16. Coburn Gore LPOE_Spec TOC_Final Concept_Combined 08-11-25.pdf

PDF 88 KB Posted

Attached to
Construction Manager as Constructor (CMc) Requirement for a New Land Port of Entry (LPOE), Coburn Gore, Maine
Solicitation number
47PB0025R0044
Issued by

About this file

This document is a Table of Contents for a Final Concept Submission for the Coburn Gore Land Port of Entry (LPOE) project located at 6092 Arnold Trail – Route 27, Coburn Gore, ME, under Prime Contract No. 47PC0321D006 and Task Order No. 479B0024F0389. The comprehensive table of contents spans 34 divisions covering every aspect of construction, from general requirements and existing conditions to specialized systems like fire suppression, communications, and electronic safety.

Key technical divisions include comprehensive coverage of concrete, masonry, metals, wood, thermal and moisture protection, openings, finishes, equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety systems, earthwork, exterior improvements, utilities, and transportation. Notably, the project includes specialized elements such as detention equipment, security systems, vehicle barriers, electric elevators, fire protection systems, and advanced building information modeling (BIM). The document is marked as property of the United States Government and is dated August 11, 2025, indicating it is a final concept submission for a federal infrastructure project.

View the file

Other files

File Type Posted
RFP Document 2 V2 - Contract Price Form 47PB0025R0044 2026 02 26.pdf PDF
RFP Document 4 V1- Agreement CMc REVISED 2026 02 26.pdf PDF
Coburn Gore 47PB0025R0044 QA V4 2026 03 02.pdf PDF
47PB0025R0044 Amendment 0005 SF30 2026 03 02.pdf PDF
Attach 29v1 Coburn Gore LPOE FFE Proposal Worksheet 2026 02 26 .xlsx XLSX spreadsheet
47PB0025R0044 Amendment 0004 SF30 .pdf PDF
47PB0025R0044_0003 Amendment SF30 .pdf PDF
Attach 26 Coburn Gore Division 01 - Table of Contents 2025 07 02.docx DOCX document
RFP Document 2 - Contract Price Form 47PB0025R0044 2026 01 22.pdf PDF
Attach 11 Wage Determination ME20260007 2026 01 02.pdf PDF
Coburn Gore 47PB0025R0044 QA V3 2026 01 22.pdf PDF
47PB0025R0044 1442 dated 2026 01 22.pdf PDF
Attach 28 Coburn Gore Parcel Acquisition 2026 01 13.pdf PDF
Attach 25 Divison 1 Template Sections 2025 07 02.docx DOCX document
Amendment 0002 to 47PB0025R0044 Final 2025 12 10 .pdf PDF
Attch 24ii- Coburn Gore -Funding Responsibility Tool 2025 12 10.xlsx XLSX spreadsheet
Attch 24iii. Coburn Gore Final Geothermal Study 2025 09 06.pdf PDF
Attch 24i. DS Quick Reference Guide- 2023 LPOE DS Overview 2023 12 06.pdf PDF
Attch 24 Coburn Gore 47PB0025R0044 QA V2 2025 12 10.pdf PDF
Attch 11 - Wage Determination ME20250007 2025 12 05.pdf PDF
47PB0025R0044 QA Document 102725.pdf PDF
Amendment 0001 to 47PB0025R0044 Final 102725.pdf PDF
Coburn Gore Attendance Sheet 102225.pdf PDF
Pre-Proposal Meeting Final.pdf PDF
RFP Document 7 - SB Sub Plan - Individual Model - May 2025 - 508 Compliant.docx DOCX document
RFP Document 9 - UNIFORMAT II - Level 3 Detail Reference Guide.xlsx XLSX spreadsheet
RFP Document 12 - CBP Non-Disclosure Agreement Form.pdf PDF
RFP Document 13 - CBP Short Term Contractors- Visitor Form_BLANK - Short Term Contractors Template.pdf PDF
4. Coburn Gore LPOE - CMa w CxP SOW 2023 10 12.pdf PDF
10. PBS Core Building Standards Memorandum 2025 02 24.pdf PDF
14. Coburn Gore LPOE - Design Narrative_Final Concept REV 08-11-25.pdf PDF
15. Coburn Gore LPOE_Final Concept Submission_Combined_REV 08-11-25.pdf PDF
RFP Document 1 - SF1442-22.pdf PDF
RFP Document 10 - Bid Bond SF24.pdf PDF
RFP Document 14 - Proprietary Information Agreement - Sample Template.docx DOCX document
11. GSA Commissioning Guide September 2020.pdf PDF
RFP Document 2 - Contract Price Form 47PB0025R0044.pdf PDF
RFP Document 3 - Solicitation CMc MAY 2025.pdf PDF
RFP Document 4 - Agreement CMc MAY 2025.pdf PDF
RFP Document 6 - Past Performance Questionnaire.docx DOCX document
RFP Document 8 - CASB DS-1.pdf PDF
RFP Document 11 - Wage Determination ME20250007.pdf PDF
1. Coburn Gore LPOE CMc SOW Final 2025 03 27.pdf PDF
2. Coburn Gore Three phase SOW Final 2025 04 04 (1).pdf PDF
17. Coburn Gore Housing_Preliminary Concepts 13June25.pdf PDF
RFP Document 5 - Reps and Certs CMc MAY 2025.pdf PDF
3. Coburn Gore AE SOW_FINAL 2024 08 06.pdf PDF
5. Colby Coburn Gore Three-Phase Final Report 2022 12 22.pdf PDF
6. P-120 Public Buildings Service Cost and Schedule Management Policy Requirements, October 2022.pdf PDF
7. Coburn Gore LPOE 15Aug25- LPOE POR at final concept.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6092 Arnold Trail – Route 27, Coburn Gore, ME 04936-999 Prime Contract No. 47PC0321D006 Coburn Gore LPOE Task Order No. 479B0024F0389

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE – PROPERLY DESTROY DOCUMENT WHEN NO LONGER NEEDED

Final Concept Submission Table of Contents August 11, 2025 TOC - 1

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

NOT INCLUDED

DIVISION 01 – GENERAL REQUIREMENTS

DIVISION 02 – EXISTING CONDITIONS

01 10 00 SUMMARY

01 14 00 WORK RESTRICTIONS

01 24 00 OPTIONS

01 25 00 SUBSTITUTION PROCEDURES

01 26 00 CONTRACT MODIFICATION PROCEDURES

01 29 00 PAYMENT PROCEDURES

01 30 00 PROJECT MANAGEMENT INFORMATION SYSTEM

01 31 00 PROJECT MANAGEMENT AND COORDINATION

01 31 10 CRITICAL PATH METHOD(CPM) SCHEDULING FOR PROSPECTUS PROJECTS

01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION

01 32 20 PHOTOGRAPHIC DOCUMENTATION

01 33 00 SUBMITTAL PROCEDURES

01 35 10 HISTORIC BUILDING TREATMENT PROCEDURES

01 36 00 CONSTRUCTION-OPERATIONS BUILDING INFORMATION EXCHANGE (COBIE)

01 40 00 QUALITY ASSURANCE & CONTROL REQUIREMENTS

01 40 50 SYSTEM QUALITY CONTROL

01 41 00 STRUCTURAL TESTING LABORATORY SERVICES

01 42 00 GENERAL REFERENCES

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 59 30 SECURITY REGULATIONS

01 59 50 SAFETY AND HEALTH

01 60 00 PRODUCT REQUIREMENTS

01 73 00 EXECUTION

01 73 50 FIRE PREVENTION RECAUTIONS FOR HOT WORK

01 74 10 CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT

01 74 19 CONSTRUCTION NONHAZARDOUS WASTE AND REMOVAL

01 77 00 CLOSEOUT PROCEDURES

01 78 10 PROJECT RECORD DOCUMENTS

01 78 22 OPERATION AND MAINTENANCE DOCUMENTATION

01 78 25 BUILDING_INFORMATION_MODELING(BIM) with CDX & REGIONAL STANDARD

01 82 00 DEMONSTRATION AND TRAINING

01 87 00 EQUIPMENT AND FURNISHINGS PERFORMANCE REQUIREMENTS

01 91 13 GENERAL COMMISSIONING(CX) REQUIREMENTS

02 41 16 STRUCTURE DEMOLITION

Coburn Gore LPOE Task Order No. 479B0024F0389

August 11, 2025 TOC - 2

DIVISION 03 – CONCRETE

DIVISION 04 – MASONRY

DIVISION 05 - METALS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

03 30 00 CAST-IN-PLACE CONCRETE

03 35 43 POLISHED CONCRETE FINISHING

03 37 13 SHOTCRETE

03 45 00 PRECAST ARCHITECTURAL CONCRETE

04 20 00 UNIT MASONRY

04 42 00 EXTERIOR STONE CLADDING

05 21 00 STRUCTURAL STEEL

05 31 00 STEEL DECKING

05 50 99 METAL FABRICATIONS – LANDSCAPE

05 51 19 METAL GRATING STAIRS

05 52 13 PIPE AND TUBE RAILINGS

06 10 00 ROUGH CARPENTRY

06 40 23 INTERIOR ARCHITECTURAL WOODWORK

06 46 29 WOOD FASCIA AND SOFFITS

07 13 26 SELF-ADHERING SHEET WATERPROOFING

07 21 00 THERMAL INSULATION

07 25 00 WEATHER BARRIERS

07 26 00 VAPOR RETARDERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 41 13.16 STANDING-SEAM METAL ROOF PANELS

07 42 93 SOFFIT PANELS

07 62 00 SHEET METAL FALSHING AND TRIM

07 71 00 ROOF SPECIALTIES

07 72 00 ROOF ACCESSORIES

07 72 53 SNOW GUARDS

07 81 00 APPLIED FIRE PROTECTION

07 84 13 PENETRATION FIRESTOPPING

07 92 20 JOINT SEALANTS

07 92 19 ACOUSTICAL JOINT SEALANTS

Coburn Gore LPOE Task Order No. 479B0024F0389

August 11, 2025 TOC - 3

DIVISION 08 – OPENINGS

DIVISION 09 – FINISHES

DIVISION 10 – SPECIALTIES

08 11 13 HOLLOW METAL DOORS AND FRAMES

08 14 16 FLUSH WOOD DOORS

08 31 13.53 SECURITY ACCESS DOORS AND FRAMES

08 35 13 FOLDING DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 41 26.23 INTERIOR ALL-GLASS ENTRANCES

08 44 13 GLAZED ALUMINUM CURTAIN WALLS

08 56 53 SECURITY WINDOWS

08 71 00 DOOR HARWARE

08 71 13 POWER DOOR OPERATORS

08 80 00 GLAZING

08 81 13 DECORATIVE GLASS GLAZING

08 88 53 SECURITY GLAZING

08 91 19 FIXED LOUVERS

09 22 16 NON-STRUCTURAL METAL FRAMING

09 29 00 GYSUM BOARD

09 30 13 CERAMIC TILING

09 51 23 ACOUSTICAL TILE CEILINGS

09 65 13 RESILIENT WALL BASE

09 91 13 EXTERIOR PAINTING

09 91 23 INTERIOR PAINTING

10 11 00 VISUAL DISPLAY UNITS

10 14 16 PLAQUES

10 14 23 PANEL SIGNAGE

10 14 23.16 ROOM-IDENTIFICATION PANEL SIGNAGE

10 21 13.14 STAINLESS-STEEL TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES

10 28 13.63 DETENTION TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 56 13 METAL STORAGE SHELVING

10 75 16 GROUND-SET FLAGPOLES

Coburn Gore LPOE Task Order No. 479B0024F0389

August 11, 2025 TOC - 4

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS

DIVISION 13 – SPECIAL CONSTRUCTION

DIVISION 14 - CONVEYING EQUIPMENT

DIVISION 21 – FIRE SUPPRESSION

Refer to Divisions 01, 14, 22, 23, 26, 27 and 28 for the scope of work furnished and installed under those divisions on which work in this division may be dependent.

11 12 00 PARKING CONTROL EQUIPMENT

11 13 13 LOADING DOCK BUMPERS

11 13 16 LOADING DOCK SEALS AND SHELTERS

11 19 16 DETENTION GUN LOCKERS

11 32 00 UNIT KITCHENS

11 66 23 GYMNASIUM EQUIPMENT

11 98 12 DETENTION DOORS AND FRAMS

11 98 14 DETENTION DOOR HARWARE

12 24 13 ROLLER WINDOW SHADES

12 36 61 SOLID SURFACING COUNTEROPS

12 55 00 DETNTION FURNITURE

12 61 00 FIXIED AUDIENCE SEATING

13 34 23.16 INSPECTION BOOTHS

14 21 00 ELECTRIC TRACTION ELEVATORS

14 21 13 ELECTRIC TRACTION FREIGHT ELEVATORS

21 00 00 GENERAL REQUIREMENTS FOR FIRE SUPPRESSION

21 01 00 OPERATION AND MAINTENANCE OF FIRE SUPPRESSION

21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION

21 05 13 COMMON MOTOR REQUIREMENTS FOR FIRE SUPPRESSION EQUIPMENT

21 05 23 GENERAL-DUTY VALVES FOR WATER-BASED FIRE SUPPRESSION PIPING

21 05 29 HANGERS AND SUPPORTS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

21 05 48.13 SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

21 05 48.16 VIBRATION ISOLATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

21 05 53 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

21 07 19 FIRE SUPPRESSION PIPING INSULATION

21 11 19 FIRE DEPARTMENT CONNECTIONS

21 12 00 FIRE SUPPRESSION STANDPIPES

21 12 19 FIRE SUPPRESSION HOSE RACKS

21 12 23 FIRE SUPPRESSION HOSE VALVES

21 12 26 FIRE SUPPRESSION VALVE AND HOSE CABINETS

21 13 13 WET-PIPE SPRINKLER SYSTEMS

21 13 16 DRY-PIPE SPRINKLER SYSTEMS

21 13 19 PREACTION SPRINKLER SYSTEMS

21 31 13 ELECTRIC-DRIVE CENTRIFUGAL FIRE PUMPS

Coburn Gore LPOE Task Order No. 479B0024F0389

August 11, 2025 TOC - 5

DIVISION 22 – PLUMBING

Refer to Divisions 01, 14, 21, 23, 26, 27 and 28 for the scope of work furnished and installed under those

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

Refer to Divisions 01, 14, 21, 22, 26, 27 and 28 for the scope of work furnished and installed under those

22 00 00 GENERAL REQUIREMENTS FOR PLUMBING

22 01 00 OPERATION AND MAINTENANCE OF PLUMBING

22 05 00 COMMON WORK RESULTS FOR PLUMBING

22 05 13 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

22 05 15 VARIABLE FREQUENCY MOTOR CONTROLLERS FOR PLUMBING EQUIPMENT

22 05 16 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING

22 05 19 METERS AND GAUGES FOR PLUMBING PIPING

22 05 20 HEAT TRACE CABLE TEMPERATURE MAINTENANCE SYSTEMS

22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPING

22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

22 05 48.13 SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

22 05 48.16 VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

22 05 76 FACILITY DRAINAGE PIPING CLEANOUTS

22 07 00 PLUMBING INSULATION

22 11 16 DOMESTIC WATER PIPING AND SPECIALTIES

22 11 23 DOMESTIC WATER PUMPS

22 12 00 FACILITY POTABLE-WATER STORAGE TANKS

22 13 16 SANITARY WASTE AND VENT PIPING

22 13 19 SANITARY WASTE PIPING SPECIALTIES

22 14 13 FACILITY STORM DRAINAGE PIPING

22 31 00 DOMESTIC WATER SOFTENERS

22 32 00 DOMESTIC WATER FILTRATION

22 33 00 ELECTRIC DOMESTIC WATER HEATERS

22 42 00 COMMERCIAL PLUMBING FIXTURES

22 45 00 EMERGENCY PLUMBING FIXTURES

22 47 00 DRINKING FOUNTAINS AND WATER COOLERS

23 00 00 GENERAL REQUIREMENTS FOR HVAC WORK

23 0088 BAS INTEGRATION

23 01 00 OPERATION AND MAINTENANCE OF HVAC SYSTEMS

23 05 00 COMMON WORK RESULTS FOR HVAC WORK

23 05 01 INSTALLATION OF PREPURCHASED EQUIPMENT

23 05 02 MECHANICAL ALTERNATES

23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 05 15 VARIABLE FREQUENCY MOTOR CONTROLLERS FOR HVAC EQUIPMENT

23 05 16 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

23 05 19 METERS AND GAUGES FOR HVAC PIPING

23 05 23 GENERAL-DUTY VALVES FOR HVAC PIPING

23 05 24 RELIEF VALVES FOR HVAC SYSTEMS AND EQUIPMENT

23 05 25 STRAINERS FOR HVAC SYSTEMS

Coburn Gore LPOE Task Order No. 479B0024F0389

August 11, 2025 TOC - 6

23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING, DUCTS AND EQUIPMENT

23 05 48.13 SEISMIC CONTROLS FOR HVAC PIPING, DUCTS AND EQUIPMENT

23 05 48.16 VIBRATION ISOLATION FOR HVAC PIPING, DUCTS AND EQUIPMENT

23 05 53 IDENTIFICATION FOR HVAC SYSTEMS

23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC

23 07 00 HVAC INSULATIONV

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC SYSTEMS

23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

23 10 00 FACILITY FUEL SYSTEMS

23 13 00 FACILITY FUEL STORAGE TANKS

23 21 13 PIPING FOR HVAC SYSTEMS AND EQUIPMENT

23 21 16 HYDRONIC PIPING SPECIALTIES

23 21 23 HYDRONIC PUMPS FOR HVAC

23 25 00 HVAC WATER TREATMENT

23 25 17 HVAC WATER FILTRATION SYSTEMS

23 31 13 METAL DUCTS

23 31 19 HVAC CASINGS AND PLENUMS

23 33 13 DAMPERS

23 33 19 DUCT SILENCERS AND ACOUSTIC TREATMENT

23 33 33 DUCTS, CASINGS AND PLENUM-MOUNTED ACCESS DOORS

23 33 43 FLEXIBLE CONNECTORS

23 34 00 HVAC FANS

23 35 16 ENGINE EXHAUST SYSTEMS

23 36 20 DIRECT OUTSIDE AIR SYSTEM TERMINAL UNITS

23 37 13 DIFFUSERS, REGISTERS AND GRILLES

23 41 00 HVAC AIR FILTRATION PRODUCTS

23 51 00 BREECHINGS, CHIMNEYS AND STACKS

23 52 01 BOILER PLANT INSTRUMENTATION AND CONTROLS

23 52 16 HIGH-EFFICIENCY CONDENSING BOILERS

23 53 00 BOILER FEEDWATER EQUIPMENT

23 57 00 HEAT EXCHANGERS FOR HVAC

23 64 23 PACKAGED WATER SOURCE HEAT PUMP SECTION

23 70 00 AIR HANDLING UNITS

23 72 13 AIR-TO-AIR ENERGY RECOVERY HEAT WHEELS

23 81 23 PACKAGED SELF-CONTAINED COMPUTER ROOM AIR CONDITIONERS

(CRAC)/TECHNOLOGY ROOM AIR CONDITIONERS (TRAC)

23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS

23 82 16 COOLING AND HEATING AIR COILS (WATER/STEAM)

23 82 17 ELECTRIC RESISTANCE HEATING COILS

23 82 19 FAN COIL UNITS

23 82 33 CONVECTORS AND RADIANT PANELS

23 82 37 ELECTRIC Baseboard Heaters

23 82 39 UNIT HEATERS

Coburn Gore LPOE Task Order No. 479B0024F0389

August 11, 2025 TOC - 7

DIVISION 26 – ELECTRICAL

Refer to Divisions 01, 14, 21, 22, 26, 27 and 28 for the scope of work furnished and installed under those

26 51 00 INTERIOR LIGHTING

26 00 00 GENERAL REQUIREMENTS FOR ELECTRICAL

26 05 00 COMMON WORK RESULTS FOR ELECTRICAL

26 05 06.03 ELECTRICAL SERVICE

26 05 07 ACCESS DOORS AND COLOR-CODED IDENTIFICATION IN GENERAL

CONSTRUCTION

26 5 13.26 MEDIUM-VOLTAGE CABLES (15 KV)

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 20 HEATING CABLE

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

26 05 33.23 SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS

26 05 48.13 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

26 05 48.16 VIBRATION ISOLATION FOR ELECTRICAL SYSTEMS

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION, SHORT CIRCUIT AND

RC-FLASH ANALYSIS

26 05 83 WIRING CONNECTIONS (600V)

26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS

26 09 23 LIGHTING CONTROL DEVICES

26 09 88 LIGHTING CONTROL INTEGRATION

26 11 03 SINGLE-ENDED MEDIUM-VOLTAGE SUBSTATIONS

26 12 16 DRY-TYPE MEDIUM-VOLTAGE TRANSFORMERS

26 13 13 MEDIUM-VOLTAGE METAL-CLAD SWITCHGEAR

26 13 16 MEDIUM-VOLTAGE METAL-ENCLOSED SWITCHGEAR

26 22 13 LOW-VOLTAGE DISTRIBUTION TRANSFORMERS

26 23 00 LOW-VOLTAGE SWITCHGEAR

26 24 13 SWITCHBOARDS

26 24 16 PANELBOARDS

26 27 13 ELECTRICITY METERING

26 27 19 MULTI-OUTLET ASSEMBLIES

26 27 26 WIRING DEVICES

26 27 88 METERING INTEGRATION

26 28 13 FUSES

26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 28 19 NETWORK PROTECTORS

26 32 00.13 SOUND-ATTENUATED GENERATOR WALK-IN ENCLOSURE(S)

26 32 13.13 DIESEL ENGINE-DRIVEN GENERATOR SET[S]

26 33 23.13 STATION BATTERY SYSTEM

26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY SYSTEMS

26 33 53.13 EMERGENCY LIGHTING INVERTER SYSTEM

26 36 23 AUTOMATIC TRANSFER SWITCHES

26 36 24 PARALLELING SWITCHGEAR (< 600 VAC)

26 37 13.03 GENERATOR LOAD CONTROL SYSTEM

26 41 13 LIGHTNING PROTECTION FOR STRUCTURES

26 43 00 SURGE PROTECTION DEVICE SYSTEM

Coburn Gore LPOE Task Order No. 479B0024F0389

August 11, 2025 TOC - 8

DIVISION 27 – COMMUNICATIONS

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY SYSTEMS

DIVISION 31 – EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

DIVISION 33 - UTILITIES

27 00 00 GENERAL SPECIFICATIONS AND REQUIREMENTS FOR COMMUNICATIONS

27 41 16

GENERAL SPECIFICATIONS AND REQUIREMENTS FOR AUDIOVISUAL

SYSTEMS

28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECUIRTY

28 10 00 ELECTRONIC ACCESS CONTROL AND INTRUSION DETECTION

28 20 00 ELECTRONIC SURVEILANCE

28 31 00 FIRE DETECTION AND ALARM

28 31 01 ASPIRATING SMOKE DETECTION SYSTEM

31 10 00 SITE PREPARATION

31 11 00 CLEARING AND GRUBBING

31 20 00 EARTH MOVING

31 23 25 GRANULAR FILL MATERIALS

31 23 33 TRENCHING, BACKFILLING AND COMPACTION

31 25 00 EROSION AND SEDIMENTATION CONTROL

32 11 00 BASE COURSES

32 14 00 UNIT PAVING

32 12 16 ASPHALT PAVING

32 13 00 CONCRETE PAVING

32 16 50 CURBING

32 17 23 PAVEMENT MARKINGS

32 32 12 TRAFFIC SIGNS

32 32 23 CONCRETE SEGMENTAL RETAINING WALLS

32 84 00 PLANTING IRRIGATION

32 91 13 SOIL PREPARATION

32 92 00 TURFS AND GRASSES

32 93 00 PLANTS

33 10 00 WATER UTILITIES

33 11 13 POTABLE WATER SUPPLY WELLS

33 11 36 WELL PUMP AND CONTROLS

33 34 13 SEPTIC TANKS

33 34 51 WASTEWATER DISPOSAL FIELD SYSTEM

33 39 00 SANITARY UTILITY SEWERAGE STRUCTURES

33 40 00 STORM DRAINAGE UTILITIES

33 40 20 WARNING AND TRACER TAPE

Coburn Gore LPOE Task Order No. 479B0024F0389

August 11, 2025 TOC - 9

DIVISION 34 – TRANSPORTATION

END OF TABLE OF CONTENTS

34 71 13 VEHICLE BARRIERS