Roof-System-Attachment-Slope,-Transition,-Change-in-Plane.pdf

PDF 122 KB Posted

Attached to
High School Roof Replacement
Solicitation number
RFP MASO 260000002613 2
Issued by
Genesee County, Edmore Village, Michigan

About this file

This is a technical drawing specification document for roof system installation details. The drawing, designated as Drawing No. 85 and titled "Roof System Attachment at Slope Transition and Change in Plane," provides construction guidance for mechanically attaching roofing membrane systems at areas where roof planes transition or change slope. The specification requires that all roofing systems be mechanically attached at transitions in plane or slope greater than 1/4 inch per linear foot to prevent potential bridging of the membrane. The drawing depicts the use of Tremply Kee membrane products with fasteners and stress plates installed at 12-inch on-center spacing (typical) and hot air weld connections, with the membrane oriented in the machine direction for optimal performance.

This document serves as a technical reference for construction contractors and specifies the materials and installation methods required for compliant roof system attachment. The specification is presented at a not-to-scale (NTS) format and references Tremply Kee membrane and Tremply Plus fastener systems as the specified products. The document does not contain information regarding pricing, contract terms, bid schedules, award dates, or other commercial terms typically found in solicitation documents.

View the file

Other files

File Type Posted
Mason High School- AOC.pdf PDF
~WRL0001.tmp —
Mason High School Summer of 2027 Roofing Scope of Work.docx DOCX document
2-Piece-Shop-Fabricated-Metal-Edge-Flashing-Model.pdf PDF
Typical-Edge-Flashing-Model.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Plumbing-Vent-Model.pdf PDF
Hot-Stack-Penetration.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Typical-Covers-at-Membrane-T-Laps-Model.pdf PDF
TremPly-KEE-at-Fascia-System-Raised-Cant-Edge-Model.pdf PDF
Field-Fabricated-Pipe-Flashing-Model.pdf PDF
Gutter-Flashing-Model.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Notice To Bidders Mason High School Summer of 2027.docx DOCX document
Familial Relationship Disclosure.docx DOCX document
Mason Middle School- Alternate AOC.pdf PDF
Addendum #1.pdf PDF
Mason High School Summer of 2027 Roofing Bid Form.doc DOC document
Project-Mason High School THERMastic 80 Roofing Replacements.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Wood-Curb-Model.pdf PDF
Roof-Hatch-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Composite-Roof-System-Cross-Section-Adhered-ISO-Hot-Model.pdf PDF
Pre-Molded-Pipe-Flashing-Model.pdf PDF
Door-Threshold-Model.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Roof 13 to 15 Detail.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

ROOF SYSTEM ATTACHMENT AT SLOPE

TRANSITION AND CHANGE IN PLANE

DWG NO. 85

NOTES

TREMPLY KEE MEMBRANE

TREMPLY KEE MEMBRANE

MEMBRANE MACHINE DIRECTION

MEMBRANE MACHINE DIRECTION

TREMPLY PLUS FASTENER &

STRESS PLATE AT 12" O.C.

(TYPICAL)

HOT AIR WELD (TYPICAL)

1. ROOFING SYSTEMS SHALL BE MECHANICALLY ATTACHED AT ALL TRANSITIONS IN PLANE/SLOPE GREATER THAN 1/4" PER LINEAR FOOT TO ELIMINATE POTENTIAL BRIDGING OF THE MEMBRANE.

Sheets and Views
Model

File details come from the government source that posted it. Updated .