This is a permit notification letter from the United States Environmental Protection Agency (EPA) Region 1 and Massachusetts Department of Environmental Protection (MassDEP) regarding the administrative continuation of the 2016 Massachusetts Small Municipal Separate Storm Sewer System (MS4) General Permit. Dated May 16, 2022, the letter informs permit holders that the MA MS4 Permit, originally set to expire on July 1, 2022, will be administratively continued on that date in accordance with Part 1.6 of the permit. The permit will remain in force and effect for all stormwater discharges previously authorized prior to July 1, 2022 until such discharges are authorized under a reissued general permit, an individual permit, or other alternative general permit.

No action is required from permit holders to maintain coverage under the administratively continued MA MS4 Permit. The letter is signed by Lynne Jennings, Chief of the Water Permits Branch at USEPA, and Lealdon Langley, Director of the Division of Watershed Management at MassDEP. Permit holders with questions are directed to contact Newton Tedder at USEPA (tedder.newton@epa.gov) or Laura Schifman at MassDEP (laura.schifman@mass.gov).

View the file

Other files

File Type Posted
36C24125R0077 0005.pdf PDF
Amendment 5 RFI Response.xlsx XLSX spreadsheet
Geotechnical Report 7 of 8 A0004.pdf PDF
SS101.1 A0004.pdf PDF
S-002 A0004.pdf PDF
AE503 A0004.pdf PDF
SF111.3A A0004.pdf PDF
S-003 A0004.pdf PDF
AE101_3 A0004.pdf PDF
Geotechnical Report 3 of 8 A0004.pdf PDF
SF101.3A A0004.pdf PDF
SF141.3A A0004.pdf PDF
S-552 A0004.pdf PDF
ES101.1 A0004.pdf PDF
CD101 A0004.pdf PDF
Hazmat A0004.pdf PDF
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
EP141.3A A0004.pdf PDF
Geotechnical Report 4 of 8 A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
AE101_5 A0004.pdf PDF
SF121.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
SF131.3A A0004.pdf PDF
AE103_3 A0004.pdf PDF
MA MS4 Permit A0004.pdf PDF
Geotechnical Report 1 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
PP141.3A A0004.pdf PDF
AE401 A0004.pdf PDF
MH121.3A A0004.pdf PDF
AE604 A0004.pdf PDF
Geotechnical Report 6 of 8 A0004.pdf PDF
Geotechnical Report 2 of 8 A0004.pdf PDF
S02 36C24125R0077 0004.docx DOCX document
S06 36C24125R0077 0003.pdf PDF
S06 Site Visit 2 Sign In Sheet 01282026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
36C24125R0077 0002.pdf PDF
Site Visit Sign In Sheet 01052026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
S06 Amendment 0001 36C24125R0077.pdf PDF
WD MA20260001 01022026.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
S02 Exhibit B.pdf PDF
07_Fire Protection.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

Region 1

5 Post Office Square – Suite 100

BOSTON, MA 02109-3912

VIA EMAIL

May 16, 2022

Re: 2016 Massachusetts Small Municipal Separate Storm Sewer System General Permit - Administratively Continued Permit Coverage

Dear Permit Holder:

You are receiving this letter because stormwater discharges from your municipal separate storm sewer system (MS4) are currently authorized under the 2016 Massachusetts Small MS4 Permit (MA MS4 permit), which will expire on July 1, 2022. In accordance with Part 1.6 of the MA MS4 Permit, the MA MS4 Permit will be administratively continued on July 1, 2022. The MA MS4 Permit will remain in force and effect for discharges that were authorized prior to July 1, 2022 until such discharges are authorized under a reissued general permit, an individual permit, or other alternative general permit. No action is required at this time to remain covered under the MA MS4 Permit.

If you have any questions regarding this matter, please contact Newton Tedder (tedder.newton@epa.gov) at USEPA or Laura Schifman (laura.schifman@mass.gov ) at MassDEP.

Sincerely, Lynne Jennings, Chief Water Permits Branch Water Division

USEPA

Lealdon Langley, Director Division of Watershed Management MassDEP mailto:tedder.newton@epa.gov mailto:laura.schifman@mass.gov

2022-05-16T10:55:24-0400
LYNNE JENNINGS

File details come from the government source that posted it. Updated .