This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs, National Cemetery Administration, Contracting Services.

The amendment, numbered 0002 and effective October 26, 2026, revises solicitation 36C78626B0028 (originally dated September 16, 2026) for a construction project with an estimated magnitude between $20,000,000 and $50,000,000. The amendment makes seven substantive changes: (1) replaces the Statement of Work in its entirety with a revised version dated October 26, 2026; (2) updates the construction solicitation magnitude range; (3) removes FAR Clause 52.219-6 entirely; (4) provides responses to Requests for Information (RFI); (5) includes A/E Addendum 1 to construction drawings and specifications with a summary of changes and updated documents; (6) provides a Geotechnical Engineering Report; and (7) supplies updated Department of Labor Payroll Form and SF 1413. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation by completing and returning items 8 and 15, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt may result in rejection of the offer. All terms and conditions of the original solicitation remain unchanged except as modified herein.

View the file

Other files

File Type Posted
4101-AE201_ADD1.pdf PDF
2101-AE201_ADD1.pdf PDF
3004-E-111_ADD1.pdf PDF
S02_Attachment - Geotechnical Engineering Report.pdf PDF
092400 PORTLAND CEMENT PLASTERING_ADD1.pdf PDF
073213 CLAY ROOF TILES_ADD1.pdf PDF
2101-AE101_ADD1.pdf PDF
S02_Attachment - DOL Payroll Form updated.pdf PDF
S05_Attachment - RFIs and Responses.pdf PDF
2101-AE111_ADD1.pdf PDF
CE121_ADD1.pdf PDF
S02_Attachment - Statement of Work revised 10.26.2026.pdf PDF
3004-ED111_ADD1.pdf PDF
050385 HISTORIC DECORATIVE FORMED METAL REPAIR_WR IR_ADD1.pdf PDF
LK111_ADD1.pdf PDF
000110 TABLE OF CONTENTS_ADD1.pdf PDF
LP111_ADD1.pdf PDF
3003-ED111_ADD1.pdf PDF
2101-AD201_ADD1.pdf PDF
3003-E-501_ADD1.pdf PDF
S02_Attachment - SF 1413 updated.pdf PDF
CB501_ADD1.pdf PDF
S02_Attachment - Addendum 1 Summary of Changes.pdf PDF
3003-E-111_ADD1.pdf PDF
087100 DOOR HARDWARE_ADD1.pdf PDF
2101-EL111_ADD1.pdf PDF
281300 PHYSICAL ACCESS CONTROL SYSTEM_ADD1.pdf PDF
2101-EP111_ADD1.pdf PDF
CB502_ADD1.pdf PDF
S04_Attachment - Site Visit Attendance Roster.pdf PDF
S06_36C78626B0028 Amend. 0001.pdf PDF
Fort Bliss Gravesite Expansion BD Part 1.pdf PDF
S02_Attachment - Limitations on Subcontracting Cert.docx DOCX document
S02_Attachment - DOL Payroll Form.pdf PDF
Fort Bliss Gravesite Expansion BD Part 3.pdf PDF
Fort Bliss Gravesite Expansion BD Part 5.pdf PDF
Fort Bliss Gravesite Expansion BD Part 10.pdf PDF
Fort Bliss Gravesite Expansion - Specifications Full Book.pdf PDF
Fort Bliss Gravesite Expansion BD Part 9.pdf PDF
Fort Bliss Gravesite Expansion BD Part 8.pdf PDF
S02_Attachment - 886CM3026 Fort Bliss NC SOW.pdf PDF
Fort Bliss Gravesite Expansion BD Part 4.pdf PDF
Fort Bliss Gravesite Expansion BD Part 7.pdf PDF
S02_36C78626B0028 Solicitation.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
Fort Bliss Gravesite Expansion BD Part 2.pdf PDF
Fort Bliss Gravesite Expansion BD Part 11.pdf PDF
S02_Attachment - Price Schedule Sheet.pdf PDF
S02_Attachment - Wage Determination Heavy.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 1

10-26-2026

886CM3026

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

To all Offerors/Bidders

36C78626B0028

09-16-2026

X

X X

The purpose of this amendment is to:

1. Provide a revised Statement of Work. See attached S02_Attachment – Statement of Work revised 10.26.2026. This replaces the previously published statement of work in its entirety.

2. Update the solicitation magnitude of construction to between $20,000,000 and $50,000,000.

3. Update the solicitation by removing FAR Clause 52.219-6 in its entirety.

4. Provide responses to requests for information (RFI). See attached S05_Attachment – RFIs and Responses

5. Provide A/E Addendum 1 to construction drawings and specifications. See attached S02_Attachment – AE Addendum 1 Summary of Changes and attached updated drawings and specifications.

6. Provide the Geotechnical Engineering Report. See attached S02_Attachment – Geotechnical Engineering Report.

7. Provide updated DOL Payroll Form and SF 1413. See attached S02_Attachment – DOL Payroll Form updated and SF 1413 updated.

File details come from the government source that posted it. Updated .