SF111.3A A0004.pdf

PDF 487 KB Posted

Attached to
Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
Solicitation number
36C24125R0077Solicitation
Issued by

About this file

This is a structural slab reinforcing plan document for a federal construction project at the West Roxbury VA Medical Center in West Roxbury, Massachusetts. The drawing, designated SF111.3A, is part of the bid documents issued for construction under Project Number 0506-0012 for the "Replace Boilers and Upgrade Controls" project, specifically Phase 3, Area A at the main level. The plan was issued on November 14, 2025, and was updated with Addendum 01 on March 2, 2026. The U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, is the federal agency overseeing this project through the Engineer of Record, Miller-Remick LLC Consultants Professional Engineer.

The technical specifications detail three concrete slab types for the foundation system: S1 denotes a 12-inch concrete slab with #5 rebar at 9 inches top and bottom, each way (T&B, EW); S2 denotes a 30-inch concrete slab with #7 rebar at 9 inches T&B, EW; and S3 denotes a 6-inch concrete slab with #5 rebar at 6 inches bottom, EW. All foundations are to be constructed on micropiles, with contractors required to retain a professional engineer registered in the project jurisdiction for micropile foundation design. The top of slab elevation is set at 100'-0". The contractor must exercise caution during excavation due to unknown buried debris and must remove and dispose of all existing debris and abandoned subgrade structures. Additional requirements include dewatering the existing site prior to excavation and coordinating all below-slab utilities on concrete shop drawings. The project involves collaboration among multiple design consultants including MABBETT & ASSOCIATES for architectural and civil engineering, WBRC for fire and life safety, KOFFEL ASSOCIATES for electronic security, GRW for tunnel structural and civil engineering, PEC for physical security, and FORCE PROTECT.

View the file

Other files

File Type Posted
Amendment 5 RFI Response.xlsx XLSX spreadsheet
S-002 A0004.pdf PDF
SF121.3A A0004.pdf PDF
SF101.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
AE103_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
S-003 A0004.pdf PDF
MH121.3A A0004.pdf PDF
PP141.3A A0004.pdf PDF
AE604 A0004.pdf PDF
AE401 A0004.pdf PDF
Geotechnical Report 6 of 8 A0004.pdf PDF
Geotechnical Report 7 of 8 A0004.pdf PDF
Geotechnical Report 2 of 8 A0004.pdf PDF
S02 36C24125R0077 0004.docx DOCX document
S06 36C24125R0077 0003.pdf PDF
S06 Site Visit 2 Sign In Sheet 01282026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
05b_Structural.pdf PDF
07_Fire Protection.pdf PDF
S02 WD MA20250001 12122025.pdf PDF
S02 Exhibit D.xlsx XLSX spreadsheet
P03 Brand Name Door Hardware_Redacted.pdf PDF
P03 Brand Name Trane_Redacted.pdf PDF
P03 Brand Name Fire Alarm_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume II.pdf PDF
09a_Mechanical.pdf PDF
01_General.pdf PDF
04_Civil.pdf PDF
S02 VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
S02 RFP 36C24125R0077 Solicitation.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit A.pdf PDF
P03 Brand Name CB Boiler Burner Fire Tube_Redacted.pdf PDF
P03 Brand Name ATS_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume I.pdf PDF
09b_Mechanical.pdf PDF
08_Plumbing.pdf PDF
05a_Structural.pdf PDF
03b_Civil Site.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

9 8 7 6 5 4

C

D

BB

21' - 4" 18' - 0" 18' - 0" 18' - 0" 25' - 3"

A.4

C.7

7.68.48.7

E

F

PIPE BRIDGE FRAMING

(TYP); SEE SF101.3E &

SF131.3E

5' - 0" 7' - 6" 7' - 6"

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S1

PIPE TRENCH AND

STL GRATING (TYP)

SEE DETAIL 3/S-511

S-501

S-302.3

S-501

S-501

S-501

S-501

HSS POST, SEE

SF112.3A (TYP)

S

SPAN OF 2" 19-

W-4 GRATING

S 2 S

S

S

TYP @

THK SLAB

TYP @

THK SLAB

FLOOR DRAIN; REFER TO

PLUMB DWGS (TYP)

STEEL BOILER RAILS;

COORDINATE LOCATION

WITH MECH DWGS;

SEE DETAIL 5/S-511

(TYP)

21' - 4"

S

S

GRADE BEAM (TYP)

SEE SF101.3A

PIPE PIT

S-511

F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W

IN

G S

F .3

B

TYP

EQ

TYP

EQ

TYP

EQ

F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W

IN

G S

F .5

100' - 7"

S-511

S-511

S-501

TYP

TYP

TY

P

TY

P

/2

/2

1' - 1 21/32"

7' - 0"

S-511

FND WALL THICKNESS

TO MATCH GRADE BEAM

BELOW (TYP)

S

S

S-302.3

2' - 0" 1' - 3" 2' - 0" 1' - 3" 2' - 0" 1' - 3" 2' - 0" 1' - 3"

2' - 6"

1' - 4" 3' - 0"

S-212.3

S3 (94'-0")

S1

GB17 (93'-6")

GB17 (93'-6")

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1

/2

:4

:3

P

M

SF111.3A

STRUCTURAL

SLAB REINFORCING PLAN

MAIN LEVEL - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 ER DS

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

SLAB REINFORCING PLAN - MAIN LEVEL - PHASE 3

AREA A

GENERAL SHEET NOTES:

1. REFER TO DRAWING S-001 AND S-002 FOR STRUCTURAL GENERAL NOTES AND

ABBREVIATIONS.

2. CONTRACTOR SHALL USE CAUTION WHILE EXCAVATING DUE TO UNKNOWN BURIED

DEBRIS. ALL EXISTING DEBRIS AND ABANDONED SUBGRADE STRUCTURES, FEATURES,

AND/OR OBJECTS ARE TO BE REMOVED AND DISPOSED OF.

3. DEWATER EXISTING SITE PRIOR TO EXCAVATION FOR FOUNDATIONS. REFER TO

GENERAL NOTES AND SPECIFICATIONS.

4. RETAIN GEOTECHNICAL ENGINEER FOR DESIGN AND INSPECTION OF MICROPILES. REFER

TO GENERAL NOTES AND SPECIFICATIONS.

5. FOR PROJECT WORK POINT, SEE DRAWING SF101.5.

6. COORDINATE ALL BELOW-SLAB UTILITIES ON CONCRETE SHOP DRAWINGS.

PLAN NOTES:

1. ALL FOUNDATIONS TO BE CONSTRUCTED ON MICROPILES. CONTRACTOR TO

RETAIN PROFESSIONAL ENGINEER REGISTERED IN PROJECT JURISDICTION FOR

DESIGN OF MICROPILE FOUNDATION.

2. TOP OF SLAB ELEVATION 100'-0".

3. 'S1' DENOTES 12" CONCRETE SLAB W/#5 @9" T&B, EW.

4. 'S2' DENOTES 30" CONCRETE SLAB W/#7 @9" T&B, EW.

5. 'S3' DENOTES 6" CONCRETE SLAB W/#5 @6" BOT, EW.

NO. DESCRIPTION DATE

1 ADDENDUM 01 03/02/26

File details come from the government source that posted it. Updated .