This document is a Table of Contents for a Final Concept Submission for the Coburn Gore Land Port of Entry (LPOE) project located at 6092 Arnold Trail – Route 27, Coburn Gore, ME, under Prime Contract No. 47PC0321D006 and Task Order No. 479B0024F0389. The comprehensive table of contents spans 34 divisions covering every aspect of construction, from general requirements and existing conditions to specialized systems like fire suppression, communications, and electronic safety.
Key technical divisions include comprehensive coverage of concrete, masonry, metals, wood, thermal and moisture protection, openings, finishes, equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety systems, earthwork, exterior improvements, utilities, and transportation. Notably, the project includes specialized elements such as detention equipment, security systems, vehicle barriers, electric elevators, fire protection systems, and advanced building information modeling (BIM). The document is marked as property of the United States Government and is dated August 11, 2025, indicating it is a final concept submission for a federal infrastructure project.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6092 Arnold Trail – Route 27, Coburn Gore, ME 04936-999 Prime Contract No. 47PC0321D006 Coburn Gore LPOE Task Order No. 479B0024F0389
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE – PROPERLY DESTROY DOCUMENT WHEN NO LONGER NEEDED
Final Concept Submission Table of Contents August 11, 2025 TOC - 1
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
NOT INCLUDED
DIVISION 01 – GENERAL REQUIREMENTS
DIVISION 02 – EXISTING CONDITIONS
01 10 00 SUMMARY
01 14 00 WORK RESTRICTIONS
01 24 00 OPTIONS
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 29 00 PAYMENT PROCEDURES
01 30 00 PROJECT MANAGEMENT INFORMATION SYSTEM
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 31 10 CRITICAL PATH METHOD(CPM) SCHEDULING FOR PROSPECTUS PROJECTS
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 32 20 PHOTOGRAPHIC DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 35 10 HISTORIC BUILDING TREATMENT PROCEDURES
01 36 00 CONSTRUCTION-OPERATIONS BUILDING INFORMATION EXCHANGE (COBIE)
01 40 00 QUALITY ASSURANCE & CONTROL REQUIREMENTS
01 40 50 SYSTEM QUALITY CONTROL
01 41 00 STRUCTURAL TESTING LABORATORY SERVICES
01 42 00 GENERAL REFERENCES
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 59 30 SECURITY REGULATIONS
01 59 50 SAFETY AND HEALTH
01 60 00 PRODUCT REQUIREMENTS
01 73 00 EXECUTION
01 73 50 FIRE PREVENTION RECAUTIONS FOR HOT WORK
01 74 10 CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT
01 74 19 CONSTRUCTION NONHAZARDOUS WASTE AND REMOVAL
01 77 00 CLOSEOUT PROCEDURES
01 78 10 PROJECT RECORD DOCUMENTS
01 78 22 OPERATION AND MAINTENANCE DOCUMENTATION
01 78 25 BUILDING_INFORMATION_MODELING(BIM) with CDX & REGIONAL STANDARD
01 82 00 DEMONSTRATION AND TRAINING
01 87 00 EQUIPMENT AND FURNISHINGS PERFORMANCE REQUIREMENTS
01 91 13 GENERAL COMMISSIONING(CX) REQUIREMENTS
02 41 16 STRUCTURE DEMOLITION
Coburn Gore LPOE Task Order No. 479B0024F0389
August 11, 2025 TOC - 2
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
DIVISION 05 - METALS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
03 30 00 CAST-IN-PLACE CONCRETE
03 35 43 POLISHED CONCRETE FINISHING
03 37 13 SHOTCRETE
03 45 00 PRECAST ARCHITECTURAL CONCRETE
04 20 00 UNIT MASONRY
04 42 00 EXTERIOR STONE CLADDING
05 21 00 STRUCTURAL STEEL
05 31 00 STEEL DECKING
05 50 99 METAL FABRICATIONS – LANDSCAPE
05 51 19 METAL GRATING STAIRS
05 52 13 PIPE AND TUBE RAILINGS
06 10 00 ROUGH CARPENTRY
06 40 23 INTERIOR ARCHITECTURAL WOODWORK
06 46 29 WOOD FASCIA AND SOFFITS
07 13 26 SELF-ADHERING SHEET WATERPROOFING
07 21 00 THERMAL INSULATION
07 25 00 WEATHER BARRIERS
07 26 00 VAPOR RETARDERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13.16 STANDING-SEAM METAL ROOF PANELS
07 42 93 SOFFIT PANELS
07 62 00 SHEET METAL FALSHING AND TRIM
07 71 00 ROOF SPECIALTIES
07 72 00 ROOF ACCESSORIES
07 72 53 SNOW GUARDS
07 81 00 APPLIED FIRE PROTECTION
07 84 13 PENETRATION FIRESTOPPING
07 92 20 JOINT SEALANTS
07 92 19 ACOUSTICAL JOINT SEALANTS
Coburn Gore LPOE Task Order No. 479B0024F0389
August 11, 2025 TOC - 3
DIVISION 08 – OPENINGS
DIVISION 09 – FINISHES
DIVISION 10 – SPECIALTIES
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 14 16 FLUSH WOOD DOORS
08 31 13.53 SECURITY ACCESS DOORS AND FRAMES
08 35 13 FOLDING DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 41 26.23 INTERIOR ALL-GLASS ENTRANCES
08 44 13 GLAZED ALUMINUM CURTAIN WALLS
08 56 53 SECURITY WINDOWS
08 71 00 DOOR HARWARE
08 71 13 POWER DOOR OPERATORS
08 80 00 GLAZING
08 81 13 DECORATIVE GLASS GLAZING
08 88 53 SECURITY GLAZING
08 91 19 FIXED LOUVERS
09 22 16 NON-STRUCTURAL METAL FRAMING
09 29 00 GYSUM BOARD
09 30 13 CERAMIC TILING
09 51 23 ACOUSTICAL TILE CEILINGS
09 65 13 RESILIENT WALL BASE
09 91 13 EXTERIOR PAINTING
09 91 23 INTERIOR PAINTING
10 11 00 VISUAL DISPLAY UNITS
10 14 16 PLAQUES
10 14 23 PANEL SIGNAGE
10 14 23.16 ROOM-IDENTIFICATION PANEL SIGNAGE
10 21 13.14 STAINLESS-STEEL TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES
10 28 13.63 DETENTION TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 56 13 METAL STORAGE SHELVING
10 75 16 GROUND-SET FLAGPOLES
Coburn Gore LPOE Task Order No. 479B0024F0389
August 11, 2025 TOC - 4
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 – SPECIAL CONSTRUCTION
DIVISION 14 - CONVEYING EQUIPMENT
DIVISION 21 – FIRE SUPPRESSION
Refer to Divisions 01, 14, 22, 23, 26, 27 and 28 for the scope of work furnished and installed under those divisions on which work in this division may be dependent.
11 12 00 PARKING CONTROL EQUIPMENT
11 13 13 LOADING DOCK BUMPERS
11 13 16 LOADING DOCK SEALS AND SHELTERS
11 19 16 DETENTION GUN LOCKERS
11 32 00 UNIT KITCHENS
11 66 23 GYMNASIUM EQUIPMENT
11 98 12 DETENTION DOORS AND FRAMS
11 98 14 DETENTION DOOR HARWARE
12 24 13 ROLLER WINDOW SHADES
12 36 61 SOLID SURFACING COUNTEROPS
12 55 00 DETNTION FURNITURE
12 61 00 FIXIED AUDIENCE SEATING
13 34 23.16 INSPECTION BOOTHS
14 21 00 ELECTRIC TRACTION ELEVATORS
14 21 13 ELECTRIC TRACTION FREIGHT ELEVATORS
21 00 00 GENERAL REQUIREMENTS FOR FIRE SUPPRESSION
21 01 00 OPERATION AND MAINTENANCE OF FIRE SUPPRESSION
21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION
21 05 13 COMMON MOTOR REQUIREMENTS FOR FIRE SUPPRESSION EQUIPMENT
21 05 23 GENERAL-DUTY VALVES FOR WATER-BASED FIRE SUPPRESSION PIPING
21 05 29 HANGERS AND SUPPORTS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
21 05 48.13 SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
21 05 48.16 VIBRATION ISOLATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
21 05 53 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
21 07 19 FIRE SUPPRESSION PIPING INSULATION
21 11 19 FIRE DEPARTMENT CONNECTIONS
21 12 00 FIRE SUPPRESSION STANDPIPES
21 12 19 FIRE SUPPRESSION HOSE RACKS
21 12 23 FIRE SUPPRESSION HOSE VALVES
21 12 26 FIRE SUPPRESSION VALVE AND HOSE CABINETS
21 13 13 WET-PIPE SPRINKLER SYSTEMS
21 13 16 DRY-PIPE SPRINKLER SYSTEMS
21 13 19 PREACTION SPRINKLER SYSTEMS
21 31 13 ELECTRIC-DRIVE CENTRIFUGAL FIRE PUMPS
Coburn Gore LPOE Task Order No. 479B0024F0389
August 11, 2025 TOC - 5
DIVISION 22 – PLUMBING
Refer to Divisions 01, 14, 21, 23, 26, 27 and 28 for the scope of work furnished and installed under those
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
Refer to Divisions 01, 14, 21, 22, 26, 27 and 28 for the scope of work furnished and installed under those
22 00 00 GENERAL REQUIREMENTS FOR PLUMBING
22 01 00 OPERATION AND MAINTENANCE OF PLUMBING
22 05 00 COMMON WORK RESULTS FOR PLUMBING
22 05 13 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
22 05 15 VARIABLE FREQUENCY MOTOR CONTROLLERS FOR PLUMBING EQUIPMENT
22 05 16 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING
22 05 19 METERS AND GAUGES FOR PLUMBING PIPING
22 05 20 HEAT TRACE CABLE TEMPERATURE MAINTENANCE SYSTEMS
22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 48.13 SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
22 05 48.16 VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 05 76 FACILITY DRAINAGE PIPING CLEANOUTS
22 07 00 PLUMBING INSULATION
22 11 16 DOMESTIC WATER PIPING AND SPECIALTIES
22 11 23 DOMESTIC WATER PUMPS
22 12 00 FACILITY POTABLE-WATER STORAGE TANKS
22 13 16 SANITARY WASTE AND VENT PIPING
22 13 19 SANITARY WASTE PIPING SPECIALTIES
22 14 13 FACILITY STORM DRAINAGE PIPING
22 31 00 DOMESTIC WATER SOFTENERS
22 32 00 DOMESTIC WATER FILTRATION
22 33 00 ELECTRIC DOMESTIC WATER HEATERS
22 42 00 COMMERCIAL PLUMBING FIXTURES
22 45 00 EMERGENCY PLUMBING FIXTURES
22 47 00 DRINKING FOUNTAINS AND WATER COOLERS
23 00 00 GENERAL REQUIREMENTS FOR HVAC WORK
23 0088 BAS INTEGRATION
23 01 00 OPERATION AND MAINTENANCE OF HVAC SYSTEMS
23 05 00 COMMON WORK RESULTS FOR HVAC WORK
23 05 01 INSTALLATION OF PREPURCHASED EQUIPMENT
23 05 02 MECHANICAL ALTERNATES
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 05 15 VARIABLE FREQUENCY MOTOR CONTROLLERS FOR HVAC EQUIPMENT
23 05 16 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
23 05 19 METERS AND GAUGES FOR HVAC PIPING
23 05 23 GENERAL-DUTY VALVES FOR HVAC PIPING
23 05 24 RELIEF VALVES FOR HVAC SYSTEMS AND EQUIPMENT
23 05 25 STRAINERS FOR HVAC SYSTEMS
Coburn Gore LPOE Task Order No. 479B0024F0389
August 11, 2025 TOC - 6
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING, DUCTS AND EQUIPMENT
23 05 48.13 SEISMIC CONTROLS FOR HVAC PIPING, DUCTS AND EQUIPMENT
23 05 48.16 VIBRATION ISOLATION FOR HVAC PIPING, DUCTS AND EQUIPMENT
23 05 53 IDENTIFICATION FOR HVAC SYSTEMS
23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC
23 07 00 HVAC INSULATIONV
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC SYSTEMS
23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
23 10 00 FACILITY FUEL SYSTEMS
23 13 00 FACILITY FUEL STORAGE TANKS
23 21 13 PIPING FOR HVAC SYSTEMS AND EQUIPMENT
23 21 16 HYDRONIC PIPING SPECIALTIES
23 21 23 HYDRONIC PUMPS FOR HVAC
23 25 00 HVAC WATER TREATMENT
23 25 17 HVAC WATER FILTRATION SYSTEMS
23 31 13 METAL DUCTS
23 31 19 HVAC CASINGS AND PLENUMS
23 33 13 DAMPERS
23 33 19 DUCT SILENCERS AND ACOUSTIC TREATMENT
23 33 33 DUCTS, CASINGS AND PLENUM-MOUNTED ACCESS DOORS
23 33 43 FLEXIBLE CONNECTORS
23 34 00 HVAC FANS
23 35 16 ENGINE EXHAUST SYSTEMS
23 36 20 DIRECT OUTSIDE AIR SYSTEM TERMINAL UNITS
23 37 13 DIFFUSERS, REGISTERS AND GRILLES
23 41 00 HVAC AIR FILTRATION PRODUCTS
23 51 00 BREECHINGS, CHIMNEYS AND STACKS
23 52 01 BOILER PLANT INSTRUMENTATION AND CONTROLS
23 52 16 HIGH-EFFICIENCY CONDENSING BOILERS
23 53 00 BOILER FEEDWATER EQUIPMENT
23 57 00 HEAT EXCHANGERS FOR HVAC
23 64 23 PACKAGED WATER SOURCE HEAT PUMP SECTION
23 70 00 AIR HANDLING UNITS
23 72 13 AIR-TO-AIR ENERGY RECOVERY HEAT WHEELS
23 81 23 PACKAGED SELF-CONTAINED COMPUTER ROOM AIR CONDITIONERS
(CRAC)/TECHNOLOGY ROOM AIR CONDITIONERS (TRAC)
23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS
23 82 16 COOLING AND HEATING AIR COILS (WATER/STEAM)
23 82 17 ELECTRIC RESISTANCE HEATING COILS
23 82 19 FAN COIL UNITS
23 82 33 CONVECTORS AND RADIANT PANELS
23 82 37 ELECTRIC Baseboard Heaters
23 82 39 UNIT HEATERS
Coburn Gore LPOE Task Order No. 479B0024F0389
August 11, 2025 TOC - 7
DIVISION 26 – ELECTRICAL
Refer to Divisions 01, 14, 21, 22, 26, 27 and 28 for the scope of work furnished and installed under those
26 51 00 INTERIOR LIGHTING
26 00 00 GENERAL REQUIREMENTS FOR ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 06.03 ELECTRICAL SERVICE
26 05 07 ACCESS DOORS AND COLOR-CODED IDENTIFICATION IN GENERAL
CONSTRUCTION
26 5 13.26 MEDIUM-VOLTAGE CABLES (15 KV)
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 20 HEATING CABLE
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 33.23 SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS
26 05 48.13 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
26 05 48.16 VIBRATION ISOLATION FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION, SHORT CIRCUIT AND
RC-FLASH ANALYSIS
26 05 83 WIRING CONNECTIONS (600V)
26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS
26 09 23 LIGHTING CONTROL DEVICES
26 09 88 LIGHTING CONTROL INTEGRATION
26 11 03 SINGLE-ENDED MEDIUM-VOLTAGE SUBSTATIONS
26 12 16 DRY-TYPE MEDIUM-VOLTAGE TRANSFORMERS
26 13 13 MEDIUM-VOLTAGE METAL-CLAD SWITCHGEAR
26 13 16 MEDIUM-VOLTAGE METAL-ENCLOSED SWITCHGEAR
26 22 13 LOW-VOLTAGE DISTRIBUTION TRANSFORMERS
26 23 00 LOW-VOLTAGE SWITCHGEAR
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
26 27 13 ELECTRICITY METERING
26 27 19 MULTI-OUTLET ASSEMBLIES
26 27 26 WIRING DEVICES
26 27 88 METERING INTEGRATION
26 28 13 FUSES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 28 19 NETWORK PROTECTORS
26 32 00.13 SOUND-ATTENUATED GENERATOR WALK-IN ENCLOSURE(S)
26 32 13.13 DIESEL ENGINE-DRIVEN GENERATOR SET[S]
26 33 23.13 STATION BATTERY SYSTEM
26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY SYSTEMS
26 33 53.13 EMERGENCY LIGHTING INVERTER SYSTEM
26 36 23 AUTOMATIC TRANSFER SWITCHES
26 36 24 PARALLELING SWITCHGEAR (< 600 VAC)
26 37 13.03 GENERATOR LOAD CONTROL SYSTEM
26 41 13 LIGHTNING PROTECTION FOR STRUCTURES
26 43 00 SURGE PROTECTION DEVICE SYSTEM
Coburn Gore LPOE Task Order No. 479B0024F0389
August 11, 2025 TOC - 8
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY SYSTEMS
DIVISION 31 – EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
DIVISION 33 - UTILITIES
27 00 00 GENERAL SPECIFICATIONS AND REQUIREMENTS FOR COMMUNICATIONS
27 41 16
GENERAL SPECIFICATIONS AND REQUIREMENTS FOR AUDIOVISUAL
SYSTEMS
28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECUIRTY
28 10 00 ELECTRONIC ACCESS CONTROL AND INTRUSION DETECTION
28 20 00 ELECTRONIC SURVEILANCE
28 31 00 FIRE DETECTION AND ALARM
28 31 01 ASPIRATING SMOKE DETECTION SYSTEM
31 10 00 SITE PREPARATION
31 11 00 CLEARING AND GRUBBING
31 20 00 EARTH MOVING
31 23 25 GRANULAR FILL MATERIALS
31 23 33 TRENCHING, BACKFILLING AND COMPACTION
31 25 00 EROSION AND SEDIMENTATION CONTROL
32 11 00 BASE COURSES
32 14 00 UNIT PAVING
32 12 16 ASPHALT PAVING
32 13 00 CONCRETE PAVING
32 16 50 CURBING
32 17 23 PAVEMENT MARKINGS
32 32 12 TRAFFIC SIGNS
32 32 23 CONCRETE SEGMENTAL RETAINING WALLS
32 84 00 PLANTING IRRIGATION
32 91 13 SOIL PREPARATION
32 92 00 TURFS AND GRASSES
32 93 00 PLANTS
33 10 00 WATER UTILITIES
33 11 13 POTABLE WATER SUPPLY WELLS
33 11 36 WELL PUMP AND CONTROLS
33 34 13 SEPTIC TANKS
33 34 51 WASTEWATER DISPOSAL FIELD SYSTEM
33 39 00 SANITARY UTILITY SEWERAGE STRUCTURES
33 40 00 STORM DRAINAGE UTILITIES
33 40 20 WARNING AND TRACER TAPE
Coburn Gore LPOE Task Order No. 479B0024F0389
August 11, 2025 TOC - 9
DIVISION 34 – TRANSPORTATION
END OF TABLE OF CONTENTS
34 71 13 VEHICLE BARRIERS