RFP Document 2 - Contract Price Form 47PB0025R0044.pdf

PDF 173 KB Posted

Attached to
Construction Manager as Constructor (CMc) Requirement for a New Land Port of Entry (LPOE), Coburn Gore, Maine
Solicitation number
47PB0025R0044
Issued by

About this file

This document is a Contract Price Form for a construction project involving the demolition and rebuild of a Land Port of Entry and associated CBP housing units. The basic requirement includes design phase services and construction, with a 3% CMc Contingency Allowance and a fee percentage to be determined by the contractor. The solicitation offers three housing unit options: 10 units, 16 units, and 18 units, each with a separate Guaranteed Maximum Price (GMP) calculation.

The pricing structure includes detailed unit prices for various remediation and abatement services, such as hazardous material removal, lead abatement, septic remediation, and soil remediation for both the existing Land Port of Entry and housing. Contractors must propose rates for overhead and daily project delay compensation. The government will evaluate proposed rates and unit prices for reasonableness by comparing them to other received proposals and the independent government cost estimate. Pricing is to be completed using the provided tables, with blank spaces for contractors to fill in specific dollar amounts and percentages.

View the file

Other files

File Type Posted
Coburn Gore 47PB0025R0044 QA V4 2026 03 02.pdf PDF
47PB0025R0044 Amendment 0005 SF30 2026 03 02.pdf PDF
Attach 29v1 Coburn Gore LPOE FFE Proposal Worksheet 2026 02 26 .xlsx XLSX spreadsheet
RFP Document 4 V1- Agreement CMc REVISED 2026 02 26.pdf PDF
RFP Document 2 V2 - Contract Price Form 47PB0025R0044 2026 02 26.pdf PDF
47PB0025R0044 Amendment 0004 SF30 .pdf PDF
47PB0025R0044_0003 Amendment SF30 .pdf PDF
Attach 28 Coburn Gore Parcel Acquisition 2026 01 13.pdf PDF
Attach 25 Divison 1 Template Sections 2025 07 02.docx DOCX document
RFP Document 2 - Contract Price Form 47PB0025R0044 2026 01 22.pdf PDF
Attach 11 Wage Determination ME20260007 2026 01 02.pdf PDF
Coburn Gore 47PB0025R0044 QA V3 2026 01 22.pdf PDF
47PB0025R0044 1442 dated 2026 01 22.pdf PDF
Attach 26 Coburn Gore Division 01 - Table of Contents 2025 07 02.docx DOCX document
Attch 24 Coburn Gore 47PB0025R0044 QA V2 2025 12 10.pdf PDF
Attch 11 - Wage Determination ME20250007 2025 12 05.pdf PDF
Amendment 0002 to 47PB0025R0044 Final 2025 12 10 .pdf PDF
Attch 24ii- Coburn Gore -Funding Responsibility Tool 2025 12 10.xlsx XLSX spreadsheet
Attch 24iii. Coburn Gore Final Geothermal Study 2025 09 06.pdf PDF
Attch 24i. DS Quick Reference Guide- 2023 LPOE DS Overview 2023 12 06.pdf PDF
Amendment 0001 to 47PB0025R0044 Final 102725.pdf PDF
47PB0025R0044 QA Document 102725.pdf PDF
Pre-Proposal Meeting Final.pdf PDF
Coburn Gore Attendance Sheet 102225.pdf PDF
RFP Document 5 - Reps and Certs CMc MAY 2025.pdf PDF
3. Coburn Gore AE SOW_FINAL 2024 08 06.pdf PDF
5. Colby Coburn Gore Three-Phase Final Report 2022 12 22.pdf PDF
6. P-120 Public Buildings Service Cost and Schedule Management Policy Requirements, October 2022.pdf PDF
7. Coburn Gore LPOE 15Aug25- LPOE POR at final concept.pdf PDF
RFP Document 1 - SF1442-22.pdf PDF
RFP Document 10 - Bid Bond SF24.pdf PDF
RFP Document 14 - Proprietary Information Agreement - Sample Template.docx DOCX document
11. GSA Commissioning Guide September 2020.pdf PDF
16. Coburn Gore LPOE_Spec TOC_Final Concept_Combined 08-11-25.pdf PDF
RFP Document 3 - Solicitation CMc MAY 2025.pdf PDF
RFP Document 4 - Agreement CMc MAY 2025.pdf PDF
RFP Document 6 - Past Performance Questionnaire.docx DOCX document
RFP Document 8 - CASB DS-1.pdf PDF
RFP Document 11 - Wage Determination ME20250007.pdf PDF
1. Coburn Gore LPOE CMc SOW Final 2025 03 27.pdf PDF
2. Coburn Gore Three phase SOW Final 2025 04 04 (1).pdf PDF
17. Coburn Gore Housing_Preliminary Concepts 13June25.pdf PDF
RFP Document 7 - SB Sub Plan - Individual Model - May 2025 - 508 Compliant.docx DOCX document
RFP Document 9 - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
RFP Document 12 - CBP Non-Disclosure Agreement Form.pdf PDF
RFP Document 13 - CBP Short Term Contractors- Visitor Form_BLANK - Short Term Contractors Template.pdf PDF
4. Coburn Gore LPOE - CMa w CxP SOW 2023 10 12.pdf PDF
10. PBS Core Building Standards Memorandum 2025 02 24.pdf PDF
14. Coburn Gore LPOE - Design Narrative_Final Concept REV 08-11-25.pdf PDF
15. Coburn Gore LPOE_Final Concept Submission_Combined_REV 08-11-25.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT PRICE FORM

Total Evaluated Price

The Government will evaluate offers for award purposes by adding the Total Evaluated Price for the Basic Requirement to the Guaranteed Maximum Prices (GMP) for all options. Evaluation of options will not obligate the Government to exercise the option(s).

BASIC REQUIREMENT

CLIN ITEM PRICE

CLIN 0001 Design Phase Services (Firm Fixed Price) –

Includes all Housing Options

CLIN 0002 Target Estimated Cost of Work (ECW) – Includes demolition of existing Land Port of Entry and

Housing

CLIN 0003 CMc Contingency Allowance (CCA) Percentage 3%

CLIN 0004 CCA (CLIN 0002 x CLIN 0003) $__________

CLIN 0005 Fee Percentage _____%

CLIN 0006 Fee (CLIN 0002 x CLIN 0005) $__________

CLIN 0007

Guaranteed Maximum Price (GMP) Option for

Construction Services (Total CLIN 0002 + CLIN

0004 + CLIN 0006)

CLIN 0008 Total Evaluated Price – Basic Requirement

(CLIN 0001 + CLIN 0007)

OPTION 1 – HOUSING UNITS (10)

Build out of ten (10) units of CBP housing with full parking, amenities, and utility spaces.

CLIN ITEM PRICE

CLIN 0001 Target Estimated Cost of Work (ECW) $__________

CLIN 0002 CMc Contingency Allowance (CCA) Percentage 3%

CLIN 0003 CCA (CLIN 0001 x CLIN 0002) $__________

CLIN 0004 Fee Percentage _____%

CLIN 0005 Fee (CLIN 0001 x CLIN 0004) $__________

CLIN 0006

Guaranteed Maximum Price (GMP) Option 1

(Total CLIN 0001 + CLIN 0003 + CLIN 0005) $__________

OPTION 2 – HOUSING UNITS (16)

Build out of sixteen (16) units of CBP housing with full parking, amenities, and utility spaces.

CLIN 0002 CMc Contingency Allowance (CCA) Percentage 3%

CLIN 0003 CCA (CLIN 0001 x CLIN 0002) $__________

CLIN 0004 Fee Percentage _____%

CLIN 0005 Fee (CLIN 0001 x CLIN 0004) $__________

CLIN 0006

Guaranteed Maximum Price (GMP) Option 2

OPTION 3 – HOUSING UNITS (18)

Build out of eighteen (18) units of CBP housing with full parking, amenities, and utility spaces.

CLIN 0002 CMc Contingency Allowance (CCA) Percentage 3%

CLIN 0003 CCA (CLIN 0001 x CLIN 0002) $__________

CLIN 0004 Fee Percentage _____%

CLIN 0005 Fee (CLIN 0001 x CLIN 0004) $__________

CLIN 0006

Guaranteed Maximum Price (GMP) Option 3

Proposed Rates and Unit Prices will be evaluated for price reasonableness by comparing the rates proposed to those received in response to the solicitation and to the independent government cost estimate.

PROPOSAL RATES (APPLICABLE TO ALL BASE AND OPTIONAL ITEMS)

RATE 0001 Contractor’s Overhead Rate for Adjustments _____%

RATE 0002 Contractor’s Daily Rate for Compensable Project

Delay (per Workday)

UNIT PRICES (APPLICABLE TO BASE PROPOSAL)

UNIT PRICE

Hazardous Material Removal, Asbestos

Abatement, Existing Land Port of Entry (including all associated costs)

LF

UNIT PRICE

Hazardous Material Removal, Asbestos

Abatement, Existing Land Port of Entry (including all associated costs)

SF

UNIT PRICE

Hazardous Material Removal, Asbestos

Abatement, Existing Land Port of Entry (including all associated costs)

EA

UNIT PRICE

Hazardous Material Removal, Asbestos

Abatement, Existing Housing (including all associated costs)

LF

UNIT PRICE

Hazardous Material Removal, Asbestos

Abatement, Existing Housing (including all associated costs)

SF

UNIT PRICE

Hazardous Material Removal, Asbestos

Abatement, Existing Housing (including all associated costs)

EA

UNIT PRICE

Hazardous Material Removal, Lead Abatement, Existing Land Port of Entry (including all associated costs)

SF

UNIT PRICE

Hazardous Material Removal, Lead Abatement, Existing Housing (including all associated costs)

SF

UNIT PRICE

Septic Remediation and Removal, Existing Land

Port of Entry (including all associated costs)

SY

UNIT PRICE

Septic Remediation and Removal, Existing Land

Port of Entry (including all associated costs)

EA

UNIT PRICE

Soil Remediation, Existing Land Port of Entry

(including all associated costs)

CY

UNIT PRICE

Soil Remediation, Existing Housing (including all associated costs)

CY