This is an architectural drawing, specifically a Plumbing Piping Plan for the roof of Phase 3, Area A, issued as part of the bid documents for a construction project.

The drawing pertains to the West Roxbury VA Medical Center in West Roxbury, Massachusetts, for the project titled "Replace Boilers and Upgrade Controls." The plan is dated November 14, 2025, with an addendum issued on March 2, 2026, and was prepared for bid document issuance for construction. The drawing is prepared by Miller-Remick LLC Consultants, the Engineer of Record, with additional design team members including Mabbett & Associates (Architect & Civil Engineering), WBRC (Fire & Life Safety), Koffel Associates (Electronic Security), GRW (Physical Security), PEC (Tunnel Structural & Civil Engineering), and Force Protect. The scale is 1/4" = 1'-0", and the drawing shows plumbing piping layout on the roof area, including three scuppers, multiple vent and drain lines (4" and 3" VTR & DN), and roof drains (4" RD-1). The drawing references additional documentation including general notes on Drawing P-001, details in Drawing Series P-500, flow and riser diagrams in Drawing Series P-600, and schedules in Drawing Series P-700. The project number is 0506-0012.

View the file

Other files

File Type Posted
Amendment 5 RFI Response.xlsx XLSX spreadsheet
SF111.3A A0004.pdf PDF
S-002 A0004.pdf PDF
SF121.3A A0004.pdf PDF
SF101.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
AE103_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
S-003 A0004.pdf PDF
MH121.3A A0004.pdf PDF
AE604 A0004.pdf PDF
AE401 A0004.pdf PDF
Geotechnical Report 6 of 8 A0004.pdf PDF
Geotechnical Report 7 of 8 A0004.pdf PDF
Geotechnical Report 2 of 8 A0004.pdf PDF
S02 36C24125R0077 0004.docx DOCX document
S06 36C24125R0077 0003.pdf PDF
S06 Site Visit 2 Sign In Sheet 01282026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
05b_Structural.pdf PDF
07_Fire Protection.pdf PDF
S02 WD MA20250001 12122025.pdf PDF
S02 Exhibit D.xlsx XLSX spreadsheet
P03 Brand Name Door Hardware_Redacted.pdf PDF
P03 Brand Name Trane_Redacted.pdf PDF
P03 Brand Name Fire Alarm_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume II.pdf PDF
09a_Mechanical.pdf PDF
01_General.pdf PDF
04_Civil.pdf PDF
S02 VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
S02 RFP 36C24125R0077 Solicitation.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit A.pdf PDF
P03 Brand Name CB Boiler Burner Fire Tube_Redacted.pdf PDF
P03 Brand Name ATS_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume I.pdf PDF
09b_Mechanical.pdf PDF
08_Plumbing.pdf PDF
05a_Structural.pdf PDF
03b_Civil Site.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

9 8 7 6 5 4

C

D

B.3

B

8.7 8.4 7.6

A.7

A.6

A.4

C.7

4"RD-1 4"RD-1 4"RD-1

SCUPPER

SEE ARCHITECTUAL

DRAWINGS

SCUPPER

SEE ARCHITECTUAL

DRAWINGS

SCUPPER

SEE ARCHITECTUAL

DRAWINGS

3"VTR &

DN

4" VTR

& DN

4"VTR

& DN

4"VTR

& DN

4"VTR

& DN

4"VTR

& DN

4"VTR

& DN

3"VTR

& DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1

/2

:3

:0

P

M

PP141.3A

PLUMBING

PIPING PLAN

ROOF - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN ROOF - PHASE 3, AREA A

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.

NO. DESCRIPTION DATE

1 ADDENDUM 01 03/02/2026

Sheets
PP141.3A - PLUMBING PIPING PLAN ROOF - PHASE 3, AREA A