S02-RFP Attachment 10- Drawings-Dublin_Part1.pdf
PDF 2 MB Posted
- Solicitation number
- 36C77626R0031_1
About this file
This is a construction document set for the renovation of Building 9A at Carl Vinson VA Medical Center in Dublin, Georgia. The project, identified as 557-21-703, involves renovating administrative space for EHRM (Employee Health and Resource Management) and is being executed by Spees Design Build (625 1st Ave, Suite 301, Seattle, WA 98104) as the Architect/Engineer of Record. The renovation is structured in two phases: Phase I focuses on IV Testing areas, and Phase II addresses classroom spaces. The construction documents comprise 102 sheets organized by discipline, including general, architectural, structural, fire protection, mechanical, plumbing, and electrical plans.
The applicable standards and regulations governing this project include the International Building Code (2021), International Existing Building Code (2021), NFPA 101 Life Safety Code, National Electrical Code, International Plumbing Code (2021), VA Design Manual PG18-10, VA Seismic Design Requirements H-18-8, and various ASHRAE standards for ventilation and refrigeration systems. The project adheres to VA Master Construction Specifications (PG18-1), VA Design and Construction Procedures (PG18-3), and accessibility standards per the Architectural Barrier Act. Key design considerations include Infectious Control Risk Assessment (ICRA) protocols with temporary barriers and containment measures, fire life safety egress pathways with maximum travel distances of 155-175 feet to emergency exits, and smoke-rated wall separations. The documents indicate that the VA functions as the Authority Having Jurisdiction (AHJ) and is not subject to local building permit and inspection requirements, with all construction to comply with VA directives and technical specifications outlined in the Technical Information Library.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECT
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
DESIGN TEAM
FIRE PROTECT
SPEES DESIGN BUILD
STRUCTURAL
REID MIDDLETON
ELECTRICAL
SPEES DESIGN BUILD
ENVIRON
SPEES DESIGN BUILD
PLUMBING
SPEES DESIGN BUILD
MECHANICAL
SPEES DESIGN BUILD
728 134TH ST SW, STE 200
EVERETT, WA 98204
PHONE: (425) 741-3800
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
PROJECT INFORMATION
STATE:
COUNTY:
JURISTICTION:
OWNER:
CODE ANALYSIS
PROJECT DESCRIPTION
THE PROPOSED DESIGN SHALL RENOVATE
EXISTING ADMINISTRATIVE SPACE WITHIN
BLDG 9A'S, FIRST FLOOR, TO FUNCTION
TEMPORARILY AS ELECTRONIC HEALTH
RECORDS MANAGEMENT (EHRM) TEACHING
AND SUPPORT SPACES (TASS) PER THE
SPACE PLANNING JOB AIDE REQUIREMENTS.
APPLICABLE BUILDING
BUILDING 9A
APPLICABLE FLOOR
FLOOR 1
APPLICABLE CLINIC
ADMINISTRATIVE
ICRA CLASS REQUIREMENTS
CONST TYPE:
CLINIC RISK:
CLASS REQS:
APPROX SQUARE FEET IN SCOPE
7,514 SF
TYPE C
LOWEST
CLASS II
GEORGIA
LAURENS
DUBLIN
GOV, VETERANS AFFAIRS
RESOURCE DOCUMENTS
ENVIRONMENTAL HAZARDOUS MATERIALS TEST REPORT PROVIDED BY TERRACON
ELECTRICAL METERING STUDY PROVIDED BY METROPOWER
CUTSHEETS PROVIDED BY SPEES
CALCULATIONS PROVIDED BY SPEES
COMMISSIONING PLAN PROVIDED BY DAVENERGY
GENERAL NOTES
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &
SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.
BRING TO THE AWARENESS OF, AND VERIFY WITH, VA COR PRIOR TO PROCEEDING.
3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE
TO VISIT THE SITE.
4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE COR.
5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.
6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK
THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.
7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
APPLICABLE PUBLICATIONS
AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS OF CODE ENFORCEMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC). THE VA
SHALL FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ).
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION
GUIDE AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL). SEE ABOVE.
INTERNATIONAL BUILDING CODE (IBC) 2021.
INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021.
NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES PRECEDENCE OVER
IBC.
NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8.
NATIONAL ELECTRICAL CODE (NEC).
INTERNATIONAL PLUMBING CODE (IPC) 2021.
SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS
(ASME) A 17.1.
ASME BOILER AND PRESSURE VESSEL CODE.
ASME CODE FOR PRESSURE PIPING.
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).
ENERGY POLICY ACT OF 2005 (EPACT).
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR
PARTS 433,434 AND 435.
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND TRANSPORTATION
MANAGEMENT.
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS
SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2004.
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.
VAMC APPROVED HARDWARE LOCKING STANDARDS.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).
AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).
FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND STANDARDS FOR
TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION.
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA).
INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE).
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND
INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI).
JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),
ENVIRONMENT OF CARE GUIDELINES AND STANDARDS.
FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE
DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES.
THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL
ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING
“ENVIRONMENTALLY RESPONSIBLE DESIGN”.
APPLICABLE VA STANDARDS
MASTER CONSTRUCTION SPECIFICATIONS (PG18-1)
DESIGN AND CONSTRUCTION PROCEDURES (PG18-3), TOPIC 1 - CODES, STANDARDS & EXECUTIVE ORDERS
SEPTEMBER 2013
EQUIPMENT GUIDE LISTS (PG18-5)
DESIGN MANUALS (PG18-10)
DESIGN GUIDES (PG18-12)
ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT BARRIER
FREE DESIGN GUIDE (PG18-13)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
G-001
COVER SHEET
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE BUILDING 9A FOR EHRM ADMINISTRATIVE SPACE
CARL VINSON VA MEDICAL CENTER, DUBLIN - GEORGIA
PROJECT #: 557-21-703
Revisions: Date:
DRAWING INDEX
PAGE # SHEET # SHEET NAME
GENERAL
01 OF 102 G-001 COVER SHEET
02 OF 102 GS101 FACILITY SITE PLAN
03 OF 102 GS201 PHASING PLAN
ARCHITECTURAL
04 OF 102 A-001 ARCH SYMBOLS, ABBREVIATIONS & GENERAL NOTES
05 OF 102 AS101 ICRA PLANS
06 OF 102 AS201 FIRE LIFE SAFETY
07 OF 102 AD001 DEMO PLAN - PHASE I - OVERALL
08 OF 102 AD002 DEMO PLAN - PHASE II - OVERALL
09 OF 102 AD011 DEMO CEILING PLAN - PHASE I - OVERALL
10 OF 102 AD101 DEMO PLAN - PHASE I - WEST
11 OF 102 AD102 DEMO PLAN - PHASE I - EAST
12 OF 102 AD103 DEMO PLAN - PHASE II - WEST
13 OF 102 AD104 DEMO PLAN - PHASE II - EAST
14 OF 102 AD111 DEMO CEILING PLAN - PHASE I - WEST
15 OF 102 AD112 DEMO CEILING PLAN - PHASE I - EAST
16 OF 102 AE001 FLOOR PLAN - PHASE I - OVERALL
17 OF 102 AE002 FLOOR PLAN - PHASE II - OVERALL
18 OF 102 AE101 FLOOR PLAN - PHASE I - WEST
19 OF 102 AE102 FLOOR PLAN - PHASE I - EAST
20 OF 102 AE103 FLOOR PLAN - PHASE II - WEST
21 OF 102 AE104 FLOOR PLAN - PHASE II - EAST
22 OF 102 AC001 CEILING PLAN - PHASE I - OVERALL
23 OF 102 AC101 CEILING PLAN - PHASE I - WEST
24 OF 102 AC102 CEILING PLAN - PHASE I - EAST
25 OF 102 AE400 ENLARGED FLOOR PLANS
26 OF 102 AE420 TYP INTERIOR ELEVATIONS
27 OF 102 AE421 INTERIOR ELEVATIONS
28 OF 102 AE422 INTERIOR ELEVATIONS
29 OF 102 AE423 INTERIOR ELEVATIONS
30 OF 102 AE424 INTERIOR ELEVATIONS
31 OF 102 A-501 DETAILS
32 OF 102 A-502 CASEWORK DETAILS
33 OF 102 A-601 FINISH SCHEDULE
34 OF 102 A-602 DOOR AND ASSEMBLY SCHEDULE
35 OF 102 A-603 SPECIALTY EQUIPMENT SCHEDULE
36 OF 102 AW001 SIGNAGE LOCATION PLAN & MESSAGE SCHEDULE
37 OF 102 AW002 ENLARGED SIGNAGE - IN-03.01, IN-04.02, & IN-09.03
STRUCTURAL
38 OF 102 S001 ABBREVIATIONS, SHEET INDEX & GENERAL STRUCTURAL NOTES
39 OF 102 S101 FLOOR PLAN - WEST
40 OF 102 S102 FLOOR PLAN - EAST
41 OF 102 S401 TYPICAL LIGHT-GAUGE FRAMING
42 OF 102 S501 TYPICAL CONCRETE DETAILS
FIRE PROTECTION
43 OF 102 FP101 FIRE PROTECTION
44 OF 102 FP102 FIRE PROTECTION - WEST
45 OF 102 FP103 FIRE PROTECTION - EAST
MECHANICAL
46 OF 102 M-001 MECHANICAL GENERAL NOTES AND ABBREVIATIONS
47 OF 102 MD100 MECHANICAL DEMO - OVERALL PLAN
48 OF 102 MD101 MECHANICAL DEMO - WEST
49 OF 102 MD102 MECHANICAL DEMO - EAST
DRAWING INDEX
PAGE # SHEET # SHEET NAME
50 OF 102 MD103 MECHANICAL PIPING DEMO - WEST
51 OF 102 MD104 MECHANICAL PIPING DEMO - EAST
52 OF 102 M-100 MECHANICAL - OVERALL PLAN
53 OF 102 M-101 MECHANICAL - WEST
54 OF 102 M-102 MECHANICAL - EAST
55 OF 102 M-103 MECHANICAL RCP - WEST
56 OF 102 M-104 MECHANICAL RCP - EAST
57 OF 102 MP100 MECHANICAL PIPING - OVERALL
58 OF 102 MP101 MECHANICAL PIPING - WEST
59 OF 102 MP102 MECHANICAL PIPING - EAST
60 OF 102 M-500 MECHANICAL DETAILS
61 OF 102 M-600 MECHANCIAL SCHEDULES
62 OF 102 M-700 MECHANICAL CONTROLS
63 OF 102 M-701 MECHANICAL CONTROLS
PLUMBING
64 OF 102 P-001 PLUMBING SYMBOLS, LEGENDS, AND SCHEDULES
65 OF 102 PD100 PLUMBING DEMO - OVERALL
66 OF 102 PD101 CRAWL SPACE PLUMBING DEMO - WEST
67 OF 102 PD102 CRAWL SPACE PLUMBING DEMO - EAST
68 OF 102 PD103 PLUMBING DEMO - WEST
69 OF 102 PD104 PLUMBING DEMO - EAST
70 OF 102 P-100 PLUMBING - OVERALL
71 OF 102 P-101 CRAWL SPACE PLUMBING - WEST
72 OF 102 P-102 CRAWL SPACE PLUMBING - EAST
73 OF 102 P-103 PLUMBING - WEST
74 OF 102 P-104 PLUMBING - EAST
ELECTRICAL
75 OF 102 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
76 OF 102 E-002 ELECTRICAL LEGENDS
77 OF 102 ED101 LIGHTING DEMOLITION PLAN - PHASE 1
78 OF 102 ED102 POWER DEMOLITION PLAN - PHASE 1
79 OF 102 ED103 SPECIAL SYSTEMS DEMOLITION PLAN - PHASE 1
80 OF 102 EL101 LIGHTING PLAN - PHASE 1
81 OF 102 EL102 LIGHTING PLAN - PHASE 2
82 OF 102 EP100 POWER PLAN - PHASE 1 - NORMAL AND EMERGENCY POWER FEED
83 OF 102 EP101 POWER PLAN - PHASE 1
84 OF 102 EP102 POWER PLAN - PHASE 2
85 OF 102 ET101 SPECIAL SYSTEMS PLAN - PHASE 1
86 OF 102 ET102 SPECIAL SYSTEMS PLAN - PHASE 2
87 OF 102 EF101 FIRE ALARM SYSTEM PLAN - PHASE 1
88 OF 102 EF102 FIRE ALARM SYSTEM PLAN - PHASE 2
89 OF 102 E-401 ENLARGED TR ROOM 101 ELECTRICAL PLANS
90 OF 102 E-402 ENLARGED TR ROOM 101 TELECOMMUNICATION PLANS
91 OF 102 E-501 ELECTRICAL DETAILS
92 OF 102 E-502 ELECTRICAL DETAILS
93 OF 102 E-503 ELECTRICAL DETAILS
94 OF 102 E-504 ELECTRICAL DETAILS
95 OF 102 E-505 ELECTRICAL DETAILS
96 OF 102 E-506 ELECTRICAL DETAILS
97 OF 102 EP601 ONE-LINE DIAGRAM - EMERGENCY POWER
98 OF 102 EP602 ONELINE DIAGRAM - NORMAL POWER
99 OF 102 ET601 FIBER RISER AND TELECOMMUNICATIONS BONDING PROGRAM
100 OF 102 E-701 ELECTRICAL SCHEDULES
101 OF 102 E-702 ELECTRICAL SCHEDULES
102 OF 102 E-703 ELECTRICAL SCHEDULES
Megan Matt's Stamp
Megan Text Box 6/14/24
AREA OF WORK
LEVEL 01
TRUE
NORTH
CARL VINSON VA MEDICAL CENTER
CAMPUS BUILDINGS
AREA OF WORK / ISOLATED
CONSTRUCTION ZONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GS101
FACILITY SITE PLAN
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
NOT TO SCALE
FACILITY SITE PLAN
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1. COORDINATE CONTRACTOR STAGING AREA WITH VA COR
AT THE PRE-CONSTRUCTION MEETING. THIS INCLUDES,
BUT IS NOT LIMITED TO, AREAS TO BE USED FOR
MATERIAL STORAGE, ACCESS FOR MATERIAL DELIVERIES
AND TRANSPORTATION ROUTES TO THE PROJECT AREA.
2. DO NOT STORE PRODUCTS, MATERIALS, TOOLS,
EQUIPMENT, VEHICLES, OR ANY OTHER NON-PERMITTED
ITEMS ON MEDICAL CENTER PROPERTY UNLESS GIVEN
PRIOR APPROVAL BY THE VA COR.
3. A LIMITED AMOUNT OF SUPPLIES MAY BE STORED IN THE
CONSTRUCTION AREA AS LONG AS SAFETY AND
CLEANLINESS ARE NOT COMPROMISED. VA COR HAS
AUTHORITY TO REQUEST RELOCATION OF ANY AND
ALL STORED ITEMS TO A DIFFERENT LOCATION.
4. VERIFY CONTRACTOR STAGING AREA AND MATERIAL /
PRODUCT DELIVERY LOCATION WITH VA COR, PRIOR TO
BRINGING OR DELIVERING ITEMS TO THE MEDICAL
CENTER.
Revisions: Date: 2 OF 102
Megan Matt's Stamp
Megan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
CHANGE MGMT
USER
IV SUPPORT
MECHANICAL
HAC
STORAGE
IV TESTING
IV TESTING
TR
STAFF BREAK
WAITING ALCOVE
RESTROOM
CORRIDOR
CR11-9
ELECTRICAL ROOM
RESTROOM
RESTROOM
RESTROOM
MECHANICAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
ELECTRICAL
MECH
CHANGE MGMT
USER
RESTROOM
TR ROOM
HAC
CLASSROOM
103A
CLASSROOM
103B
CLASSROOM
104A
CLASSROOM
106A
CLASSROOM
106B
STAFF BREAK
RESTROOM
RESTROOM
RESTROOM
STORAGE
CORRIDOR
CR11-9
MECHANICAL
102A
ELECTRICAL
CLOSET
WAITING
ALCOVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GS201
PHASING PLAN
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
GENERAL NOTES
1. MAINTAIN STAFF ACCESS TO LEVEL 02 THROUGH STAIR
ENTRANCE.
2. THE TWO PHASES WILL BE SEPERATED BY STAFF USING
THE IV TESTING SPACE; ONLY ONCE VA IV TESTING IS
COMPLETE WILL PHASE II BEGIN CONSTRUCTION.
Revisions: Date:
3/32" = 1'-0"
LEVEL I - PHASE I - IV TESTING
3/32" = 1'-0"
LEVEL 1 - PHASE II - CLASSROOMS
PROJECT
NORTH
TRUE NORTH
(DASHED)
Megan Matt's Stamp
Megan
101A
EXTERIOR ELEVATION
INTERIOR ELEVATION
BUILDING SECTION FLAG
WALL SECTION FLAG
CALLOUT FLAG
VERTICAL GRID LINE
HORIZONTAL GRID LINE
TRUE NORTH ARROW
PROJECT NORTH ARROW
(TRUE NORTH DASHED)
ELEVATION / LEVEL MARKER
KEY NOTE
ROOM TAG
(SF OPTIONAL)
CEILING HEIGHT TAG
WALL TAG
FLOOR TAG
ROOF TAG
DOOR TAG
WINDOW TAG
SPECIALTY EQUIPMENT TAG
SIGNAGE TAG
SIGNAGE KEY NOTE
(AW SHEETS ONLY)
SIGNAGE MATERIAL TAG
(AW SHEETS ONLY)
TOILET
150 SF
A
01A
TRUE
NORTH
W1
PROJECT
NORTH
TRUE NORTH
(DASHED)
A01
D88
A5175SOAP DISH
IN-04.02-01
ACT 2x2
9' - 0" AFF
F-1
R-1
SYMBOLS
A-101
A-101
SIM
A-101
TYP
EXISTING TO REMAIN
NEW CONSTRUCTION
TO DEMOLISH
(DEMO SHEET(S) ONLY)
ABOVE
BELOW
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
(DEMO SHEET(S) ONLY)
NEW DOOR
AREA SHOWN ON SHEET
OUT OF SCOPE
INACCESSIBLE DURING PHASE
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA BOUNDRY
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA BARRIER
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA DOOR
(ICRA SHEET(S) ONLY)
ADHESIVE WALK-OFF MATS
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA AIR PRESSURE
(ICRA SHEET(S) ONLY)
CONTRACTOR PATH OF TRAVEL
(ICRA SHEET(S) ONLY)
SMOKE COMPARTMENT PERIMETER
(FIRE LIFE SAFETY SHEET(S) ONLY)
SMOKE RATED WALL
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
SMOKE & 1 HR FIRE RATED WALL
FIRE EXTINGUISHER CABINET
(FIRE LIFE SAFETY SHEET(S) ONLY)
EMERGENCY EGRESS PATHWAY
(FIRE LIFE SAFETY SHEET(S) ONLY)
SUPPLY GRILLE PER MECHANICAL
(SIZE & PROPORTIONS MAY VARY)
RETURN GRILLE PER MECHANICAL
(SIZE & PROPORTIONS MAY VARY)
LIGHTING PER ELECTRICAL
(SIZE & PROPORTIONS MAY VARY)
MATERIALS
EARTH
SAND
BATT INSULATION
RIGID INSULATION
CONCRETE
STEEL
PLYWOOD, FIRE RATED
GYPSUM BOARD, TYPE 'X'
GYPSUM BOARD, LEAD LINED
ACOUSTICAL CEILING TILE, 2' x 2'
ACOUSTICAL CEILING TILE, 2' x 4'
A-101
A-101
SIM
FEC
ABBREVIATIONS
SYMBOLS
& AND
∠ ANGLE
@ AT
℄ CENTERLINE
° DEGREES
# NUMBER
A
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
A(C)T ACOUSTICAL (CEILING) TILE
ACM ASBESTOS CONTAINING MATERIAL
ACW ACOUSTICAL WALL
ADA AMERICANS W/ DISABILITIES ACT
ADJ ADJACENT
A/E ARCHITECT/ENGINEER
AF ACCESS FLOOR
AFF ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ASPH ASPHALT
A/V AUDIO / VIDEO
B
BARR BARRIER
BATH BATHROOM
BB BACKER BOARD
BLD(G) BUILDING
BLK(G) BLOCK(ING)
BLW BELOW
BM BEAM
BMT(U) BONE MARROW TRANSPLANT (UNIT)
BO BOTTOM OF
BOC BOTTOM OF CURB
BOS BOTTOM OF SLAB
BRC BRACE, BRACING
BRKT BRACKET
BRNG BEARING
BTM BOTTOM
BTWN BETWEEN
C
CAB CABINET
CC CONTRACTOR FURN, CONTRACTOR INST
CD CONSTRUCTION / CONTRACT DOCUMENTS
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR(ANCE)
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMP COMPOSITION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER REPRESENTATIVE
CORR CORRIDOR
CS CONCRETE SEALER
CT CERAMIC TILE
CTR CENTER
CV CONTRACTOR FURNISHED, VA INSTALLED
D
DB DESIGN BUILD
DBL DOUBLE
DC DIRECT CURRENT
DD DESIGN DEVELOPMENT
DEMO DEMOLISH(ION)
DEPT DEPARTMENT
DG DESIGN GUIDE
DIA DIAMETER
DIM DIMENSION
DM DESIGN MANUAL
DWN DOWN
DR DOOR
DTL DETAIL
DWG DRAWING(S)
E
E EAST
EA EACH
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
ELEV ELEVATION OR ELEVATOR
ENG ENGINEER(ING)
EOC EDGE OF CURB
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
ETS EXPOSED TO STRUCTURE
EX(IST) EXISTING
EXP EXPANSION
EXT EXTERIOR
F
FA FIRE ALARM
FD FLOOR DRAIN
FE(C) FIRE EXTINGUISHER (CABINET)
FF FACTORY FINISH
FFB FINISH FLOOR BREAK
FIN FINISH(ED)
FLASH FLASHING
FLR FLOOR(ING)
FLRSNT FLORESCENT
FNDN FOUNDATION
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOS FACE OF STUDS
FP FIRE PROOF
FR FIRE RATED
FRM FRAME
FT FOOT, FEET
FTG FOOTING
FUR FURRING
FURN FURNISHED
G
GA GAGE, GAUGE
GALV GALVANIZED
GE GENERAL ELECTRIC
G(W)B GYPSUM (WALL) BOARD
GC GENERAL CONTRACTOR
GL GRID LINE
GLB GLUE LAMINATED BEAM
GMU GLASS MASONRY UNIT
GOV(T) GOVERNMENT
GYP GYPSUM BOARD
H
HAC HOUSEKEEPING AIDES CLOSET
HDR HEADER
H(D)W(E) HARDWARE
HM HOLLOW METAL
HORZ HORIZONTAL
HPDL HIGH PRESSURE DECORATIVE LAM
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATION & AIR CONDITIONING
I
ICRA INFECTIOUS CONTROL RISK ASSESSMENT
ID IDENTIFICATION
ILSM INTERIM LIFE SAFETY MEASURES
INCL INCLUDE(D,ING)
INST INSTALL
INSUL INSULATION
INT INTERIOR
J
JT JOINT
K
KV KILOVOLT
L
LAM LAMINATE(D)
LAV LAVATORY
LCM LEAD CONTAINING MATERIAL(S)
LD LEAD
LT LIGHT
M
MAT MATERIAL(S)
MAX MAXIMUM
MDF MEDIUM-DENSITY FIBREBOARD
MECH MECHANIC(AL)
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFR MANUFACTURE(R)
MIN MINIMUM
MISC MISCELLANEOUS
MOD MODIFIED
MTL METAL
N
N NORTH
N(/)A NOT APPLICABLE
NEG NEGATIVE
NO. NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
O.C. ON CENTER(S)
OPN(G) OPEN(ING)
OPP OPPOSITE
OPT OPTION(AL)
OVHD OVERHEAD
P
P PAINT
PCONC PRECAST CONCRETE
PCRA PRE-CONSTRUCTION RISK ASSESSMENT
PL PLATE
PLAM PLASTIC LAMINATE
PLY(WD) PLYWOOD
PNL PANEL
PR PAIR
PRFB PREFABRICATED
PS PLASTIC
PT PORCELAIN TILE
PTN(S) PARTITION(S)
PVMT PAVEMENT
Q
QTY QUANTITY
R
RAD RADIUS
RCP(S) REFLECTED CEILING PLAN(S)
REF REFERENCE
REINF REINFORCE(D,ING)
REP REPRESENTATIVE
REQ(S,(')D) REQUIRE(D,S,MENT(S))
RESIL RESILIENT
REV REVERSE
RF ROOF
RM ROOM
RMV REMOVE
RO ROUGH OPENING
S
S SOUTH
SCHED SCHEDULE
SCI(D) SPINAL CORD INJURY (& DISABILITY)
SD SCHEMATIC DESIGN
SECT SECTION
SF SQUARE FEET
SFRM SPRAY APPLIED FIRE-RESISTIVE MATERIAL
SHG SHINGLES
SHLD(G) SHEILD(ING)
SHT(G) SHEET (SHEATHING)
SIM SIMILAR
SM SEAM
SOW SCOPE OF WORK
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
ST STAIN
STDG STANDING
STF STAFF
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SURG SURGERY, SURGICAL
SUSP SUSPENDED
SV SHEET VINYL
SYS SYSTEM
T
TBD TO BE DETERMINED
TBL TABLE
TEMP TEMPORARY
T&G TONGUE AND GROOVE
THK THICK(NESS)
THRESH THRESHOLD
TOC TABLE OF CONTENTS
TOS TOP OF SLAB
TPH TOILET PAPER HOLDER
TRANS TRANSITION
TS TUBE STEEL
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
V
VA VETERANS AFFAIRS
VAR VARIES
VB VAPOR BARRIER
VC VA FURNISHED, CONTRACTOR INSTALLED
VERT VERTICAL
VIF VERIFY IN FIELD
VV VA FURNISHED, VA INSTALLED
W
W WEST
W/ WITH
WD WOOD
WDW WINDOW
WGHT WEIGHT
W/O WITHOUT
WP WATERPROOF(ING)
WR WATER RESISTANT
WRK WORK
X
XRY X-RAY
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS
BETWEEN EXISTING CONDITIONS AND THE CONTRACT
DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE
ATTENTION OF THE COR.
2. ALL WORK DONE BY THE CONTRACTOR AND/OR SUB-
CONTRACTORS SHALL BE PERFORMED WITH A HIGH LEVEL
OF WORKMANSHIP.
3. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE.
4. DO NOT SCALE DRAWINGS.
5. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A
+/- SYMBOL. ONLY NORMAL INDUSTRY STANDARD
TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM
DIMENSIONS INDICATED.
6. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE
FULL SPACE INDICATED WITHOUT ENCROACHMENTS.
7. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH
THE CONTRACT DOCUMENTS.
8. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH
FLOOR ELEVATION, UON.
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-001
ARCH SYMBOLS, ABBREVIATIONS
& GENERAL NOTES 009A
MK AB
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
Revisions: Date: 4 OF 102
Megan Matt's Stamp
Megan
OUT OF SCOPE
TEMPORARY ICRA BOUNDRY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
2 TYP.
AREA SHOWN
TRUE
NORTH
RCC103C
120 121 122 123 124
RCC101C
RCC101R 125
RCC104C
129A
RCC105C
RCC106C
131A
CR15-9
132 133 134 135 136 137
137B
137A 139
RCC102C 141
142 142A
RCC102R
101103104105106107108109110111112
CR13-9
113114CR12-9115116116A
CR14-9
116B
121A
ST11-9
CR11-9
RCC107C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
2 TYP.
106 103
CR11-9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AS101
ICRA PLANS
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
PROJECT
NORTH
TRUE NORTH
(DASHED)
1" = 10'-0"
ICRA PLAN - PHASE I
1. ICRA CLASS II REQUIREMENTS MUST BE MET
THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.
2. COMPLY WITH ALL REQS LISTED IN THE INFECTION
CONTROL SECTION OF SPECIFICATION 01 35 26 - SAFETY
REQUIREMENTS.
3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
1 TEMPORARILY SEAL DOOR FOR DURATION OF
CONSTRUCTION PHASE.
EXISTING WALL ACTING AS AN ICRA BOUNDRY. SEAL
OPENINGS / PENETRATIONS / HVAC DUCTS AS
REQUIRED. MAINTAIN 1-HR FIRE RATING. ALL
PENETRATIONS MUST BE FIRE-STOPPED.
Revisions: Date:
1" = 10'-0"
ICRA PLAN - PHASE II
PROJECT
NORTH
TRUE NORTH
(DASHED)
Megan Matt's Stamp
Megan
EMERGENCY EGRESS ROUTE
2 HR FIRE RATED WALL
FIRE EXTINGUISHER CABINETFEC
79' - 6" TO POINT OF TWO EGRESSES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
MAX ALLOWABLE 200'
PROVIDED 155' - 2"
MAX ALLOWABLE 200'
PROVIDED 174' - 8"
FEC
FEC
FEC
FEC
CHANGE MGMT
USER
108 IV SUPPORT
MECHANICAL
HAC
STORAGE
IV TESTING
IV TESTING
TR
STAFF BREAK
WAITING ALCOVE
RESTROOM
CORRIDOR
CR11-9
ELECTRICAL ROOM
RESTROOM
RESTROOM
RESTROOM
MECHANICAL
STG
103A
ELECTRICAL
CLOSET
AREA SHOWN
TRUE
NORTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
51' - 6" TO POINT OF TWO EGRESSES
FEC
MAX ALLOWABLE 200'
PROVIDED 175' - 0"
MAX ALLOWABLE 200'
PROVIDED 155' - 5"
FEC
FEC
FEC
ELECTRICAL
MECH
CHANGE MGMT
USER
RESTROOM
TR ROOM
HAC
CLASSROOM
103A
CLASSROOM
103B
CLASSROOM
104A
CLASSROOM
106A
CLASSROOM
106B
STAFF BREAK
RESTROOM
RESTROOM
RESTROOM
STORAGE
CORRIDOR
CR11-9
WAITING
ALCOVE
ELECTRICAL
CLOSET
MECHANICAL
102A
STG
CLASSROOM
104B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AS201
FIRE LIFE SAFETY
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
1" = 10'-0"
FIRE LIFE SAFETY PLAN - PHASE I
LEGEND
GENERAL NOTES
KEY PLAN
1. BUILDING IS FULLY SPRINKLERED.
2. EXISTING BUILDING CONSTRUCTION TYPE SHALL NOT BE
ALTERED AS PART OF THIS PROJECT.
A. NFPA 220 FIRE RESISTIVE RATING: TYPE 1 (332).
B. UBC FIRE RESISTIVE RATING: TYPE 1, FR.
3. EXISTING BUILDING OCCUPANCY TYPE SHALL NOT BE
ALTERED AS PART OF THIS PROJECT.
A. NFPA 101 OCCUPANCY TYPE: EXISTING BUSINESS
(CHAPTER 39) WITH INCIDENTAL STORAGE.
4. OCCUPANT LOADS IN AREA OF WORK ARE EQUAL OR LESS
THAN EXISTING, AND THEREFORE, EXISTING EXIT WIDTHS
ARE NOT REQUIRED TO BE ALTERED AS PART OF THIS
PROJECT.
A. 2,507 SF BUSINESS (CONCENTRATED) AT 50 SF /
OCCUPANT = 50 OCCUPANTS
B. 1,252 SF BUSINESS (GENERAL) AT 150 SF / OCCUPANT
= 8 OCCUPANTS
C. 260 SF STORAGE AT MAXIMUM PROBABLE = 2
OCCUPANTS
D. TOTAL NET OCCUPANT LOAD = 60
5. EGRESS CAPACITY:
A. OCCUPANT LOAD (60) / NUMBER OF EXITS (3) = 20
OCCUPANTS
6. # OF REQ'D EGRESS EXITS: 2.
7. MAX COMMON PATH OF TRAVEL BEFORE TWO PATHS ARE
PROVIDED SHALL NOT EXCEED 100' (EXISTING BUSINESS,
FULLY SPRINKLERED).
A. PROVIDED: 79' - 6" (PHASE I), 51' - 6" (PHASE II).
8. MAX TRAVEL DISTANCE TO EXITS SHALL NOT EXCEED
200' - 0" (EXISTING BUSINESS, FULLY SPRINKLERED).
9. MAX DISTANCE BETWEEN FIRE EXTINGUISHERS: 75' - 0".
MAX DISTANCE FROM HAZARDOUS AREAS: 50' - 0".
ALL FIRE EXTIGUISHERS TO BE CLASS ABC.
10. SEE ELECTRICAL FOR EXIT SIGNAGE LOCATIONS &
REQUIREMENTS.
11. SEE FIRE PROTECTION FOR SPRINKLER AND FIRE ALARM
LOCATIONS AND REQUIREMENTS.
Revisions: Date:
1" = 10'-0"
FIRE LIFE SAFETY PLAN - PHASE II
PROJECT
NORTH
TRUE NORTH
(DASHED)
Megan Matt's Stamp
Megan
/1 AD102/1 AD101PROSTHETICS
STOR
VERTICAL SPACE
CHASE
RCC103C
PROSTHETICS
WRK RM
PROSTHETICS
STOR
PROSTHETICS
PURCHASING
AGENT OFF
PROSTHETICS
PURCHASING
AGENT SUPV
PROSTHETICS
STOR
VERTICAL SPACE
PIPE CHASE
RCC101C
PROSTHETICS PIPE
CLO
RCC101R
COMMON MECH RM
PROSTHETICS PGM
ANALYST NETWRK
EMPLOYEE
VERTICAL SPACE
PIPE CHASE
RCC104C
COMMON TLT
PROSTHETICS FILE
RM
129A
VERTICAL SPACE
PIPE CHASE
RCC105C
COMMON FEMALE
TLT
VERTICAL SPACE
PIPE CHASE
RCC106C
GERIATRICS COMM
/ NH NRS GE AND C
OFF
GERIATRICS PIPE
CLO
131A
GERIATRICS BRK
RM
131COMMON CORR
CR15-9
GERIATRICS
SPECIAL PGMS
CO-ORDER SCI /
TBI / VISIT OFF
GERIATRICS SOC
WRK SUPV COMM
CARE PGMS OFF
GERIATRICS
RECREATION OFF
GERIATRICS G AND
EC PHY
GERIATRICS
EXTENDED CARE
OFF
GERIATRICS ACOS
AND EXTENDED
CARE OFF
GERIATRICS CLO
137B
GERIATRICS TLT
137A
COMMON MALE
TLT
COMMON TEL CLO
GERIATRICS SOC
WRK EXTERNAL
CARE
VERTICAL SPACE
CHASE
RCC102C
GERIATRICS
MULTIPURPOSE
RM
GERIATRICS STOR
COMMON FEC
142A
CANTEEN SVC
VENDING AREA
ENGINEERING
MECH RM
NUTRITION/FOOD
DIETICIAN OFF
GERIATRICS
FEMALE TLT
GERIATRICS OFF
GERIATRICS G AND
EC PSA
GERIATRICS
DIETICIAN AND
EXTENDED CARE
OFF
GERIATRICS
DIETICIAN AND
EXTENDED CARE
OFF
NUTRITION/FOOD
DIETICIAN OFF
GERIATRICS OFF
GERIATRICS COMM
HEALTH NRS
CO-ORDR
COMMON CORR
CR13-9
PROSTHETICS OFF
PROSTHETICS OFF
COMMON CORR
CR12-9
PROSTHETICS
RECEPTION AND
WAIT
PROSTHETICS PGM
MGR PROSTHETIC
PROSTHETICS
PURCHASING
116A
PROSTHETICS
CORR
CR14-9
PROSTHETICS
PURCHASING
116B
COMMON FEC
121A
VERTICAL SPACE
STAIR
ST11-9
COMMON CORR
CR11-9
VERTICAL SPACE
CHASE
RCC107C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AD001
DEMO PLAN - PHASE I - OVERALL
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
Revisions: Date:
GENERAL NOTES
1/8" = 1'-0"
DEMO PLAN - PHASE I - OVERALL
1. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED,
PRIOR TO BEGINNING ANY WORK. NO WORK SHALL BE
DONE WITHOUT PROPERLY MEETING ALL ICRA
REQUIREMENTS, REF ICRA PLAN(S) AND SPECIFICATION
SECTION 01 35 25 'SAFETY REQUIREMENTS' FOR
SPECIFIC ICRA CLASS LOCATIONS & REQUIREMENTS.
2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION
OF ANY EXISTING EQUIPMENT.
3. DEMO EXISTING FINISHES AS REQ'D TO INSTALL NEW,
REF FINISH SCHEDULE.
4. DEMO EXISITING WALLS & DOORS AS INDICATED ON
PLAN (PHASE I ONLY).
5. DEMO EXISTING FLOOR FINISH THROUGHOUT WORK
AREA (PHASE I ONLY).
6. REMOVE WALL MOUNTED ACCESSORIES REQUIRED TO
COMPLETE A CONSTRUCTION TASK. VERIFY WITH COR
BEFORE DISPOSAL (PHASE I ONLY).
Megan Matt's Stamp
Megan
/1 AD104/1 AD103
CHANGE
MGMT
USER
IV
SUPPORT
MECHANICAL
HAC
STORAGE
IV
TESTING
IV
TESTING
TR
STAFF
BREAK
WAITING
ALCOVE
RESTROOM
CORRIDOR
CR11-9
ELECTRICAL
ROOM
RESTROOM
RESTROOM
RESTROOM
MECHANICAL
ELECTRICAL
CLOSET
115 STG
103A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AD002
DEMO PLAN - PHASE II - OVERALL
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
GENERAL NOTES
Revisions: Date:
1/8" = 1'-0"
DEMO PLAN - PHASE II - OVERALL
1. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED,
PRIOR TO BEGINNING ANY WORK. NO WORK SHALL BE
DONE WITHOUT PROPERLY MEETING ALL ICRA
REQUIREMENTS, REF ICRA PLAN(S) AND SPECIFICATION
SECTION 01 35 25 'SAFETY REQUIREMENTS' FOR
SPECIFIC ICRA CLASS LOCATIONS & REQUIREMENTS.
2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION
OF ANY EXISTING EQUIPMENT.
Megan Matt's Stamp
Megan
C
S
C
S
C
S
C
S
C
S
C
S
C
S
C
S
C
S
C
S
C
S
C
S
C
S
C
S
WAP
WAP
WAP
WAP WAP
WAP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 60 61 62 63 64
17 18 19 20 21 25 26 27 28 29 30 31 32
TYP. TYP.
/1 AD112/1 AD111PROSTHETICS
STOR
VERTICAL SPACE
CHASE
RCC103C
PROSTHETICS
WRK RM
PROSTHETICS
STOR
PROSTHETICS
PURCHASING
AGENT OFF
PROSTHETICS
PURCHASING
AGENT SUPV
PROSTHETICS
STOR
VERTICAL SPACE
PIPE CHASE
RCC101C
PROSTHETICS PIPE
CLO
RCC101R
COMMON MECH RM
PROSTHETICS PGM
ANALYST NETWRK
EMPLOYEE
VERTICAL SPACE
PIPE CHASE
RCC104C
COMMON TLT
PROSTHETICS FILE
RM
129A
VERTICAL SPACE
PIPE CHASE
RCC105C
COMMON FEMALE
TLT
VERTICAL SPACE
PIPE CHASE
RCC106C
GERIATRICS COMM
/ NH NRS GE AND C
OFF
GERIATRICS PIPE
CLO
131A
GERIATRICS BRK
RM
131COMMON CORR
CR15-9
GERIATRICS
SPECIAL PGMS
CO-ORDER SCI /
TBI / VISIT OFF
GERIATRICS SOC
WRK SUPV COMM
CARE PGMS OFF
GERIATRICS
RECREATION OFF
GERIATRICS G AND
EC PHY
GERIATRICS
EXTENDED CARE
OFF
GERIATRICS ACOS
AND EXTENDED
CARE OFF
GERIATRICS CLO
137B
GERIATRICS TLT
137A
COMMON MALE
TLT
COMMON TEL CLO
GERIATRICS SOC
WRK EXTERNAL
CARE
VERTICAL SPACE
CHASE
RCC102C
GERIATRICS
MULTIPURPOSE
RM
GERIATRICS STOR
COMMON FEC
142A
CANTEEN SVC
VENDING AREA
ENGINEERING
MECH RM
NUTRITION/FOOD
DIETICIAN OFF
GERIATRICS
FEMALE TLT
GERIATRICS OFF
GERIATRICS G AND
EC PSA
GERIATRICS
DIETICIAN AND
EXTENDED CARE
OFF
GERIATRICS
DIETICIAN AND
EXTENDED CARE
OFF
NUTRITION/FOOD
DIETICIAN OFF
GERIATRICS OFF
GERIATRICS COMM
HEALTH NRS
CO-ORDR
COMMON CORR
CR13-9
PROSTHETICS OFF
PROSTHETICS OFF
COMMON CORR
CR12-9
PROSTHETICS
RECEPTION AND
WAIT
PROSTHETICS PGM
MGR PROSTHETIC
PROSTHETICS
PURCHASING
116A
PROSTHETICS
CORR
CR14-9
PROSTHETICS
PURCHASING
116B
COMMON FEC
121A
VERTICAL SPACE
STAIR
ST11-9
COMMON CORR
CR11-9
VERTICAL SPACE
CHASE
RCC107C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AD011
DEMO CEILING PLAN - PHASE I -
OVERALL 009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
Revisions: Date:
GENERAL NOTES
1/8" = 1'-0"
DEMO CEILING PLAN - PHASE I - OVERALL
PROJECT
NORTH
TRUE NORTH
(DASHED)
1. MAINTAIN EXISTING SPRINKLER HEADS AND SYSYEM
WHILE COMPLETING DEMO WORK.
2. REMOVE ANY CEILING MOUNTED ACCESSORIES
REQUIRED TO COMPLETE ANY CONSTRUCTION TASK.
3. DEMO EXISTING FINISHES AS REQ'D TO INSTALL NEW
PER FINISH SCHEDULE.
Megan Matt's Stamp
Megan
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
TO DEMOLISH
EXISTING TO REMAIN
1. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED,
PRIOR TO BEGINNING ANY WORK. NO WORK SHALL BE
DONE WITHOUT PROPERLY MEETING ALL ICRA
REQUIREMENTS, REF ICRA PLAN(S) AND SPECIFICATION
SECTION 01 35 25 'SAFETY REQUIREMENTS' FOR SPECIFIC
ICRA CLASS LOCATIONS & REQUIREMENTS.
2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION OF
ANY EXISTING EQUIPMENT.
AREA SHOWN
PROJECT
NORTH
TRUE NORTH
(DASHED)
BUILDING 9A
1 2 3 4 5 6 7 8
17 18 19 20 21
2 TYP.
TYP.
/4
PROSTHETICS
STOR
VERTICAL SPACE
CHASE
RCC103C
PROSTHETICS
WRK RM
PROSTHETICS
STOR
PROSTHETICS
PURCHASING
AGENT OFF
PROSTHETICS
PURCHASING
AGENT SUPV
PROSTHETICS
STOR
VERTICAL SPACE
PIPE CHASE
RCC101C
PROSTHETICS PIPE
CLO
RCC101R
COMMON MECH RM
PROSTHETICS PGM
ANALYST NETWRK
EMPLOYEE
VERTICAL SPACE
PIPE CHASE
RCC104C
COMMON TLT
PROSTHETICS FILE
RM
129A
VERTICAL SPACE
PIPE CHASE
RCC105C
COMMON FEMALE
TLT
VERTICAL SPACE
PIPE CHASE
RCC106C
GERIATRICS COMM
/ NH NRS GE AND C
OFF
GERIATRICS PIPE
CLO
131A
GERIATRICS BRK
RM
COMMON CORR
CR15-9
PROSTHETICS OFF
COMMON CORR
CR12-9
PROSTHETICS
RECEPTION AND
WAIT
PROSTHETICS PGM
MGR PROSTHETIC
PROSTHETICS
PURCHASING
116A
PROSTHETICS
CORR
CR14-9
PROSTHETICS
PURCHASING
116B
COMMON FEC
121A
VERTICAL SPACE
STAIR
ST11-9
VERTICAL SPACE
CHASE
RCC107C
1 DEMOLISH EXISTING WALLS AS INDICATED ON DEMO
PLAN, TYP.
DEMOLISH EXISTING DOORS AS INDICATED ON DEMO
PLAN, TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AD101
DEMO PLAN - PHASE I - WEST
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
Revisions: Date:
3/16" = 1'-0"
DEMO PLAN - PHASE I - WEST
Megan Matt's Stamp
Megan
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
TO DEMOLISH
EXISTING TO REMAIN
1. ENSURE CONSTRUCTION ZONE IS FULLY ENCLOSED,
PRIOR TO BEGINNING ANY WORK. NO WORK SHALL BE
DONE WITHOUT PROPERLY MEETING ALL ICRA
REQUIREMENTS, REF ICRA PLAN(S) AND SPECIFICATION
SECTION 01 35 25 'SAFETY REQUIREMENTS' FOR SPECIFIC
ICRA CLASS LOCATIONS & REQUIREMENTS.
2. COORDINATE WITH VA COR PRIOR TO THE DEMOLITION OF
ANY EXISTING EQUIPMENT.
AREA SHOWN
PROJECT
NORTH
TRUE NORTH
(DASHED)
BUILDING 9A
8 9 10 11 12 13 14 15 16 60 61 62 63 64
25 26 27 28 29 30 31 32
TYP.
TYP.
GERIATRICS
SPECIAL PGMS
CO-ORDER SCI /
TBI / VISIT OFF
GERIATRICS SOC
WRK SUPV COMM
CARE PGMS OFF
GERIATRICS
RECREATION OFF
GERIATRICS G AND
EC PHY
GERIATRICS
EXTENDED CARE
OFF
GERIATRICS ACOS
AND EXTENDED
CARE OFF
GERIATRICS CLO
137B
GERIATRICS TLT
137A
COMMON MALE
TLT
COMMON TEL CLO
GERIATRICS SOC
WRK EXTERNAL
CARE
VERTICAL SPACE
CHASE
RCC102C
GERIATRICS
MULTIPURPOSE
RM
GERIATRICS STOR
142 COMMON FEC
142A
VERTICAL SPACE
ELEV
RCC102R
COMMON VEST
100 ENVIR MGMT HAC
CLO
CANTEEN SVC
VENDING AREA
ENGINEERING
MECH RM
NUTRITION/FOOD
DIETICIAN OFF
GERIATRICS
FEMALE TLT
GERIATRICS OFF
GERIATRICS G AND
EC PSA
GERIATRICS
DIETICIAN AND
EXTENDED CARE
OFF
GERIATRICS
DIETICIAN AND
EXTENDED CARE
OFF
NUTRITION/FOOD
DIETICIAN OFF
GERIATRICS OFF
GERIATRICS COMM
HEALTH NRS
CO-ORDR
COMMON CORR
CR13-9
PROSTHETICS OFF
COMMON CORR
CR11-9
1 DEMOLISH EXISTING WALLS AS INDICATED ON DEMO
PLAN, TYP.
DEMOLISH EXISTING DOORS AS INDICATED ON DEMO
PLAN, TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AD102
DEMO PLAN - PHASE I - EAST
009A
MK MC
CONSTRUCTION
DOCUMENT
6/14/2024
557-21-703
CARL VINSON VA MEDICAL CENTER - DUBLIN, GA
RENOVATE BUILDING 9A FOR
EHRM ADMINISTRATIVE SPACE
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
PROJECT
NORTH
TRUE NORTH
(DASHED)
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
Revisions: Date:
3/16" = 1'-0"
DEMO PLAN - PHASE I - EAST
Megan Matt's Stamp
Megan
| Sheets |
| A-001 - ARCH SYMBOLS, ABBREVIATIONS & GENERAL NOTES |
| AD001 - DEMO PLAN - PHASE I - OVERALL |
| AS101 - ICRA PLANS |
| AS201 - FIRE LIFE SAFETY |
| G-001 - COVER SHEET |
| GS101 - FACILITY SITE PLAN |
| GS201 - PHASING PLAN |
File details come from the government source that posted it. Updated .