This document is a set of architectural bid documents containing exterior demolition elevation drawings for an administrative building at Fort Bliss National Cemetery in El Paso, Texas. The drawings are part of the FT Bliss National Cemetery Expansion project (Project Number 18528, Building Number 2101) and were issued on June 15, 2026, with an addendum dated October 12, 2026.

The demolition scope includes removal of approximately 2,500 square feet of stucco finish from walls, sills, ramps, stairs, and entrance canopy on all sides of the building. Specific demolition tasks include removal of existing clay tile roofing assembly with salvage of tiles, gutter and downspout systems, stucco and metal flashing on chimneys, and light fixtures, along with removal and salvage of handrails, awnings, brackets, splash blocks, and signage for reinstallation after stucco work completion. The drawings indicate that existing mechanical and electrical systems requiring relocation must be coordinated with the VA, and that existing elements such as precast concrete caps, crawlspace vents, and vent pipes are to remain in place. The construction is noted as not sprinklered. Four exterior demolition elevation views (North, East, South, and West) are provided at 1/4-inch equals 1-foot scale, with detailed keyed notes (DE1 through DE15) specifying demolition requirements for each marked element.

View the file

Other files

File Type Posted
4101-AE201_ADD1.pdf PDF
2101-AE201_ADD1.pdf PDF
3004-E-111_ADD1.pdf PDF
S02_Attachment - Geotechnical Engineering Report.pdf PDF
092400 PORTLAND CEMENT PLASTERING_ADD1.pdf PDF
073213 CLAY ROOF TILES_ADD1.pdf PDF
2101-AE101_ADD1.pdf PDF
S02_Attachment - DOL Payroll Form updated.pdf PDF
S05_Attachment - RFIs and Responses.pdf PDF
2101-AE111_ADD1.pdf PDF
CE121_ADD1.pdf PDF
S02_Attachment - Statement of Work revised 10.26.2026.pdf PDF
3004-ED111_ADD1.pdf PDF
050385 HISTORIC DECORATIVE FORMED METAL REPAIR_WR IR_ADD1.pdf PDF
LK111_ADD1.pdf PDF
000110 TABLE OF CONTENTS_ADD1.pdf PDF
LP111_ADD1.pdf PDF
3003-ED111_ADD1.pdf PDF
3003-E-501_ADD1.pdf PDF
S02_Attachment - SF 1413 updated.pdf PDF
S06_36C78626B0028 0002.pdf PDF
CB501_ADD1.pdf PDF
S02_Attachment - Addendum 1 Summary of Changes.pdf PDF
3003-E-111_ADD1.pdf PDF
087100 DOOR HARDWARE_ADD1.pdf PDF
2101-EL111_ADD1.pdf PDF
281300 PHYSICAL ACCESS CONTROL SYSTEM_ADD1.pdf PDF
2101-EP111_ADD1.pdf PDF
CB502_ADD1.pdf PDF
S04_Attachment - Site Visit Attendance Roster.pdf PDF
S06_36C78626B0028 Amend. 0001.pdf PDF
Fort Bliss Gravesite Expansion BD Part 1.pdf PDF
S02_Attachment - Limitations on Subcontracting Cert.docx DOCX document
S02_Attachment - DOL Payroll Form.pdf PDF
Fort Bliss Gravesite Expansion BD Part 3.pdf PDF
Fort Bliss Gravesite Expansion BD Part 5.pdf PDF
Fort Bliss Gravesite Expansion BD Part 10.pdf PDF
Fort Bliss Gravesite Expansion - Specifications Full Book.pdf PDF
Fort Bliss Gravesite Expansion BD Part 9.pdf PDF
Fort Bliss Gravesite Expansion BD Part 8.pdf PDF
S02_Attachment - 886CM3026 Fort Bliss NC SOW.pdf PDF
Fort Bliss Gravesite Expansion BD Part 4.pdf PDF
Fort Bliss Gravesite Expansion BD Part 7.pdf PDF
S02_36C78626B0028 Solicitation.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
Fort Bliss Gravesite Expansion BD Part 2.pdf PDF
Fort Bliss Gravesite Expansion BD Part 11.pdf PDF
S02_Attachment - Price Schedule Sheet.pdf PDF
S02_Attachment - Wage Determination Heavy.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST LEVEL

100'-0"

DE1

DE2

DE7

DE2DE4

DE1

DE2

DE5

DE10DE11 TYPTYP

DE13

DE5

FIRST LEVEL

100'-0"

DE1

DE2

DE4

DE2

DE1

DE5

DE6

DE2

DE9

TYP

DE14DE14

T .O

. R

ID

G E

C A

P

8'

-0

(E X

IS

T

IN

G

DE15

DE5

DE8

FIRST LEVEL

100'-0"

DE1

DE5

DE2

DE7

DE1

DE2

DE2

DE4 DE6 DE6

DE2

DE8

DE9

DE8

3' -6

TYP

DE14

DE14

DE13

DE15 BEYOND

DE5

FIRST LEVEL

100'-0"

DE1

DE5

DE2

DE2

DE4

DE2

DE6

DE7 FOREGROUND

DE9

DE9

DE10DE10

DE10

DE11

TYP

TYP

DE13

DE14

DE14

DE14

1'

-6

E X

IS

T

IN

G

DE5

WALLS BEYOND SHOWN

GRAY TONED

DEMOLITION ELEVATION KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH ELEVATION

DE1

REMOVE ALL EXISTING CLAY TILE ROOFING ASSEMBLY, ASSOCIATED

UNDERLAYMENT, ROOF FLASHINGS, EAVE CLOSERS AND TREATED WOOD

BLOCKING, EXCEPT WHERE NOTED OTHERWISE. EXISTING WOOD SHEATHING

TO REMAIN, SALVAGE A PORTION OF THE REMOVED TILES FOLLOWING THE

DIRECTION PROVIDED IN THE DEMOLITION GENERAL NOTES

DE2 DEMO EXISTING GUTTER AND DOWNSPOUT SYSTEM IN ITS ENTIRETY

DE3 NOT USED

DE4 REMOVE AND SALVAGE EXISTING SPLASH BLOCK DURING DEMOLITION, TYP

DE5

REMOVE ALL EXISTING STUCCO FINISH AND METAL FLASHING ON CHIMNEY IN

PREPARATION FOR NEW

DE6

REMOVE AND SALVAGE ALL EXISTING HANDRAILS AT STAIR AND RAMP FOR

REFINISHING AND REINSTALLATION AFTER STUCCO WORK IS COMPLETE. SEE

FLOOR PLAN FOR REFINISHING OF THESE ELEMENTS.

DE7

REMOVE AND SALVAGE AWNING, BRACKETS, FASTENERS AND POSTS AND

SALVAGE FOR REINSTALLATION AFTER STUCCO WORK IS COMPLETE. ANY

COMPONENTS OF THE AWNING ASSEMBLY DAMAGED DURING CONSTRUCTION,

INCLUDING FABRIC, BRACKETS, FASTENERS OR POSTS, ARE TO BE REPLACED

IN-KIND OR BETTER THAN THE EXISTING.

DE8 EXISTING PRECAST CONCRETE CAP TO REMAIN

DE9

REMOVE ALL STUCCO FROM WALL AND ENTRANCE CANOPY IN IT'S ENTIRETY -

SEE DEMOLITION PLAN

DE10

EXISTING MECH AND ELEC SYSTEMS IN THIS AREA. IF NECESSARY FOR

STUCCO REPLACEMENT, REMOVE AND SALVAGE FOR REINSTALLATION AFTER

STUCCO WORK IS COMPLETE. PROVIDE AND COORDINATE ALL DISCONNECTS

WITH THE VA - SEE ELECTRICAL

DE11 EXISTING CRAWLSPACE VENT TO REMAIN

DE12 NOT USED

DE13 REMOVE AND DISPOSE LIGHT FIXTURE - SEE ELECTRICAL

DE14 EXISTING VENT PIPE TO REMAIN.

DE15

REMOVE AND SALVAGE EXISTING SIGN FOR REINSTALLATION ONCE STUCCO

WORK IS COMPLETE

DEMOLITION ELEV SYMBOLS

KEY NOTE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

AREA OF

STUCCO

REMOVAL

AREA OF TOTAL STUCCO REMOVAL AND REPLACEMENT

TOTAL STUCCO = 2,500 SF

INCLUDING WALLS, SILLS, RAMP AND STAIR

PARTIAL HEIGHT WALLS (ALL SIDES), AND

ENTRANCE CANOPY (ALL SIDES)

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name:

Date:

License number:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

NOT SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

IRRIGATION:

AQUA ENGINEERING

300 BOARDWALK DRIVE

UNIT 4B

FORT COLLINS,CO 80525

970.372.6104

JD LEONARD

GEOTECHNICAL:

TERRACON

6460 HILLER STREET

SUITE A

EL PASO, TX 79925

915.778.5233

IVAN AVELAR

COST ESTIMATING:

OCMI

2100 NORTH GREENVILLE AVENUE

SUITE 1150

RICHARDSON, TX 75082

469.431.0571

RAYMOND BODO

FIRE / L0W VOLTAGE / SECURITY:

IMEG

623 26TH AVENUE

ROCK ISLAND, IL 61201

309.781.3770

MATT SNYDER / PETE MCGHEE

CHRISTINA MCDANIEL

06/15/2026

52909

C U s e rs

\j tu c h te n h a g e n

\D o c u m e n ts \1

-A D

M

IN

-A -R jt u c h te n h a g e n a e

-m n

.c o m

.r v t

/1 /2

:0

:1

P M

2101- AD201

ADMIN BLDG - DEMOLITION EXTERIOR

ELEVATIONS

FT BLISS NATIONAL CEMETERY

EXPANSION

5200 FRED WILSON AVENUE, EL PASO,TEXAS

886CM3026

JUNE 15, 2026 CM RG

18528

1/4" = 1'-0"

EXTERIOR DEMOLITION ELEVATION - NORTH

1/4" = 1'-0"

EXTERIOR DEMOLITION ELEVATION - EAST

1/4" = 1'-0"

EXTERIOR DEMOLITION ELEVATION - SOUTH

1/4" = 1'-0"

EXTERIOR DEMOLTION ELEVATION - WEST

0 4' 8'2' 0 4' 8'2'

0 4' 8'2'0 4' 8'2'