROSTHETICS

PURCHASING

AGENT OFF

PROSTHETICS

PURCHASING

AGENT SUPV

PROSTHETICS

STOR

VERTICAL SPACE

PIPE CHASE

RCC101C

PROSTHETICS PIPE

CLO

RCC101R

COMMON MECH RM

PROSTHETICS PGM

ANALYST NETWRK

EMPLOYEE

VERTICAL SPACE

PIPE CHASE

RCC104C

COMMON TLT

PROSTHETICS FILE

RM

129A

VERTICAL SPACE

PIPE CHASE

RCC105C

COMMON FEMALE

TLT

VERTICAL SPACE

PIPE CHASE

RCC106C

GERIATRICS COMM

/ NH NRS GE AND C

OFF

GERIATRICS PIPE

CLO

131A

GERIATRICS BRK

RM

COMMON CORR

CR15-9

PROSTHETICS OFF

COMMON CORR

CR12-9

PROSTHETICS

RECEPTION AND

WAIT

PROSTHETICS PGM

MGR PROSTHETIC

PROSTHETICS

PURCHASING

116A

PROSTHETICS

CORR

CR14-9

PROSTHETICS

PURCHASING

116B

COMMON FEC

121A

VERTICAL SPACE

STAIR

ST11-9

VERTICAL SPACE

CHASE

RCC107C

1 DEMOLISH EXISTING WALLS AS INDICATED ON DEMO

PLAN, TYP.

DEMOLISH EXISTING DOORS AS INDICATED ON DEMO

PLAN, TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AD101

DEMO PLAN - PHASE I - WEST

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

3/16" = 1'-0"

DEMO PLAN - PHASE I - WEST

Megan Matt's Stamp

Megan

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

TO DEMOLISH

EXISTING TO REMAIN

1. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED,

PRIOR TO BEGINNING ANY WORK. NO WORK SHALL BE

DONE WITHOUT PROPERLY MEETING ALL ICRA

REQUIREMENTS, REF ICRA PLAN(S) AND SPECIFICATION

SECTION 01 35 25 'SAFETY REQUIREMENTS' FOR SPECIFIC

ICRA CLASS LOCATIONS & REQUIREMENTS.

2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION OF

ANY EXISTING EQUIPMENT.

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9A

8 9 10 11 12 13 14 15 16 60 61 62 63 64

25 26 27 28 29 30 31 32

TYP.

TYP.

GERIATRICS

SPECIAL PGMS

CO-ORDER SCI /

TBI / VISIT OFF

GERIATRICS SOC

WRK SUPV COMM

CARE PGMS OFF

GERIATRICS

RECREATION OFF

GERIATRICS G AND

EC PHY

GERIATRICS

EXTENDED CARE

OFF

GERIATRICS ACOS

AND EXTENDED

CARE OFF

GERIATRICS CLO

137B

GERIATRICS TLT

137A

COMMON MALE

TLT

COMMON TEL CLO

GERIATRICS SOC

WRK EXTERNAL

CARE

VERTICAL SPACE

CHASE

RCC102C

GERIATRICS

MULTIPURPOSE

RM

GERIATRICS STOR

142 COMMON FEC

142A

VERTICAL SPACE

ELEV

RCC102R

COMMON VEST

100 ENVIR MGMT HAC

CLO

CANTEEN SVC

VENDING AREA

ENGINEERING

MECH RM

NUTRITION/FOOD

DIETICIAN OFF

GERIATRICS

FEMALE TLT

GERIATRICS OFF

GERIATRICS G AND

EC PSA

GERIATRICS

DIETICIAN AND

EXTENDED CARE

OFF

GERIATRICS

DIETICIAN AND

EXTENDED CARE

OFF

NUTRITION/FOOD

DIETICIAN OFF

GERIATRICS OFF

GERIATRICS COMM

HEALTH NRS

CO-ORDR

COMMON CORR

CR13-9

PROSTHETICS OFF

COMMON CORR

CR11-9

1 DEMOLISH EXISTING WALLS AS INDICATED ON DEMO

PLAN, TYP.

DEMOLISH EXISTING DOORS AS INDICATED ON DEMO

PLAN, TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AD102

DEMO PLAN - PHASE I - EAST

009A

MK MC

CONSTRUCTION

DOCUMENT

6/14/2024

557-21-703

CARL VINSON VA MEDICAL CENTER - DUBLIN, GA

RENOVATE BUILDING 9A FOR

EHRM ADMINISTRATIVE SPACE

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

PROJECT

NORTH

TRUE NORTH

(DASHED)

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

3/16" = 1'-0"

DEMO PLAN - PHASE I - EAST

Megan Matt's Stamp

Megan

Sheets
A-001 - ARCH SYMBOLS, ABBREVIATIONS & GENERAL NOTES
AD001 - DEMO PLAN - PHASE I - OVERALL
AS101 - ICRA PLANS
AS201 - FIRE LIFE SAFETY
G-001 - COVER SHEET
GS101 - FACILITY SITE PLAN
GS201 - PHASING PLAN

File details come from the government source that posted it. Updated .