AE101_5 A0004.pdf

PDF 1 MB Posted

Attached to
Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
Solicitation number
36C24125R0077Solicitation
Issued by

About this file

This is an architectural floor plan drawing for a federal construction project at the West Roxbury VA Medical Center in West Roxbury, Massachusetts. The drawing, designated AE101.5, depicts the main level floor plan for Phase 5 of the project, which involves replacing boilers and upgrading controls. The plan is drawn at a scale of 1/8 inch equals 1 foot and identifies several rooms including a boiler room (106), generator room (102), control room (120), substations (121), and multiple stairwells (104, 105). The drawing indicates areas to remain as existing (hatched areas) and identifies future phase work. The plan references Area C and includes coordination with MEP and structural drawings, specifically noting a piping bridge. The document is issued for construction bidding with an issue date of November 14, 2025, and includes Addendum 01 dated March 2, 2026.

The drawing is produced by WBRC Inc. Consultants as engineer of record, with supporting consultants including Mabbett & Associates for architect and civil engineering, Koffel Associates for fire and life safety, GRW for electronic security, Force Protect for physical security, and PEC for tunnel structural and civil engineering. The U.S. Department of Veterans Affairs Office of Construction and Facilities Management is the federal agency involved. The project number is 0506-0012, and the drawing includes standard architectural notations, dimensions, and a north arrow with actual and plan orientations. This document serves as part of the bid documents for construction and requires the seal and signature of the architect of record for any prints used.

View the file

Other files

File Type Posted
36C24125R0077 0005.pdf PDF
Amendment 5 RFI Response.xlsx XLSX spreadsheet
Geotechnical Report 7 of 8 A0004.pdf PDF
SS101.1 A0004.pdf PDF
S-002 A0004.pdf PDF
AE503 A0004.pdf PDF
SF111.3A A0004.pdf PDF
S-003 A0004.pdf PDF
AE101_3 A0004.pdf PDF
Geotechnical Report 3 of 8 A0004.pdf PDF
SF101.3A A0004.pdf PDF
SF141.3A A0004.pdf PDF
S-552 A0004.pdf PDF
ES101.1 A0004.pdf PDF
CD101 A0004.pdf PDF
Hazmat A0004.pdf PDF
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
EP141.3A A0004.pdf PDF
Geotechnical Report 4 of 8 A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
SF121.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
MA MS4 Admin A0004.pdf PDF
SF131.3A A0004.pdf PDF
AE103_3 A0004.pdf PDF
MA MS4 Permit A0004.pdf PDF
Geotechnical Report 1 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
PP141.3A A0004.pdf PDF
AE401 A0004.pdf PDF
MH121.3A A0004.pdf PDF
AE604 A0004.pdf PDF
Geotechnical Report 6 of 8 A0004.pdf PDF
Geotechnical Report 2 of 8 A0004.pdf PDF
S02 36C24125R0077 0004.docx DOCX document
S06 36C24125R0077 0003.pdf PDF
S06 Site Visit 2 Sign In Sheet 01282026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
36C24125R0077 0002.pdf PDF
Site Visit Sign In Sheet 01052026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
S06 Amendment 0001 36C24125R0077.pdf PDF
WD MA20260001 01022026.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
S02 Exhibit B.pdf PDF
07_Fire Protection.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

F

F F F

F

F F

F

F

UP

16' - 6 7/8" 210' - 6 3/8"

65' - 3 1/8"

4' - 7 1/2"

R.O.

14' - 0" 4' - 0"

R.O.

14' - 0" 4' - 0"

R.O.

14' - 0" 5' - 4"

R.O.

3' - 4"

2'

1/

8"

3/

4"

R .O

3'

4"

/8

AE201.5

B1

AE201.5

F1

AE201.5D5

EXISTING TO REMAIN

WHERE HATCHED

FUTURE PHASE

BOILER ROOM

STAIR

CONTROL ROOM

STAIR

121SUBSTATION

ROOM

GENERATOR

ROOM

C6

AE301.5

F1

AE301.5

F6

AE301.5

106B

106F

101B

101A

FE

C

FEC

FE

C

106C 106D 106E

AE501

F9

AE501

F7

F

PIPING BRIDGE. SEE MEP AND

STRUCTURAL DRAWINGS

A

C

D

B.3

B

A.4

C.9

A.6

E

A.7

2' - 10" 6' - 6" 7' - 8" 1' - 8" 4' - 8" 13' - 5" 18' - 0" 9' - 7" 8' - 5" 10' - 9" 8' - 10" 5' - 0" 7' - 6" 7' - 6" 10' - 6" 18' - 0" 18' - 0" 25' - 3" 13' - 6" 13' - 6" 13' - 6"

8'

6" 7'

4"

9"

6'

6'

1" 8'

3/ 8"

2'

5/

8"

5'

0"

X6 13 12 11 10 9 8 7 6 5 4 110.5 3 2X5 7.68.48.71415 12.8

C12

E1

E1

EXISTING TO REMAIN

DRAWING PHASING LEGEND:

PHASE 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD WBRC INC

ARCHITECT OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE ARCHITECT OF RECORD

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

AREA C

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

2/

/2

3:

:4

PM

AE101.5

ARCHITECTURAL

MAIN LEVEL FLOOR PLAN PHASE 5

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 TRJ BRS

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

1/8" = 1'-0"

F1 MAIN LEVEL FLOOR PLAN

NO. DESCRIPTION DATE

1 ADDENDUM 01 03/02/2026

3/3/2026

File details come from the government source that posted it. Updated .