MQ141.3A A0004.pdf
PDF 285 KB Posted
- Solicitation number
- 36C24125R0077Solicitation
About this file
This is a mechanical equipment plan drawing for a construction project at West Roxbury VA Medical Center in West Roxbury, Massachusetts. The drawing (MQ141.3A) depicts the roof-level equipment layout for Phase 3, Area A of a boiler replacement and controls upgrade project. The project is identified as 0506-0012 and was issued for construction bidding on November 14, 2025, with an addendum dated March 2, 2026.
The drawing shows the mechanical equipment plan at a scale of 1/4" = 1'-0" and includes equipment such as four boiler units, roof drains (referencing plumbing drawings), a 24-inch boiler stack (typical), and associated mechanical components including heat exchangers and related piping connections. The plan references coordination with other drawing series including M-001 for general notes and symbols, MP500 series for mechanical details, MP600 series for flow diagrams, and M-700 series for schedules. The design team includes Miller-Remick LLC Consultants as the Engineer of Record, with supporting consultants: Mabbett & Associates (Architect & Civil Engineering), WBRC (Hazardous Materials), Koffel Associates (Fire & Life Safety), GRW (Electronic Security), PEC (Tunnel Structural & Civil Engineering), and Force Protect (Physical Security). The document is issued as bid documents for construction and is sealed by the professional engineer, with a requirement that all field dimensions and clearances be verified in the field rather than scaled from the drawing.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
9 8 7 6 5 4
C
D
B.3
B
8-EF-38-EF-28-EF-1
F O
R C
O N
T
IN
U A
T
IO
N
S E
E D
R A
W
IN
G M
Q
.3 B
F O
R C
O N
T
IN
U A
T
IO
N
S E
E D
R A
W
IN
G M
Q
.3 B
8-GRV-1 8-GRV-2 8-GRV-3 8-GRV-4
8.7 8.4 7.6
A.7
A.6
A.4
C.7
ROOF DRAIN
REFER TO PLBG DRAWINGS (TYP.)
8-CU-18-CU-2
8-EF-9
24" BOILER STACK (TYP)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
523A4-20-208
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
EMERGENCY
GENERATOR
BLDG.
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW BOILER
PLANT
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1
/2
:2
:1
P
M
MQ141.3A
MECHANICAL
EQUIPMENT PLAN
ROOF - PHASE 3, AREA A
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
SCALE: 1/4" = 1'-0"1
EQUIPMENT PLAN - ROOF LEVEL - PHASE 3, AREA A
NO. DESCRIPTION DATE
1 ADDENDUM 01 03/02/2026
| Sheets |
| MH121.3A - MECHANICAL DUCTWORK PLAN MEZZANINE LEVEL - PHASE 3, AREA A |
| MH131.3A - MECHANICAL DUCTWORK PLAN UPPER MEZZANINE LEVEL - PHASE 3, AREA A |
| MQ141.3A - MECHANICAL EQUIPMENT PLAN ROOF - PHASE 3, AREA A |
File details come from the government source that posted it. Updated .