S02 36C24125R0077 0004.docx
DOCX document 115 KB Posted
- Solicitation number
- 36C24125R0077Solicitation
About this file
This is Amendment 0004 to a federal construction solicitation (36C24125R0077) issued by the Department of Veterans Affairs, Veterans Health Administration, VA Central Western Massachusetts Network Contracting Office for Project 523A4-20-208: Replace Boilers and Upgrade Controls at the VAMC West Roxbury Campus. The amendment extends the deadline for proposal submission to 4:00 PM EDT on April 10, 2026. The amendment incorporates VAAR Clause 852.204-72 and a Class Deviation for VAAR 852.204-70, provides responses to Requests for Information (RFIs) received during the pre-bid phase, and attaches supporting documentation including a hazmat assessment, regulated building materials survey, and geotechnical reports.
The project requires a general contractor to perform general construction, demolition, modification, and renovation of the existing Central Boiler Plant (Building 8) in accordance with detailed specifications and drawings. The amendment includes multiple architectural and engineering drawings, site plans, and technical documents covering structural, mechanical, electrical, plumbing, and site work components. All other terms and conditions of the solicitation remain unchanged. The contracting officer for this amendment is Karla Rotondo at the VA Central Western Massachusetts Network Contracting Office, 421 North Main Street, Leeds, MA 01053-9764.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
03-18-2026
523A4-20-208 36C241 Department of Veterans Affairs VA Central Western Massachusetts Network Contracting Office 1 421 North Main Street Leeds MA 01053-9764
36C241 Department of Veterans Affairs VA Central Western Massachusetts Network Contracting Office 1 421 North Main Street Leeds MA 01053-9764 To all Offerors/Bidders
36C24125R0077 12-18-2025
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-10-2026 4:00PM EDT
The purpose of the amendment for the 523A4-20-208 Replace Boilers and Upgrade Controls is to provide the following:
1. Incorporate VAAR Clause 852.204-72 and Class Deviation for VAAR 852.204-70.
2. Responses to the RFIs received and corresponding attachments.
3. The deadline for the proposal submission is extended to 4:00PM EST on 4/10/2026.
All other terms and conditions remain unchanged.
Karla Rotondo Contracting Officer
See attached document: Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.
See attached document: PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.
See attached document: Hazmat A0004.
See attached document: Regulated Building Materials Survey Report A0004.
See attached document: Geotechnical Report 1 of 8 A0004.
See attached document: Geotechnical Report 2 of 8 A0004.
See attached document: Geotechnical Report 3 of 8 A0004.
See attached document: Geotechnical Report 4 of 8 A0004.
See attached document: Geotechnical Report 5 of 8 A0004.
See attached document: Geotechnical Report 6 of 8 A0004.
See attached document: Geotechnical Report 7 of 8 A0004.
See attached document: Geotechnical Report 8 of 8 A0004.
See attached document: AE101_3 A0004.
See attached document: AE101_5 A0004.
See attached document: AE102_3 A0004.
See attached document: AE103_3 A0004.
See attached document: AE401 A0004.
See attached document: AE503 A0004.
See attached document: AE604 A0004.
See attached document: CD101 A0004.
See attached document: EP141.3A A0004.
See attached document: ES101.1 A0004.
See attached document: MH121.3A A0004.
See attached document: MH131.3A A0004.
See attached document: MQ141.3A A0004.
See attached document: PP141.3A A0004.
See attached document: S-002 A0004.
See attached document: S-003 A0004.
See attached document: S-552 A0004.
See attached document: SF101.3A A0004.
See attached document: SF111.3A A0004.
See attached document: SF121.3A A0004.
See attached document: SF131.3A A0004.
See attached document: SF141.3A A0004.
See attached document: SS101.1 A0004.
See attached document: MA MS4 Admin A0004.
See attached document: MA MS4 Permit A0004.
File details come from the government source that posted it. Updated .