This is an architectural floor plan drawing for a federal construction project at the West Roxbury VA Medical Center in West Roxbury, Massachusetts. The drawing (designated as AE102.3 and drawing number 523A4-20-208) depicts the Boiler Plant & Electrical Spaces at the Mezzanine Level and is part of Phase 3 of the project scope titled "Replace Boilers and Upgrade Controls." The plan is drawn at 1/8" = 1'-0" scale and shows the detailed layout of the mezzanine level including generator room (201), security office (205), IT room (206), electrical room (207), mechanical room (217), lounge (209), bedrooms (214), shower facilities (211-212), lockers (210), storage areas (202, 204, 215), and multiple stair and corridor spaces (203, 220, 221).
The drawing was issued as Bid Documents for Construction on November 14, 2025, with revisions noted in Addendum 01 dated March 2, 2026. The document identifies the Office of Construction and Facilities Management at the U.S. Department of Veterans Affairs as the project owner, with the project number 0506-0012. The design team includes WBRC INC Consultants as Engineer of Record, Mabbett & Associates as Architect & Civil Engineering, Koffel Associates for Fire & Life Safety, GRW for Electronic Security, PEC for Tunnel Structural & Civil Engineering, and Force Protect for Physical Security. The drawing indicates existing conditions to remain where hatched, piping bridges referenced on MEP and structural drawings, and specifications for building envelope protection membranes on exposed CMU walls.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DNFEC
FEC
D W
F
DN
UP
FEC
FECFEC
EXISTING BOILER
ROOM BELOW
BOILER ROOM
CATWALKS
EXISTING COAL BUNKERS (FUEL
OIL STORAGE TANK LOCATIONS)
TO REMAIN
EXISTING TO
REMAIN
AE201.3
B1
AE201.3D1
AE201.3
F1
F1
AE301.3
F4
AE301.3
LOUNGE
I.T.
BEDROOM
TLT
SHOWER
LOCKERS
TLT/SHOWER
STORAGE
STAIR
CORRIDOR
STAIR
C O
R R
ID
O
R
STORAGE
GENERATOR ROOM
MEZZANINE
SECURITY
10' - 7 1/4" 2' - 2 1/4" 14' - 8" 8' - 0" 10' - 0" 8' - 0" 10' - 0" 8' - 0" 10' - 0" 8' - 0" 10' - 11"
C1
AE301.3
C4
AE301.3
AE201.3D5
EXISTING TO REMAIN
WHERE HATCHED
AE401
F5
STORAGE
AE501
F5
8' - 6 7/8" 5' - 10 7/8" 28' - 5 7/8"
/4
6'
1/
2"
8' - 1 1/4" 11' - 0" 10' - 4 7/8" 10' - 4 7/8" 9' - 3 7/8" 23' - 7"
7'
3/
4"
JAN.
ELEC
C
LR
3'
7"
C C C C C C C C
PIPING BRIDGE. SEE MEP AND
STRUCTURAL DRAWINGS
M6.1
OFFICE
D D
C
F15
5'
7/
8"
2'
3/
4"
/4
1'
/4
C8.2
AE503
B6
AE503
D1
MECH
17' - 0" 13' - 10 1/2" 13' - 6" 13' - 6" 14' - 2 1/2" 11' - 5" 8' - 10" 5' - 0" 7' - 6" 7' - 6" 10' - 6" 18' - 0" 18' - 0" 25' - 3" 13' - 6" 13' - 6" 13' - 6"
F9
F9
X6 X4 9 8 7 6 5 4 13 2X2 X1X5 7.68.48.7X3
M4 M6.1
M6.2
M4
M4M4
M4M4C
M4C
M4
M4M4
M4
M4
M4
M4
M4
M4
M4C
TYP.
APPLY FULLY ADHERED,
PERMEABLE, AIR AND
MOISTURE BUILDING
ENVELOPE PROTECTION
MEMBRANE TO EXPOSED
CMU WALL
C12
C12.1
E1 E2
E2
E2
E1
E1
EXISTING TO REMAIN
DRAWING PHASING LEGEND:
PHASE 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD WBRC INC
ARCHITECT OF RECORDCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE ARCHITECT OF RECORD
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
523A4-20-208
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
AREA A AREA B
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
2/
/2
3:
:0
PM
AE102.3
ARCHITECTURAL
BOILER PLANT & ELEC SPACES
MEZZANINE LEVEL - PHASE 3
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 TRJ BRS
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
1/8" = 1'-0"
F1 BOILER PLANT & ELEC SPACES MEZZANINE LEVEL
- FLOOR PLAN
NO. DESCRIPTION DATE
1 ADDENDUM 01 03/02/2026
3/3/2026
File details come from the government source that posted it. Updated .