Conduit-or-Piping-Support.pdf
PDF 110 KB Posted
- Attached to
- High School Roof Replacement
- Solicitation number
- RFP MASO 260000002613 2
- Issued by
- Genesee County, Edmore Village, Michigan
About this file
This is a technical drawing specification document for built-up roofing and conduit or piping support installation. The drawing illustrates the proper methodology for securing conduit or piping to roof decking using clamps attached to wood blocking spaced at five-foot intervals. The installation includes specified insulation and built-up roofing (BUR) membrane application, with walk pads constructed from treated sheet material. The drawing is designated as Drawing No. 28 and is presented at a not-to-scale (NTS) ratio, dated 2023. The document serves as a reference specification for contractors performing roofing work that involves conduit or piping installations on roof decks.
No additional information regarding pricing terms, contract award dates, response deadlines, bidding procedures, funding sources, or other commercial terms is contained within this technical drawing specification document.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DWG NO. 28
BUILT UP ROOFING
HOT/COLD CONDUIT OR
PIPING SUPPORT
ROOF DECK AS SPECIFIED
SECURE CONDUIT/ PIPING WITH CLAMP
TO WOOD BLOCKING
WOOD BLOCKING SPACED EVERY 5 FEET
SPECIFIED INSULATION
SPECIFIED BUR
MEMBRANE
WALK PAD
TREMTRED