S02 Exhibit B.pdf

PDF 111 KB Posted

Attached to
Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
Solicitation number
36C24125R0077Solicitation
Issued by

About this file

This document is an Exhibit B Subcontractor Information and Consent Form for a Request for Proposal (RFP) issued by the Department of Veterans Affairs. The specific project is Project 523A4-20-208 for Replace Boilers and Upgrade Controls, with RFP Number 36C24125R0077. The form requires major subcontractors and/or teaming partners to provide consent for the release of their past and present performance information to the prime contractor during the source selection process.

The form emphasizes the government's increased focus on past performance for obtaining best value in source selections. Each major subcontractor identified in the technical proposal must complete this consent form, and while written references are encouraged, subcontractors are not required to send out past performance questionnaires. The form includes spaces for the subcontractor's name, signature, title of the authorizing individual, address, and date of submission.

View the file

Other files

File Type Posted
36C24125R0077 0005.pdf PDF
Amendment 5 RFI Response.xlsx XLSX spreadsheet
Geotechnical Report 7 of 8 A0004.pdf PDF
SS101.1 A0004.pdf PDF
S-002 A0004.pdf PDF
AE503 A0004.pdf PDF
SF111.3A A0004.pdf PDF
S-003 A0004.pdf PDF
AE101_3 A0004.pdf PDF
Geotechnical Report 3 of 8 A0004.pdf PDF
SF101.3A A0004.pdf PDF
SF141.3A A0004.pdf PDF
S-552 A0004.pdf PDF
ES101.1 A0004.pdf PDF
CD101 A0004.pdf PDF
Hazmat A0004.pdf PDF
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
EP141.3A A0004.pdf PDF
Geotechnical Report 4 of 8 A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
AE101_5 A0004.pdf PDF
SF121.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
MA MS4 Admin A0004.pdf PDF
SF131.3A A0004.pdf PDF
AE103_3 A0004.pdf PDF
MA MS4 Permit A0004.pdf PDF
Geotechnical Report 1 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
PP141.3A A0004.pdf PDF
AE401 A0004.pdf PDF
MH121.3A A0004.pdf PDF
AE604 A0004.pdf PDF
Geotechnical Report 6 of 8 A0004.pdf PDF
Geotechnical Report 2 of 8 A0004.pdf PDF
S02 36C24125R0077 0004.docx DOCX document
S06 36C24125R0077 0003.pdf PDF
S06 Site Visit 2 Sign In Sheet 01282026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
36C24125R0077 0002.pdf PDF
Site Visit Sign In Sheet 01052026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
S06 Amendment 0001 36C24125R0077.pdf PDF
WD MA20260001 01022026.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
07_Fire Protection.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B – SUBCONTRACTOR INFORMATION AND CONSENT FORM

Each major subcontractor and/or teaming partner identified in your technical proposal must complete an Exhibit B, “Subcontractor Information and Consent Form” to be considered. Written references for subcontractors may be included and are encouraged; however, subcontractors do not need to send out past performance questionnaires.

Subcontractor and/or teaming partner consent for the release of past performance information to the prime contractor and reference information:

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. To assist the Government in assessing your past performance relevancy we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms shall be submitted to the offering contractor for submission with the technical proposal.

(Name of Firm) is currently planning on participating as a (subcontractor and or a teaming partner) with (prime contractor or name of entity providing proposal) in responding to the Request for Proposal Number 36C24125R0077, Project 523A4-20-208 Replace Boilers and Upgrade Controls, issued by the Department of Veterans Affairs.

We understand that the Government is placing increased emphasis on past performance to obtain best value in source selections. To facilitate the performance confidence assessment process, we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.

(Signature) (Title of Individual with authority to sign for and legally bind the company)

Address:

City/State/Zip Code: Date:

File details come from the government source that posted it. Updated .