2-Piece-Shop-Fabricated-Metal-Edge-Flashing-Model.pdf

PDF 113 KB Posted

Attached to
High School Roof Replacement
Solicitation number
RFP MASO 260000002613 2
Issued by
Genesee County, Edmore Village, Michigan

About this file

This is a technical specification drawing for a 2-piece shop-fabricated metal edge flashing system. The document presents a detailed construction assembly diagram (Drawing No. 01, Sheet 1 of 1) showing the component layers and installation requirements for metal edge flashing applications. The specification details the sequential assembly of insulation, wood blocking attached at 250 pounds-force per foot, a clip-on metal fascia system using Tremply Kee LV bonding adhesive, and a Tremply Kee membrane secured with galvanized annular ring shank nails spaced at 3 inches on center. Additional components include an optional butyl sealing tape, a continuous metal cant dam, and a flashing strip assembly. The metal fascia is specified to be one gauge heavier than standard material to ensure structural integrity and durability.

No pricing information, contract terms, bid response dates, award timelines, or procurement details are included in this technical drawing. The document functions exclusively as a manufacturing and installation specification standard, drawn to scale NTS (not to scale), establishing the technical requirements that must be met during the fabrication and installation process for this particular metal edge flashing system type.

View the file

Other files

File Type Posted
Slip-Metal-Skirt-Flashing.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Field-Fabricated-Pipe-Flashing-Model.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Addendum #1.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Pre-Molded-Pipe-Flashing-Model.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Mason High School- AOC.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
Mason High School Summer of 2027 Roofing Scope of Work.docx DOCX document
Roof 13 to 15 Detail.pdf PDF
Mason High School Summer of 2027 Roofing Bid Form.doc DOC document
Project-Mason High School THERMastic 80 Roofing Replacements.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Plumbing-Vent-Model.pdf PDF
Roof-Hatch-Model.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Wood-Curb-Model.pdf PDF
Typical-Edge-Flashing-Model.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Composite-Roof-System-Cross-Section-Adhered-ISO-Hot-Model.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Mason Middle School- Alternate AOC.pdf PDF
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
~WRL0001.tmp —
Gauge-or-Thickness-Guide.pdf PDF
TremPly-KEE-at-Fascia-System-Raised-Cant-Edge-Model.pdf PDF
Typical-Covers-at-Membrane-T-Laps-Model.pdf PDF
Gutter-Flashing-Model.pdf PDF
Roof-System-Attachment-Slope,-Transition,-Change-in-Plane.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Familial Relationship Disclosure.docx DOCX document
Piping-Through-Roof-Deck.pdf PDF
Notice To Bidders Mason High School Summer of 2027.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSULATION ATTACHED PER

SPECIFICATION REQUIREMENTS

WOOD BLOCKING

ATTACHED @ 250 LBF/FT

CLIP ON METAL FASCIA SYSTEM

TREMPLY KEE LV BONDING ADHESIVE

HOT AIR WELD

TREMPLY KEE MEMBRANE

FASTEN WITH GALVANIZED ANNULAR

RING SHANK NAILS (3" O.C.)

BUTYL SEALING TAPE (OPTIONAL)

(1 GA. HEAVIER THAN FASCIA)

CONTINUOUS METAL CANT DAM

TREMPLY KEE MEMBRANE FLASHING STRIP

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

2-PIECE SHOP FABRICATED

METAL EDGE FLASHING

DWG NO. 01

Sheets and Views
Model

File details come from the government source that posted it. Updated .