MH131.3A A0004.pdf

PDF 381 KB Posted

Attached to
Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
Solicitation number
36C24125R0077Solicitation
Issued by

About this file

This is a mechanical ductwork plan drawing for the West Roxbury VA Medical Center in West Roxbury, Massachusetts. The drawing, designated MH131.3A, depicts the upper mezzanine level ductwork layout for Phase 3, Area A of the "Replace Boilers and Upgrade Controls" project. The document is part of the bid documents issued for construction as of November 14, 2025, with an addendum dated March 2, 2026. The project number is 0506-0012, and the drawing was prepared by Miller-Remick LLC Consultants as the Engineer of Record, with architectural and civil engineering by MABBETT & ASSOCIATES, fire and life safety by KOFFEL ASSOCIATES, electronic security by GRW, tunnel structural and civil engineering by PEC, physical security by FORCE PROTECT, and hazardous materials by WBRC.

The drawing illustrates ductwork configurations including 24-inch diameter boiler exhaust stacks extending through the roof, multiple 32x32-inch ducts for supply and return air, 4-inch combustion air and exhaust ducts, and a 14x12-inch duct running to the upper mezzanine level. The plan references multiple related drawing series (M-001 for general notes, MP500 for details, MP600 for flow diagrams, and M-700 for schedules) and notes that contractors must verify all dimensions, clearances, and as-built conditions in the field rather than scaling the drawing. The plan encompasses the area between the existing boiler plant, new boiler plant, and tunnel connecting to Building 1.

View the file

Other files

File Type Posted
Amendment 5 RFI Response.xlsx XLSX spreadsheet
SS101.1 A0004.pdf PDF
SF131.3A A0004.pdf PDF
ES101.1 A0004.pdf PDF
AE101_5 A0004.pdf PDF
AE101_3 A0004.pdf PDF
AE503 A0004.pdf PDF
CD101 A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Hazmat A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
SF111.3A A0004.pdf PDF
S-002 A0004.pdf PDF
SF121.3A A0004.pdf PDF
SF101.3A A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
AE103_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
S06 36C24125R0077 0003.pdf PDF
S02 VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
S02 RFP 36C24125R0077 Solicitation.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit A.pdf PDF
P03 Brand Name CB Boiler Burner Fire Tube_Redacted.pdf PDF
P03 Brand Name ATS_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume I.pdf PDF
09b_Mechanical.pdf PDF
08_Plumbing.pdf PDF
05a_Structural.pdf PDF
03b_Civil Site.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
05b_Structural.pdf PDF
07_Fire Protection.pdf PDF
S02 WD MA20250001 12122025.pdf PDF
S02 Exhibit D.xlsx XLSX spreadsheet
P03 Brand Name Door Hardware_Redacted.pdf PDF
P03 Brand Name Trane_Redacted.pdf PDF
P03 Brand Name Fire Alarm_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume II.pdf PDF
09a_Mechanical.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

9 8 7 6 5 4

C

D

B.3

B

8.7 8.4 7.6

A.7

A.6

A.4

C.7

E

F

8-DA-1

8-STS-1

STORAGE

STAIR

BOILER ROOM

RE:MP121.3A

F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W

IN

G M

H .3

B

24" DIA.

BOILER EXHAUST STACK

UP THRU ROOF & DN

(TYP. 4)

32x32"

DUCT UP&DN

32x32"

DUCT UP&DN

32x32"

DUCT UP&DN

4"COMBUSTION AIR UP&DN

4" EXH UP&DN

8-UH-1 8-UH-2

T x

14x12 UP

TO 8-EF-9

14x12 DN TO

MEZZANINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1

/2

:2

:1

P

M

MH131.3A

MECHANICAL

DUCTWORK PLAN

UPPER MEZZANINE LEVEL - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

DUCTWORK PLAN - UPPER MEZZANINE LEVEL - PHASE 3, AREA A

1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND

SYMBOLS.

2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.

3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.

4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.

5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.

6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,

CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.

GENERAL SHEET NOTES:

NO. DESCRIPTION DATE

1 ADDENDUM 01 03/02/2026

Sheets
MH121.3A - MECHANICAL DUCTWORK PLAN MEZZANINE LEVEL - PHASE 3, AREA A
MH131.3A - MECHANICAL DUCTWORK PLAN UPPER MEZZANINE LEVEL - PHASE 3, AREA A
MQ141.3A - MECHANICAL EQUIPMENT PLAN ROOF - PHASE 3, AREA A

File details come from the government source that posted it. Updated .