This document outlines the requirements for a federal construction contract opportunity to renovate space at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contractor shall demolish existing interior spaces and renovate approximately 11,000 square feet on the 7th floor to create a new GI Procedure Clinic for around $2,000,000 to $5,000,000. The work includes mechanical, electrical, plumbing and other systems updates. The project completion deadline is 515 calendar days from notice to proceed. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses and falls under NAICS code 236220 with a size standard of $39.5 million. A pre-bid conference will be held in October 2020 and bids are due in mid-November 2020. The Department of Veterans Affairs Veterans Health Administration VISN 12 is the contracting agency.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INFECTION CONTROL PLAN NOTES #
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY : TYPE D
PATIENT RISK GROUP: MEDIUM
CLASS OF PRECAUTION MATRIX: IV
PROVIDE TEMPORARY 1 HR FIRE RATED WALL CONSTRUCTION PER NFPA 241.
REFER TO DETAIL 1/GI102.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
CARD READER ACCESS. REFER TO ELEVATION 2/GI102.
EXISTING WALL PROVIDES A 1-HR CONSTRUCTION BARRIER. CONTRACTOR
TO MODIFY WALL AND PROVIDE FIRE CAULKING AS NEEDED TO PROVIDE
ENSURE 1-HR CONSTRUCTION BARRIER THROUGHOUT.
SEAL AND TAPE EXISTING DOOR TO PREVENT CONSTRUCTION DEBRIS FROM
PASSING THROUGH.
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 01 01 10 AND 01 35 26.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE INFECTION CONTROL
WORKPLAN AND DRAWING TO COR FOR APPROVAL BEFORE ANY DEMOLITION.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING
INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED
CPM SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR
PLATE OF THE PROJECT BOUNDARY.
SIXTH FLOOR ABOVE CEILING WORK MAY TAKE PLACE AT ANY TIME ONCE
SUB-PHASE INFECTION CONTROL BARRIERS ARE UP AND APPROVED. EACH
6TH FLOOR SUB-PHASE WILL BE VACATED TO AID THE CONTRACTOR IN HIS
WORK. IN EACH SUB-PHASE, 6TH FLOOR CEILING TILES SHALL BE REMOVED
AND STORED IN A SAFE MANNER UNTIL THEY CAN BE REPLACED AT THE
CONCLUSION OF EACH DAY’S WORK. THE CEILING MUST REMAIN
CONTINUOUS WHEN THE CONTRACTOR IS NOT PRESENT AS IT IS PART OF
THE FIRE SUPPRESSION SYSTEM ON THE 6TH FLOOR. DAMAGED AND BROKEN
CEILING TILES SHALL BE REPLACED BY THE CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE 24" X 36" STICK WALK-OFF MATT AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART (SHARK TANK) FOR ABOVE CEILING ACCESS
OUTSIDE PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
INFECTION CONTROL GENERAL NOTES
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
REFERENCE AREA FOR ABOVE
CEILING WORK ON FLOOR BELOW.
REFER TO ENGINEERING DRAWINGS
FOR FULL SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION
BATT.
5/8" TYPE X GYPSUM BOARD, BOTH
SIDES
3 5/8" METAL STUD @ 16" O.C.
WITH RUNNER CHANNELS ALONG
TOP AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY
ADHERE TO THE STRUCTURAL DECK
ABOVE AND TO THE FLOOR BELOW
WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING:
U465
COORDINATE WITH EXISTING
CEILING
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY AND FRAME
WITH SEALS, CARD READER, HARDWARE AND CLOSER. VA
WILL PROVIDE CONSTRUCTION SFIC TO BE INSTALLED IN
CONTRACTOR-PROVIDED HARDWARE.
NEGATIVE AIR MONITOR (TRIATEK BASIS
OF DESIGN)
HAND SANITIZER
SEAL ALL EDGES WITH TAPE (SEE
SPECIFICATIONS)
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE
FOR REQUIRED CONDITION TO
STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
PROTECT EXISTING WALLS AND
FLOORING FROM TEMP.
CONSTRUCTION BARRIER.
EXISTING FINISHES DAMAGED
BY TEMP/IC/CN BARRIER SHALL
BE REPAIRED BY THE
CONTRACTOR.
23 25222119 2016 171311 12109
A
B
C
D
E
H
K
L
M
J
UP
WORKROOM
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
OFFICE
WAITING AREA
OFFICE
MED RM
7210A
OFFICE
SOILED UTILITY
CLEAN UTILITY
EC
EC
EC
TREATMENT
LAB / TREATMENT
HAC
STAIR
7-5
EXAM
STORAGE
RESTROOM
BREAK
LAB
STORAGE
STORAGE
7250A
OFFICE
EXAM
OFFICE
OFFICE
EC
VP
7-33
ELEV
7-A-7
ELEV
7-A-8
PROCTO DO RM
7240A
WOUND RM
7240B
WOUND STAFF
7240C
WAITING RM
WAITING AREA
CORRIDOR
C7A01
CORRIDOR
C7A02
CORRIDOR
C7A03
CORRIDOR
C7A05
CORRIDOR
C7A04
CORRIDOR
C7A04A
CORRIDOR
C7A06
CORRIDOR
C7A07
CORRIDOR
C7A14
CLEAR MIN.
6' - 0"
C
LE
A R
M
IN
6'
2 1
4'
7' - 11 5/8"
PROJECT AREAA
B
C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
R e n o v a te
A N d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/1 /2
:1
:1
P M
GC101
INFECTION CONTROL/PHASING
PLANGUIDON DESIGN INC.
1221 N. Pennsylvania St.
Suite 200
Indianapolis, Indiana 46202
317.800.6388
RING & DUCHATEAU, LLP.
17400 W. Capital Drive
Brookfield, WI 53045
414.778.1700
RENOVATE 7AN FOR
ENDOSCOPY LAB
5000 W National Ave, Milwaukee, WI 53295
695-19-107
08/21/2020 DV DMC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1 1/2" = 1'-0"GC101
1 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241
SCALE: 1/4" = 1'-0"GC101
2 TEMPORARY WALL CONSTRUCTION ELEVATION
SCALE: 1/8" = 1'-0"GC101
3 SEVENTH FLOOR PLAN INFECTION CONTROL N
SCALE: 1" = 100'-0"
KEY PLAN
SCALE: 1/4" = 1'-0"GC101
4 EXISTING DEMISING WALL PHOTO
SCALE: 1/4" = 1'-0"GC101
5 EXISTING DEMISING WALL PHOTO
Revisions: Date: