This document is Addendum 1 to a federal solicitation for the Fort Bliss National Cemetery project (Project 886CM3026), summarizing changes and responses to Requests for Information (RFIs) across civil, landscape, architectural, electrical, and specification disciplines.

Civil and landscape revisions clarify crypt construction details, drainage specifications, and fill requirements across sheets CB501, CB502, CE121, LK111, and LP111, adopting ACI 318-19 standards and establishing uniform 3-inch decomposed granite cover as final stabilization. Architectural changes address a 2,500-square-foot stucco scope including exterior walls, chimneys, canopy sides, and ramp/stair walls, requiring three-coat direct-applied stucco on sheets 2101-AD201, 2101-AE101, 2101-AE111, 2101-AE201, and 4101-AE201, with specifications for chemical railing paint removal and clarified hardware responsibilities between the hardware contractor and security integrator. Electrical modifications remove references to Section 26 09 23 (Lighting Controls) across multiple sheets (2101-EL111, 3003-E-111, 3004-E-111, and related demolition sheets), add missing electrical coordination details, and specify GFI receptacle replacements. Specification section updates address door hardware assignments, stucco assembly and substrate requirements, clay roof tile underlayment details (prohibiting OSB and requiring two layers of self-adhering underlayment), surge protective devices, historic decorative metal repair procedures with TCLP testing, and Physical Access Control System configuration as a standalone network with 200 smart cards and no PIV middleware enterprise integration. All affected sheets have been completely replaced with ADD1 versions reflecting the RFI responses.

View the file

Other files

File Type Posted
4101-AE201_ADD1.pdf PDF
2101-AE201_ADD1.pdf PDF
3004-E-111_ADD1.pdf PDF
S02_Attachment - Geotechnical Engineering Report.pdf PDF
092400 PORTLAND CEMENT PLASTERING_ADD1.pdf PDF
073213 CLAY ROOF TILES_ADD1.pdf PDF
2101-AE101_ADD1.pdf PDF
S02_Attachment - DOL Payroll Form updated.pdf PDF
S05_Attachment - RFIs and Responses.pdf PDF
2101-AE111_ADD1.pdf PDF
CE121_ADD1.pdf PDF
S02_Attachment - Statement of Work revised 10.26.2026.pdf PDF
3004-ED111_ADD1.pdf PDF
050385 HISTORIC DECORATIVE FORMED METAL REPAIR_WR IR_ADD1.pdf PDF
LK111_ADD1.pdf PDF
000110 TABLE OF CONTENTS_ADD1.pdf PDF
LP111_ADD1.pdf PDF
3003-ED111_ADD1.pdf PDF
2101-AD201_ADD1.pdf PDF
3003-E-501_ADD1.pdf PDF
S02_Attachment - SF 1413 updated.pdf PDF
S06_36C78626B0028 0002.pdf PDF
CB501_ADD1.pdf PDF
3003-E-111_ADD1.pdf PDF
087100 DOOR HARDWARE_ADD1.pdf PDF
2101-EL111_ADD1.pdf PDF
281300 PHYSICAL ACCESS CONTROL SYSTEM_ADD1.pdf PDF
2101-EP111_ADD1.pdf PDF
CB502_ADD1.pdf PDF
S04_Attachment - Site Visit Attendance Roster.pdf PDF
S06_36C78626B0028 Amend. 0001.pdf PDF
Fort Bliss Gravesite Expansion BD Part 1.pdf PDF
S02_Attachment - Limitations on Subcontracting Cert.docx DOCX document
S02_Attachment - DOL Payroll Form.pdf PDF
Fort Bliss Gravesite Expansion BD Part 3.pdf PDF
Fort Bliss Gravesite Expansion BD Part 5.pdf PDF
Fort Bliss Gravesite Expansion BD Part 10.pdf PDF
Fort Bliss Gravesite Expansion - Specifications Full Book.pdf PDF
Fort Bliss Gravesite Expansion BD Part 9.pdf PDF
Fort Bliss Gravesite Expansion BD Part 8.pdf PDF
S02_Attachment - 886CM3026 Fort Bliss NC SOW.pdf PDF
Fort Bliss Gravesite Expansion BD Part 4.pdf PDF
Fort Bliss Gravesite Expansion BD Part 7.pdf PDF
S02_36C78626B0028 Solicitation.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
Fort Bliss Gravesite Expansion BD Part 2.pdf PDF
Fort Bliss Gravesite Expansion BD Part 11.pdf PDF
S02_Attachment - Price Schedule Sheet.pdf PDF
S02_Attachment - Wage Determination Heavy.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1 | 1

Addendum 1 Summary of Changes and RFI Responses

Fort Bliss National Cemetery | Project 886CM3026

Civil and landscape

• CB501 | RFIs G-1, G-2, G-4, G-6 and Q-5 — Questions addressed conflicting crypt cover, drainage, aisle fill, fabric and references. Responses require 4-inch sand, 11–12-inch general fill, 3-inch decomposed granite, no topsoil, 6-inch drain rock, general aisle fill and revised fabric details. Sheet updates details, references CB101–CB108 and adopts ACI 318-19. Sheet CB501 has been replaced in it’s entirety with CB501_ADD1.

• CB502 | RFIs G-1, G-2, G-4, G-6 and G-7 — Questions addressed crypt layers, fabric and excavation through section breaks. Responses confirm the layers above and no excavation to continue drainage aggregate between burial sections. Revised transverse detail clarifies geotextile, perimeter crypts and general aisle fill; select-fill wording elsewhere remains to be reconciled. Sheet CB502 has been replaced in it’s entirety with CB502_ADD1.

• CE121 | RFI K-1 — Asked whether decomposed granite/nonvegetative cover qualifies as final stabilization. Response: yes. Revised note requires uniform 3-inch cover, temporary BMP removal and sediment cleanup; seed/mulch/sod wording remains elsewhere. Sheet CE121 has been replaced in it’s entirety with CE121_ADD1.

• LK111 | RFI Q-8 — Asked to correct the bid-option section-marker detail reference. Response: revise the callout. Keynote 6 now references Detail 3/LK501. Sheet LK111 has been replaced in it’s entirety with LK111_ADD1.

• LP111 | RFI K-2 — Asked for seed mix and erosion-control blanket locations or deletion of the note.

Response: no blanket is needed. Former Note 3 is deleted. Sheet LP111 has been replaced in it’s entirety with LP111_ADD1.

Architectural

• 2101-AD201 | RFI L-3 — Asked what the 2,500-SF stucco scope includes. Response includes exterior walls, chimneys, canopy sides and ramp/stair walls, with canopy ceiling retained. Sheet adds the quantity and included surfaces; “all sides” canopy wording needs coordination. Sheet 2101-AD201 has been replaced in it’s entirety with 2101-AD201_ADD1.

• 2101-AE101 | RFI L-2 and related O-8 — Asked which railing paint-removal method governs and who provides electrified hardware. Responses require chemical removal, specified coating testing and hardware responsibilities by set. FL22 is revised for chemical stripping/refinishing; FL8 says credential reader. No direct RFI for the FL8 terminology change was identified. Sheet 2101-AE101 has been replaced in it’s entirety with 2101-AE101_ADD1.

• 2101-AE111 | RFI L-2 and related O-8 — Same railing-removal and electrified-hardware questions as

AE101. Responses require chemical stripping and hardware allocation by set. Shared FL22 and FL8 notes are coordinated with AE101. Sheet 2101-AE111 has been replaced in it’s entirety with 2101-

AE111_ADD1.

• 2101-AE201 | RFI L-3 — Asked which stucco assembly and areas govern. Response calls for three-coat direct-applied stucco and the identified 2,500-SF scope. Sheet revises chimney stucco/flashing and adds the quantity; the specification still requires metal lath. Sheet 2101-AE201 has been replaced in it’s entirety with 2101-AE201_ADD1.

Addendum 1 | 2

• 4101-AE201 | RFIs M-1 and M-2 — Asked which coatings govern and whether welding is capped at 8

LF per railing. Responses defer coatings to the Material Schedule and require full weld repairs. EL5 is revised; EL3 still specifies epoxy primer and an 8-LF welding cap and needs correction. Sheet 4101-

AE201 has been replaced in it’s entirety with 4101-AE201_ADD1.

Electrical

• 2101-EL111 | RFI Q-3 — Asked to resolve the missing Lighting Controls specification. Response removes Section 26 09 23 references. Lighting General Note 1 is marked “Not Used.” Sheet 2101-

EL111 has been replaced in it’s entirety with 2101-EL111_ADD1.

• 2101-EP111 | Revises the Panel A/service-disconnect demolition one-line; new Panel A and reconnection of existing loads remain shown. Sheet 2101-EP111 has been replaced in it’s entirety with 2101-EP111_ADD1

• 3003-E-111 | RFIs P-5 and Q-3 — Asked for missing E9 and resolution of Section 26 09 23 references. Responses add E9 and remove the reference. Sheet adds E9 coordination with AC-SCP-1 and marks General Note 1 “Not Used”; E8 also adds 15A-to-20A GFI receptacle replacement. Sheet

3003-E-111 has been replaced in it’s entirety with 3003-E-111_ADD1

• 3003-E-501 | Revises panel/subfeed demolition one-line information while retaining new Panel B and load reconnections. Sheet 3003-E-501 has been replaced in it’s entirety with 3003-E-501_ADD1

• 3003-ED111 | Adds ED4 requiring 15A-to-20A GFI receptacle replacement in existing backboxes and field verification. Sheet 3003-ED111 has been replaced in it’s entirety with 3003-E111_ADD1

• 3004-E-111 | RFIs P-6 and Q-3 — Asked whether PIC demolition is required and how to resolve the missing lighting-controls reference. Responses exclude power demolition, retain lighting work and remove Section 26 09 23 references. Power-plan view is removed; General Note 1 is “Not Used.”

Sheet 3004-E-111 has been replaced in it’s entirety with 3004-E-111_ADD1

• 3004-ED111 | RFI P-6 — Asked whether demolition is required in the PIC areas. Response excludes power demolition but retains shown lighting work. Power-demolition view is removed; switch disconnection/storage for reinstallation remains. Sheet 3004-ED111 has been replaced in it’s entirety with 3004-ED111_ADD1

Specifications and contents

• 00 01 10 | RFI Q-4 — Asked to confirm Surge Protective Devices and reconcile section numbers.

Response adds Section 26 43 13 to the contents. Reissue includes it and lists stucco as 09 24 00; and

Decorative Metal Fence as 32 31 19. Spec section 000110 TABLE OF CONTENTS has been replaced in it’s entirety with Spec Section 000110 TABLE OF CONTENTS_ADD1.

• 05 03 85 | RFIs M-1 and L-2 — Asked which coating system and removal/testing methods govern.

Responses use drawing Material Schedules, chemical stripping and specified railing-coating TCLP testing. Revised specification refers primer/paint selection to Section 09 91 00 and the Material

Schedules. Spec section 050385 HISTORIC DECORATIVE FORMED METAL REPAIR_WR IR has been replaced in it’s entirety with Spec Section 050385 HISTORIC DECORATIVE FORMED

METAL REPAIR_WR IR_ADD1.

• 07 32 13 | RFI L-5 — Asked about sheathing/insulation and conflicting underlayment requirements.

Response retains PIC nailable insulation, includes manufacturer-required sheathing and replaces felt with self-adhering underlayment or approved equal. Reissue requires two layers, specified laps and additional sheathing as needed; OSB is prohibited. Spec section 073213 CLAY ROOF TILES has been replaced in it’s entirety with 073213 CLAY ROOF TILES_ADD1.

Addendum 1 | 3

• 08 71 00 | RFI O-8 — Asked whether electrified hardware is included and which trade provides it.

Response assigns locks/power transfers to the hardware contractor and designated components to the security integrator. Reissue identifies electric strikes as “Not Used” and changes applicable operation descriptions to “electrified lock.” Spec section 087100 DOOR HARDWARE has been replaced in it’s entirety with 087100 DOOR HARDWARE_ADD1.

• 09 24 00 | RFI L-3 — Asked about stucco assembly, substrates, accessories and repairs. Response specifies three-coat direct-applied stucco and Contractor repair of damage caused by its work.

Reissued specification still requires self-furring metal lath, including on masonry/concrete, plus screeds, beads and joints; reconcile with the response/drawings. Spec section 092400 PORTLAND

CEMENT PLASTERING has been replaced in it’s entirety with 092400 PORTLAND CEMENT

PLASTERING_ADD1.

• 28 13 00 | RFIs O-6 and O-7 — Asked whether complete security is included and whether enterprise integration is required. Responses require a complete standalone system with Contractor credentials/software/programming and no PIV middleware. Reissue specifies a standalone network and 200 smart cards but retains PIV/FIPS provisions requiring coordination. Spec section 281300

PHYSICAL ACCESS CONTROL SYSTEM has been replaced in it’s entirety with 281300 PHYSICAL

ACCESS CONTROL SYSTEM_ADD1.