This document is an architectural floor plan for Phase 3 of a construction project at the West Roxbury VA Medical Center in West Roxbury, Massachusetts. The plan details the main level layout for a Boiler Plant and Electrical Spaces project with the primary objective of replacing boilers and upgrading controls. The project is under the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, with project number 0506-0012. The drawing was issued for construction as bid documents on November 14, 2025, with an addendum dated March 2, 2026. The architectural firm of record is Mabbett & Associates, with WBRC serving as engineer of record and supporting consultants including Koffel Associates (Fire & Life Safety), GRW (Electronic Security), PEC (Tunnel Structural & Civil Engineering), and Force Protect (Physical Security).

The floor plan illustrates multiple interconnected rooms and spaces including a Control Room (102), Generator Room (105), Substation Room (104), Boiler Room (101), and associated stair access (120, 121). The plan specifies construction details such as mechanical wall louvers, scissor lift installation, 1-hour rated through-penetration firestop systems, and fully adhered permeable building envelope protection membrane application to exposed concrete masonry unit walls. Key dimensions are provided throughout, with room sizes ranging from approximately 10 feet to over 70 feet in various directions. The drawing includes references to mechanical, electrical, plumbing, structural, and civil drawings for comprehensive project coordination. The document is drawn to 1/8 inch equals 1 foot scale and includes a key plan showing the actual north orientation relative to the project location.

View the file

Other files

File Type Posted
S-003 A0004.pdf PDF
MH121.3A A0004.pdf PDF
PP141.3A A0004.pdf PDF
AE604 A0004.pdf PDF
AE401 A0004.pdf PDF
Geotechnical Report 6 of 8 A0004.pdf PDF
Geotechnical Report 7 of 8 A0004.pdf PDF
Geotechnical Report 2 of 8 A0004.pdf PDF
S02 36C24125R0077 0004.docx DOCX document
SS101.1 A0004.pdf PDF
SF131.3A A0004.pdf PDF
ES101.1 A0004.pdf PDF
AE101_5 A0004.pdf PDF
AE503 A0004.pdf PDF
CD101 A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Hazmat A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
S06 Site Visit 2 Sign In Sheet 01282026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
S02 WD MA20250001 12122025.pdf PDF
S02 Exhibit D.xlsx XLSX spreadsheet
P03 Brand Name Door Hardware_Redacted.pdf PDF
P03 Brand Name Trane_Redacted.pdf PDF
P03 Brand Name Fire Alarm_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume II.pdf PDF
09a_Mechanical.pdf PDF
01_General.pdf PDF
04_Civil.pdf PDF
S02 VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
S02 RFP 36C24125R0077 Solicitation.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit A.pdf PDF
P03 Brand Name CB Boiler Burner Fire Tube_Redacted.pdf PDF
P03 Brand Name ATS_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume I.pdf PDF
09b_Mechanical.pdf PDF
08_Plumbing.pdf PDF
05a_Structural.pdf PDF
03b_Civil Site.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
05b_Structural.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

F

F F F

F

F F

UP

6'

3/

8" 6'

2"

6'

3/

8"

R .O

6'

4" 6'

8"

R .O

6'

4" 1'

/2

2'

0" R

.O

3'

4"

43' - 4 1/8"

/8

/4

22' - 0" 23' - 2 5/8" 2' - 0" 8' - 0" 2' - 4" 8' - 0" 2' - 0"

2'

0"

R .O

2'

8" 1'

4"

R .O

3'

4"

AE201.3

B1

AE201.3D1

AE201.3

F1

F1

AE301.3

F4

AE301.3

18' - 4 1/8"

R.O.

3' - 4" 4' - 0" 14 - 0" R.O. 4' - 0"

R.O.

14' - 0" 4' - 0"

R.O.

14' - 0" 4' - 0"

R.O.

14' - 0" 3' - 4"

R.O.

3' - 4" 4' - 4"

R.O.

10' - 0" 3' - 4"

R.O.

10' - 0" 3' - 4"

R.O.

10' - 0" 3' - 11 1/4"

101B

101A

120A

102A

102B

104A

101C 101D 101E 101F 101G 101H

105A

121A

105B

CONTROL ROOM

STAIR

GENERATOR ROOM

SUBSTATION ROOM

BOILER ROOM

STAIR

EXISTING TO REMAIN

WHERE HATCHED

C1

AE301.3

C4

AE301.3

17' - 4"

R.O.

3' - 4" 1' - 4" 71' - 4"

R.O.

3' - 4"

4'

0"

R .O

3'

4"

AE201.3D5

11' - 4 1/4"

121B

104B

8' - 10 1/2"

FEC

FE

C

FE

C

FE

C

AE501

D9

AE501

D7

AE501

D3

AE501

D5

F

A B

PIPING BRIDGE. SEE MEP AND

STRUCTURAL DRAWINGS

TO

R

.O

TO

R

.O

/8

A

C

D

B.3

B

A.4

C.9

A.6

E

A.7

B

101I

RETAINING WALL

SEE CIVIL DWG'S

C

LE

AR

8'

0" M

IN

F2

F4 F4 F4

F4

C10

C10

C8.2

C8.2

C8.2

C8.1

C8.1

C10

4'

4"

R .O

3'

4"

/8

R .O

3'

4" 3'

4"

1/ 2"

AE503

F1

AE503

B9

F4

17' - 0" 13' - 10 1/2" 13' - 6" 13' - 6" 14' - 2 1/2" 9' - 3 3/4" 2' - 1 1/4" 8' - 10" 5' - 0" 7' - 6" 7' - 6" 10' - 6" 18' - 0" 18' - 0" 25' - 3" 13' - 6" 13' - 6" 13' - 6" 2' - 1"

2'

1/

8"

1"

0" 2'

1/ 8"

120B

8'

6" 7'

4"

9"

6'

6'

1" 8'

3/ 8"

2'

5/

8"

5'

0"

F9

AE401

D1

3' - 11 1/4"

X6 X4 9 8 7 6 5 4 13 2X2 X1X5 7.68.48.7X3

APPLY FULLY ADHERED,

PERMEABLE, AIR AND

MOISTURE BUILDING

ENVELOPE PROTECTION

MEMBRANE TO EXPOSED

CMU WALL

C12

C12.1

E1

E1

E2

E2E1

EXISTING TO REMAIN

DRAWING PHASING LEGEND:

PHASE 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD WBRC INC

ARCHITECT OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE ARCHITECT OF RECORD

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

AREA A AREA B

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

2/

/2

3:

:0

PM

AE101.3

ARCHITECTURAL

BOILER PLANT & ELEC SPACES

MAIN LEVEL FLOOR PLAN - PHASE 3

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 TRJ BRS

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

1/8" = 1'-0"

F1 MAIN LEVEL FLOOR PLAN

KEYNOTES:

F2 SCISSOR LIFT AS SPECIFIED.

F4 MECHANICAL WALL LOUVERS, SEE

MECH. DWGS.

F9 1-HR RATED

THROUGH-PENETRATION FIRESTOP

SYSTEM @ STEEL DIAGONAL BRACE

(TYP). SEE STRUCTURAL DWGS.

FLOORPLAN

NO. DESCRIPTION DATE

1 ADDENDUM 01 03/02/2026

3/3/2026

File details come from the government source that posted it. Updated .