About this file

This document outlines the requirements for a federal construction contract opportunity to renovate space at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contractor shall demolish existing interior spaces and renovate approximately 11,000 square feet on the 7th floor to create a new GI Procedure Clinic for around $2,000,000 to $5,000,000. The work includes mechanical, electrical, plumbing and other systems updates. The project completion deadline is 515 calendar days from notice to proceed. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses and falls under NAICS code 236220 with a size standard of $39.5 million. A pre-bid conference will be held in October 2020 and bids are due in mid-November 2020. The Department of Veterans Affairs Veterans Health Administration VISN 12 is the contracting agency.

View the file

Other files

File Type Posted
36C25221B0002 0003.docx DOCX document
S06 - ET101 - SEVENTH FLOOR PLAN - TECHNOLOGY - Amd03.pdf PDF
36C25221B0002 0002.docx DOCX document
S06 - Appendix E - Physicist Report.pdf PDF
S06 - AE501 - BUILDING DETAILS.pdf PDF
S06 - EP602 - SCHEDULES POWER.pdf PDF
S06 - ET101 - SEVENTH FLOOR PLAN - TECHNOLOGY.pdf PDF
S06 - DG107 - SEVENTH FLOOR MEDICAL GAS PLAN.pdf PDF
S06 - 08 71 13.11 - LOW ENERGY DOOR OPERATORS Amend No2.pdf PDF
S06 - 7AN_ShieldingReport_20200601.pdf PDF
S06 - AE002 - WALL TYPES.pdf PDF
S06 - AE101 - SEVENTH FLOOR ARCHITECTURAL PLAN.pdf PDF
S06 - ET501 - DETAILS - TECHNOLOGY.pdf PDF
S06 - 11 73 00 - CEILING MOUNT PATIENT LIFT Amend No2.pdf PDF
S06 - EP401 - POWER RISERS.pdf PDF
S04 - Site Visit Sign-In Sheet - 695-19-107.pdf PDF
36C25221B0002 0001.docx DOCX document
S02 - Wage Determination Effective 10.2.2020.pdf PDF
S02 - J_A 695-19-107_Door Hardware.pdf PDF
S02 - J_A 695-19-107_HVAC BAS.pdf PDF
S02 - 695-19-107_2020.09.24_Volume 2 Specifications 100percent.pdf PDF
S02 - 695-19-107_2020.09.24_Volume 1 Specifications 100percent.pdf PDF
S02 - J_A 695-19-107_Interior Signage.pdf PDF
S02 - J_A 695-19-107_Firestop Systems.pdf PDF
S02 - 695-19-107 Drawing Set Updated.pdf PDF
S02 - J_A 695-19-107_Medical Gas Systems.pdf PDF
36C25221B0002_1.docx DOCX document
S02 - J_A 695-19-107_Card Readers.pdf PDF
S02 - J_A 695-19-107_Nurse Call.pdf PDF
S02 - J_A 695-19-107_Fire Alarm System.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY : TYPE D

PATIENT RISK GROUP: MEDIUM

CLASS OF PRECAUTION MATRIX: IV

PROVIDE TEMPORARY 1 HR FIRE RATED WALL CONSTRUCTION PER NFPA 241.

REFER TO DETAIL 1/GI102.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH

CARD READER ACCESS. REFER TO ELEVATION 2/GI102.

EXISTING WALL PROVIDES A 1-HR CONSTRUCTION BARRIER. CONTRACTOR

TO MODIFY WALL AND PROVIDE FIRE CAULKING AS NEEDED TO PROVIDE

ENSURE 1-HR CONSTRUCTION BARRIER THROUGHOUT.

SEAL AND TAPE EXISTING DOOR TO PREVENT CONSTRUCTION DEBRIS FROM

PASSING THROUGH.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 01 01 10 AND 01 35 26.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE INFECTION CONTROL

WORKPLAN AND DRAWING TO COR FOR APPROVAL BEFORE ANY DEMOLITION.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CPM SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

SIXTH FLOOR ABOVE CEILING WORK MAY TAKE PLACE AT ANY TIME ONCE

SUB-PHASE INFECTION CONTROL BARRIERS ARE UP AND APPROVED. EACH

6TH FLOOR SUB-PHASE WILL BE VACATED TO AID THE CONTRACTOR IN HIS

WORK. IN EACH SUB-PHASE, 6TH FLOOR CEILING TILES SHALL BE REMOVED

AND STORED IN A SAFE MANNER UNTIL THEY CAN BE REPLACED AT THE

CONCLUSION OF EACH DAY’S WORK. THE CEILING MUST REMAIN

CONTINUOUS WHEN THE CONTRACTOR IS NOT PRESENT AS IT IS PART OF

THE FIRE SUPPRESSION SYSTEM ON THE 6TH FLOOR. DAMAGED AND BROKEN

CEILING TILES SHALL BE REPLACED BY THE CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE 24" X 36" STICK WALK-OFF MATT AT EACH TEMPORARY DOOR

LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART (SHARK TANK) FOR ABOVE CEILING ACCESS

OUTSIDE PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

INFECTION CONTROL GENERAL NOTES

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION

BATT.

5/8" TYPE X GYPSUM BOARD, BOTH

SIDES

3 5/8" METAL STUD @ 16" O.C.

WITH RUNNER CHANNELS ALONG

TOP AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY

ADHERE TO THE STRUCTURAL DECK

ABOVE AND TO THE FLOOR BELOW

WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING:

U465

COORDINATE WITH EXISTING

CEILING

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY AND FRAME

WITH SEALS, CARD READER, HARDWARE AND CLOSER. VA

WILL PROVIDE CONSTRUCTION SFIC TO BE INSTALLED IN

CONTRACTOR-PROVIDED HARDWARE.

NEGATIVE AIR MONITOR (TRIATEK BASIS

OF DESIGN)

HAND SANITIZER

SEAL ALL EDGES WITH TAPE (SEE

SPECIFICATIONS)

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE

FOR REQUIRED CONDITION TO

STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

PROTECT EXISTING WALLS AND

FLOORING FROM TEMP.

CONSTRUCTION BARRIER.

EXISTING FINISHES DAMAGED

BY TEMP/IC/CN BARRIER SHALL

BE REPAIRED BY THE

CONTRACTOR.

23 25222119 2016 171311 12109

A

B

C

D

E

H

K

L

M

J

UP

WORKROOM

EXAM

EXAM

EXAM

EXAM

EXAM

OFFICE

OFFICE

WAITING AREA

OFFICE

MED RM

7210A

OFFICE

SOILED UTILITY

CLEAN UTILITY

EC

EC

EC

TREATMENT

LAB / TREATMENT

HAC

STAIR

7-5

EXAM

STORAGE

RESTROOM

BREAK

LAB

STORAGE

STORAGE

7250A

OFFICE

EXAM

OFFICE

OFFICE

EC

VP

7-33

ELEV

7-A-7

ELEV

7-A-8

PROCTO DO RM

7240A

WOUND RM

7240B

WOUND STAFF

7240C

WAITING RM

WAITING AREA

CORRIDOR

C7A01

CORRIDOR

C7A02

CORRIDOR

C7A03

CORRIDOR

C7A05

CORRIDOR

C7A04

CORRIDOR

C7A04A

CORRIDOR

C7A06

CORRIDOR

C7A07

CORRIDOR

C7A14

CLEAR MIN.

6' - 0"

C

LE

A R

M

IN

6'

2 1

4'

7' - 11 5/8"

PROJECT AREAA

B

C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1

.1

.1

R e n o v a te

A N d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1 /2

:1

:1

P M

GC101

INFECTION CONTROL/PHASING

PLANGUIDON DESIGN INC.

1221 N. Pennsylvania St.

Suite 200

Indianapolis, Indiana 46202

317.800.6388

RING & DUCHATEAU, LLP.

17400 W. Capital Drive

Brookfield, WI 53045

414.778.1700

RENOVATE 7AN FOR

ENDOSCOPY LAB

5000 W National Ave, Milwaukee, WI 53295

695-19-107

08/21/2020 DV DMC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1 1/2" = 1'-0"GC101

1 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241

SCALE: 1/4" = 1'-0"GC101

2 TEMPORARY WALL CONSTRUCTION ELEVATION

SCALE: 1/8" = 1'-0"GC101

3 SEVENTH FLOOR PLAN INFECTION CONTROL N

SCALE: 1" = 100'-0"

KEY PLAN

SCALE: 1/4" = 1'-0"GC101

4 EXISTING DEMISING WALL PHOTO

SCALE: 1/4" = 1'-0"GC101

5 EXISTING DEMISING WALL PHOTO

Revisions: Date:

ADDENDUM 01 2020/11/13

ACCOMPANYING 36C25221B0002 0002

VHAMIWBeierJ Text Box Amendment 0002

VHAMIWBeierJ Text Box 11/17/2020

File details come from the government source that posted it. Updated .