This is a mechanical ductwork plan drawing for a construction project at West Roxbury VA Medical Center in West Roxbury, Massachusetts. The drawing is part of bid documents issued for construction on November 14, 2025, and represents Phase 3, Area A of a boiler replacement and controls upgrade project. The drawing number is MH121.3A, with project number 0506-0012, prepared by Miller-Remick LLC Consultants as the Engineer of Record.

The mezzanine level ductwork plan depicts HVAC distribution systems including multiple air handling units (8-ACU-1 and 8-ACU-2), variable air volume boxes (5-VAV-07 through 5-VAV-12), and ductwork with various dimensions ranging from 6 inches to 32 inches. The plan shows exhaust and return air configurations, combustion air and boiler stack locations, and CFM (cubic feet per minute) specifications for individual terminal units. Key rooms identified include a boiler room, electrical room, IT room, corridors, lockers, shower facilities, and bedroom spaces. The drawing references related mechanical drawings (M-001 general notes, MP500 series details, MP600 series flow diagrams, and M-700 series schedules) and includes one addendum dated March 2, 2026. The scale is 1/4 inch equals 1 foot, and contractors are instructed not to scale the drawing but to verify all dimensions and clearances in the field.

View the file

Other files

File Type Posted
Amendment 5 RFI Response.xlsx XLSX spreadsheet
S-003 A0004.pdf PDF
PP141.3A A0004.pdf PDF
AE604 A0004.pdf PDF
AE401 A0004.pdf PDF
Geotechnical Report 6 of 8 A0004.pdf PDF
Geotechnical Report 7 of 8 A0004.pdf PDF
Geotechnical Report 2 of 8 A0004.pdf PDF
S02 36C24125R0077 0004.docx DOCX document
SF111.3A A0004.pdf PDF
S-002 A0004.pdf PDF
SF121.3A A0004.pdf PDF
SF101.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
AE103_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
S-552 A0004.pdf PDF
SF141.3A A0004.pdf PDF
S06 Site Visit 2 Sign In Sheet 01282026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
S06 36C24125R0077 0003.pdf PDF
36C24125R0077 0002.pdf PDF
WD MA20260001 01022026.pdf PDF
Site Visit Sign In Sheet 01052026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
S06 Amendment 0001 36C24125R0077.pdf PDF
S02 WD MA20250001 12122025.pdf PDF
S02 Exhibit D.xlsx XLSX spreadsheet
P03 Brand Name Door Hardware_Redacted.pdf PDF
P03 Brand Name Trane_Redacted.pdf PDF
P03 Brand Name Fire Alarm_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume II.pdf PDF
09a_Mechanical.pdf PDF
01_General.pdf PDF
04_Civil.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
05b_Structural.pdf PDF
07_Fire Protection.pdf PDF
S02 Exhibit C.pdf PDF
P03 Brand Name Generator_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume IV.pdf PDF
10_Electrical.pdf PDF
03a_Civil Site.pdf PDF
02_Hazmat.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

9 8 7 6 5 4

C

D

B.3

B

8.7 8.4 7.6

C.7

E

F

8-FHX-1 8-FHX-2 8-FHX-3

8-FHX-4

8-DA-1

F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W

IN

G M

H .3

B

STAIR

STORAGE

CORRIDOR

LOCKERS

TLT/SHOWER

SHOWER

LOUNGE

TLT

BEDROOM

JAN.

ELEC

I.T.

BOILER ROOM

10x8 SA/RA DN

14x12 EA UP

8-UH-4

8-UH-3

4"COMBUSTION AIR UP

4" EXH UP

24" BOILER

STACK UP

32x32" DUCT UP&DN

BOD 21'-0" AFF

32x32" DUCT UP&DN

BOD 21'-0" AFF

24" BOILER

STACK UP

24" BOILER

STACK UP

24" BOILER

STACK UP

32x32" DUCT

UP&DN

BOD 21'-0" AFF

CD-1

75 CFM

RG-1

60 CFM

CD-2

130 CFM

EG-1

50 CFM

EG-1

75 CFM CD-1

50 CFM

CD-3

80 CFM

EG-4

100 CFM

EG-6

225 CFM

EG-6

225 CFM

CD-5

285 CFM

CD-3

100 CFM

EG-1

75 CFM

CD-1

55 CFM

CD-1

100 CFM

EG-2

155 CFM

RG-4

75 CFM

CD-3

75 CFM

CD-1

90 CFM

RG-1

90 CFM

RG-3

160 CFM

CD-2

120 CFM

8-ACU-1 8-ACU-2

6"x6" 6"x6" 10"x6" 12"x8" 14"x10"

10"Ø10"Ø8"Ø8"Ø

6"Ø 6"x8" 12"x10" 14"x10"

5-VAV-12

5-VAV-11

5-VAV-10

5-VAV-09

5-VAV-08

5-VAV-07

x x x x

10"x10"10"Ø

6"Ø6 x

6"Ø

Ø

6"Ø 6 Ø x

12"x6" x

6"x6"

12"x8"

8"x4" x

8"x8" x

8"x8"

6"Ø

8-EH-1

6"x6"

Ø

T

T

T

T T

T

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1

/2

:2

:1

P

M

MH121.3A

MECHANICAL

DUCTWORK PLAN

MEZZANINE LEVEL - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

DUCTWORK PLAN - MEZZANINE LEVEL - PHASE 3, AREA A

1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND

SYMBOLS.

2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.

3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.

4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.

5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.

6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,

CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.

GENERAL SHEET NOTES:

NO. DESCRIPTION DATE

1 ADDENDUM 01 03/02/2026

Sheets
MH121.3A - MECHANICAL DUCTWORK PLAN MEZZANINE LEVEL - PHASE 3, AREA A
MH131.3A - MECHANICAL DUCTWORK PLAN UPPER MEZZANINE LEVEL - PHASE 3, AREA A
MQ141.3A - MECHANICAL EQUIPMENT PLAN ROOF - PHASE 3, AREA A

File details come from the government source that posted it. Updated .