Roof-Hatch-Model.pdf

PDF 126 KB Posted

Attached to
High School Roof Replacement
Solicitation number
RFP MASO 260000002613 2
Issued by
Genesee County, Edmore Village, Michigan

About this file

This is a technical drawing document, specifically a roof hatch detail specification sheet for built-up roofing (BUR) construction. The document provides architectural and construction guidance for installing a hot/cold roof hatch assembly on an existing roof deck. The drawing specifies a two-ply stripping system with gravel surfacing and outlines the layered composition of the roofing assembly, including the specified existing deck, insulation, BUR membrane, base sheet, counterflashing, and cant sheet. The document is identified as Drawing No. 25 and is presented at a not-to-scale (NTS) notation, dated 2023, indicating it is part of a larger set of construction documents.

The document does not contain information regarding pricing terms, bid due dates, award dates, contract duration, renewal options, funding sources, or set-asides. This is purely a technical specification and detail drawing intended to guide contractors in the proper installation and composition of the roof hatch assembly. As a design document, it serves as a reference standard within a broader construction or renovation project but does not establish procurement terms, financial obligations, or contractual conditions between parties.

View the file

Other files

File Type Posted
Mason Middle School- Alternate AOC.pdf PDF
Addendum #1.pdf PDF
Mason High School Summer of 2027 Roofing Bid Form.doc DOC document
Project-Mason High School THERMastic 80 Roofing Replacements.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Wood-Curb-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Typical-Covers-at-Membrane-T-Laps-Model.pdf PDF
TremPly-KEE-at-Fascia-System-Raised-Cant-Edge-Model.pdf PDF
Field-Fabricated-Pipe-Flashing-Model.pdf PDF
Roof-System-Attachment-Slope,-Transition,-Change-in-Plane.pdf PDF
Gutter-Flashing-Model.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Notice To Bidders Mason High School Summer of 2027.docx DOCX document
Familial Relationship Disclosure.docx DOCX document
Mason High School- AOC.pdf PDF
~WRL0001.tmp —
Mason High School Summer of 2027 Roofing Scope of Work.docx DOCX document
2-Piece-Shop-Fabricated-Metal-Edge-Flashing-Model.pdf PDF
Typical-Edge-Flashing-Model.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Plumbing-Vent-Model.pdf PDF
Hot-Stack-Penetration.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Composite-Roof-System-Cross-Section-Adhered-ISO-Hot-Model.pdf PDF
Pre-Molded-Pipe-Flashing-Model.pdf PDF
Door-Threshold-Model.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Roof 13 to 15 Detail.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 25

BUILT UP ROOFING

HOT/COLD ROOF HATCH

TWO-PLY STRIPPING

GRAVEL SURFACING

SPECIFED EXISTING DECK

SPECIFIED INSULATION

SPECIFIED BUR MEMBRANE

4'' MIN.

SPECIFIED BASE SHEET

SPECIFIED COUNTERFLASHING

SPECIFIED CANT

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

Sheets and Views
Model

File details come from the government source that posted it. Updated .