Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
Solicitation number
36C24125R0077Solicitation
Issued by

About this file

This is a structural framing plan drawing for a construction project at the West Roxbury VA Medical Center in West Roxbury, Massachusetts. The drawing, designated SF131.3A, depicts the Upper Mezzanine framing plan for Phase 3, Area A of a project to replace boilers and upgrade controls. The document is issued as part of bid documents for construction, with an issue date of November 14, 2025, and prepared by Miller-Remick LLC Consultants as the Engineer of Record.

The plan details structural steel framing specifications including W16X31, W21X44, W12X26, and W10X49 beam designations with varying connection details and stud counts. Key features include a finished floor elevation of 125'-11", steel elevation 5" below finished floor on standard areas and 1 1/2" below on grated platforms, composite deck construction with 3.5" lightweight concrete on 1.5" 18-gauge composite deck, guardrail systems along the upper mezzanine, a deaerator platform at elevation 121'-6", and removable railing sections with safety gates. The plan incorporates concrete masonry unit (CMU) construction with specified reinforcing patterns, pipe rack framing details, and cross-bracing elements. Addendum 01 was issued on March 2, 2026. The project involves multiple consultants including Mabbett & Associates for architecture and civil engineering, WBRC for fire and life safety, GRW for electronic security, PEC for tunnel structural and civil engineering, and Force Protect for physical security.

View the file

Other files

File Type Posted
Amendment 5 RFI Response.xlsx XLSX spreadsheet
SF111.3A A0004.pdf PDF
S-002 A0004.pdf PDF
SF121.3A A0004.pdf PDF
SF101.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
AE103_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
SS101.1 A0004.pdf PDF
ES101.1 A0004.pdf PDF
AE101_5 A0004.pdf PDF
AE101_3 A0004.pdf PDF
AE503 A0004.pdf PDF
CD101 A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Hazmat A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
S06 36C24125R0077 0003.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
05b_Structural.pdf PDF
07_Fire Protection.pdf PDF
S02 VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
S02 RFP 36C24125R0077 Solicitation.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit A.pdf PDF
P03 Brand Name CB Boiler Burner Fire Tube_Redacted.pdf PDF
P03 Brand Name ATS_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume I.pdf PDF
09b_Mechanical.pdf PDF
08_Plumbing.pdf PDF
05a_Structural.pdf PDF
03b_Civil Site.pdf PDF
S02 WD MA20250001 12122025.pdf PDF
S02 Exhibit D.xlsx XLSX spreadsheet
P03 Brand Name Door Hardware_Redacted.pdf PDF
P03 Brand Name Trane_Redacted.pdf PDF
P03 Brand Name Fire Alarm_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume II.pdf PDF
09a_Mechanical.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

9 8 7 6 5 4

C

D

B

A.4

C.7

E

F

XE

21' - 4" 18' - 0" 18' - 0" 18' - 0" 25' - 3"

LADDER

SEE 7/S-531

W X

W X

W X

W21X44 [25]W16X31 <18>W16X31 <18>W16X31 <18>W16X31 <21>

W X

W X

W X

W X

W X

W21X44 [25]W16X31 <18>W16X31 <18>

W X

W X

W16X31 <18>

W16X31 <21>

W16X31

W X

W X

W X

W X

W X

W X

W12X26

W12X26

W X

W X

W X

W X

W X

W X

W X

W X

[125' - 6"]W10X49 [125' - 6"]W10X49 [125' - 6"]W10X49 [125' - 6"]W10X49 [125' - 6"]W10X49

1 1/2"x3/16" 19-W-2

GRATING; SPAN AS SHOWN

GUARDRAIL SYSTEM;

ALL ALONG UPPER

MEZZANINE (TYP)

E O

D

/2

3.5" LW CONC ON 1.5" 18 GA

COMPOSITE DECK (5" TOTAL THICKNESS)

W/ W2.1xW2.1-6x6

0' - 9 1/2"

EOD

1' - 1 1/2"

E O

D

E O

D

F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W

IN

G S

F .3

BPIPE BRIDGE FRAMING (TYP);

SEE SF101.3E & SF131.3E

OPEN

TO BELOW

W X

PRV PIPE RACK

SEE DETAIL 4/S-551

PIPE ANCHOR AT WALL

SEE DETAIL 1/S-552

[1

W X

S-522

W12X26

W12X26 W12X26

DEAERATOR PLATFORM

T/GRATING EL = 121'-6"

W X

B F

B F D

B F

AGUARD RAIL

(TYP)

GUARD RAIL

S-531

S-522

2-#4 @12" O.C. 2-#4 @12" O.C. 2-#4 @12" 2-#4 @12" 2-#4 @12" 2-#4 @12"

L3 L3 L3 L3 L3

2-#3 @8" O.C. 2-#3 @8" O.C. 2-#3 @8" O.C. 2-#3 @8" O.C. 2-#4 @32"

DECK SIDE LAP FASTENERS @8" O.C.

[1

W X

11' - 8"

GUARD RAIL

W/HSS12X2X1/4"W/HSS12X2X1/4"W/HSS12X2X1/4"W/HSS12X3X1/4" W/HSS12X3X1/4"

FIXED GUARD RAIL

(TYP)

SECTION OF REMOVABLE

RAILING W/ SWINGING

SAFETY GATE

5' - 0"

F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W

IN

G S

F .5

S-522

S-212.3

S-522

S-522

L1

S-531

SI

M

S-522

12" CMU

W/2-#5 @8"

12" CMU W/#5

@32"

S-551

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1

/2

:4

:4

P

M

SF131.3A

STRUCTURAL

FRAMING PLAN

UPPER MEZZANINE - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 ER DS

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

GENERAL SHEET NOTES:

1. REFER TO DRAWING S-001 AND S-002 FOR STRUCTURAL GENERAL NOTES AND

ABBREVIATIONS.

2. FOR PROJECT WORK POINT, SEE DRAWING SF101.5

SCALE: 1/4" = 1'-0"1

FRAMING PLAN - UPPER MEZZANINE - PHASE 3 AREA A

PLAN NOTES:

1. FINISHED FLOOR ELEVATION = 125'-11" U.N.O.

2. T/STEEL EL = -5" OF FINISHED FLOOR ELEVATION U.N.O.

3. [#"] DENOTES T/STEEL ELEVATION FROM FINISHED FLOOR.

4. ON GRATED PLATFORM T/TEEL EL = -1 1/2".

5. <#> DENOTES NUMBER OF 3/4" DIA x4" LONG HEADED STUDS.

6. BF-# DENOTES BRACED FRAME. SEE S-201.3 FOR ELEVATIONS.

7. T/HORIZONTAL BRACING EL = -2" T/STEEL ELEVATION.

8. SEE PLAN FOR CMU VERTICAL REINFORCING. SEE 1/S-541 FOR

HORIZONTAL REINFORCING.

NO. DESCRIPTION DATE

1 ADDENDUM 01 03/02/26