This document is an Electrical Demolition Plan for a maintenance building renovation project at Fort Bliss National Cemetery in El Paso, Texas. The drawing set consists of two detailed plans at 1/8" = 1'-0" scale: a Lighting Demolition Plan and an Electrical Power Demolition Plan, prepared by Anderson (Designer of Record) with consulting services from IMEG for low voltage/security and fire alarm work.
The scope requires electrical contractors to disconnect and remove existing electrical systems not being reused or extended, including all connections, wiring, and conduit. Key demolition tasks identified include: disconnecting branch circuits from existing panels and pulling circuits back to the nearest junction box (ED2); disconnecting and removing existing fixtures while restoring circuit continuity to remaining fixtures (ED3); and removing existing 15-amp receptacles and replacing them in-place with 20-amp GFI-protected receptacles per NEC Article 210.8, reusing existing backboxes (ED4). The plans cover the maintenance yard and various facility areas including wash bay, vehicle storage, men's and women's facilities, mud room, HVAC room, offices, lunch room, maintenance bays, and flammable/pesticide storage areas. General notes require contractors to field verify the site, coordinate with architectural drawings regarding floor cutting and ceiling removal, maintain fire ratings of affected walls and floors, and ensure all mechanical and electrical systems scheduled for removal are included in the bid. The project is issued as Bid Documents dated June 15, 2026, under Project Number 18528 and Building Number 3003, managed by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GFI
AC
GFI
AC
GFI
AC
J
EXISTING WASH BAY
EXISTING VEHICLE STORAGE
EXISTING MENS
EXISTING WOMEN'S
EXISTING MUD RM
EXISTING HVAC
EXISTING OFFICE
EXISTING LUNCH
EXISTING OFFICE
EXISTING OFFICE/ ELEC
EXISTING MAINTENANCE
BAYS
EXISTING FLAMABLE
STORAGE
EXISTING PARTS & TOOLS
EXISTING PESTICIDE
STORAGE
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX EX
EX
EXEXEX EX
EX EX EX EX
EX EX EX EX
EX EX EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX EX
EX
EX
EX EX
EX EX EX
EX EXEX
EX
EX
EX
EX
EX
EX
EX
ER
ED1
MAINTENANCE YARD
ED1
PANEL A
ED3
ER
PANEL A
HP-1
ER
ER
ER
EX EX
ER
ER
ER
EX
EX
EX
EX
EX
EX
EX
EX EX EX
EX EX
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EX EX EX
EX
EX
EX
ER ER ER
ER
ER
ER
ER
EREX
ER EREX
EX
EX
EX EX
EX
MAINTENANCE YARD
ED1
PANEL B .
ER
ED2
ED4
ED4
ER
ELECTRICAL DEMOLITION
GENERAL NOTES
1. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS AND
FIELD OBSERVATION. ELECTRICAL CONTRACTORS SHALL FIELD VERIFY THE SITE
AND INCLUDE ALL REQUIRED DEMOLITION IN THE BID.
2. ALL REQUIRED DEMOLITION MAY NOT BE INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL MECHANICAL AND ELECTRICAL SYSTEMS (NOT TO BE
REUSED OR EXTENDED) BE REMOVED. COORDINATE WITH ARCHITECTURAL
DRAWINGS.
3. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING ALL
EQUIPMENT TO BE REMOVED.
4. MAINTAIN FIRE RATINGS OF WALLS AND FLOORS AFFECTED BY DEMOLITION.
5. REFER TO ARCHITECTURAL DRAWINGS FOR DETAILS ON FLOOR CUTTING AND
CEILING REMOVAL. CONTRACTOR SHALL COORDINATE WORK TO BE CONSISTENT
WITH SCOPE OF GENERAL CONTRACTOR'S DEMOLITION.
ELECTRICAL DEMOLITION PLAN KEYED
NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
ED1 NO ELECTRICAL DEMOLITION SCOPE IN THIS AREA.
ED2
DISCONNECT BRANCH CIRCUITS FROM EXISTING PANEL. CIRCUITS SHALL
BE PULLED BACK TO NEAREST JUNCTION BOX, PROVIDING NEW AS
NECESSARY. PREPARE TO EXTEND TO NEW PANELBOARD.
ED3
DISCONNECT AND REMOVE EXISTING FIXTURE. CIRCUIT CONTINUITY SHALL
BE RESTORED TO REMAINING FIXTURES AS REQUIRED.
ED4
EXISTING 15A RECEPTACLES IN THIS ROOM SHALL BE REMOVED AND
REPLACED IN PLACE WITH 20A RECEPTACLES. EXISTING BACKBOXES
SHALL BE REUSED. ALL NEW DEVICES SHALL BE GFI PROTECTED IN
ACCORDANCE WITH NEC ARTICLE 210.8. DEVICES INDICATED FOR BIDDING
PURPOSES. VERIFY EXISTING DEVICE LOCATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
NOT SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENTS
L0W VOLTAGE/SECURITY:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
PETE MCGHEE
IRRIGATION:
AQUA ENGINEERING
300 BOARDWALK DRIVE
UNIT 4B
FORT COLLINS,CO 80525
970.372.6104
JD LEONARD
GEOTECHNICAL:
TERRACON
6460 HILLER STREET
SUITE A
EL PASO, TX 79925
915.778.5233
IVAN AVELAR
FIRE ALARM:
IMEG
623 26TH AVENUE
ROCK ISLAND, IL 61201
309.781.3770
MATT SNYDER
C U s e rs \a w e b e r\
D o c u m e n ts
\1
-M A
IN
T
-M -R a w e b e r9
S
.r v t
/1 /2
:0
:4
P M
3003-ED111
MAINTENANCE BLDG - ELECTRICAL
DEMOLITION PLANS
FT BLISS NATIONAL CEMETERY
EXPANSION
5200 FRED WILSON AVENUE, EL PASO, TEXAS
886CM3026
JUNE 15, 2026 ATW DIL
18528
1/8" = 1'-0"1
LIGHTING DEMOLITION PLAN
1/8" = 1'-0"2
ELECTRICAL POWER DEMOLITION PLAN
Revisions: Date:
| Sheets |
| 3003-E-111 - MAINTENANCE BLDG - ELECTRICAL PLANS |
| 3003-E-501 - MAINTENANCE BLDG - ELECTRICAL SCHEDULES AND DETAILS |
| 3003-ED111 - MAINTENANCE BLDG - ELECTRICAL DEMOLITION PLANS |
File details come from the government source that posted it. Updated .