RFP Document 2 - Contract Price Form 47PB0025R0044.pdf
PDF 173 KB Posted
- Solicitation number
- 47PB0025R0044
About this file
This document is a Contract Price Form for a construction project involving the demolition and rebuild of a Land Port of Entry and associated CBP housing units. The basic requirement includes design phase services and construction, with a 3% CMc Contingency Allowance and a fee percentage to be determined by the contractor. The solicitation offers three housing unit options: 10 units, 16 units, and 18 units, each with a separate Guaranteed Maximum Price (GMP) calculation.
The pricing structure includes detailed unit prices for various remediation and abatement services, such as hazardous material removal, lead abatement, septic remediation, and soil remediation for both the existing Land Port of Entry and housing. Contractors must propose rates for overhead and daily project delay compensation. The government will evaluate proposed rates and unit prices for reasonableness by comparing them to other received proposals and the independent government cost estimate. Pricing is to be completed using the provided tables, with blank spaces for contractors to fill in specific dollar amounts and percentages.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT PRICE FORM
Total Evaluated Price
The Government will evaluate offers for award purposes by adding the Total Evaluated Price for the Basic Requirement to the Guaranteed Maximum Prices (GMP) for all options. Evaluation of options will not obligate the Government to exercise the option(s).
BASIC REQUIREMENT
CLIN ITEM PRICE
CLIN 0001 Design Phase Services (Firm Fixed Price) –
Includes all Housing Options
CLIN 0002 Target Estimated Cost of Work (ECW) – Includes demolition of existing Land Port of Entry and
Housing
CLIN 0003 CMc Contingency Allowance (CCA) Percentage 3%
CLIN 0004 CCA (CLIN 0002 x CLIN 0003) $__________
CLIN 0005 Fee Percentage _____%
CLIN 0006 Fee (CLIN 0002 x CLIN 0005) $__________
CLIN 0007
Guaranteed Maximum Price (GMP) Option for
Construction Services (Total CLIN 0002 + CLIN
0004 + CLIN 0006)
CLIN 0008 Total Evaluated Price – Basic Requirement
(CLIN 0001 + CLIN 0007)
OPTION 1 – HOUSING UNITS (10)
Build out of ten (10) units of CBP housing with full parking, amenities, and utility spaces.
CLIN ITEM PRICE
CLIN 0001 Target Estimated Cost of Work (ECW) $__________
CLIN 0002 CMc Contingency Allowance (CCA) Percentage 3%
CLIN 0003 CCA (CLIN 0001 x CLIN 0002) $__________
CLIN 0004 Fee Percentage _____%
CLIN 0005 Fee (CLIN 0001 x CLIN 0004) $__________
CLIN 0006
Guaranteed Maximum Price (GMP) Option 1
(Total CLIN 0001 + CLIN 0003 + CLIN 0005) $__________
OPTION 2 – HOUSING UNITS (16)
Build out of sixteen (16) units of CBP housing with full parking, amenities, and utility spaces.
CLIN 0002 CMc Contingency Allowance (CCA) Percentage 3%
CLIN 0003 CCA (CLIN 0001 x CLIN 0002) $__________
CLIN 0004 Fee Percentage _____%
CLIN 0005 Fee (CLIN 0001 x CLIN 0004) $__________
CLIN 0006
Guaranteed Maximum Price (GMP) Option 2
OPTION 3 – HOUSING UNITS (18)
Build out of eighteen (18) units of CBP housing with full parking, amenities, and utility spaces.
CLIN 0002 CMc Contingency Allowance (CCA) Percentage 3%
CLIN 0003 CCA (CLIN 0001 x CLIN 0002) $__________
CLIN 0004 Fee Percentage _____%
CLIN 0005 Fee (CLIN 0001 x CLIN 0004) $__________
CLIN 0006
Guaranteed Maximum Price (GMP) Option 3
Proposed Rates and Unit Prices will be evaluated for price reasonableness by comparing the rates proposed to those received in response to the solicitation and to the independent government cost estimate.
PROPOSAL RATES (APPLICABLE TO ALL BASE AND OPTIONAL ITEMS)
RATE 0001 Contractor’s Overhead Rate for Adjustments _____%
RATE 0002 Contractor’s Daily Rate for Compensable Project
Delay (per Workday)
UNIT PRICES (APPLICABLE TO BASE PROPOSAL)
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Land Port of Entry (including all associated costs)
LF
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Land Port of Entry (including all associated costs)
SF
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Land Port of Entry (including all associated costs)
EA
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Housing (including all associated costs)
LF
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Housing (including all associated costs)
SF
UNIT PRICE
Hazardous Material Removal, Asbestos
Abatement, Existing Housing (including all associated costs)
EA
UNIT PRICE
Hazardous Material Removal, Lead Abatement, Existing Land Port of Entry (including all associated costs)
SF
UNIT PRICE
Hazardous Material Removal, Lead Abatement, Existing Housing (including all associated costs)
SF
UNIT PRICE
Septic Remediation and Removal, Existing Land
Port of Entry (including all associated costs)
SY
UNIT PRICE
Septic Remediation and Removal, Existing Land
Port of Entry (including all associated costs)
EA
UNIT PRICE
Soil Remediation, Existing Land Port of Entry
(including all associated costs)
CY
UNIT PRICE
Soil Remediation, Existing Housing (including all associated costs)
CY
File details come from the government source that posted it. Updated .