This document package includes a federal contract solicitation and related technical specifications for low energy door operators. The solicitation seeks bids for a renovation project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin to renovate approximately 11,000 square feet for a relocated GI Procedure Clinic. The project scope includes demolishing existing interior spaces, updating mechanical, electrical, plumbing and other building systems. The contract value is estimated between $2-5 million. The North American Industry Classification code is 236220 and the size standard of $39.5 million applies. The completion period is 515 calendar days. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and will be posted to SAM.gov on October 15th, 2020 with bid opening on November 16th, 2020. A pre-bid conference will also be held. The technical specifications outline requirements for low energy automatic door operators to meet standards for life safety, ADA compliance and performance criteria.

View the file

Other files

File Type Posted
36C25221B0002 0003.docx DOCX document
S06 - ET101 - SEVENTH FLOOR PLAN - TECHNOLOGY - Amd03.pdf PDF
36C25221B0002 0002.docx DOCX document
S06 - Appendix E - Physicist Report.pdf PDF
S06 - AE501 - BUILDING DETAILS.pdf PDF
S06 - EP602 - SCHEDULES POWER.pdf PDF
S06 - ET101 - SEVENTH FLOOR PLAN - TECHNOLOGY.pdf PDF
S06 - DG107 - SEVENTH FLOOR MEDICAL GAS PLAN.pdf PDF
S06 - 7AN_ShieldingReport_20200601.pdf PDF
S06 - AE002 - WALL TYPES.pdf PDF
S06 - AE101 - SEVENTH FLOOR ARCHITECTURAL PLAN.pdf PDF
S06 - ET501 - DETAILS - TECHNOLOGY.pdf PDF
S06 - 11 73 00 - CEILING MOUNT PATIENT LIFT Amend No2.pdf PDF
S06 - GC101 - INFECTION CONTROL_PHASING PLAN.pdf PDF
S06 - EP401 - POWER RISERS.pdf PDF
S04 - Site Visit Sign-In Sheet - 695-19-107.pdf PDF
36C25221B0002 0001.docx DOCX document
S02 - Wage Determination Effective 10.2.2020.pdf PDF
S02 - J_A 695-19-107_Door Hardware.pdf PDF
S02 - J_A 695-19-107_HVAC BAS.pdf PDF
S02 - 695-19-107_2020.09.24_Volume 2 Specifications 100percent.pdf PDF
S02 - 695-19-107_2020.09.24_Volume 1 Specifications 100percent.pdf PDF
S02 - J_A 695-19-107_Interior Signage.pdf PDF
S02 - J_A 695-19-107_Firestop Systems.pdf PDF
S02 - 695-19-107 Drawing Set Updated.pdf PDF
S02 - J_A 695-19-107_Medical Gas Systems.pdf PDF
36C25221B0002_1.docx DOCX document
S02 - J_A 695-19-107_Card Readers.pdf PDF
S02 - J_A 695-19-107_Nurse Call.pdf PDF
S02 - J_A 695-19-107_Fire Alarm System.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Milwaukee VAMC 08-01-16

695-19-107 Renovate 7AN for Endoscopy Lab Amendment #2

Milwaukee, WI 53295 November 17, 2020

08 71 13.11 - 1

SECTION 08 71 13.11

LOW ENERGY POWER ASSIST DOOR OPERATORS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Low-energy, power-assisted automatic swing door operators.

1.2 RELATED REQUIREMENTS

A. Commissioning; Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.

B. Steel Doors; Section 08 11 13, HOLLOW METAL DOORS AND FRAMES.

C. Wood Doors; Section 08 14 00, INTERIOR WOOD DOORS.

D. Aluminum Frames Entrance Work; Section 08 41 13, ALUMINUM-FRAMED

ENTRANCES AND STOREFRONTS.

E. Door Hardware; Section 08 71 00, DOOR HARDWARE.

F. Finish Color, Section 09 06 00, SCHEDULE FOR FINISHES.

G. Electric General Wiring, Connections and Equipment Requirements;

Division 26, ELECTRICAL.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. ASTM International (ASTM):

1. B209-14 - Aluminum and Aluminum-Alloy Sheet and Plate.

2. B221-14 - Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.

C. Builders Hardware Manufacturers Association, Inc. (BHMA):

1. 156.19-07 - Power Assist and Low Energy Power Operated Doors.

1.4 PREINSTALLATION MEETINGS

A. Conduct preinstallation meeting at project site minimum 30 days before beginning Work of this section.

1. Required Participants:

a. Contracting Officer's Representative.

b. Contractor.

c. Installer.

d. Other installers responsible for adjacent and intersecting work, including electrical wiring installers.

1.5 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

ACCOMPANYING 36C25221B0002 0002

Milwaukee, WI 53295 November 17, 2020

08 71 13.11 - 2

B. Submittal Drawings:

1. Show size, configuration, and fabrication and installation details.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Maintenance manuals.

3. Installation instructions.

4. Warranty.

D. Samples:

1. Door Operator: Full sized, complete assembly.

2. Approved samples may be incorporated into work.

E. Certificates: Certify products comply with specifications.

1. Show door operator shall be UL Listed for specified application.

F. Operation and Maintenance Data:

1. Care instructions for each exposed finish product.

2. Start-up, maintenance, troubleshooting, emergency, and shut-down instructions for each operational product.

1.6 QUALITY ASSURANCE

A. Manufacturer Qualifications:

1. Regularly manufactures specified products.

B. Installer Qualifications:

1. Regularly installs specified products.

1.7 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.8 STORAGE AND HANDLING

A. Store products indoors in dry, weathertight conditioned facility.

B. Protect products from damage during handling and construction operations.

1.9 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

B. Manufacturer's Warranty: Warrant automatic door operators against material and manufacturing defects.

08 71 13.11 - 3

1. Warranty Period: two years.

PART 2 - PRODUCTS

2.1 SYSTEM DESCRIPTION

A. Power assisted automatic door equipment accommodating normal traffic as well as the weight of the doors; UL approved and comply with applicable codes.

2.2 SYSTEM PERFORMANCE

A. Opening Force: Maximum 67 N (15 lbf.).

B. Cycle Tests: 300,000 cycles.

1. Use the widest and heaviest door specified as a test specimen.

Narrower or lighter doors of the same configurations will be considered to meet the cycle test requirements.

2.3 MATERIALS

A. Aluminum:

1. Sheet: ASTM B209.

2. Extrusions: ASTM B221.

2.4 PRODUCTS - GENERAL

A. Low-Energy Automatic Door Operators shall be Tormax 1301 Series or equal manufacturer.

2.5 LOW-ENERGY AUTOMATIC DOOR OPERATORS

A. Conform to ANSI/BHMA A156.19 and A156.10.

B. Life Safety: Shall meet NFPA 101 Life Safety Code requirements per subsection 7.2.1.9, Powered Door Leaf Operation.

C. ADA requirements: Shall meet or be adjustable to meet applicable ADA requirements and be available for indoor and outdoor use.

D. Door Limits: Shall be rated for use on doors weighing up to 500 lbs and on door leaves up to 48-in wide.

E. Mounting: Surface-mounted on either right-hand or left-hand installed doors. Operator shall allow for either in-swing or outswing mounting.

F. Enclosure: Self-contained within an extruded aluminum housing (alloy

6063-T6) to conceal operator mechanism and mounting brackets and with removable access cover with an overall maximum size of 5-1/2 inches wide by 6 inches deep.

G. Motors: Supplied motors shall be brushless AC type.

H. Open Angle (max): Shall allow for up to 110-degrees of opening.

08 71 13.11 - 4

I. Safety Features:

1. Adjustable time delay.

2. Adjustable speed for opening and closing operations.

3. Adjustable backcheck.

4. Decals indicating "In" or "Do Not Enter" installed on both faces of each door where shown conforming to the requirements of ANSI/

BHMA A156.19.

5. Re-activation sensor mounted on the push-side door face near the top detect any person standing in the door swing path and prevent the door from closing.

6. The operator shall be programmable or adjustable to compensate for and overcome wind and stack pressures.

7. Motion sensor to detect any person standing in the door swing path and prevent the door from opening.

a. Adjustable door sensor system providing complete operation and safety zone coverage.

J. Power Units:

1. .

2. Operator power unit shall utilize non-hydraulic componentry and be available for subassembly replacement for ease of maintenance/ repair.

3. Self-contained electric circuits for automatic operators located on each floor of the building.

4. Interruption or failure of power circuits for operators located on one floor of the building shall not interfere with continuous performance of automatic operated doors located on other floors.

5. Power units designed to not interfere with continuous performance of automatic operated doors located on other floors in the case of power interruption or failure.

6. Capacity and size of power circuits according to automatic operator manufacturer's specifications.

2.6 OPERATION

A. Traffic Operation:

1. Double Doors: Double egress.

B. Operator: Electromechanical; surface-mounted.

1. Operators to have checking mechanism providing cushioning action at last part of door travel, in both opening and closing cycle.

08 71 13.11 - 5

2. Operators to recycle doors instantaneously to full open position from any point in closing cycle when control switch is reactivated.

3. Operators to allow manual door control in event of power failure.

C. Controls: Solid-state type.

D. Activation: Wave-plate switch.

2.7 FINISHES

A. Aluminum Anodized Finish: NAAMM AMP 500.

1. Clear Anodized Finish: AA-C22A41; Class I Architectural, 0.7 mil thick.

2. Color Anodized Finish: AA-C22A42 or AA-C22A44; Class I

Architectural, 0.7 mil thick.

3. Clear Anodized Finish: AA-C22A31; Class II Architectural, 0.4 mil thick.

4. Color Anodized Finish: AA-C22A32 or AA-C22A34; Class II

Architectural, 0.4 mil thick.

B. Aluminum Paint finish:

1. Baked-Enamel or Powder-Coat: AAMA 2603; dry film thickness of

1.5 mil.

2.8 ACCESSORIES

A. Signage: BHMA standard for operation and door type specified.

B. Guide Rails: Aluminum bar with anodized baked-enamel or powder-coat finish.

C. Fasteners: Corrosion-resistant, compatible with adjoining materials.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine conditions effecting work, including door and frame preparation and electrical rough-ins.

3.2 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions and approved submittal drawings.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

B. Coordinate installation of equipment with other related work.

08 71 13.11 - 6

C. Mount manual controls and power disconnect switches recessed or semi-flush in partitions.

D. Secure operator components to adjacent construction with suitable fastenings. Conceal conduits, piping, and electric equipment in finish work.

E. Install power units and controls in locations indicated.

1. Where units are to be mounted on walls, provide metal supports or shelves for the units.

3.3 ADJUSTING

A. All equipment, including time delay switches, to be accessible for maintenance and adjustment.

B. Adjust operators to function properly for the type o£ traffic

(pedestrians) expected to pass through doors.

C. Adjust each door leaf of pairs of doors to open and close in synchronization.

D. On pairs of doors, adjust operators allowing either door to be opened manually without the other door opening.

3.4 DEMONSTRATION AND TRAINING

A. Instruct VA personnel in proper door operator operation and maintenance.

1. Trainer: Manufacturer approved instructor.

B. Submit training plan and trainer qualifications. See Section 01 91 00 -

GENERAL COMMISSIONING REQUIREMENTS.

C. Acceptance Condition: After completing work, operate door operators 15 consecutive calendar days without breakdown.