Piping-Through-Roof-Deck.pdf
PDF 142 KB Posted
- Attached to
- High School Roof Replacement
- Solicitation number
- RFP MASO 260000002613 2
- Issued by
- Genesee County, Edmore Village, Michigan
About this file
This is a technical drawing specification document detailing roofing and piping installation procedures for built-up roofing (BUR) systems. The document provides comprehensive construction guidance for routing hot and cold piping through roof decks with proper weatherproofing and insulation measures. The specification outlines the required materials and installation methods, including wood nailers secured to the roof deck with appropriate fasteners in two rows spaced 24 inches on center in a staggered pattern, specified BUR insulation, gravel surfacing, and two-ply stripping flanges set in asphalt cement and mechanically fastened at 3-inch intervals. The drawing (Drawing No. 18, not to scale) specifies that metal flanges must be primed before stripping application and that pipes must slope downward and away from the hood to facilitate drainage. Fasteners are to be spaced at 8-inch intervals, and sheet metal collars and hoods must include cross breaks or slopes for proper water drainage.
The specification emphasizes critical weatherproofing details for cold climates, requiring insulation of the interior metal work to prevent condensation and thermal issues. The sheet metal hood assembly includes a closure detail with asphalt cement seal and membrane application to ensure a watertight installation. The document provides standard construction details without pricing information, set-asides, funding sources, or contract terms, functioning solely as a technical reference guide for construction execution and material specifications.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DWG NO. 18
BUILT UP ROOFING
HOT/COLD PIPING THROUGH ROOF DECK
WOOD NAILER SECURED
SPECIFIED BUR
INSULATION
ROOF DECK
TO DECK w/ APPROPRIATE
FASTENERS, 2 ROWS
STAGGERED EACH
ROW 24'' O.C.
AS SPECIFIED
GRAVEL SURFACING
TWO-PLY STRIPPING
FLANGE SET IN SPECIFIED
ASPHALT CEMENT,
MECHANICALLY FASTENED
3'' O.C., PRIME METAL
FLANGE BEFORE STRIPPING
SLOPE PIPES DOWN
AND AWAY FROM
HOOD
FASTENERS 8'' O.C.
SHEET METAL
COLLAR
SEAL
INSULATE INSIDE OF
METAL WORK IN COLD
CLIMATES
SHEET METAL HOOD
CROSS BREAK
OR SLOPE FOR
DRAINAGE
METAL SCREW
SEAL
CLOSURE DETAIL
ASPHALT CEMENT
SEAL
MEMBRANE
SHEET TITLE:
DRAWING No.:
SCALE:
NTS
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .