MQ141.3A A0004.pdf

PDF 285 KB Posted

Attached to
Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
Solicitation number
36C24125R0077Solicitation
Issued by

About this file

This is a mechanical equipment plan drawing for a construction project at West Roxbury VA Medical Center in West Roxbury, Massachusetts. The drawing (MQ141.3A) depicts the roof-level equipment layout for Phase 3, Area A of a boiler replacement and controls upgrade project. The project is identified as 0506-0012 and was issued for construction bidding on November 14, 2025, with an addendum dated March 2, 2026.

The drawing shows the mechanical equipment plan at a scale of 1/4" = 1'-0" and includes equipment such as four boiler units, roof drains (referencing plumbing drawings), a 24-inch boiler stack (typical), and associated mechanical components including heat exchangers and related piping connections. The plan references coordination with other drawing series including M-001 for general notes and symbols, MP500 series for mechanical details, MP600 series for flow diagrams, and M-700 series for schedules. The design team includes Miller-Remick LLC Consultants as the Engineer of Record, with supporting consultants: Mabbett & Associates (Architect & Civil Engineering), WBRC (Hazardous Materials), Koffel Associates (Fire & Life Safety), GRW (Electronic Security), PEC (Tunnel Structural & Civil Engineering), and Force Protect (Physical Security). The document is issued as bid documents for construction and is sealed by the professional engineer, with a requirement that all field dimensions and clearances be verified in the field rather than scaled from the drawing.

View the file

Other files

File Type Posted
SS101.1 A0004.pdf PDF
SF131.3A A0004.pdf PDF
ES101.1 A0004.pdf PDF
AE101_5 A0004.pdf PDF
AE101_3 A0004.pdf PDF
AE503 A0004.pdf PDF
CD101 A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Hazmat A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
S-003 A0004.pdf PDF
MH121.3A A0004.pdf PDF
PP141.3A A0004.pdf PDF
AE604 A0004.pdf PDF
AE401 A0004.pdf PDF
Geotechnical Report 6 of 8 A0004.pdf PDF
Geotechnical Report 7 of 8 A0004.pdf PDF
Geotechnical Report 2 of 8 A0004.pdf PDF
S02 36C24125R0077 0004.docx DOCX document
S06 Site Visit 2 Sign In Sheet 01282026 523A4-20-208 Replace Boilers and Upgrade Controls.pdf PDF
S02 VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
S02 RFP 36C24125R0077 Solicitation.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit A.pdf PDF
P03 Brand Name CB Boiler Burner Fire Tube_Redacted.pdf PDF
P03 Brand Name ATS_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume I.pdf PDF
09b_Mechanical.pdf PDF
08_Plumbing.pdf PDF
05a_Structural.pdf PDF
03b_Civil Site.pdf PDF
S02 WD MA20250001 12122025.pdf PDF
S02 Exhibit D.xlsx XLSX spreadsheet
P03 Brand Name Door Hardware_Redacted.pdf PDF
P03 Brand Name Trane_Redacted.pdf PDF
P03 Brand Name Fire Alarm_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume II.pdf PDF
09a_Mechanical.pdf PDF
01_General.pdf PDF
04_Civil.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

9 8 7 6 5 4

C

D

B.3

B

8-EF-38-EF-28-EF-1

F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W

IN

G M

Q

.3 B

F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W

IN

G M

Q

.3 B

8-GRV-1 8-GRV-2 8-GRV-3 8-GRV-4

8.7 8.4 7.6

A.7

A.6

A.4

C.7

ROOF DRAIN

REFER TO PLBG DRAWINGS (TYP.)

8-CU-18-CU-2

8-EF-9

24" BOILER STACK (TYP)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1

/2

:2

:1

P

M

MQ141.3A

MECHANICAL

EQUIPMENT PLAN

ROOF - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

GENERAL SHEET NOTES:

1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND

SYMBOLS.

2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.

3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.

4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.

5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.

6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,

CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.

SCALE: 1/4" = 1'-0"1

EQUIPMENT PLAN - ROOF LEVEL - PHASE 3, AREA A

NO. DESCRIPTION DATE

1 ADDENDUM 01 03/02/2026

Sheets
MH121.3A - MECHANICAL DUCTWORK PLAN MEZZANINE LEVEL - PHASE 3, AREA A
MH131.3A - MECHANICAL DUCTWORK PLAN UPPER MEZZANINE LEVEL - PHASE 3, AREA A
MQ141.3A - MECHANICAL EQUIPMENT PLAN ROOF - PHASE 3, AREA A

File details come from the government source that posted it. Updated .