AE103_3 A0004.pdf

PDF 668 KB Posted

Attached to
Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
Solicitation number
36C24125R0077Solicitation
Issued by

About this file

This document is an architectural floor plan drawing for a federal construction project at the West Roxbury VA Medical Center in West Roxbury, Massachusetts. The drawing, dated November 14, 2025, with Addendum 01 issued March 2, 2026, depicts the Upper Mezzanine level of the Boiler Plant and Electrical Spaces for Phase 3 of the project titled "Replace Boilers and Upgrade Controls." The project number is 0506-0012, and the drawing number is AE103.3. The plan identifies key spaces including a boiler room below, generator room below, and storage areas (rooms 301 and 320-321), along with mechanical systems such as a piping bridge referenced to MEP and structural drawings. The document is issued for construction bidding and includes phasing information indicating this represents Phase 3 work.

The drawing was prepared by WBRC Architects and Civil Engineers as the Architect of Record, with WBRC Inc. Consultants as the Engineer of Record. Additional consultants include Mabbett & Associates (Hazardous Materials), Koffel Associates (Fire & Life Safety), GRW (Electronic Security), PEC (Tunnel Structural & Civil Engineering), and Force Protect (Physical Security). The scale used is 1/8" = 1'-0", and the document includes a key plan, north orientation, and detailed dimensional annotations. This bid document was issued for construction on March 3, 2026, and is under the jurisdiction of the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
Amendment 5 RFI Response.xlsx XLSX spreadsheet
SF111.3A A0004.pdf PDF
S-002 A0004.pdf PDF
SF121.3A A0004.pdf PDF
SF101.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
SS101.1 A0004.pdf PDF
SF131.3A A0004.pdf PDF
ES101.1 A0004.pdf PDF
AE101_5 A0004.pdf PDF
AE101_3 A0004.pdf PDF
AE503 A0004.pdf PDF
CD101 A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Hazmat A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
S06 36C24125R0077 0003.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
05b_Structural.pdf PDF
07_Fire Protection.pdf PDF
S02 VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
S02 RFP 36C24125R0077 Solicitation.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit A.pdf PDF
P03 Brand Name CB Boiler Burner Fire Tube_Redacted.pdf PDF
P03 Brand Name ATS_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume I.pdf PDF
09b_Mechanical.pdf PDF
08_Plumbing.pdf PDF
05a_Structural.pdf PDF
03b_Civil Site.pdf PDF
S02 WD MA20250001 12122025.pdf PDF
S02 Exhibit D.xlsx XLSX spreadsheet
P03 Brand Name Door Hardware_Redacted.pdf PDF
P03 Brand Name Trane_Redacted.pdf PDF
P03 Brand Name Fire Alarm_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume II.pdf PDF
09a_Mechanical.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

F

F

DN

UP

BOILER ROOM

BELOW

AE201.3

B1

AE201.3D1

AE201.3

F1

F1

AE301.3

F4

AE301.3

C1

AE301.3

C4

AE301.3

AE201.3D5

GENERATOR

ROOM BELOW

STORAGE

STAIR

STAIR

F

PIPING BRIDGE. SEE MEP AND

STRUCTURAL DRAWINGS

A

C

D

B.3

B

A.4

C.9

A.6

E

A.7

8'

6" 7'

4"

9"

6'

6'

1" 8'

3/ 8"

2'

5/

8"

5'

0"

5' - 0" 6' - 0" 18' - 8" 6' - 0" 12' - 0" 6' - 0" 12' - 0" 6' - 0" 35' - 0" 6' - 0" 7' - 4" 6' - 0" 7' - 4" 6' - 0" 5' - 11 1/4"

E E E E E E E E

AE503

B1

AE503

B4

R.O.

3' - 4" 1' - 4" R .O

3'

4" 3'

4"

B9

AE502

17' - 0" 13' - 10 1/2" 27' - 0" 14' - 2 1/2" 11' - 5" 8' - 10" 5' - 0" 7' - 6" 7' - 6" 10' - 6" 18' - 0" 18' - 0" 25' - 3" 13' - 6" 13' - 6" 13' - 6"

F9

X6 X4 9 8 7 6 5 4 13 2X2 X1X5 7.68.48.7X3

5'-0" SECTION OF

REMOVABLE GUARD

RAIL FOR SCISSOR

LIFT ACCESS.

SEE STRUCTURAL

DWGS FOR DETAILS

M6.2

E1

E2

E2

E2E1

C12

C12.1

C8.2

E1

APPLY FULLY ADHERED,

PERMEABLE, AIR AND

MOISTURE BUILDING

ENVELOPE PROTECTION

MEMBRANE TO EXPOSED

CMU WALL

EXISTING TO REMAIN

DRAWING PHASING LEGEND:

PHASE 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD WBRC INC

ARCHITECT OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE ARCHITECT OF RECORD

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

AREA A AREA B

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

2/

/2

3:

:4

PM

AE103.3

ARCHITECTURAL

BOILER PLANT & ELEC SPACES

UPPER MEZZANINE - PHASE 3

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 TRJ BRS

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

1/8" = 1'-0"

F1 BOILER PLANT & ELEC SPACES MEZZANINE LEVEL

3 - FLOOR PLAN

NO. DESCRIPTION DATE

1 ADDENDUM 01 03/02/2026

3/3/2026

File details come from the government source that posted it. Updated .