This is Section B of a federal contract solicitation (36C78626B0028) outlining the price schedule for burial expansion and sitework services with pre-placed crypts.

The contract includes a base bid and one optional bid period. The base bid (CLIN 0001) requires installation of all burial expansion and sitework to address FCA deficiencies as shown in plans and specifications, priced as a lump sum (JB). CLIN 0002 covers the supply and delivery of 6,632 pre-placed crypts for the base period, priced per each (EA). Bid Option 1 (CLIN 0003) mirrors the base bid structure for burial expansion and sitework installation as a lump sum, while CLIN 0004 provides for 2,652 pre-placed crypts with delivery charges for Option 1, also priced per each. The solicitation explicitly requires that pre-placed crypt supply costs and delivery charges be separated from installation work and detailed in their respective CLINs. The contract specifies periods of performance (POP begin and end dates) for both the base and option periods, though specific dates are not filled in on this template. A grand total line is provided for the cumulative contract value across all CLINs.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C78626B0028 Section B

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 PRICE SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1.00 JB

BASE BID – BURIAL EXPANSION AND SITEWORK, FCA DEFICIENCIES:

Installation of all work as shown on the plans and described in the specifications.

Contract Period: Base POP Begin:

POP End:

Note: Ensure that the supply cost of preplaced crypts and their delivery to the job site is NOT included in this Contract Line Item Number (CLIN). These should be detailed separately in CLIN 0002

6,632.00 EA

BASE BID - Pre-placed Crypts (include delivery charges) Contract Period: Base POP Begin:

POP End:

Note: Include supply costs for preplaced crypts and their delivery to the job site in this

CLIN

1.00 JB

BID OPTION 1 – BURIAL EXPANSION AND SITEWORK: Installation of all work as shown on the plans and described in the specifications.

Contract Period: Option 1 POP Begin:

POP End:

Note: Ensure that the supply cost of preplaced crypts and their delivery to the job site is NOT included in this Contract Line Item Number (CLIN). These should be detailed separately in CLIN 0004

2,652.00 EA

BID OPTION 1 - Pre-placed Crypts (include delivery charges) Contract Period: Option 1 POP Begin:

POP End:

Note: Include supply costs for preplaced crypts and their delivery to the job site in this

CLIN

GRAND TOTAL