S06 - DG107 - SEVENTH FLOOR MEDICAL GAS PLAN.pdf
PDF 963 KB Posted
- Solicitation number
- 36C25221B0002
About this file
This document contains a medical gas plan drawing and related federal contract opportunity notice. The contract opportunity is for renovation work at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project will demolish and renovate approximately 11,000 square feet of space on the seventh floor for a relocated GI procedure clinic. The renovation work will update and correct mechanical, electrical, plumbing, medical gases, fire protection, nurse call and other building systems. The estimated value is between $2-5 million. The NAICS code is 236220 for nonresidential building construction and the size standard is $39.5 million. The completion period is 515 calendar days. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation and drawings are scheduled for posting on SAM.gov by October 15, 2020 with a bid opening of November 16, 2020. A pre-bid site walkthrough will be held.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1" OXY
UP & DN.
1 1/4"
1 1/4" MV UP & DN. MV
STAFF TOILET
7214B
STAFF LOUNGE /
TRAINING
OPEN OFFICE
OFFICE
7216B
OFFICE
7216A
SPECIAL EXAM RM
PATIENT TOILET
7215A
LOCKERS
CLEAN UTILITY
CORRIDOR
C7A02
ELECTRICAL
ELECTRICAL
ELECTRICAL
CORRIDOR
C7A04
FLUOROSCOPY
PREP / RECOVERY
7231PREP / RECOVERY
PREP / RECOVERY
TEAM LEAD
PREP / RECOVERY
PREP / RECOVERY
PREP / RECOVERY
PREP / RECOVERY
PREP / RECOVERY
WORKROOM
CORRIDOR
C7A01
RECEPTION
WAITING
GI ENDOSCOPY
CONSULT
FAMILY TOILET
PATIENT TOILET
GI ENDOSCOPY
GI ENDOSCOPY
CONTROL ROOM
SCOPE STORAGE
PHYSICIAN /
RESIDENT WORK
STATIONS
7239 ANESTHESIA WORK
RM
7239A
PRIVATE TOILET
7233A
MEDICATION
MECH.
HAC
EQUIP. ROOM
7209A
MSA
URINALYSIS LAB
7152PUBLIC TLT
WAITING ROOM
CORRIDOR
C7A14
CORRIDOR
C7A13
INTAKE
RECEPTION
EXAM
OFFICE
7158 OFFICE
OFFICE
CORRIDOR
C7A08
OFFICE
7155 OFFICE
OFFICE
TRAINING/CONSULT
EC
EC
CENTRAL SCOPE
AND EQUIPMENT
STORAGE
SOILED UTILITY
CO2 STORAGE
7206A
CHANGING ROOM
7214A
23 25222119 2016 171311 12109
A
B
C
D
E
H
K L
M
J
ZVB-2
MV MA O MV
MA
O
MAO MV MV MA O
MA O
MA
MV
O
EXISTING 2 1/2" MEDICAL AIR RISER LOCATION
M A
M A
1"
1"
1"
PROVIDE FULL SIZE
VALVE & CAPPED
PIPE FOR FUTURE
MA
M A
1"
MV
MA
O
O M
A M
V
MV
MA
O
MV
MA
O
M A
MA
1 1/2"
(2)
1 1/2"
ZVB-1
O M
A M
V
MV
O
MA
MV
MA
O
MV
MA
O
O
MA
MV
O
MV
O
MV
O
O M
A M
V
MV
O
MV
O
M V O
NOTE:
WORK BEYOND LIMIT OF PROJECT-
THIS IS AN ACTIVE EMPLOYEE WORK AREA 6AM - 5PM MONDAY - FRIDAY. THE CONTRACTOR SHALL BE ALLOWED ACCESS TO PORTIONS OF THIS AREA TO COMPLETE PLUMBING (INCLUDES MEDICAL GAS) DEMOLITION, RELOCATIONS AND NEW WORK DURING OFF-SHIFT. THE
CONTRACTOR SHALL PLAN FOR PHASES FOR THIS WORK. PLUMBING SHALL BE COORDINATED. EACH PHASE SHALL HAVE ITS OWN PLASTIC
INFECTION CONTROL BARRIER WITH ZIP-WALLS AND NEGATIVE AIR MACHINES. CEILINGS SHALL BE RETURNED TO NORMAL AT THE END OF
THE WORK DAY. OFF SHIFT WORK IS ACCEPTABLE WITH COR PERMISSION. OUTAGES SHALL BE OFF SHIFT. EACH SUB-PHASE REQUIRES ITS OWN INFECTION CONTROL WORKPLAN. AN OVERALL SUB-PHASING PLAN IS REQUIRED DURING PRE-CONSTRUCTION SUBMITTAL PHASE TO
COORDINATE ACCESS TO THIS SPACE AND MOVES BY VA PERSONNEL.
1/2"1/2"1"
3/4" MV, 1/2" MA & OXY DN
(TYPICAL FOR EACH
PREP/ RECOVERY ROOM)
1/2"
3/4" 1/2"
3/4"
1/2"
1/2"
3/4"
3/4"
1/2"
3/4"3/4" 1"
1"1"
1 1/4"
3/4"
3/4" 1"
3/4" 3/4" 1"
1" 1/2" 1/2"
3/4"
1/2"1/2" 1"3/4"3/4" 1" 1/2"1/2"
MGA-1,
MGA-2,
MGA-3,
TMA-1
TRANSDUCERS - ALARM MUST BE
WIRED SEPARATELY OFF OF
MEDICAL MAINS AS FLUOROSCOPY
IS AN ANESTHESIA LOCATION
TRANSDUCERS
3-PIECE SECTIONAL
VALVES WITH
LOCKABLE HANDLES
(TYPICAL)
M V
O M
A
EXISTING ZVB:
PROVIDE BLANK COVER PLATE
LABELED AS "SERVICE VALVES"
PROVIDE NEW 1" MA VALVE AND
PIPING THROUGH BOX. PROTECT
EXISTING O & MV VALVES AND
PIPING DURING CONSTRUCTION
CO2
CO2
EQUIPMENT
BOOM
EQUIPMENT
BOOM
MV
EQUIPMENT
BOOM
MA
EQUIPMENT
BOOM
MA
MA
M A
MA
1/2"
MV
MA
O
CO2
MANIFOLD
ROOM
MV
MA
O
MV
MA
O
O
MV
MA
O
CO2
MV O
CO2
MAMV O
CO2
CO2
CO2
M V
M A
C O
CO2
MANIFOLD
CO2CO2
C O
CO2
C O
CO2
C O
M V
M A
O
O M
A M
V
M V
M A
O
M V
M A
O
M V
M A
O
M V
M A
O O M
A M
V
CO2 EXHAUST
LOCATION
MV
MA
MA MVO
WAGD
CEILING
OUTLETS
MA MVO
WAGD
CEILING
OUTLETS
MAMV O
MA MVO WAGD
CEILING
OUTLETS
MA
M A
MV
MA
O
CO2
1/2"
1/2"
1/2"
1/2"
1" 1/2" 1/2" 1/2"
W A
G D
M V
C O
M
A O
ZVB-3
TRANSDUCERS - ALARM MUST BE WIRED
SEPARATELY OFF OF MEDICAL MAINS AS
ENDOSCOPY 7207 IS AN ANESTHESIA LOCATION
1/2"
3/4"
1/2" 1/2"
1/2" 3/4"
1/2"
3/4"
1/2"
1/2"
3/4" 3/4" 1/2" 1/2"
1/2"
1"1" 1 1/4"
1/2"
1" 1/2"1/2"1/2" 1"
MV
O
3/4"
1/2"1/2"
3/4"
1/2"
3/4"
1" MA DN.
1/2"
1"
1/2"
1/2"1/2"
3/4" 1/2"1/2"3/4"
1/2"
3/4"
1"
1/2"1/2"1/2"
N
PROJECT AREAA
B
C
MEDICAL GAS GENERAL NOTES
A
B
C
D
E
REMOVE, CAP AND SEAL PIPING FROM OUTLETS BEING REMOVED, BACK TO
THE POINT OF ORIGIN, OR THE LAST FITTING WITH FLOW.
ABOVE CEILING DEMOLITION, NEW AND RESTORATION WORK ON THE 7TH
OR 6TH FLOORS - WITH THE EXCEPTION OF UTILITY OUTAGES THAT AFFECT
PATIENT CARE, DISRUPT HOSPITAL OPERATIONS OR REQUIRE A
CURTAILMENT OF SERVICES MEMO - CAN BE COMPLETED DURING ANY
SHIFT ONCE INFECTION CONTROL BARRIERS ARE ESTABLISHED AND
APPROVED PER THE SUBMITTED PHASING AND WORKPLAN. THE
CONTRACTOR MAY WORK OFF-SHIFT AS WELL TO COMPLETE
CONSTRUCTION ACTIVITIES IN AN EXPEDITED MANNER. UTILITY OUTAGES
THAT AFFECT PATIENT CARE, DISRUPT HOSPITAL OPERATIONS OR REQUIRE
A CURTAILMENT OF SERVICES MEMO MUST BE COMPLETED ON 2ND AND
3RD SHIFTS ON WEEKDAYS OR ANYTIME ON WEEKENDS (SATURDAY AND
SUNDAY).
SEE ARCHITECTURAL PLANS FOR PROJECT PHASING DRAWINGS AND
NOTES.
6TH FLOOR CEILING TILES WHICH MUST BE REMOVED FOR ABOVE CEILING
WORK SHALL BE CAREFULLY REMOVED AND STORED IN A SAFE MANNER
UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING
TILES SHALL BE REPLACED BY THE CONTRACTOR. ASSUME ALL CEILINGS
ARE ACOUSTIC TILE AND GRID UNLESS NOTED AS GYPSUM BOARD CEILINGS
ON ARCHITECTURAL. AFFECTED HARD CEILINGS SHALL BE PATCHED AND
PAINTED FOR A FLUSH AND SEAMLESS CONDITION TO MATCH EXISTING
EXACTLY. CONTRACTOR TO VERIFY ALL EXISTING CEILING TYPES ON THE
6TH FLOOR IN FIELD.
THE WORKPLAN FOR 6TH FLOOR ACTIVITIES SHALL BE ORGANIZED BY THE
CONTRACTOR SUCH THAT ALL TRADES (ELECTRICAL, PLUMBING,
MECHANICAL, FIRE PROTECTION, DRAIN, ETC.) DEMOLITION, NEW AND
RESTORATION ACTIVITIES - TO INCLUDE ESTABLISHMENT OF INFECTION
CONTROL BARRIERS, INSPECTIONS, AND SEALING OF PENETRATIONS - CAN
BE COMPLETED IN THREE (3) WEEKS OR LESS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
R e v it L o c a lF ile s \2
\9
-P
R D
-W O
Z M
J .r v t
/8
/2
:5
:2
P M
DG107
SEVENTH FLOOR MEDICAL GAS
PLANGUIDON DESIGN INC.
1221 N. Pennsylvania St.
Suite 200
Indianapolis, Indiana 46202
317.800.6388
RING & DUCHATEAU, LLP.
17400 W. Capital Drive
Brookfield, WI 53045
414.778.1700
RENOVATE 7AN FOR
ENDOSCOPY LAB
5000 W National Ave, Milwaukee, WI 53295
695-19-107
08/21/2020 RJW MJW
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"DG107
1 SEVENTH FLOOR MEDICAL GAS PLAN
N
TRUE NORTH PROJECT NORTH
SCALE: 1" = 100'-0"
VA 7AN KEY PLANN
Revisions: Date:
ACCOMPANYING 36C25221B0002 0002
VHAMIWBeierJ Text Box
ZVB-0707
VHAMIWBeierJ Text Box
ZVB-0705
VHAMIWBeierJ Text Box
ZVB-0706
VHAMIWBeierJ Text Box
MGA-0703
VHAMIWBeierJ Text Box
MGA-0704
VHAMIWBeierJ Text Box
MGA-0705
VHAMIWBeierJ Text Box
TMA-0701
VHAMIWBeierJ Text Box Amendment 0002
VHAMIWBeierJ Text Box 11/17/2020
VHAMIWBeierJ Text Box Amendment 0002 clarification - Zone Valve Boxes and Alarm Panels have just been re-tagged in this amendment drawing.
File details come from the government source that posted it. Updated .