3004-E-111_ADD1.pdf

PDF 339 KB Posted

Attached to
Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
Solicitation number
36C78626B0028
Issued by

About this file

This is an Electrical Lighting Plan for a restroom expansion project at Fort Bliss National Cemetery in El Paso, Texas. The drawing, numbered 3004-E-111, is dated June 15, 2026, and prepared by ANDERSON as the Designer of Record, with IMEG serving as the Low Voltage/Security and Fire Alarm consultant. The project involves installing electrical lighting and associated components in a new restroom facility that is not sprinklered.

The electrical scope includes installation of lighting fixtures, hand dryers (men's and women's), refrigeration units, exhaust fans, controllers, water heaters, heat pumps, fire control systems, water fountains, and receptacles with ground fault protection (GFI). All devices will connect to an existing NEMA 1 surface-mounted panelboard (PANEL A) rated at 250 amperes, 208 volts three-phase, with a 225-ampere main breaker and 10 kA short circuit current rating. General notes specify that surface raceway is prohibited in finished areas without design team approval, lighting fixtures must remain accessible without ceiling cutting, wall-mounted fixtures require design team approval of rough-in locations, and all work must coordinate with architectural elevations and reflected ceiling plans prior to rough-in. Existing light switches will be reinstalled after architectural work completion with coordination for new door openings.

View the file

Other files

File Type Posted
4101-AE201_ADD1.pdf PDF
2101-AE201_ADD1.pdf PDF
S02_Attachment - Geotechnical Engineering Report.pdf PDF
092400 PORTLAND CEMENT PLASTERING_ADD1.pdf PDF
073213 CLAY ROOF TILES_ADD1.pdf PDF
2101-AE101_ADD1.pdf PDF
S02_Attachment - DOL Payroll Form updated.pdf PDF
S05_Attachment - RFIs and Responses.pdf PDF
2101-AE111_ADD1.pdf PDF
CE121_ADD1.pdf PDF
S02_Attachment - Statement of Work revised 10.26.2026.pdf PDF
3004-ED111_ADD1.pdf PDF
050385 HISTORIC DECORATIVE FORMED METAL REPAIR_WR IR_ADD1.pdf PDF
LK111_ADD1.pdf PDF
000110 TABLE OF CONTENTS_ADD1.pdf PDF
LP111_ADD1.pdf PDF
3003-ED111_ADD1.pdf PDF
2101-AD201_ADD1.pdf PDF
3003-E-501_ADD1.pdf PDF
S02_Attachment - SF 1413 updated.pdf PDF
S06_36C78626B0028 0002.pdf PDF
CB501_ADD1.pdf PDF
S02_Attachment - Addendum 1 Summary of Changes.pdf PDF
3003-E-111_ADD1.pdf PDF
087100 DOOR HARDWARE_ADD1.pdf PDF
2101-EL111_ADD1.pdf PDF
281300 PHYSICAL ACCESS CONTROL SYSTEM_ADD1.pdf PDF
2101-EP111_ADD1.pdf PDF
CB502_ADD1.pdf PDF
S04_Attachment - Site Visit Attendance Roster.pdf PDF
S06_36C78626B0028 Amend. 0001.pdf PDF
Fort Bliss Gravesite Expansion BD Part 1.pdf PDF
S02_Attachment - Limitations on Subcontracting Cert.docx DOCX document
S02_Attachment - DOL Payroll Form.pdf PDF
Fort Bliss Gravesite Expansion BD Part 3.pdf PDF
Fort Bliss Gravesite Expansion BD Part 5.pdf PDF
Fort Bliss Gravesite Expansion BD Part 10.pdf PDF
Fort Bliss Gravesite Expansion - Specifications Full Book.pdf PDF
Fort Bliss Gravesite Expansion BD Part 9.pdf PDF
Fort Bliss Gravesite Expansion BD Part 8.pdf PDF
S02_Attachment - 886CM3026 Fort Bliss NC SOW.pdf PDF
Fort Bliss Gravesite Expansion BD Part 4.pdf PDF
Fort Bliss Gravesite Expansion BD Part 7.pdf PDF
S02_36C78626B0028 Solicitation.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
Fort Bliss Gravesite Expansion BD Part 2.pdf PDF
Fort Bliss Gravesite Expansion BD Part 11.pdf PDF
S02_Attachment - Price Schedule Sheet.pdf PDF
S02_Attachment - Wage Determination Heavy.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EX

EX EX

EX

EX

EX

EX

EX

EX

EX

EX

EX EX EX

EX

EX

EX

EX

EX

EX

EX

E1

A

EXR

E2

PANEL A

EX EX

ELECTRICAL GENERAL NOTES

1. NOT USED.

2. SURFACE RACEWAY SHALL NOT BE USED IN ANY FINISHED AREAS WITHOUT

PRIOR APPROVAL OF THE DESIGN TEAM.

3. INSTALL DEVICES SUCH THAT NO TWO DEVICES ON OPPOSITES SIDES OF THE

SAME WALL ARE WITHIN 6" OF EACH OTHER.

4. COORDINATE ALL DEVICES WITH ARCHITECTURAL PLANS AND CASEWORK.

5. ALL LIGHTING FIXTURES SHALL BE INSTALLED IN SUCH A WAY THAT DRIVERS ARE

ACCESSIBLE WITHOUT CUTTING OF CEILING. THE DESIGN TEAM SHALL BE

NOTIFIED IMMEDIATELY OF AREAS WHERE THIS IS NOT POSSIBLE.

6. ALL WALL-MOUNTED FIXTURES SHALL HAVE THEIR EXACT ROUGH-IN LOCATION

DETERMINED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

7. UNLESS NOTED OTHERWISE BY DESIGNATED LIGHTING CONTROL ZONES,

SWITCHES SHOWN SHALL CONTROL ALL FIXTURES IN THE ROOM.

8. REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS FOR

THE SPECIFIC DEVICE ROUGH-IN AND PLACEMENT. ANY DEVIATIONS FROM THE

ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS SHALL BE

REVIEWED AND APPROVED BY THE DESIGN TEAM PRIOR TO ROUGH-IN.

ELECTRICAL PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

E1 NO ELECTRICAL SCOPE IN THIS AREA.

E2

REINSTALL EXISTING LIGHT SWITCH AFTER ARCHITECTURAL WORK HAS

BEEN COMPLETED. CLEAN AND INSPECT ALL COMPONENTS. COORDINATE

WITH NEW DOOR OPENING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

NOT SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

L0W VOLTAGE/SECURITY:

IMEG

623 26TH AVENUE

ROCK ISLAND, IL 61201

309.781.3770

PETE MCGHEE

IRRIGATION:

AQUA ENGINEERING

300 BOARDWALK DRIVE

UNIT 4B

FORT COLLINS,CO 80525

970.372.6104

JD LEONARD

GEOTECHNICAL:

TERRACON

6460 HILLER STREET

SUITE A

EL PASO, TX 79925

915.778.5233

IVAN AVELAR

FIRE ALARM:

IMEG

623 26TH AVENUE

ROCK ISLAND, IL 61201

309.781.3770

MATT SNYDER

C

U s e rs

\a w e b e r\

D o c u m e n ts \1

-P

IC

R

E S

T R

O O

M -M

-2 a w e b e r9

S

.r v t

/1

/2

:5

:4

P

M

3004-E-111

PIC/RESTROOM - ELECTRICAL PLANS FT BLISS NATIONAL CEMETERY

EXPANSION

5200 FRED WILSON AVE, EL PASO, TX

886CM3026

JUNE 15, 2026 ATW DIL

18528

1/4" = 1'-0"

ELECTRICAL LIGHTING PLAN

Notes: G=GFI M=MOTORIZED E=EXISTING ST=SHUNT TRIP A=ARC FAULT H=HANDLE LOCK

Demand Current: 0 A

Demand Load: 0 kVA

Connected Current: 0 A

Connected Load: 0 kVA

Panel Totals

Load Classification Connected Factor Demand

Connected Current: 0 A 0 A 0 A

Connected Load: 0 kVA 0 kVA 0 kVA

A-41 A-42

A-39 FLAG POLE LIGHTS SOUTH 20 1 E 0 0 A-40

A-37 FLAG POLE LIGHTS NORTH 20 1 E 0 0

E 2 15 MEN DYSON DRYER

A-38

A-35 A-36

A-33 0 0 A-34

A-31

MENS HAND DRYER 20 2 E

0 0

E 2 60 REF. UNIT

A-32

A-29 A-30

A-27 0 0 A-28

A-25

WOMENS HAND DRYER 20 2 E

0 0

E 2 60 REF. UNIT

A-26

A-23 A-24

A-21 CONTROLLER #2 20 1 E 0 0 E 1 20 CONTROLLER #3 A-22

A-19 ER #2 20 1 E 0 0 E 1 20 EXHAUST FAN A-20

A-17 A-18

A-15 0 E 1 20 NEW HEAT PUMP A-16

A-13 WATER HEATER 20 1 E 0 0 E 1 20 GFI A-14

A-11 A-12

A-9 FIRE CONTROL 20 1 E 0 0 E 1 20 WATER FOUNTAIN A-10

A-7 OUTSIDE/INSIDE SITTING LIGHTS 20 1 E 0 0 E 1 20 RESTROOM GFI RECEPTS A-8

A-5 A-6

A-3 RESTROOMS LIGHTING 20 1 E 0 0 E 1 20 OUTSIDE GFI RECEPTS A-4

A-1 LIGHTING 20 1 E 0 0 E 1 20 COMPUTER GFI RECEPTS A-2

Ckt Description Trip (A) Poles FN/Note Phase A

Load (VA) Phase B

Load (VA) Phase C

Load (VA) FN/Note Poles Trip (A) Description Ckt

NOTES: EXISTING PANELBOARD TYPE PRL-1A

Enclosure: NEMA 1

Mounting: Surface Features & Modifications: -

Supply: Feed-Thru Lugs: No SCCR: 10 kA

Location: EXISTING HVAC 106 Neutral: 100% Mains FN/Note: -

Bus Rating: 250 A Mains Rating: 225 A

Panelboard: PANEL A Voltage: 208 V, 3Ø, 4W Mains Type: MCB

A MANUAL ON/OFF MANUAL LINE VOLTAGE TOGGLE SWITCH N/A

TAG ACTIVATION DECRIPTION SCHEDULE

LIGHTING CONTROL - SEQUENCE OF OPERATION

Revisions: Date:

Addendum 1 10/12/2026

Sheets
3004-E-111 - PIC/RESTROOM - ELECTRICAL PLANS
3004-ED111 - PIC/RESTROOM - ELECTRICAL DEMOLITION PLANS

File details come from the government source that posted it. Updated .