This solicitation notice is for a construction project to renovate approximately 11,000 square feet of space on the 7th floor of Building 111 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin for a relocated GI Procedure Clinic. The project scope includes demolishing existing interior spaces, renovating areas for the new clinic, and updating mechanical, electrical, plumbing, medical gas, fire protection, and pneumatic tube systems. The estimated value is between $2,000,000 and $5,000,000. The North American Industry Classification code is 236220 for construction of commercial and institutional buildings with a size standard of $39.5 million. The completion period is 515 calendar days from notice to proceed. This solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation and drawings are scheduled to be posted on SAM.gov on October 15, 2020 with a bid opening of November 16, 2020. A pre-bid conference will be held at the location.

View the file

Other files

File Type Posted
36C25221B0002 0003.docx DOCX document
S06 - ET101 - SEVENTH FLOOR PLAN - TECHNOLOGY - Amd03.pdf PDF
36C25221B0002 0002.docx DOCX document
S06 - Appendix E - Physicist Report.pdf PDF
S06 - AE501 - BUILDING DETAILS.pdf PDF
S06 - EP602 - SCHEDULES POWER.pdf PDF
S06 - ET101 - SEVENTH FLOOR PLAN - TECHNOLOGY.pdf PDF
S06 - DG107 - SEVENTH FLOOR MEDICAL GAS PLAN.pdf PDF
S06 - 08 71 13.11 - LOW ENERGY DOOR OPERATORS Amend No2.pdf PDF
S06 - 7AN_ShieldingReport_20200601.pdf PDF
S06 - AE002 - WALL TYPES.pdf PDF
S06 - AE101 - SEVENTH FLOOR ARCHITECTURAL PLAN.pdf PDF
S06 - ET501 - DETAILS - TECHNOLOGY.pdf PDF
S06 - 11 73 00 - CEILING MOUNT PATIENT LIFT Amend No2.pdf PDF
S06 - GC101 - INFECTION CONTROL_PHASING PLAN.pdf PDF
S06 - EP401 - POWER RISERS.pdf PDF
S04 - Site Visit Sign-In Sheet - 695-19-107.pdf PDF
36C25221B0002 0001.docx DOCX document
S02 - Wage Determination Effective 10.2.2020.pdf PDF
S02 - J_A 695-19-107_Door Hardware.pdf PDF
S02 - J_A 695-19-107_HVAC BAS.pdf PDF
S02 - 695-19-107_2020.09.24_Volume 2 Specifications 100percent.pdf PDF
S02 - 695-19-107_2020.09.24_Volume 1 Specifications 100percent.pdf PDF
S02 - J_A 695-19-107_Interior Signage.pdf PDF
S02 - J_A 695-19-107_Firestop Systems.pdf PDF
S02 - J_A 695-19-107_Medical Gas Systems.pdf PDF
36C25221B0002_1.docx DOCX document
S02 - J_A 695-19-107_Card Readers.pdf PDF
S02 - J_A 695-19-107_Nurse Call.pdf PDF
S02 - J_A 695-19-107_Fire Alarm System.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING OFFICER SIGNATURE

CONTRACTING OFFICER REPRESENTATIVE SIGNATURE

CHIEF ENGINEER SIGNATURE

LEAD USER SIGNATURE

DATE

DATE

DATE

DATE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1

.1

.1

R e n o v a te

A N d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:5

P

M

GI000

COVER SHEET

GUIDON DESIGN INC.

1221 N. Pennsylvania St.

Suite 200

Indianapolis, Indiana 46202

317.800.6388

RING & DUCHATEAU, LLP.

17400 W. Capital Drive

Brookfield, WI 53045

414.778.1700

RENOVATE 7AN FOR

ENDOSCOPY LAB

5000 W National Ave, Milwaukee, WI 53295

695-19-107

08/21/2020 DV JDJ

695-19-107

RENOVATE 7AN FOR ENDOSCOPY LAB

CLEMENT J. ZABLOCKI VAMC

5000 W National Ave, Milwaukee, WI 53295

100% CONSTRUCTION DOCUMENTS

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SHEET LIST

SHEET

NUMBER SHEET NAME

REFERENCE

GUL101 FACILITY SIGNOFF

GUL102 GEN. INFO

GUL102.1 GEN. INFO

GUL103 ATTACHMENT

GUL104 PROJECT DETAILS

GUL104.1 PROJECT DETAILS

GUL104.2 PROJECT DETAILS

GUL104.3 PROJECT DETAILS

GUL104.4 PROJECT DETAILS

GUL105 GI ENODSCOPY - 7207

GUL106 SPECIAL EXAM RM - 7215

GUL107 FLUOROSCOPY - 7230

GUL109 PREP/RECOVERY - 7233

GUL110 GI ENDOSCOPY - 7236

GUL111 GI ENDOSCOPY 7244

GUL112 7TH FLOOR OVERALL

A-101 SIEMENS - ARTIS ZEE MULTI-PURPOSE SITE SPECIFIC DRAWING

A-102 SIEMENS - ARTIS ZEE MULTI-PURPOSE SITE SPECIFIC DRAWING

S-101 SIEMENS - ARTIS ZEE MULTI-PURPOSE SITE SPECIFIC DRAWING

E-101 SIEMENS - ARTIS ZEE MULTI-PURPOSE SITE SPECIFIC DRAWING

E-102 SIEMENS - ARTIS ZEE MULTI-PURPOSE SITE SPECIFIC DRAWING

E-501 SIEMENS - ARTIS ZEE MULTI-PURPOSE SITE SPECIFIC DRAWING

M-501 SIEMENS - ARTIS ZEE MULTI-PURPOSE SITE SPECIFIC DRAWING

SKYTRON--00 SKYTRON REFERENCE DRAWING

SKYTRON-00A SKYTRON REFERENCE DRAWING

SKYTRON-01A SKYTRON REFERENCE DRAWING

SKYTRON-02A SKYTRON REFERENCE DRAWING

SKYTRON-03A SKYTRON REFERENCE DRAWING

SKYTRON-A1 SKYTRON REFERENCE DRAWING

SKYTRON-A1.1 SKYTRON REFERENCE DRAWING

SKYTRON-A2 SKYTRON REFERENCE DRAWING

SKYTRON-A3 SKYTRON REFERENCE DRAWING

SKYTRON-A4 SKYTRON REFERENCE DRAWING

SKYTRON-B1 SKYTRON REFERENCE DRAWING

SKYTRON-B1.1 SKYTRON REFERENCE DRAWING

SKYTRON-B2A SKYTRON REFERENCE DRAWING

SKYTRON-B2B SKYTRON REFERENCE DRAWING

SKYTRON-B3 SKYTRON REFERENCE DRAWING

SKYTRON-B4A SKYTRON REFERENCE DRAWING

SKYTRON-B4B SKYTRON REFERENCE DRAWING

SKYTRON-B5A SKYTRON REFERENCE DRAWING

SKYTRON-B5B SKYTRON REFERENCE DRAWING

SKYTRON-C1 SKYTRON REFERENCE DRAWING

SKYTRON-C1.1 SKYTRON REFERENCE DRAWING

SKYTRON-S1A SKYTRON REFERENCE DRAWING

SKYTRON-S1B SKYTRON REFERENCE DRAWING

SKYTRON-S SKYTRON REFERENCE DRAWING

PT-2.07A SWISSLOG - PNEUMATIC TUBE ROUTE

SHEET LIST

SHEET

NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI101 LIFE SAFETY PLAN

GC101 INFECTION CONTROL/PHASING PLAN

HA101 HAZARDOUS MATERIAL REMOVAL PLAN

ARCHITECTURAL

AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AE002 WALL TYPES

AD101 SEVENTH FLOOR DEMOLITION PLAN

AD102 SIXTH FLOOR REFLECTED CEILING PLAN (DEMO/NEW WORK)

AE101 SEVENTH FLOOR ARCHITECTURAL PLAN

AE102 SEVENTH FLOOR DIMENSION PLAN

AE111 SEVENTH FLOOR REFLECTED CEILING PLAN

AE501 BUILDING DETAILS

AE502 LEAD SHIELDING DETAILS

AE601 DOOR AND WINDOW SCHEDULE

AI101 SEVENTH FLOOR FINISH AND WALL PROTECTION PLAN

AI201 INTERIOR ELEVATIONS AND ENLARGED PLANS

AI202 INTERIOR ELEVATIONS AND ENLARGED PLANS

AI203 INTERIOR ELEVATIONS AND ENLARGED PLANS

AI204 INTERIOR ELEVATIONS AND ENLARGED PLANS

AI205 INTERIOR ELEVATIONS AND ENLARGED PLANS

AI501 INTERIOR FINISH AND CASEWORK DETAILS

AI601 FINISH SCHEDULES

AI901 SIGNAGE PLAN

AI902 SIGNAGE TYPE

QH101 SEVENTH FLOOR FIXED EQUIPMENT FLOOR PLAN

IF101 SEVENTH FLOOR FURNITURE PLAN

IF102 SEVENTH FLOOR FURNITURE PLAN ELEVATIONS

FIRE PROTECTION

FP001 FIRE SUPPRESSION SYMBOLS, ABBREVIATIONS AND SHEET INDEX

FPD107 SEVENTH FLOOR DEMOLITION FIRE SUPPRESSION PLAN

FP107 SEVENTH FLOOR FIRE SUPPRESSION PLAN

PLUMBING

PS001 PLUMBING SYMBOLS, ABBREVIATIONS AND SHEET INDEX

PD106 SIXTH FLOOR DEMOLITION FLOOR PLAN

PD107 SEVENTH FLOOR DEMOLITION PLAN

DD107 SEVENTH FLOOR DEMOLITION MEDICAL GAS PLAN

PL106 SIXTH FLOOR PLUMBING PLAN

PL107 SEVENTH FLOOR PLUMBING PLAN

DG107 SEVENTH FLOOR MEDICAL GAS PLAN

PL300 MASH PLUMBING PLAN

PL400 PLUMBING ISOMETRICS

PL500 PLUMBING DETAILS AND SCHEDULES

MECHANICAL

MI000 MECHANICAL SYMBOLS, ABBREVIATIONS, SHEET INDEX

MD101 MECHANICAL DEMOLITION FLOOR PLAN - 7TH FLOOR

MD102 MECHANICAL DEMOLITION FLOOR PLAN - 6TH FLOOR

MH101 MECHANICAL DUCTWORK FLOOR PLAN - 7TH FLOOR

MH102 MECHANICAL DUCTWORK FLOOR PLAN - 8TH FLOOR

MP101 MECHANICAL PIPING FLOOR PLAN - 7TH FLOOR

MM400 ENLARGED PLANS AND SECTIONS

MM500 MECHANICAL DETAILS

MM501 MECHANICAL DETAILS

MM502 MECHANICAL DETAILS

MM600 MECHANICAL SCHEDULES

MM601 MECHANICAL SCHEDULES

MM602 MECHANICAL SCHEDULES

MM603 MECHANICAL SCHEDULES

ELECTRICAL

EI000 SYMBOLS, ABBREVIATIONIS AND SHEET INDEX

ED101 SEVENTH FLOOR - DEMOLITION

EL101 SEVENTH FLOOR PLAN - LIGHTING

EP100 SECOND FLOOR PLAN

EP101 SEVENTH FLOOR PLAN - OVERALL

EP102 SEVENTH FLOOR PLAN - POWER

EP103 PARTIAL ROOF PLAN - POWER

EP300 ENLARGED PLANS

EP301 ENLARGED PLANS

EP400 ONE-LINE SYMBOLS

EP401 POWER RISERS

EP500 DETAILS LIGHTING

EP501 DETAILS LIGHTING

EP510 DETAILS POWER

EP600 LIGHTING SCHEDULES

EP601 SCHEDULE POWER

EP602 SCHEDULES POWER

ET000 SYMBOLS, ABBREVIATIONS AND SHEET INDEX

ET101D SEVENTH FLOOR - TECHNOLOGY DEMOLITION

ET101 SEVENTH FLOOR PLAN - TECHNOLOGY

ET102 SEVENTH FLOOR PLAN - SYSTEMS

ET500 DETAILS TECHNOLOGY

ET501 DETAILS TECHNOLOGY

ET600 SCHEDULES

Contact:

CLEMENT J. ZABLOCKI

VA MEDICAL CENTER

5000 West National Ave.

Milwaukee, WI 53295

OWNER

GUIDON DESIGN INC.

David Vallandingham

Project Manager, Architect

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 130 e: dvallandingham@guidondesign.com

ARCHITECT

LOCATION MAP: NOT TO SCALE

CAMPUS MAP: NOT TO SCALE

N

N

Contact:

RING & DUCHATEAU, LLP.

Frank Lopez

Mechanical Engineer

MECHANICAL

17400 W. Capitol Drive Broookfield, WI 53045 p: 414.778.1700 x e: flopez@ringdu.com

Contact:

RING & DUCHATEAU, LLP.

Marcos Perez

Electrical Engineer

ELECTRICAL

Contact:

RING & DUCHATEAU, LLP.

Bob Wagner

Pluming Engineer

PLUMBING

p: 414.778.1700 x e: mperez@ringdu.com p: 414.778.1700 x e: rwagner@ringdu.com

17400 W. Capitol Drive Broookfield, WI 53045

17400 W. Capitol Drive Broookfield, WI 53045

PROJECT NORTH

Contact:

Milwaukee VA Medical Center p: 414.384.2000

TRUE NORTH

N

N

PROJECT NORTHTRUE NORTH

Revisions: Date:

Code Criteria General:

This summary of code requirements is based primarily on NFPA 101. Design features not addressed by NFPA 101 or documents referenced therein shall comply with the requirements of the latest edition of the IBC or as otherwise identified. For design features that in conflict between the NFPA and ICC standards, NFPA requirements shall rule.

Local Codes:

As an agency of the federal government, VA is not subject to local imposition of code enforcement procedures (drawing reviews, building permits, inspections, fees, etc.).

VA must function as the authority having jurisdiction (AHJ) and thus has the responsibility to guard public health and safety through enforcing its adopted codes.

Notes:

Conflicts between nationally recognized codes and standards and VA requirements – should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure a consistency system wide.

Intervening Rooms: IBC: section 1014 exit access, 1014.2 egress through intervening spaces. Egress through intervening spaces shall comply with this section. 1. Egress from a room or space shall not pass through adjoining or intervening rooms or areas, except where such adjoining rooms or areas and the area served are accessory to one or the other.

Exit Route, IBC/NFPA conflict: suite exits directly into exit stair, allowed by NFPA.

Code Review The 2018 edition of the life safety code, NFPA 101, and the sixth edition of the department of veterans affairs fire protection design manual have been used to review this project for compliance with the fire and life safety requirements. For features not addressed by NFPA 101 and the referenced national fire codes, the 2018 edition of the international building code has been used.

Project Scope The existing Dialysis Clinic in the main hospital Building 111, 7th floor, A-wing is being remodeled to bring the suite to current healthcare standards. The clinic will serve inpatient and outpatient populations. Patients require egress assistance in an event of an emergency. The Inpatient and Outpatient area is a Group I, Institutional occupancy (IBC 2018). There is one waiting area which occupancy count will be reviewed as an A, assembly occupancy (2018 IBC). Based on verification provided by the VA, the suite is being reviewed against the requirements for a new Health Care occupancy, NFPA 101 chapter 18.

1. Occupancy type, I-2 hospital occupancy, IBC chapter 3. The 7th Floor A-wing floor shall be NFPA 101 Healthcare, chapter 18. No change from existing occupancy type.

2. Construction type, the building is assumed to be type 1-A based on allowable heights and area per IBC chapter 5, equivalent to NFPA 101 I (332). No change to overall building height or area.

3. Fire Resistive Ratings Type IA/ I (332) construction, chapter 6 IBC/NFPA 101:

1. Structural frame: Noncombustible, 3-hour fire resistive

2. Bearing walls

1. Exterior: Noncombustible, 3 hour fire resistive

2. Interior: Noncombustible, 3-hour fire resistive

3. Non-bearing walls and partitions

1. Exterior: Noncombustible, 0-1-hour fire resistive

2. Interior: Noncombustible, 0 hour fire-resistive

4. Floor: Noncombustible, 2-hour fire resistive

5. Roof: Noncombustible, 1-1/2-hour fire resistive

4. Structural design shall comply with chapter 16 of the IBC.

5. Allowable area: Based upon a I-2 occupancy and non-combustible, Type 1A: allowable area: unlimited (IBC, table 503)

6. Allowable Height: Unlimited (NFPA 101 table 18.1.6.1)

7. Occupancy Separation: Occupancy separation is not required.

8. Occupant Load are per NFPA 7.3.1.2 and IBC and outlined on the Life Safety Sheet.

9. Means of Egress section 18.2 (NFPA 101)

1. Clear width of corridors shall be clear 8 feet. Corridors not used by patients may be no less than 44 inches.

2. Door widths shall not be less than 41 ½” from treatment areas.

3. Not less than 2 exits shall be provided per floor.

4. Egress from smoke compartments shall be permitted through adjacent compartments but shall not require return through the compartment of fire origin.

5. Not less than 2 exits shall serve a smoke compartment.

6. Dead end corridors shall not exceed 30 feet.

7. Patient Care Non-Sleeping Suite does not exceed 12,500 sq.ft.

8. Maximum travel distance does not exceed 100 feet to exit a suite into an exit access corridor or horizontal exit.

10. Protection 18.3 (NFPA 101)

1. Hazardous Areas - Storage rooms and Soiled Rooms over 100sq.ft. shall be constructed with 1 hour fire rate partitions, rooms over 50 sq.ft. shall be constructed with smoke partitions.

2. Interior finish

1. Walls and Ceilings: shall be labeled as class A. Rooms with 4 or less occupants may have finishes labeled Class A and B.

2. Interior Floor Finish: critical radiant flux of at least 0.1W/cm2

3. Fire alarm system shall be provided. The system shall be by manual means.

4. Occupant notification shall be through automatic means.

5. Portable fire extinguishers shall be provided per NFPA 10.

6. Sprinkler in areas where cubicle curtains are installed shall be in accordance with NFPA 13. The sprinkler system shall be hydraulically designed in accordance with NFPA 13 and the Department of Veterans Affairs Fire Protection Design Manual, December 2015: minimum design requirements:

• Storage mechanical and electrical rooms shall be protected as:

• Ordinary hazard occupancy, group 1: 0.15 gpm/ft2 over 1,500 ft2.

• Hose stream allowance: 250 gpm

• All other areas shall be protected as:

• Light hazard occupancy: 0.10 gpm/ft2 over 1,500 ft2.

• Hose stream allowance: 100 gpm

• All sprinklers within the smoke zone shall be changed to quick response sprinklers.

11. Special provisions 8.4 (NFPA 101)

1. Alcohol Dispensers to be installed by owner and to meet this provision.

12. Building Services 18.5 (NFPA 101)

13. Reserve 18.6

14. Operating Features 18.7

1. Construction barriers constructed along means of egress shall be constructed and maintained per NFPA 241.

CODE ANALYSIS - NFPA 101, HEALTHCARE CHAPTER 18

CODE ANALYSIS LEGEND

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

NPFA, National Fire Protection Association full listing of current codes, including but not limited to:

NFPA 10 Standard for Portable Fire Extinguisher NFPA 13 Standard for the Installation of Sprinkler Systems NFPA 72 Fire Alarm Code NFPA 70, NEC National Electrical Code NFPA 80 Standard for Fire Doors and Fire Windows NFPA 88A Standard for Parking Structures NFPA 99 Healthcare Facilities Code NPFA 101 Life Safety Code NFPA 220 Standard on Types of Building Construction NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations

ICC Codes, International Code Council full listing of current codes, including but not limited to:

International Building Code International Plumbing Code International Mechanical Code International Fuel Gas Code International Fire Code International Energy and Conservation Code

ASHRAE Standards, as referenced within other codes including, but not limited to:

Standard 170-2017, Ventilation of Healthcare Facilities Standard 188-2018, Legionellosis: Risk Management for Building Water Systems

Accessibility Codes ADAAG, ADA Accessibility Guidelines VA Barrier Free Design Guide Pg-18-13, ABAAS

FGI, The Facility Guidelines Institute Guidelines for Design and Construction of Hospitals Guidelines for Design and Construction of Outpatient Facilities

Behavioral Health Design Guide

Systems relating to maintenance of facilities OSHA, Occupational, Safety and Health Administration Standards.

Codes and guidelines referenced within NFPA and ICC codes are to also be followed and applied to all design and construction. Refer to VA manual pg-18-3, specifications for additional codes, standards, guidelines and regulations. Contractor is responsible for constructing work compliant with OSHA, Occupational, Safety and Health Administration Standards.

VA Directives, Design Manuals, Master Specifications, VA National Cad Standard Application Guide, and other Guidance on the Technical Information Library (Til), www.cfm.va.gov/til/.

VA DESIGN GUIDES

ARCHITECTURAL

ASBESTOS ABATEMENT

CRITICAL PATH METHOD SCHEDULE & RISK MANAGEMENT FOR A/E

Volume 1 Volume 2

ELECTRICAL

ELEVATORS

EQUIPMENT

ESTIMATING

FIRE PROTECTION

HVAC

INTERIOR DESIGN

LIGHTING DESIGN

PHYSICAL SECURITY

Life Safety Protected Facilities Mission Critical Facilities Appendix Aa Appendix Ab Appendix Ac Appendix B

PLUMBING

SITE PARKING

Site Development Site Appendix

STEAM, HEATING, HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEMS

Volume 1 Volume 2 Volume 3

STRUCTURAL

A. Ancillary Facility B. Energy Center C. Medical Unit D. Nursing Home E. Parking Structure F. Regional Office G. Seismic Retrofit

SUSTAINABILITY

TELECOMMUNICATIONS

VA DESIGN MANUALS PG-18-10:

GOVERNING CODES:

PROJECT AREAA

B

C

23 25222119 2016 171311 12109

A

B

C

D

E

H

K

L

M

J

DIAGONAL DISTANCE = 143'-3"

TRAVEL DISTANCE= 108'-0" EXIT

EXIT

PREP / RECOVERY

PREP / RECOVERY

PREP / RECOVERY

PREP / RECOVERY

PREP / RECOVERY

PREP / RECOVERY

MEDICATION

PHYSICIAN /

RESIDENT WORK

STATIONS

MECH.

PRIVATE TOILET

7233A

PREP / RECOVERY

PREP / RECOVERY

OFFICE

7216A

OFFICE

7216B

OPEN OFFICE

STAFF LOUNGE /

TRAINING

SPECIAL EXAM RM

PATIENT TOILET

7215A

CLEAN UTILITY

SCOPE STORAGE

ELECTRICAL

ELECTRICAL

ELECTRICAL

CONTROL ROOM

FLUOROSCOPY

GI ENDOSCOPY

CONSULT

WORKROOM

FAMILY TOILET

TEAM LEAD

RECEPTION

WAITING

F

E C

F E

C

STAIR

STAIR 7-5

LOCKERS

CORRIDOR

C7A02

CORRIDOR

C7A04

CORRIDOR

C7A01

GI ENDOSCOPY

9449 SF

10095

I

623 SF

I

PATIENT TOILET

GI ENDOSCOPY

EC

STAFF TOILET

7214B

ANESTHESIA WORK

RM

7239A

T R

A V

E L

D

IS

T A

N C

E

2'

-1

T R

A V

E L

D

IS

T A

N C

E

'-6

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

TRAINING/CONSULT

PUBLIC TLT

RECEPTION

WAITING ROOM

CORRIDOR

C7A14

MSA

EC

RECEPTION

INTAKE

CORRIDOR

C7A13

SEP. ROOM

WATER TREATMENT

PATIENT TLT.

7135A PATIENT TLT.

7136A

SEP. ROOM

7135 ISO ROOM

EQUIP. ROOM

7209A

FEC

CO2 STORAGE

7206A

EXIT SEPARATION = 89'-5"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1

.1

.1

R e n o v a te

A N d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1

/2

:3

:3

P

M

GI101

LIFE SAFETY PLAN

GUIDON DESIGN INC.

1221 N. Pennsylvania St.

Suite 200

Indianapolis, Indiana 46202

317.800.6388

RING & DUCHATEAU, LLP.

17400 W. Capital Drive

Brookfield, WI 53045

414.778.1700

RENOVATE 7AN FOR

ENDOSCOPY LAB

5000 W National Ave, Milwaukee, WI 53295

695-19-107

08/21/2020 AWS DV

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1" = 100'-0"

KEY PLANN

SCALE: 3/32" = 1'-0"GI101

1 SEVENTH FLOOR LIFE SAFETY PLAN

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY : TYPE D

PATIENT RISK GROUP: MEDIUM

CLASS OF PRECAUTION MATRIX: IV

PROVIDE TEMPORARY 1 HR FIRE RATED WALL CONSTRUCTION PER NFPA 241.

REFER TO DETAIL 1/GI102.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH

CARD READER ACCESS. REFER TO ELEVATION 2/GI102.

EXISTING WALL PROVIDES A 1-HR CONSTRUCTION BARRIER. CONTRACTOR

TO MODIFY WALL AND PROVIDE FIRE CAULKING AS NEEDED TO PROVIDE

ENSURE 1-HR CONSTRUCTION BARRIER THROUGHOUT.

SEAL AND TAPE EXISTING DOOR TO PREVENT CONSTRUCTION DEBRIS FROM

PASSING THROUGH.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 01 01 10 AND 01 35 26.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE INFECTION CONTROL

WORKPLAN AND DRAWING TO COR FOR APPROVAL BEFORE ANY DEMOLITION.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CPM SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

SIXTH FLOOR ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE

HOURS OF 5:00 PM AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING

WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED

AND STORED IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED.

DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED BY

CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE 24" X 36" STICK WALK-OFF MATT AT EACH TEMPORARY DOOR

LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART (SHARK TANK) FOR ABOVE CEILING ACCESS

OUTSIDE PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

INFECTION CONTROL GENERAL NOTES

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION

BATT.

5/8" TYPE X GYPSUM BOARD, BOTH

SIDES

3 5/8" METAL STUD @ 16" O.C.

WITH RUNNER CHANNELS ALONG

TOP AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY

ADHERE TO THE STRUCTURAL DECK

ABOVE AND TO THE FLOOR BELOW

WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING:

U465

COORDINATE WITH EXISTING

CEILING

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY AND FRAME

WITH SEALS, CARD READER, HARDWARE AND CLOSER. VA

WILL PROVIDE CONSTRUCTION SFIC TO BE INSTALLED IN

CONTRACTOR-PROVIDED HARDWARE.

NEGATIVE AIR MONITOR (TRIATEK BASIS

OF DESIGN)

HAND SANITIZER

SEAL ALL EDGES WITH TAPE (SEE

SPECIFICATIONS)

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE

FOR REQUIRED CONDITION TO

STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

PROTECT EXISTING WALLS AND

FLOORING FROM TEMP.

CONSTRUCTION BARRIER.

EXISTING FINISHES DAMAGED

BY TEMP/IC/CN BARRIER SHALL

BE REPAIRED BY THE

CONTRACTOR.

23 25222119 2016 171311 12109

A

B

C

D

E

H

K

L

M

J

UP

WORKROOM

EXAM

EXAM

EXAM

EXAM

EXAM

OFFICE

OFFICE

WAITING AREA

OFFICE

MED RM

7210A

OFFICE

SOILED UTILITY

CLEAN UTILITY

EC

EC

EC

TREATMENT

LAB / TREATMENT

HAC

STAIR

7-5

EXAM

STORAGE

RESTROOM

BREAK

LAB

STORAGE

STORAGE

7250A

OFFICE

EXAM

OFFICE

OFFICE

EC

VP

7-33

ELEV

7-A-7

ELEV

7-A-8

PROCTO DO RM

7240A

WOUND RM

7240B

WOUND STAFF

7240C

WAITING RM

WAITING AREA

CORRIDOR

C7A01

CORRIDOR

C7A02

CORRIDOR

C7A03

CORRIDOR

C7A05

CORRIDOR

C7A04

CORRIDOR

C7A04A

CORRIDOR

C7A06

CORRIDOR

C7A07

CORRIDOR

C7A14

CLEAR MIN.

6' - 0"

C

LE

A R

M

IN

6'

2 1

4'

7' - 11 5/8"

PROJECT AREAA

B

C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1

.1

.1

R e n o v a te

A N d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1

/2

:3

:2

P

M

GC101

INFECTION CONTROL/PHASING

PLANGUIDON DESIGN INC.

1221 N. Pennsylvania St.

Suite 200

Indianapolis, Indiana 46202

317.800.6388

RING & DUCHATEAU, LLP.

17400 W. Capital Drive

Brookfield, WI 53045

414.778.1700

RENOVATE 7AN FOR

ENDOSCOPY LAB

5000 W National Ave, Milwaukee, WI 53295

695-19-107

08/21/2020 DV DMC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1 1/2" = 1'-0"GC101

1 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241

SCALE: 1/4" = 1'-0"GC101

2 TEMPORARY WALL CONSTRUCTION ELEVATION

SCALE: 1/8" = 1'-0"GC101

3 SEVENTH FLOOR PLAN INFECTION CONTROL N

SCALE: 1" = 100'-0"

KEY PLAN

SCALE: 1/4" = 1'-0"GC101

4 EXISTING DEMISING WALL PHOTO

SCALE: 1/4" = 1'-0"GC101

5 EXISTING DEMISING WALL PHOTO

PROJECT BOUNDARY

AREA FOR REMOVAL OF ASBESTOS-CONTAINING FLOORING

AND ASSOCIATED MASTIC

A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. REMOVE ACCORDING

TO SAFETY STANDARDS. REFERENCE SPECIFICATION 02 82 11.

B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH

APPLICABLE CODES AND LAWS.

C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL

OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS

TO COMPLETE THE CONSTRUCTION WORK.

D. PROVIDE ABATEMENT OF VCT AND FLOORING MASTIC WITHIN HATCHED

AREA.

E. ALL FLOORING WILL REQUIRE ABATEMENT INCLUDING BUT NOT LIMITED TO

ALL 9X9 OR 12X12 VCT OR CERAMIC TILES.

F. PROVIDE COST FOR REMOVAL OF COUNTED AND UNFORESEEN MUD

FITTINGS ON FIBEGLASS INSULATED DOMESTIC WATER LINES. ASSUME 300

PLUMBING FITTINGS BETWEEN 1.5 INCH AND 6 INCH DIAMETER. PLUMBING

FITTING FOR ABATEMENT ARE LOCATED ON 7TH FLOOR AND CEILING OF

6TH FLOOR.

G. PROVIDE COST FOR REMOVAL OF COUNTED AND UNFORESEEN MUD

FITTING ON FIBERGLASS INSULATED PERIMETER HEATING AND COOLING

WATER LINES. ASSUME 300 HVAC PIPING FITTINGS BETWEEN 1.5 INCH AND 6

INCH DIAMETER. HVAC PIPING FITTINGS FOR ABATEMENT ARE LOCATED

PRIMARILY IN CEILING OF 6TH FLOOR AND ARE ASSOCAITED WITH EACH OF

THE WINDOW CABINET UNITS.

H. PROVIDE COST FOR REMOVAL OF ASBESTOS CONTAINING CABINET UNIT

HEATER BOXES. INSIDES OF UNITS ARE COATED WITH ACM. QUANITY 26.

I. PROVIDE COST FOR REMOVAL OF ASBESTOS CONTAINING 9X9 LVT, TILE

AND MASTIC, ASSUME 9,020 SF.

J. PROVIDE COST FOR REMOVAL OF ASBESTOS CONTAINING 4X4 WALL TILE,

MASTIC AND GROUT, ASSUME 1,816 SF.

K. PROVIDE COST FOR REMOVAL OF ASBESTOS CONTAINING 4X4 / 8X4 WALL

TILE BASE, ASSUME 132 LINEAR FEET.

L. PROVIDE COST FOR REMOVAL OF FLOURESCENT LIGHT TUBES AND CFL

BULBES, ASSUME 350 TOTAL.

M. PROVIDE COST FOR REMOVAL OF PDB CONTAINING BALLASTS FOR

FLUORESCENT LIGHTING FIXTURES, ASSUME 175 EACH.

N. BASED ON THE DATE OF THE EXISTING CONSTRUCTION AND

UNDERSTANDING OF THE FACILITY, LEAD PAINT IS WITHIN THE PROJECT

AREA. DO NOT PROVIDE LEAD PAINT ABATEMENT. CONTRACTOR TO

PERFORM DEMOLITION ACTIVITIES AFTER IMPLEMENTATION OF LEAD

STABILIZATION. CONTRACTOR TO USE MEASURES FOR PROTECTION AND

TO MINIMIZE PAINT DEBRIS.

1. DOMESTIC WATER RISERS

2. HVAC PIPING RISER

3. 4"X4" VERTICAL ASBESTOS-CONTAINING TILES AROUND SINK

HAZARDOUS MATERIAL REMOVAL GENERAL NOTES

HAZARDOUS MATERIAL REMOVAL PLAN NOTES

HAZARDOUS MATERIAL REMOVAL LEGEND

BEYOND PROJECT BOUNDARY

AREA FOR REMOVAL OF VERTICAL 4X4 ASBESTOS-CONTAINING

TILES

23 25222119 2016 171311 12109

A

B

C

D

E

H

K

L

M

J

UP

WORKROOM

EXAM

EXAM

EXAM

EXAM

EXAM

OFFICE

OFFICE

WAITING AREA

OFFICE

MED RM

7210A

OFFICE

SOILED UTILITY

CLEAN UTILITY

EC

EC

EC

541 SF

TREATMENT

LAB / TREATMENT

HAC

STAIR

7-5

EXAM

STORAGE

RESTROOM

BREAK

LAB

STORAGE

STORAGE

7250A

OFFICE

EXAM

OFFICE

OFFICE

EC

VP

7-33

ELEV

7-A-7

ELEV

7-A-8

STORAGE

OFFICE

OFFICE

VP

7-29

FC

PROCTO DO RM

7240A

WOUND RM

7240B

WOUND STAFF

7240C

WAITING RM

WAITING AREA

CORRIDOR

C7A01 CORRIDOR

C7A02

CORRIDOR

C7A03

CORRIDOR

C7A05

CORRIDOR

C7A04

CORRIDOR

C7A04A

CORRIDOR

C7A06

CORRIDOR

C7A14

1 1 1

1 1 1

2 2 2 2

33 33

PROJECT AREAA

B

C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1

.1

.1

R e n o v a te

A N d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1

/2

:3

:3

P

M

HA101

HAZARDOUS MATERIAL REMOVAL

PLANGUIDON DESIGN INC.

1221 N. Pennsylvania St.

Suite 200

Indianapolis, Indiana 46202

317.800.6388

RING & DUCHATEAU, LLP.

17400 W. Capital Drive

Brookfield, WI 53045

414.778.1700

RENOVATE 7AN FOR

ENDOSCOPY LAB

5000 W National Ave, Milwaukee, WI 53295

695-19-107

08/21/2020 AWS DV

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"HA101

1 SEVENTH FLOOR PLAN HAZMAT ABATEMENT PLAN

Revisions: Date:

SCALE: 1" = 100'-0"

KEY PLAN

N

ARCHITECTURAL ABBREVIATIONS

SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

SCALE: ??

VIEW TITLE

N

NORTH ARROW

INCANDESCENT WALL MOUNTED LIGHTING

INCANDESCENT SURFACE MOUNT LIGHTING

SURFACE MOUNTED FLUORESCENT

RECESSED FLUORESCENT

HVAC RETURN AIR GRILLE

HVAC SUPPLY DIFFUSER

PENDANT LIGHT

ACCESS PANEL

EXIT LIGHTING

S

D

SPEAKER

SMOKE DETECTOR

INCANDESCENT RECESSED LIGHTING

A 9'-0"

CEILING TAG CEILING TYPE

FINISHED CEILING HEIGHT

REFER TO CEILING LEGEND FOR MORE

INFORMATION

EXTENT OF REVISION

REVISION SET

MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY, NIC

REFLECTED CEILING PLAN SYMBOLS

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

A/C AIR CONDITION

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANT ANTENNA

APPD APPROVED

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ATCH ATTACHMENT

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING INSTITUTE

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BEV BEVEL

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKG BLOCKING

BLKT BLANKET

BM BEAM OR BENCHMARK

BOT BOTTOM

BRCG BRACING

BRDG BRIDGING

BRG BEARING

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C CELSIUS CHANNEL OR CHANNEL CELSIUS

C CONC CAST CONCRETE

C TO C CENTER TO CENTER

CAB CABINET

CB CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CLEANOUT

CO₂ CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CS CAST CONCRETE STONE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

N NORTH

NA NOT APPLICABLE

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEG NEGATIVE

NEUT NEUTRAL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION

OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE RADIUS

ORD ORDNANCE OR OVERFLOW ROOF DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR PORTLAND CEMENT

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PLATE, PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION OR REFRIGERATION

REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)

YD YARD

YR YEAR

GENERAL CONSTRUCTION NOTES

1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®

SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION

MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL

DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,

SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES

MANAGEMENT.

2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE

CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE

NATIONAL CAD STANDARD AS GUIDES.

3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT

TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.

CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER

QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY

THE BID DUE DATE.

4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH

OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED

WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,

ACCESS CONTROL, ETC.

5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN

FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT

LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK

AND ACCESS TO EXISTING UTILITIES FOR TIE IN.

6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING

BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC

MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR

VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH

THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS

AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,

ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION

REQUIREMENTS.

7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF

WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE

FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK

THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF

WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY

CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.

8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR

UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,

GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.

9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING

AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING

CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING

PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED

METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.

10. MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW

INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL

CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING

AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND

STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.

11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT

IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW

CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION

BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED

CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY

ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR

MISSING DIMENSIONS.

12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL

ORIENTATION AND CONTEXT ONLY.

13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF

CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.

14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW

STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN

GRID LINES UNLESS NOTED OTHERWISE.

15. FLOOR ELEVATION 100’-0” IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING

SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.

16. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.

17. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS

“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE

DETAIL, AREA, OR ITEM REFERENCED.

18. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,

INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.

19. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS

AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL

DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.

20. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND

EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF

DELIVERY AND ROUGH-IN.

21. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY

CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.

22. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE

FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND

HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.

23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL

UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO

UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE

OWNER.

24. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING

REQUIRED DURING CONSTRUCTION.

25. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT

CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE

CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE

CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO

COST TO THE OWNER.

26. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT

DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER

QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.

27. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,

ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE

AND COMPATIBLE SYSTEMS REQUIRED FOR THEIR OPERATION. REFER TO DOOR

HARDWARE SCHEDULE, HARDWARE SPECIFICATIONS, AUTOMATIC OPERATOR

SPECIFICATIONS, ACCESS CONTROL SPECIFICATIONS AND ELECTRICAL DRAWINGS.

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM OR DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOZ DOZEN

DN DOWN

DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION AGENCY

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

ETS EXPOSE TO STRUCTURE

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FH FLAT HEAD OR FLAT HEAD SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLUOR FLUORESCENT

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT, OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR FIBERGLASS

REINFORCED PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTIC

GI GALVANIZED IRON

GL GLASS

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

H HIGH

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER OR HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR HORSEPOWER

HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE DIAMETER

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE ASSEMBLY

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

J-BOX JUNCTION BOX

JT JOINT

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE OR LEFT HAND REVERSE

LATENT HEAT RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM OR MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE OR MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

ARCHITECTURAL SYMBOLS

X

X

XXXX

SHEET LOCATION

VIEW NUMBER

X X

X

SHEET LOCATION

VIEW NUMBER

XXXX

BUILDING SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

BUILDING X

XXXX

X

XXXX

ELEVATION REFERENCES

NEW WALL

WALL TO BE

REMOVED

S3A.G

INDICATES STRUCTURAL MATERIAL

INDICATES NOMINAL SIZE

INDICATES STRUCTURE AND FINISH HEIGHTS

INDICATES QUALIFER

EXISTING WALL TO

REMAIN

TEMPORARY IC

BARRIER WALL

CONSTRUCTION

ROOM

ROOM TAG

NEW DOOR

EXISTING DOOR

DEMOLISHED DOOR

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE DETECTOR OR SOAP

DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

S SOUTH

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL STEEL

STL LNTL STEEL LINTEL

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

TA TOILET ACCESSORY

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL OR TEMPERATURE

CONTROL PANEL OR TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD FINISH

TRTD TREATED

TS TENSILE STRENGTH OR TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

REVISION TO PLAN CALLOUT

WALLS

DOOR TAG

KEY NOTE TAGS

WALL TAG : REFER TO WALL LEGEND FOR MORE INFORMATION

DOORS

PT-1

A

T

101 EQUIPMENT/FURNITURE TAG

FINISH INDICATION

FRAME / WINDOW

GLAZING1

1 PLAN NOTE

1 DEMOLITION NOTE

ALTERNATE/BID DEDUCT ITEM

KEY NOTE SYMBOLS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1

.1

.1

R e n o v a te

A N d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1

/2

:3

:1

P

M

AE001

ARCHITECTURAL SYMBOLS AND

ABBREVIATIONSGUIDON DESIGN INC.

1221 N. Pennsylvania St.

Suite 200

Indianapolis, Indiana 46202

317.800.6388

RING & DUCHATEAU, LLP.

17400 W. Capital Drive

Brookfield, WI 53045

414.778.1700

RENOVATE 7AN FOR

ENDOSCOPY LAB

5000 W National Ave, Milwaukee, WI 53295

695-19-107

08/21/2020 AWS TAA

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

WALL TYPES LEGEND AND GENERAL NOTES

A. ALL WALLS WILL BE WALL TYPS S3C.G UNLESS OTHERWISE NOTED.

B. ALL WALL TYPE INDICATORS REFER TO THIS SHEET UNLESS OTHERWISE

NOTED.

C. REFER TO DIMENSION PLANS FOR PARTITION TYPE LOCATIONS.

PARTITIONS ARE DISTINGUSHED ON PLANS BY SYMBOL DESIGNATION

GRAPHIC DESIGNATION, OR A COMBINATION OF BOTH.

This is the start of the file's text. The full file is on GovTribe.